APPENDIX D (FIRE PUMP SYSTEM INSPECTION CHECK LIST)
‘To be completed by the Inspector at the time of Inspection
‘Attach additional sheets, data or calculation as necessary to provide a complete record
FACTORY INFORMATION
Factory Name: Big Boss Corporation itd.
Address: 30 Sarabo, Kashimpur, Gazipur.
Representative Name: Ma. Aminul Islam
Designation: Asst, Manager-Fire Safety
Phone: 01984616368 Fax:
E-mail: firest.aip@aptechdesignsitd.com
INSTALLATION, SERVICE AND TESTING CONTRACTOR INFORMATION
Contractor Name: GURABA ENGINEERING LTD.
Address: House# 489 & 491(4" Floor), Uttarayon, Road# 08, DOHS Mirpur, Dhaka-1216,
Bangladesh. Phone: 01730375731, Email:mahabur.rahman@gurababd.com
Inspector or Tester Name: _ Engr. Md. Mahabur Rahman
Qualification of Inspector or Tester: Engineer Fire & Life Safety consultants (NFPA
‘Membership No-2815729, IEB No-24506.
Phone: +8801730375731 Fax:
E-mail: mahabur.rahman@gurababd.com
‘A Contraet for Inspection & testing in accordance with NFPA is in effect as of: NFPA70, 72
‘The Contract Expires: i Frequency of Test:
WITNESS BY
Company Name: Big Boss Corporation Ltd.
Address: 30 Sarabo, Kashimpur, Gazipur.
Representative Name: Md, Mahbub Sarwar
Designation: Asst. General Manager (Compliance)
Phone: +88 01716316119 Fax:
E-mail: aipcompliance@aptechdesignsitd.comMONTHLY FIRE PUMP INSPECTION, TESTING AND MAINTENACE
(As per NFPA-25, Table-8.1.2)
' :
Inspection, Testing & scope Acton Taken
Electrical |_Maintonance: Month
System
Enercis isolating wich and orout | Vsualiapecton | ~/ 2
breaker Checking
Case exteror Goan and dy Gatary | Tesing Zz
rea) yes
pec gravity or state of charge vavaiinspecion | Ye
Batter state
Diesel
, Charger end charge rate (Batery checking yes
‘System | system)
Emmize charge (ater eysan) | checting yes
ean breston arene Earn | vauiinpactn | OS.
ete
Disclaimer: Thelstisnotall encompassing duetotheestensvelistofadopted codes. The
Inspector shall documents all freand life safety violations and corrections when any
are discovered during inspection.
|
|(WEEKLY FIRE PUMP INSPECTION, TESTING AND MAINTENACE
(As per NFPA-25, Table-8.1.2)
Diese!
Engine
System
Inspection, Testing &
Maintenance: Weekly
‘Scope
‘etion Taken
Testing
Tank level Visual Inspection yes
Checking
Tank float switch Visual Inspection
YES
Solenoid valve operation
Visual Inspection
Testing
yee
Water in system
Checking
Cleaning
NES
Flexible hoses and connectors
Visual Inspection
YEE
oltre Meus pacton “
cresting We
Lube oi heater checking yes
Level (Cooling system)
Visual Inspection
Yes
Creaking
pdequte cool watertohest | Charing Yes
ee nue Ee
Condon of exe howe ane vee YES
Jacket water heater Checking YES
Leakage (Exhaust system)
Visual inspection
Yes
chactng
Drain condensate tap Checking Es
Bectoyo toe @atmy oom) | crecg Yes
General inspection
Visual Inspection
Yes
Pump house, heating ventilating
louvers
Visual Inspection
Checking
es
Disclaimer: The list is not all encompassing dueto the extensive list of adopted codes. The
Inspector shall documents all fireand life safety violations and corrections when
any are discovered during inspection.
TechnicignsFire & Safety
Factory Authorizer’s Signature
‘Asst, Manager ire & Safety
ate (7)WEEKLY FIRE PUMP INSPECTION, TESTING AND MAINTENACE
(As per NFPA-25, Table-8.1.2)
Inspection, Testing &
Maintenance: Weekly
Scope
‘Action Taken
Tank level
Visual Inspection
Checking
YES
Tank float switch
Visual Inspection
Testing
yes
Solenoid valve operation
Visual Inspection
Testing
Yes
Water in system
Checking
Gleaning
Yes
Flexible hoses and connectors
Visual inspection
nea
ies
ol vel Mica npecion
checking
Lute ether cneting mes
Level (Cooling system)
Visual Inspection
Checking
We
Engine
‘Adequate cooling water to heat
exchanger
Checking
Yes
System
Yes
Jacket water heater Checking Yes
Leakage (Exhaust system)
Visual Inspection
Yes
Electroyte level Battery system
| chosing
brah conde rap cheching Yes
cheating XE
General inspection
Visual inspection
YES
Pump house, heating ventilating
louvers
Visual Inspection
Checking
YEs
Disclaimer: The list is not all encompassing due to the extensive list of adopted codes. The
Inspector shall documents all fireand life safety violations and corrections when
Inspector's Signature
anyare discovered during inspection.
Techpicign-Fire & Safety
oie 9/8092
Factory Authorizer’s Signature
Asst. Manager-F
Date
& SafetyWEEKLY FIRE PUMP INSPECTION, TESTING AND MAINTENACE
(As per NFPA-25, Table-8.1.2)
Inspection, Testing &
Maintenance: Weokly
‘Scope ‘Aetion Taken
Tank level
Visual Inspection
Checking
Tank float switch
Visual Inspection
Testing
Solenoid valve operation
Visual Inspection
Testing
Water in system
Checking
Cleaning
Flexible hoses and connectors
Visual Inspection
Oittevel
Visual Inspection
Checking
Lube oll heater
Checking
Level (Cooling system)
Visual Inspection
Checking
Di
Engine
‘Adequate cooling water to heat
exchanger
Checking
System
Water pump(s)
‘Visual Inspection
Condition of flexible hoses and
Visual inspection
Checking
Jacket water heater
Checking
Leakage (Exhaust system)
Visual Inspection
Checking
Drain condensate trap Checking
Electrolyte level (Battery system) Checking
General inspection
Visual Inspection
Pump house, heating ventilating
Visual Inspection
Checking,
Disclaimer: The list is not all encompassing dueto the extensive list of adopted codes. The
Inspector shall documents all fireand life safety violations and corrections when
anyare discovered during inspection.
Inspector's Signature
TechnigjansFire & Safety
ome. oor
Factory Authorizer’s Signature
‘Asst. Manager-fire & Safety