Professional Documents
Culture Documents
IM SM Avanta Plus EN
IM SM Avanta Plus EN
IM SM Avanta Plus EN
Av a n t a
Installation and service manual
R e m e h a
Remeha Avanta Plus
• Remeha Avanta Plus 28c
1
Remeha Avanta Plus
INTRODUCTION
1 SAFETY 5
1.1 General safety 5
1.2 Safety during assembly and installation 5
1.3 Safety during installation, inspection and maintenance 5
2 INSTALLATION 7
2.1 Scope of delivery 7
2.2 Mounting the boiler 7
2.2.1 Clearance requirements 7
2.2.2 Dimensions and connection points. 8
2.2.3 Mounting the Remeha Avanta Plus 10
2.3 Water-side connections 10
2.3.1 Water flow 10
2.3.2 Circulation pumps 11
2.3.3 Additional guidelines for the domestic and CH water 11
2.3.4 Water treatment 11
2.3.5 Safety valve discharge 12
2.3.6 Expansion vessel 13
2.3.7 Connecting DHW pipes (Combi-type only) 13
2.3.8 Connecting the ‘CH return’ 14
2.3.9 Connecting ‘CH flow’ 14
2.3.10 Connecting condensate drain 15
2.3.11 Connecting under floor heating 15
2.4 Gas-side connections 15
2.4.1 Additional guidelines for gas connections 15
2.4.2 Connecting the gas supply 16
2.5 Flue terminal and air supply connections 16
2.5.1 Flue terminal positions 16
2.5.2 Room sealed flue 17
2.5.3 Connecting the flue terminal and air supply 18
2.6 Electrical connection 19
2.6.1 The control unit 19
2.7 Connecting external controls 20
2.7.1 On/off control – room temperature (volt free switching) 22
2.7.2 Time control using an internal or external 230 V clock 23
2.7.3 Connecting a 230 V time clock in combination with a modulating room control 23
2.7.4 Modulating control – room or outside compensation 23
2.7.5 Connecting an outside temperature sensor 24
2.7.6 Connecting the DHW sensor/thermostat 25
2.7.7 Connecting a frost protection device 25
2.7.8 Connecting an external interlock 26
2.7.9 Connecting remote alarm and boiler run indication 26
2.7.10 Connecting a PC/PDA 26
2.8 Wiring diagram 27
2.9 Commissioning 27
2.9.1 Control Panel 27
2.9.2 Additional guidelines for commissioning 27
2.9.3 Putting the boiler into operation 27
2.9.4 Normal start-up procedure 33
2.9.5 Error during the start-up procedure 33
2.9.7 Adjust the boiler according to the system 35
2.9.8 Changing the parameters at service level (with access code) 35
2.9.9 Changing the maximum output (Hi) for CH operation 37
2.9.10 Restore factory settings 39
2
2.10 Putting the boiler out of operation 39
2.10.1 Boiler with frost protection, during longer periods of non-use 39
2.10.2 Boiler without frost protection, during longer periods of non-use 39
4 ERRORS 49
4.1 General 49
4.2 Error codes 49
4.3 Control stop or shut down 51
4.4 Error memory 51
4.4.1 Error read outs 52
4.4.2 Deleting errors 52
5 SERVICE PARTS 53
5.1 General 53
6 EC DECLARATION 56
7 REGULATIONS 57
7.1 EC regulations 57
7.2 Remeha factory test 57
3
Remeha Avanta Plus
INTRODUCTION
o
Read these instructions carefully before putting the boiler into
operation, familiarise yourself with their control functions and
operation, strictly observing the instructions given. Failure to
do so may invalidate warranty or prevent the boiler from
operating correctly.
o
On commissioning the certificate in the Boiler Service Log
book (supplied with the boiler) must be completed and left on
site with a copy send on to Broag Ltd for registration purposes.
LT.AL.W7H.000.001
o
When contacting Broag with a problem on the boiler, please
have available the boiler type, Serial No (located on the
bottom of the casing), and the symptoms or fault code (the
fault code is a series of flashing red digits in the display panel).
4
1 SAFETY
m
Can you smell gas? What to do:
• do not smoke and do not create any flame or sparks;
• do not use any electric switches;
• turn off the gas tap;
• open windows and doors;
• trace possible leaks and seal them.
Warning! If the leak is before the gas meter, alert your gas
supplier, TRANSCO, tel. 0800 111 999
m
Can you smell smoke or flue gasses? What to do:
• isolate power supply.
• open windows and doors;
• trace possible leaks and seal them.
5
Remeha Avanta Plus
6
2 INSTALLATION
0
30
00
n.6
mi
LT.AL.W7H.000.003
7
Remeha Avanta Plus
LT.AL.W7H.000.005
8
combi type
Return connection Ø 22 mm
Flow connection Ø 22 mm
Gas connection Ø 22 mm
Combustion air inlet Ø 100 mm (concentric)
Flue duct Ø 60 mm (concentric)
DHW inlet (cold) connection Ø 15 mm
¢ DHW outlet (hot) connection Ø 15 mm
Condensate drain connection ¾”
(standard overflow pipe size)
º Connection safety valve Ø 15 mm
z
• Based on the guidelines and the required installation space,
determine where to mount the Remeha Avanta Plus.
• In determining the boiler position, consider carefully the flue
outlet position and any pluming consequences.
LT.AL.W7H.000.002
9
Remeha Avanta Plus
m
• The boiler should be mounted on a suitable vertical wall
which is able to support the weight of the boiler.
• The boiler should be mounted in a room which, even during
severe cold weather, remains frost-free.
• If the boiler is to be installed in a timber framed building,
please refer to British Gas publication: ‘Guide for Gas
Installations in Timber frame Housing’, reference DM2.
• In a new installation it is possible to fit just the wall plate
and valve set to enable the system pipework to be complet-
ed and tested before fitting the boiler at a later date (place
fibre washers supplied in a safe place for use when fitting
the boiler).
z
• Make sure the boiler and any open connections are protec-
ted from building dust etc. during the installation.
• There must be a 3 amp fused switched spur within 1m of
the boiler.
• Provision must be made for the condensate discharge.
LT.AL.W7H.000.012
10
2.3.2 Circulation pumps
The Remeha Avanta Plus 24s and 28c are fitted with the
Grundfos UPR 15-60 and the Avanta Plus 35c and 39c with
the UPR 15-70, two-speed circulation pumps. The control unit
ensures that when the hot-water function is active, the pump
runs at ‘high’. The factory setting of the pump for CH func-
tion is ‘low.’ If necessary, the service installer can adjust this
to ‘high’ by switching parameter 21 (from 0 to 1) see par.
2.9.8.
dT 20°C 18kW fluxes and debris before connecting the boiler to the central
400 heating system in accordance with BS 7593 (1992).
Pump 'high'
300
m
Pump 'low'
200
m
All scale deposits however small will reduce the efficiency of
the boiler and should be prevented.
11
Remeha Avanta Plus
z
Please ensure that the new boiler plant is not in circuit when
the flushing takes place, especially if cleansing chemicals are
used to assist the process.
For the correct dosage and the suitability of inhibitors for use
with our boilers and for further information on water treatment
or system cleaning we advise direct contact with either of the
following companies:
or:
Sentinal ‘X100®’ manufactured by:
BetzDearborn Ltd
Sentinal
Foundry Lane
Widnes
Cheshire WA8 8UD
Tel No: 0151 424 5351
Fax No: 0151 420 5447
12
2.3.6 Expansion vessel
An 8 litre expansion vessel (with the vessel charge set to 1.0
bar) is fitted as standard within the boiler case and is suitable
for use in a heating system with a water content up to 100
litres, operating at a flow temperature of 80°C, a maximum
pressure of 3 bar and a maximum system static head of 5
metres above the boiler. If the system water content is greater
than 100 litres, or the system static head above the boiler is
greater than 5 m, an additional vessel must be installed in the
system to allow for the increase in expansion, see table 01.
m
Install additional vessel according BS 5449, part1.
• Fit the outlet pipe for hot water to the DHW outlet ¢
15 mm Ø connection.
• Fit the inlet pipe for cold water to the DHW inlet 15 mm
Ø connection.
z
• The DHW pipes must be connected in accordance with
current regulations.
• For plastic pipes, follow the manufacturer’s instructions (for
connection).
LT.AL.W7H.000.015
13
Remeha Avanta Plus
o
The Remeha Avanta Plus has a drain cock built into the return
isolating valve
It is considered good practice to install an air separator / dirt
removal device in the return to the boiler.
LT.AL.W7H.000.016
o
The Remeha Avanta Plus has a drain cock built into the flow
isolating valve.
LT.AL.W7H.000.017
14
2.3.10 Connecting condensate drain
z
• If connecting into an internal discharge branch (i.e. sink
waste etc) the connection must be down stream of the
existing waste trap.
• Fill the boiler siphon with water before operation, to
prevent flue gasses discharging into the room.
LT.AL.W7H.000.018 • The condensate drain must be connected in accordance
with current regulations.
z
Please ensure that the residual pump duty of the boiler is
sufficient for the resistance of the under floor system. If not a
low loss header should be used to separate the boiler from
the under floor circuit to allow a separate pump sized for the
resistance of the under floor system to be used.
m
Before installation, check that the gas meter has sufficient
capacity for the demand. Remember to consider the
consumption of all household appliances.
15
Remeha Avanta Plus
• Before starting any work on the gas supply, turn off the main
isolation valve.
• Connect the gas supply to the 22 mm Ø boiler
connection.
m
• Make sure there is no dirt in the gas pipe. Blow through
the pipe before installation or tap well to purge.
• Make sure that the minimum gas service pressure is high
LT.AL.W7H.000.019 enough (in full load > 17 mbar).
• Preferably install a gas filter in the gas pipe to prevent the
gas block from getting dirty.
• The gas supply must be connected, tested for soundness
and purged by a qualified Engineer and in accordance
with BS6891.
z
It should not be necessary to provide compartment ventilation
when the boiler is used with a standard concentric flue.
z
The boiler will produce a water vapour plume during normal
operation.
Positions for the Remeha Avanta Plus are shown in the figure
and table 02.
16
A Dimen- Terminal location Minimum
sions distance
600 mm
(in mm)
No flue must penetrate
600 mm
area within dotted lines to terminal
S round roof light
(room
2000 mm
G S sealed)
D,E
A Directly below an opening, air brick,
F B 300
C opening window, etc.
B Above an opening, air brick, opening
P A M 300
J window, etc.
H L
G J C Horizontally to an opening, air brick,
300
opening window, etc.
K,N
D Below a gutter or sanitary pipe work 40 1)
E Below the eaves 40 1)
F Below a balcony or carport roof 40 1)
G Above ground, roof or balcony level 300
LT.AL.W7H.000.020 H From vertical drain/soil pipe work 40 1)
J From an internal or external corner 40 1)
K From a surface or boundary facing the 2)
600
terminal
L Vertically from a terminal on same wall 1500
M Horizontally from a terminal on same
300
wall
N From a terminal facing the terminal 1200
P From an opening in a carport (e.g.
1200
door, window) into the building
R From a vertical structure on the roof n/a
S Above an intersection with the roof n/a
table 02 Minimum distances to terminal
1)
= We advise to use deflectors in case of these small dis-
tances.
2)
= Where the terminal is positioned directly opposite an
opening in the facing wall the min will be 2 m.
n/a = not applicable.
L
Eq. Length of 45° elbow
0.65
80/125 or 60/100
table 03 Maximum pipe lengths for flue duct and air supply in
room sealed application
17
Remeha Avanta Plus
z
For flue installations not covered by this booklet, please
contact our technical help line 0118 978 3434.
• Check the depth of the wall and cut the terminal to suit
– taking note of the cutting instructions supplied with it
• Core drill a 125 mm Ø hole in the wall, fit the rubber closure
ø 125 mm plate at the exit end and slide the terminal through the wall
until the closure plate is clear of the outer edge of the wall
158 mm – pull back the terminal till the closure plate is flush then fit
inner wall closure to secure.
z
• All connections must be airtight and waterproof.
• Horizontal extension sections should slope towards the
boiler (at least 3 cm per metre).
1
2
LT.AL.W7H.000.021
18
2.6 Electrical connection
• Connect the boiler to the fused (3 amp) switch spur unit
adjacent to boiler.
• The switch unit must always be accessible.
{
When the switch spur is on the following components of this
230 V appliance can be live (230 V):
• electrical connection pump;
• electrical connection gas combination block;
• electrical connection three-way valve;
• most parts of the control unit;
• ignition transformer;
• X1, X2, X4, X5, X6 and X7 terminal strip;
• 230 V supply cable connection.
LT.AL.W7H.000.022
19
Remeha Avanta Plus
Manufacturer Sit Controls
Supply voltage 230 V – 1ph – 50 Hz
Pre-purge time 3s
Post-purge time 5s
Ignition time 2.5 s
Safety time 5s
Anti-cycling time 3 till 10 min.
Fuse value F1 (230 V) 2 AT
DC fan 24 VDC
table 04 Control unit characteristics
m
Any loads other than those specified above are only allowed if
an isolating transformer is used.
z
• All connections on terminal X1, X2, X4, X5, X6 and X7
are 230 VAC.
• All connections on terminal X9 are low voltage only.
1
{
• Isolate power supply at the fused spur before carrying out
any work on the boiler controls.
LT.AL.W7H.000.024
20
Terminal
Block X6
L 230v - 3 Amp
N Power Supply X2
E
Terminal
Block X7
1
Common Alarm
X5
(Closes on alarm) Boiler Run
X6
2 X7
(Closes on run)
3 X9
Terminal
Block X5
1 Neutral
For external DHW priority
Open valve to DHW (230v) diverting valve on System boiler
2 when used in conjunction with
"Open Therm" compensation
3 Open valve to HTG (230v)
Terminal
Block X9
3 DHW sensor (red band) or volt free thermostat (make on temp fall)
Remove existing link to use this function
4
Exist 5
External interlock (volt free)
links Remove existing link to use function
6
Terminal
Block X2
5 N
Power supply to external time clock -230v
4 L
Switch live (230v) from external time clock DHW demand
3 Remove existing link 4-3 to use this function
Exist
links 2
Switch live (230v) from external time clock HTG demand
1 Remove existing link 4-1 to use this function
LT.AL.W7H.000.025
21
Remeha Avanta Plus
Exist
5 z
links 6 If a room thermostat with an anticipation resistor is being used,
7 Modulating - using Open Therm control
parameter p5 should be changed from 0 to 1, see par.
eg: Honeywell Chronotherm or Celcia 20 2.9.8.
8 On / Off - using simple volt free switching control
LT.AL.W7H.000.026
{
When the switch spur is on, the terminal strip X2 will be live
(230 V).
m
Exist
links 2
Switch live (230v) from external time clock HTG demand
1 Remove existing link 4-1 to use this function For this option to function correctly a link or room control must
be fitted between connectors 7 and 8 of X9 terminal strip
LT.AL.W7H.000.027 (remove existing link before use).
For continuous DHW on, when using a combi boiler, the link
across connectors 3 and 4 MUST not be removed
If the 230 V supply for the external time clock is not taken from
the boiler – terminal block X2 connections 4 & 5, it must be
taken from the same phase as the boiler 230cv supply and
correct polarities observed.
22
2.7.3 Connecting a 230 V time clock in combination with
a modulating room control
With an externally mounted simple 230 V switching time clock
connected to connectors on X2 terminal strip and a Celcia 15
connected to connectors 7 and 8 of X9 terminal strip (remove
existing link between connectors 7 and 8 before use), the
Remeha Avanta Plus will provide room compensated heating
and time control over CH and DHW (System boiler).
o
An OpenTherm® room modulating control (Celcia 15) used
in conjunction with a simple external 230 V time clock will
provide easy to set up and operate - timed room
compensation heating
LT.AL.W7H.000.028
23
Remeha Avanta Plus
z
The Remeha Avanta Plus can therefore be controlled directly
by any other controls with this OpenTherm® logo
Terminal
2.7.5 Connecting an outside temperature sensor
Block X9
1 Outside sensor (red band) for direct boiler weather compensation An outside temperature sensor can be connected to connec-
or when used in conjuction with a compatable Open Therm
2 control eg: Chronotherm or Celcia 20 tors 1 and 2 of the X9 terminal strip.
3
The boiler will regulate the output using the set point of the
internal heat curve.
4
This can be set as follows:
Exist 5
links
- Outside temperature minimum set point = -15°C (adjustable
6
with parameter p29 to between 0 and -30°C)
7
- Outside temperature maximum set point = 20°C (adjustable
8 with parameter p28 to between 0 and 40°C)
- Flow temperature set point at maximum outside tempera-
ture = 20°C (adjustable with parameter p27 to between
0 and 60°C)
X9 - Flow temperature set point at minimum outside temperature
= 20°C (adjustable with parameter p1 to between
LT.AL.W7H.000.029 20 and 85°C)
o
An outside sensor used in conjunction with a simple 230 V
75
time clock will provide easy to set up and operate - timed
60
weather compensation heating based on the above graph.
Factory setting
40
20
-15 0 10 20
LT.AL.W7H.000.030
24
2.7.6 Connecting the DHW sensor/thermostat
Terminal
Block X9 • If an external DHW calorifier is being used with the Avanta
1
Plus system boiler a volt-free DHW control sensor or ther-
2
mostat can be connected to connectors 3 and 4 of the X9
terminal strip after removing the existing link. The control will
3
DHW sensor (red band) or volt free thermostat (make on temp fall)
Remove existing link to use this function automatically detect whether a sensor or a thermostat has
4
been connected.
Exist 5
links 6
o
• A frost thermostat should preferably be installed in rooms
Terminal with a high frost risk.
Block X9
• Connect the frost thermostat in parallel to the room ther-
1 mostat - connectors 7 and 8 of the X9 terminal strip (remo-
2 ve existing link between connectors 7 and 8 before use).
3
4
X9 z
5 If a 230 V switching time clock is connected to terminal strip
Exist
links 6
X2, the frost thermostat wired as indicated (on connectors 7
and 8 of the X9 terminal strip) it will not bring the boiler on if
7 Modulating - using Open Therm control
eg: Honeywell Chronotherm or Celcia 20 the time clock is in the OFF position. In these cases the frost
8 On / Off - using simple volt free switching control
stat must be connected in parallel with the time clock on con-
LT.AL.W7H.000.032 nectors 1 and 4 of the X2 terminal strip (frost stat contacts to
close on temperature fall).
m
• The integrated boiler protection described above will not
provide complete system or fabric protection.
• When a Celcia 20 control has been fitted to connectors 7
and 8 on X9 (see Par. 2.7.4) an outside sensor as detailed
in Par. 2.7.5) must be used to provide system and building
fabric frost protection. I
• If a frost thermostat is connected parallel to the Celcia on
connectors 7 and 8 on X9, when the frost thermostat calls
for heat (contact closed) it will override the Celcia 20 control
and cause an error message (OT ERROR) flashes in the
display and the boiler will operate continuously to achieve
the flow set point.
25
Remeha Avanta Plus
3
X9
4
LT.AL.W7H.000.033
X10
LT.AL.W7H.000.035
26
2.8 Wiring diagram
X9
X10 X8 X0 X6
X13 X7
X6 L N
X5 Power supply
X4 1 2 230V, 50Hz
X3 BL
N
X15 X0 L
BR
X2 GN/YW
X1
GN/YW
X1 X2 X3 X4 X5 X7 X8 X9 X13 X15
4 5 1 3 2 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 1 2 3 1 2 3 4 1 2 3 4 5 6 7 8 4 1 3 7 5 6 8 1 10
Blocking up entry
DHW sensor/thermostat
NC.
BK BL BL BR
BR WH BR BK COMM. WH RD BL BK
GY BK RD GN WH WH BK
WH WH YW
OR
GN
Os S WH
T
1 2 3 1 5 1 5 4 2 1 2 1 2 1 2
As Rs
X131A
1 2
1 2 3
X132 T
LT.AL.W7H.000.234
27
Remeha Avanta Plus
2.9 Commissioning
1 = display
2 = [reset] key
1 3 = [-] key
4 = [+] key
5 = [enter] key
m
The boiler must not be put into operation with a different type
of gas without reference to Broag.
28
1. Isolating the power supply and opening the front cover
• Switch off the boiler at the fused spur and remove the fuse;
230 V • Remove the front panel (release the two screws at the bot-
tom of the front panel, pull the bottom of the panel; forward
and lift off the two pins on the top of the main casing).
LT.AL.W7H.000.037
z
Open the valves on all the radiators connected to the central
1 heating system before filling the system with water.
2
3
1,2 bar
m
• When the vent caps start leaking water, close them with
the vent caps supplied attached to gas combination block
and replace the leaking vent cap(s) as soon as possible.
Check • Avoid water getting into the boiler.
LT.AL.W7H.000.038 • Check the condensate siphon. This should be filled to the
mark with clean water if necessary.
29
Remeha Avanta Plus
• Open the boiler gas valve and check the static pressure to
the boiler at the measurement point (C) on the gas block.
C
m
The boiler has been factory tested for natural gas at 20 mbar.
The minimum gas inlet pressure is 17 mbar for natural gas.
• Check that the gas supply to the boiler is gas tight (in com-
pliance with the current regulations, see Chapter 7 the maxi-
Check
mum test pressure at the gas pipe inlet, with the boiler gas
valve open, is 60 mbar.
LT.AL.W7H.000.039 • Vent the gas pipe by unscrewing the measurement point (C)
on the gas block (tighten it again as soon as the pipe is fully
vented).
• Check that the gas connections in the boiler are sealed.
• Check that all electrical connections, including the earth
connection, have been made correctly.
• Check the electrical connections to the thermostat and other
external controls.
• Check that the flue-gas and air-supply connections are
sealed.
LT.AL.W7H.000.040
• Replace the fuse in the spur and switch on the 230 V power
supply.
• Set the controls to heat demand.
• The boiler will begin an automatic venting-programme
(which lasts approx. 3 minutes) and will do this every time
the power supply is isolated.
• The boiler now starts to run. The operational status is shown
in the display. The normal operating status finally shows 0
in the display.
230 V
LT.AL.W7H.000.041
30
4. Checking/setting the gas/air ratio at full load
The Avanta Plus boilers are suitable for both natural gas and
propane firing. For the Avanta Plus 39c an optional propane-
set is needed.
R The boilers are supplied as standard set for natural gas
(H), therefore the following procedure must be carried out
BEFORE the boilers are fired and commissioned for the first
time on propane:
- adjust the fan speed (for procedure; see Par. 2.9.8, for val-
A ues; see table 06 and table 08) and;
- adjust the gas/air ratio (for values; see table 06 and table 08).
A
Setting values O2/CO2 for natural gas H / L
Fan speed (rpm) O2 CO2
Boiler type Full load h3 *) % %
5.2 8.8
LT.AL.W7H.000.042 24s approx. 4300
± 0.1 ± 0.1
5.2 8.8
28c approx. 5500
± 0.1 ± 0.1
5.2 8.8
35c approx. 6300
± 0.1 ± 0.1
5.2 8.8
39c approx. 6700
± 0.1 ± 0.1
table 05 Setting values full load CO2 and O2 (front panel not
fitted)
*) On forced full load, the 2nd digit indicates the operating code
• Unscrew the flue gas sampling cap and connect the flue gas
analyser.
• Set boiler to full load;
• Press the [enter]- key, keep it pressed and also press the [+]-
key until h3 appears in the display; full load has been set.
• Once the unit has reached the full-load fan speed, measure
the O2/CO2-percentage and compare this to the values in
table 05.
• If the values are not in accordance with the table then cor-
rect the gas /air ratio controls using the adjusting screw A on
the gas block.
• If the value is too low turn the screw A anti clockwise; this
increases the gas rate – if the value is too high turn the
screw clockwise which decreases the gas rate
• Check the flame through the sight glass which should be
stable with a regular blue distribution
31
Remeha Avanta Plus
z
Ensure that the analysing probe has a gas tight seal in the
sampling point with the probe end in the centre of the flue
duct.
*) On forced part load, the 2nd digit indicates the operating code.
z
Ensure that the analysing probe has a gas tight seal in the
sampling point with the probe end in the centre of the flue duct.
• Repeat the ‘test at full load’ and ‘test at part load’ as often as
necessary until the correct values are achieved without fur-
ther adjustments
32
6. Preparing the boiler for use
• Remove the analysing probe and replace the cap on the flue
gas sampling point.
• Refit the front panel and secure with the two screws again.
1 • Press [reset]-key for the boiler to return to the normal oper-
ating mode.
z
Following a manual override the boiler will return to normal
operating mode if no keys are pressed for 15 minutes.
o
The Remeha Avanta Plus is delivered pre-tested and operat-
ing parameters set up with standard factory settings to suit the
most common systems. These setting can be adjusted to suit
specific site conditions but must not be changed without
reference to Broag or one of our approved contractors.
33
Remeha Avanta Plus
z
After any error é1, é2, é7, é10 or é13 ; the 3
minute venting cycle will run first before starting
the boiler.
• Checking CH function;
- Ensure the time control is in the CH on position
- Set the room thermostat on a high demanding tempera-
ture and, the display shows
[1 ; pre-purge stage
[2 ; Ignition stage
[3 ; operating in CH mode.
- Set the room thermostat back to a lower temperature (no
more heat demand), the display shows;
[4 ; operating in DHW mode (boost to DHW plate on
minimum load)
[5 ; waiting-time; 3 to 10 minutes (only when flow
temperature has already been reached and heating demand
is still existing)
[1 ; pre-purge stage
[7 ; pump run on after CH or DHW is satisfied
[0 ; stand-by mode
34
o
• If the boiler is set to the economy setting (see par. 2.9.8), it
will not supply a boost to DHW after CH is satisfied. The
display then shows; [1 ; pre-purge stage [6 ; pump run
on after CH [0 ; stand-by mode.
• If a two channel time clock is fitted and connected to a
combi boiler and the time control for DHW is in the “OFF”
position, the DHW production will be disabled unless the link
between connectors 2 and 3 on the X2 terminal is fitted
(normally factory fitted).
35
Remeha Avanta Plus
o
How to change the parameters at user level can be read in the
“User manual” provided and therefore will not be detailed in
this Installation and Service manual.
36
Maximum fan speed CH 10 – 70
37 1 ) 37 1 ) 41 1 ) 50 1 )
(natural gas) X 100 rpm
p 17
Maximum fan speed CH 10 – 70
35 1 ) 37 1 ) 41 1 ) 48 1 )
(propane) X 100 rpm
Maximum fan speed DHW
Do not change *** 43 1 ) 55 1 ) 63 1 ) 67 1 )
(natural gas)
p 18
Maximum fan speed DHW Adjustments for
41 1 ) 52 1 ) 60 1 ) 65 1 )
(propane) propane firing
Minimum fan speed
(CH and DHW) Do not change *** 13
(natural gas)
p 19
Minimum fan speed
Adjustments for
(CH and DHW) 20
propane firing
(propane)
0 = low
p 21 Pump setting CH
1 = high
0
0 = combi
p 30 Boiler type
1 = system
1 0 0 0
37
Remeha Avanta Plus
R
m
Changing the factory settings could result in the boiler not
working properly.
LT.AL.W7H.000.047
o
The boiler will automatically return to the normal operating
mode if no keys are pressed for 10 minutes.
LT.AL.W7H.000.048
38
Avanta Plus 24s
Speed-input ratio
30.0
25.0
20.0
Hi input [kW]
15.0
10.0
5.0
0
1000 1500 2000 2500 3000 3500 4000 4500
Fan speed [rpm]
LT.AL.W7H.000.049
30.0
25.0
Hi input [kW]
20.0
15.0
10.0
5.0
0
1000 2000 3000 4000 5000 6000
Fan speed [rpm]
LT.AL.W7H.000.050
40
35
30
Hi input [kW]
25
20
15
10
0
1000 2000 3000 4000 5000 6000 7000
Fan speed [rpm]
40
35
30
Hi input [kW]
25
20
15
10
0
1000 2000 3000 4000 5000 6000 7000
Fan speed [rpm]
LT.AL.W7H.000.051
39
Remeha Avanta Plus
m
Drain the boiler and central heating system if you will not be
using the home for a long period and there is a chance of
night frost.
40
3 INSPECTION AND MAINTENANCE
z
If during the annual inspection the flue gas analysis indicates
that the values are outside the figures given in table 10,
maintenance work should be carried out as described in
par.3.2. Also carry out maintenance if the ionisation read-out
value is lower than 3 or higher than 9μA, or when the flame
core is not satisfying.
3.1 Inspection
> 1 bar
LT.AL.W7H.000.053
41
Remeha Avanta Plus
z
Check system for leaks if the system needs re-filling more
than 3 times per year.
2 bar
LT.AL.W7H.000.054
3.1.2 Checking the flue pipes and air supply pipes for
leaks
• Check that the flue and air-supply connections and
pipes are sealed and the terminal exit is clear.
LT.AL.W7H.000.055
42
3.1.3 Checking the condensate siphon
• Check the condensate siphon. Remove any dirt resi-
dues and refill with clean water to the mark.
LT.AL.W7H.000.0233
z
Ensure that the analysing probe has a gas tight seal in the
sampling point with the probe end in the centre of the flue
duct.
LT.AL.W7H.000.057
43
Remeha Avanta Plus
z
The O2/CO2 - values in table 10 are checking values. For
setting values see table 05 and table 07.
If the flue gas analysis readings are within the values in table
10 the boiler combustion is OK. However if the readings are
outside the given values, then adjust the gas air ratio control to
the given values, see table 05 and table 07 in par.2.9.3.
If the adjustments cannot achieve the mentioned values, the
boiler will require a full service please refer to the maintenance
instructions in par. 3.2.
- check the flame via the inspection glass; in full load the
flame should be stable with an even blue colour and in part
load should be stable with an even orange colour.
3.2 Maintenance
To conduct maintenance:
z
Ensure that a service gasket set and new ignition/ionisation
electrode is available before carrying out this procedure.
{
• Isolate power supply at the fused spur before carrying out
any work on the boiler.
44
1. Open the boiler
Gas
1
LT.AL.W7H.000.058
2x
LT.AL.W7H.000.059
45
Remeha Avanta Plus
1
3
2
LT.AL.W7H.000.060
• Carefully clean the burner with pressured air (do not keep
the nozzle to close to the surface).
• Visual inspection of the burner for any damages or cracks
on the surface. If you see any damages, then replace the
burner.
LT.AL.W7H.000.061
46
5. Maintenance to the heat exchanger (CH)
• Check the seal between the front plate and the heat
exchanger and the insulation section. Replace sealing.
• Handle the fragile front-plate insulation and the back-plate
insulation of the heat exchanger with great care and do not
let them get wet.
• Visual inspection of the heat exchanger for scale or dirt. If
you see obvious deposits, than clean the heat exchanger
carefully. Carefully remove any loose dirt with a vacuum
cleaner.
• Then brush the coils of the heat exchanger (if required a
cleaning brush is available as an accessory) and remove
the loosened particles with a vacuum cleaner.
47
Remeha Avanta Plus
1
2 230 V
48
7. Re-Assembling the boiler and checking the combustion
4x z
2 • Check that the packing between the front plate and the heat
exchanger has been fitted correctly.
4 z
3 5 Fill in the Boiler Log Book after conducting any maintenance.
230 V
Check
LT.AL.W7H.000.063
49
Remeha Avanta Plus
4 ERRORS
4.1 General
The Remeha Avanta Plus has an advanced control unit. The
heart of this control unit is a microprocessor, the abc®-con-
trol which both controls and protects the boiler. If an error is
detected anywhere in the boiler, it will lock-out and an error
code will appear in the display.
o
The error code is important for the correct and swift detection
of the nature of the error and for possible support from our
technical help line 0118 978 3434.
• Press the ‘reset’ key for 3 seconds. If the error code contin-
ues to appear, look for the cause in the error table below and
resolve it.
Error Description Possible cause Check / solution
code
Short circuit in the flow, Check the wiring and the connections of the sensors visually: are the
return or boiler temperature plugs all correctly in position? With a multimeter: measure the resist-
sensor. ance in the wiring and connection.
Flow or return
é0 Check that the sensors are working; take the sensors out * and
sensor fault. Defective or not (properly)
measure the resistance with a multimeter at room temperature (20
connected flow, return or
- 25°C); the sensor is working properly if the resistance is between
boiler temperature sensor.
12 and 15 kΩ.
Insufficient water. Check the minimum water pressure, read off the gauge.
Check that the pump is working; turn the spindle with a screwdriver,
Flow tempera- No through flow. if that works but the pump still does not respond, check the wiring; if
ture is higher that is in order the pump is faulty.
é1 than the set Too much air in the system. Vent the system.
maximum tem- Check that the sensors are working; take the sensors out * and
perature Deviation in the flow or measure the resistance with a multimeter at room temperature (20
return temperature sensor. - 25°C); the sensor is working properly if the resistance is between
12 and 15 kΩ.
Insufficient water. Check the minimum water pressure, read off the gauge.
Check that the pump is working; turn the spindle with a screwdriver,
No through flow. if that works but the pump still does not respond, check the wiring;
Return tempera- that is in order the pump is faulty.
ture is higher Too much air in the system. Vent the system.
é2
than the flow Sensors not wired correctly Check the wiring between sensors and control unit.
temperature Check that the sensors are working; take the sensors out * and
Deviation in the flow or measure the resistance with a multimeter at room temperature (20
return temperature sensor. - 25°C); the sensor is working properly if the resistance is between
12 and 15 kΩ.
Mains supply not correctly
Control unit or Check that the power supply from the switch spur is properly
é3 earthed.
earth fault earthed, if that is the case the control unit is faulty.
Control unit faulty.
50
Error Description Possible cause Check / solution
code
Check:
• the connection between the ignition wire and the ignition trafo;
No ignition spark.
• the ignition wire and electrode for ‘dielectric breakdown’;
• the inter-electrode distance, this should be 3-4 mm; that the
ignition electrode is properly earthed.
A spark but no flame. Check that:
• the gas tap is open;
• the gas pre-pressure is sufficient;
• the gas pipe is de-aerated;
• the gas valve is energised during ignition and opens;
More than 5 start • the electrode is correctly fitted and clean;
attempts without • the CO2 adjustment at low and full load;
é4
any flame forma- • there is no obstruction / fitting fault in the gas pipe;
tion. • there is no obstruction in the air supply or flue (e.g. a blocked
siphon); there is no recirculation of flue gasses
(either inside or outside the boiler).
There is a flame but no, or Check:
insufficient ionisation (lower • the flame, is the heart of the flame visible and the flame stable?
than 3 or higher than 9 μA) • the CO2 adjustment at low and full load;
• that the ignition electrode is correctly earthed;
• visual check of the ignition/ionisation electrode: look for white
oxide film (remove with sandpaper or a screwdriver); look at
the shape (are the pins still the original shape and is the distance
between the two ends of the pins between 3 and 4 mm).
CO2 wrongly adjusted Check:
No ionisation or • CO2 adjustment on the gas block;
ionisation failure • ignition/ionisation pin;
é5 more than 5 • flue/air-supply connections;
times during one • gas flow at full load;
heat demand. • if there is no recirculation of flue gasses (either inside or
outside the boiler).
Unwanted flame
é6 Faulty control unit, replace control unit.
formation
Check the minimum water pressure, read off the gauge and check
Insufficient water.
for leaks.
No water in the
Check that the pump is working; turn the spindle with a screwdriver,
boiler or the
é7 No through flow. if that works but the pump still does not respond, check the wiring;
pump is not
that is in order the pump is faulty.
working
Too much air in the system. Vent the system.
Wrong pump wiring. Check wiring from and to control unit.
Fan is not working Check:
• fan function;
• fan wiring and connection.
é8 Fan fault Fan does not stop Check:
• fan function;
• fan wiring and connection;
• excess chimney draught.
Insufficient water. Check the minimum water pressure, read off the gauge and check
for leaks.
No through flow Check that the pump is working; turn the spindle with a screwdriver,
No through flow
if that works but the pump still does not respond, check the wiring;
é10 during venting
that is in order the pump is faulty.
cycle
Too much air in the system. Vent the system.
Wrong pump wiring. Check wiring from and to control unit.
51
Remeha Avanta Plus
25000
4.3 Control stop or lock-out
The code 8 , 5 or 9 can appear in the display.
20000 • Code 8 is a control stop and will appear if the measured
flow temperature (t1) is higher than the flow temperature
resistance in Ω
15000 set (Tset flow). The boiler will start working again automati-
cally once the flow temperature falls below the flow tem-
10000
perature set.
• Code 5 is a control stop from 3 till 10 minutes and
appears if the set flow temperature (t1) has already been
5000
reached and the heating demand still exists.
• Code 9 is a lock-out and appears if the maximum tem-
0
perature rise is exceeded or if the dT between the sup-
10 20 30 40 50 60 70 80 90 100
temperature in °C
ply and return temperature ≥ 45°C or a rate of rise in the
SENSOR RESISTANCE flow temperature > 1°C/sec. And also at a boiler-start with
no through flow or insufficient water. The boiler will try to
restart after 10 minutes.
z
Every 10 minutes the boiler will try to restart until the cause
has been removed.
z
The lock-out will disappear once the cause has been removed!
52
4.4 Error memory
The Remeha Avanta Plus control unit has an error memory,
in which the last 16 errors are stored. In addition to the error
code (é and a number xx).
The following data is also stored:
• the number of times the error occurred (n and a number
xx)
• the operating status of the boiler (5t and a number xx)
• the flow temperature (t1 and the value xx) return tem-
perature (t2 and the value xx) at the time the error
occurred.
To get access to the error memory, access code must be
entered.
o
When tracing an error, the cause can often be found more
quickly if the operating status at the time the error occurred
can be retrieved from the error memory.
53
Remeha Avanta Plus
5 SERVICE PARTS
5.1 General
If, following the annual inspection or maintenance any part of
the boiler is found to need replacing, use Remeha spare parts
only or spare parts and materials recommended by Remeha.
Problem description
Problem description
Your details
Company name Smit
Address Londonstreet 1, London
Telephone
Reference Mr. Johnson
Your order number 530002004
Job number -
Project number 14 (Canal flats)
table 13 Return form example
* These details can be found on the boiler type plate; the type
plate is stuck to the bottom of the boiler.
54
2010 2007
2030 2008
1005
1012
2032
2017
2024 2004
2001
2009
2014
1003
2002 2033
2023
2035
2015
2034
2003
3010 1010
2016 3001
2029 2006 3004
2020
3009
2018 3008
2009 3011
2005 2013 3002
2024 3006 3007
2028 3003
2039 3012
2036 3005
2040 2021
2032 2042 4003
2037 4008
5017 5001
3009 5008
2027 2038 3004 4010
2019
2025 5010 5018
1004 5013 5029
1001 2011
2012 3013
5004 4004 5028
2041 5006
5011 5002
2022
5009
5012
4006 5033
4011 5014 5018 5017
5015 2019
4001
1006 5003
4005 1009 5011
5012
1008
1002
4007
4014
1007
4012
5026 5027
4013 1009 5031 5032
1002
4007
5019 5030 5027
4002 3017 5032
5020
3014
5022
3016
5021 3014 5030
2026 5022
5020
4009 5023 5026
4007 5021 5031
5019
5024
3015 5020
5020
4004 5025
5023
LT.AL.W7H.000.065
55
Remeha Avanta Plus
56
6 EC DECLARATION
EC – DECLARATION OF CONFORMITY
92/42/EEG
W.F. Tijhuis
Approval Manager
57
Remeha Avanta Plus
7 REGULATIONS
7.1 EC regulations
The boiler meets the requirements of the EC regulations at the
following directives:
- 90/396EEC Gas appliances directive
- 92/42/EEC Efficiency directive
- 73/23/EEC Electrical low voltage directive
- 89/336/EEC EMC directive
- 97/23/EEC Pressure equipment directive (art. 3, sub. 3)
58
8 TECHNICAL SPECIFICATIONS AND WORKING PRINCIPLE
59
Remeha Avanta Plus
7
8.3 Working principle
The Remeha Avanta Plus casing serves as a sealed air box,
with air drawn in by the fan. On the outlet side of the fan is
11 a venturi, into which a measured quantity of gas is injected
8
based on the volume of air available. The fan speed con-
9 trol is dependent on the settings of the external control, the
10 advanced boiler controller ‘abc®’ and the prevailing tempera-
tures (measured by the temperature sensors).
LT.AL.W7H.000.202 This method of gas/air ratio control ensures that the gas
quantity is precisely adjusted to the air quantity. Thus creating
optimum combustion over the whole heat input range. The gas
and air is mixed in the venturi and then passes into the spe-
cially designed pre-mix burner. After combustion, the hot flue
gas is directed through a specially designed, high efficiency
helicoil stainless steel heat exchanger with a large surface
area, and transfers it’s heat to the system water circulating
around the coils. In the condensing part of the exchanger the
water vapour in the flue gas condenses within it and the heat
released during this process (the so-called latent or condens-
ing heat) is also transferred to the system water. The conden-
sate water so formed is discharged from the heat exchanger
via a siphon.
60
o
In normal operation, the boiler’s flue gas discharge will
produce a visible white condensing “plume” and therefore care
should be taken when choosing a location for the terminal.
8.3.1 Regulating
The Remeha Avanta Plus is a fully modulating boiler and can
be regulated using one or more of the following methods;
1. Open Therm – 2 wire interface compatible with the
Remeha Celcia 15 room compensator and the Remeha
Celcia 20 outside weather compensator or with any other
proprietor’s OpenTherm® controls.
2. Open Therm thermostat in combination with an external
time clock.
3. On/Off room thermostat – volt free (on the X9 terminal
strip).
4. On/Off room thermostat – 230 V (on the X2 terminal strip).
5. 230 V Switching time clock - compatible with the Remeha
two channel time clock or with any other proprietor’s time
clock. For further details see par. 2.8.
61
Remeha Avanta Plus
o
Provided that the situation is not actually hazardous, the
Remeha Avanta Plus will always try to supply heat.
The ‘abc®’- control prevents unnecessary additional call outs.
62
9 EFFICIENCY DATA AND GAS EFFICIENCY LABELS
9.1 Annual efficiency
Up to 110.5 % in relation to Hi at a load of 30% and a return
temperature of 30°C.
63
P l u s
Av a n t a
R e m e h a
Broag Ltd.
Remeha House
© Copyright
Molly Millars Lane
All technical and technological information contained in these technical instructions, as
well as any drawings and technical descriptions furnisched by us remain our property and RG41 2QP WOKINGHAM, Berks.
may not be multiplied without our prior consent in writing. Tel: +44 118 9783434
Fax: +44 118 9786977
Internet: uk.remeha.com
112952-0906/AC Subject to alterations
E-mail: boilers@broag-remeha.com