ZFOD-Zubair Field Op - Div
ZFOD-Zubair Field Op - Div
Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1
Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit
WO Type Work Type Activity Type Status WBS Element
PM02 PM RO Routine APPR 6EIQ02036MA0005
Object List
Equipment Equipment Description Equipment Functional Location Functional Location Description
Tag
Manhours Required:
W. Centers W.C. Description Num Hrs
10ELEC ZUBAIR MISHRIF ELECTRICAL 2 2.00
10MROT ZUBAIR MISHRIF MECHANICAL - ROTARY 2 4.00
Page: 1 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1
Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit
Tool Required:
Code Description Q.ty Hrs
Operation List:
Op. Sub. Op. Work Center Description Persons Actual Man Hours
Page: 2 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1
Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit
Page: 3 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1
Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit
FOUNDATION BOLTS
120,,CHECK THE LEVEL OF LUBRICATING OIL;
REFILL AS REQUIRED
130,,CLEAN EQUIPMENTS AND AREA AFTER THE
WORK
140,,RE-ENERGIZE EQUIPMENT AND INFORM
CONTROL ROOM OF ENDING OF THE WORKS
150,,PREPARE FINAL CHECK REPORT
160,,CLOSE AND CHECK IF THE WORK PERMIT
HAS BEEN CORRECTLY SIGNED
0020 10ELEC HORIZONTAL CENTRIFUGAL PUMP GROUP 2
A1_1M
Page: 4 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1
Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit
Signatures
Work Done
Remarks
Name Date
WO Waiting for Scheduling VINCENZO DIFINO 13.01.2023
WO Waiting for material by
WO Waiting for Plant
WO Waiting for approval HYDER TAMAH 13.01.2023
WO Approved by Bartolomeo SGARLATA 15.01.2023
WO Approved by WAHAB ALSHWAIRED 15.01.2023