ZFOD-Zubair Field Op.Div.

WORK ORDER EXECUTION REPORT

Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1

Horizontal Centrifugal Pump GROUP A1

Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit
WO Type Work Type Activity Type Status WBS Element
PM02 PM RO Routine APPR 6EIQ02036MA0005

Object List
Equipment Equipment Description Equipment Functional Location Functional Location Description
Tag

Main Discipline MEC Mechanical


PM Plan Z10PA01M19
PM Plan Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
Planner Group 1MR ZubMish MechRotary
Main Work Center CN-MROT
Failure Mode
Failure Cause
Failure Consequence
D. Time Hours 0.00
Action Taken

Manhours Required:
W. Centers W.C. Description Num Hrs
10ELEC ZUBAIR MISHRIF ELECTRICAL 2 2.00
10MROT ZUBAIR MISHRIF MECHANICAL - ROTARY 2 4.00

Page: 1 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1

Horizontal Centrifugal Pump GROUP A1

Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit

Tool Required:
Code Description Q.ty Hrs

Operation List:
Op. Sub. Op. Work Center Description Persons Actual Man Hours

Page: 2 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1

Horizontal Centrifugal Pump GROUP A1

Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit

0010 10MROT HORIZONTAL CENTRIFUGAL PUMP GROUP 2


A1_1M
HORIZONTAL CENTRIFUGAL PUMP GROUP A1_1M

10,,INFORM THE CONTROL ROOM OF BEGINNING


OF THE WORKS AND OPEN THE WORK PERMIT
20,,CHECK ITEM SUBJECT TO MAINTENANCE
FOR HSE CONDITIONS
30,,CHECK THE OPERATING CONDITIONS BOTH
PUMP AND ELECTRICAL MOTOR (VIBRATION,
NOISE AND TEMPERATURE, OPERATIONAL FLOW
AND HEAD)
40,,CHECK PIPING CONNECTIONS FOR ANY
LEAKS
50,,CHECK MECHANICAL SEAL FOR ANY LEAKS
60,,CHECK THAT AUXILIARIES ARE
FUNCTIONING PROPERLY
70,,MECHANICAL SEAL FLUSHING LINE
DISCONNECTION, CLEANING OF THE LINE AND
STRAINER (IF ANY)
80,,MAKE SURE EQUIPMENT DE-ENERGIZED AND
ELECTRICAL PERMIT OPENED
90,,EXTERNAL CLEANING OF EQUIPMENT
100,,CHECK COUPLING GUARD AND ANY
ROTATING PARTS PROTECTION FOR ANY DEFECT
AND REINSTATE THEM IF PREVIOUSLY REMOVED
110,,CHECK PROPER TIGHTENING OF

Page: 3 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1

Horizontal Centrifugal Pump GROUP A1

Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit

FOUNDATION BOLTS
120,,CHECK THE LEVEL OF LUBRICATING OIL;
REFILL AS REQUIRED
130,,CLEAN EQUIPMENTS AND AREA AFTER THE
WORK
140,,RE-ENERGIZE EQUIPMENT AND INFORM
CONTROL ROOM OF ENDING OF THE WORKS
150,,PREPARE FINAL CHECK REPORT
160,,CLOSE AND CHECK IF THE WORK PERMIT
HAS BEEN CORRECTLY SIGNED
0020 10ELEC HORIZONTAL CENTRIFUGAL PUMP GROUP 2
A1_1M

Page: 4 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001050077 Scheduling Start Date 22.01.2023 - Scheduling Finish Date 22.01.2023, WO Print Date 20.01.2023
First Scheduled Dates Original Planned Start Date 27.01.2023 - Original Planned Finish Date 27.01.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP A1
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP A1

Horizontal Centrifugal Pump GROUP A1

Superior Order
Sup. Order Description
Functional Location Z010-P-310 OILY WAT PUMP FOR 3RD PAY FLOW TANKS
Equipment 2016012697 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer SULZER
Model Number CPT12-1
Serial Number 1.00033E+007
Work Permit

Signatures
Work Done

Remarks

Name Date
WO Waiting for Scheduling VINCENZO DIFINO 13.01.2023
WO Waiting for material by
WO Waiting for Plant
WO Waiting for approval HYDER TAMAH 13.01.2023
WO Approved by Bartolomeo SGARLATA 15.01.2023
WO Approved by WAHAB ALSHWAIRED 15.01.2023

Page: 5 of 6
Page: 6 of 6