Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

IDl"lll■ff OP PLANl • DOCIMlltffA110N...

AIIIID IY XXXX
-
GENERAL Building Certifiers ,,,, ,.,,
Gl. THESE DRAWING SHALL BE READ IN CONJUNCTION WITH All • PROPPING MAY B E REQUIRED TO THE SIDES OF THE EXCAVATION CUl CORNER C4. All CONCRETE PLACED SHALL BE WELL VIBRATED AND COMPACTED
ARCHITECTURAL AND OTHER CONSULTANTS DRAWING AND TO HAINT AIN THE INTEGRITY OF THE fOUNOA TIONS. MESH 1 USING AN AP PROVED VIBRATOR ANO TECHNIQUE.
r
!IF.TAILS !1'01"F.D
SPECIFICATIONS AND WITH SUCH OTHER WRITTEN INSTRUCTIONS
AS HAY BE ISSUED DURING THE COURSE OF THE CONTRAC T. ALL MESH 3 CS. CONSTRUCTION JOINTS WHERE NOT SHOWN SHALL BE LOCATED TO
't111dn,p ce.n,11«� do� IHI� .......,.r.t tk ,l((:\jf�q

THE APPROVAL OF THE ENGINEER


of IM, -�;> 1mat,o� cor,!�...S ¥,iltu,. th• doc.irrAl'II

DISCREPANCIES SHALL BE REFERED TO THE ENGINEER FOR


DECISION BEFORE PROCEEDING WITH THE WORK, CDC20 1 8-0346
C6. NO HOLES OR CHASES OTHER THAN THOSE SHOWN ON THE
I

G2. DIMENSIONS SHALL NOT BE OBTAINED BY S CALING THE Rl TRENCH MESH: 500mm MINIMUM LAP. STRUCTURAL DRAWINGS SHALL BE HADE IN CONCRETE MEMBERS.
STRUCTURAL DRAWINGS . (Refer ARCHITECTURAL DRAWINGS) WITHOUT THE PRIOR APPROVAL OF THE ENGINEER.
Gl SETTING OUT DIHENIONS SHOWN ON THE DRAWINGS SHALL BE R4. AROUND THE ENTIRE EDGE OFTHt SCAB,. THERE MUST
VERIFIED BY THE BUILDER BE AN INTACT EOGE WIRE.OF THE FABRIC PARALLEL C1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 HOURS BEFORE
T O AND 10mm FROM THE FORM BOARD.- PREStNT, PROVIDE AN REINFORCEMENT IS COMPLETED. THE CONTRACTOR SHALL ALLOW
G4. SITE PREPARATION SHALL INCLUDE: STRIP GRASS/VEGETATION, ADDITIONAL 1-N12 TO EDGE AFTER THE COMPLETION OF THE REINFORCEMENT TWO HOURS FOR
STRIP TOPSOIL . BENCHING THE SITE BY CUT & FILL TO A LEVEL THE ENGINEERS INSPECTIONS, UPON APPROVAL CONCRETE MAY
PLATFORH NOHINALL Y 150mm BELOW FINISH SLAB LEVEL RS. ALL REINF0RCEHENl SHALL BE FIRHL Y SUPPORTED ON MILD STEEL
PLASTIC TIPPEO (HAIRS OR CONCRETE CHAIRS AT NOT GREATER BE ORDERED.
GS. TREATHENT OF CUT- AND - FILL SLOPING SITES: THAN 1 MfTRE CENTRES BOTlt WAYS
FOUNDATIONS CONTINUED: CB. CONCRETE TO BE CURED A MINIMUM OF 1 DAYS AFTER POURING.
F6.• FIIJING USED IN THE CONSTRUCTION Of A SLAB, SHALL CONSIST R6. SITE BENDiNG OF DEFORMED REINFORCING BARS S HALL BE DONE C9. FORMWDRK TO BEAMS AND SLABS SPANING GREATER THAN Sm
OF CONTROLLED FILL WITHOUT HE,ATING USING MECHANICAL BENDING TOOLS, SHALL BE PRECAHHBERED UPWARDS BY 1/500 DF CLEAR SPAN IN
� • S AND FILL UP TO 0.8 m DEEP, WELL COMPACTED IN NOT HORE THAN EACH SPAN UNLESS NOTED DEFERENTL Y ON THE ORAWNINGS.
PROPOSED o.� m THICK LAYERS BY " VIBRATING ROLLER.
,· - DWELLING � • NON-SAND FILL UP ro 0.4 m DEEP, WELL COMPACTED IN NOT HORE C10. CURING OF ALL CONCRETE SHALL BE ACHIEVED BY KEEPING

,w::::=:.,,.,====lrl'�;;;::::::=='�
1:20 FALL THAN 0.1s m LAYEnS BY A HE.( HANICAL ROLLER. CLAY Fill SHALL SURFACES COMPLETELY WET FOR A PERIOD OF 3 DAYS, AND
2 BE MOIST DURING COMPACTION. PREVENTION OF LOSS OF MOISTURE FOR A TOTAL OF 7 DAYS
PLASTIC SHRINKAGE CRACKING: SFOLLOWED BY A GRADUAL DRYING OUT. POLYTHENE SHEETING OR WET

-NGL
COMPACTED
Fill
"""'-.. DEEPENED EDGE EAM
'--'OR BULK PIERS THROUGH
FILL TO NATURAL HA TERIAL
PIERS:
XL WATER MUST NOT BE ADDED TO CONCRETE ON SITE AS EXCES SIVELY
WET CONCRETE IS ONE OF THE HAIN COURSES OF SHRINKAGE CRACKING.
X2. ENSURE MAX 20mm TOP COVER TO FABRIC REO IN ORDER TO
HESSIAN HAY BE USED TO RETAIN CONCRETE MOISTURE.

!REFER PIER NOTES) MINIMISE SHRINKAGE CRACKS.


Pt ALL EDGE BEAMS &. s TIFFENING BEAMS TO BE FOUNDED ON STEELWORK:
CONSISTENT NATURAL STRATA OF 1SOKPa (mini BEARING CAPACITY X3. SHRINKAGE CRACKING IS ALMOST INEVITABLE &. DOES NOT REPRESENT
THE FILL SHALL CONTINUE P AST THE EDGE OF THE HOUSE BY AT
LEAST 1H AND SHALL BE RETAINED OR BATTERED BEYOND THIS OTHERWISE, 91400 PERS @ 18 00cts (maM) ARE REQUIRED TO B Y-PASS FAILURE. HOWEVER, IS OF CONCERN UNDER BRITTLE FLOOR COVERINGS S 1. FABRICATE ANO ERECT STRUCTURAL STEEL WORK IN ACCORDANCE WITH
POINT BY A SLOPE (PROTECTED FROM EROSION) AND NOT STEEPER FILL &. ACHIEVE 25011Pa BEARING CAPACITY ON NATURAL STRATA DAMAGE t1AY BE REDUCED BT USING FLEXIBLE MORTAR S &, GLUES FOR AS 4100 AND RELEVANT ASSOCIATED STANDARDS.
THAN TWO HORIZONTAL TO ONE VERTICAL P2. IF PIERS ARE REQUIRED, AN ADDITIONAL. 2N12 FIXED TO THE UNDERSIDE FIXING TILES t. FIXING OPERATION MUST BE DELAYED
. AS LATE AS 52. UNLE SS NOTED OTHERWISE, USE:
G6. THIS DRAWING IS SIGNED SUBJECT TO CERTIFICATE O F INSPECTION­ OF THE TOP FABRIC MESH IS REQUIRED ALONG PIER LOCATIONS. POSSIBLE. A) 10mm GUEST, FIN AND END PLATES.
ISSUED BY ENGINEER. B) H20 8.8/S BOLTS. HIGH STRENGTH STRUCTURAL IAS1252A)
G1. SLAB DESIGN IN ACCORDANCE WITH AS2810-1996 C) 6mm CONTINUOUS FILLET WELDS HADE WITH E48XX MILD
"RESIDENTIAL SLABS AND FOOTINGS". ELECTRODES.
S3. STEEL WORK DESIGNED IN ACCORDANCE WITH AS4100
CONCRETE: "STEEL STRUCTURES CODE" AND AS1170/AS1110,2 " DEAD AND LIVE
(1. ALL WORKMANSHIP AND MATERIALS S HALL BE IN AC(ORDANCE WITH LOADS AND WIND LOADS."
AS 3600 CURRENT EDITION. S4. ALL STEELWORK SHALL BE SECURELY TEMPORARY 811ACED BY THE
FOUNDATIONS: �-- !' T)M'{?t\ . ERECTOR AS NECESSARY TO s T ABIUSE THE STRUCTURE DURING
F1. SITE CLAS SIFICA TION: p P3. IF ANY PIEll (OR FOOTING) ENCOUNTERS ROCK OR SHALE, ALL EDGE c2. coNrnrn auALITY SC\\;"',�Y Q-Hec,� A.s ,k CONSTRUCTION,
BEAMS (l.flE TO BE PIERED TO ROCK OR SHALE- 300 PIERS @I 1.8mcls 55. THE BUILDER SHALL PROVIDE ALL CLEA TS ANO DRILL ALL HOLES
F2. FOOTINGS HAVE BEEN DESIGNED FOR AN ALLOWABLE BEARING ONLY INTERNAL LO/ltrBEARING WALL BEAMS .R EOUIRE .. PIERING NECESSARY FOR FIXING STEEL TD STEEL AND TIMBER AND OTHER
CAPACITY OF 150KPa AT FOUNDATION LEVEL TO ROCK, ELSE AS PER Pl. , ELEMENTS TO STEEL WHETHER OR NOT DETAILED IN THE DRAWINGS.
ELEMENT SLUl'P MAX SIZE Ft ADMIXTURE S6. WELDS TO BE PROPERLY CHIPPED TO REMOVE SLAG.
F3. THE BUILDER SHALL OBTAIN APPROVAL OF THE FOUNDATION P4. All PIERS ARE TO BE OEWATERED CLEAN & FINISHED SQUARE A T AGGREGATE (28 DAY.S)
MATERIAL BEFORE PLACING CONCRETE. BASE PRIOR ·ro PLACEMENT O F CONCRETE. 51. COIU! OSION PROTECTION: MECHANICALLY WIRE BRUSlfAND PAINT TWO
• PIERS TO ROCK OR SHALE NEED NOT BE FOUNDED 500mm min BELOW SLAB 80mm 20mm COATS OF 11ED OXIDE ZINC CHROMATE OR EQUAL PRIOR TO ERECTING,
F4. ALL FOOTING EXCAVATIONS SHALL BE FINISHED CLEARED AND 32 MPa
FOOTING TRENCH LEVEL
nil
HORIZONTAL OR AT A SLOPE OF NOT HORE THEN 1 IN 10 80mm 2 011m 32 MPa
x IF PREVIOUSLY FILLED GROUND. ,INADEOUATE BEARING OR EXCES SIVE FOOTINGS nil
GROUNDWATER IS ENCOUNTED, THE ENGINEER IS TO BE CONTACTED GALINTa • T • BAR:
IMMEDIATELY. PIERS 80mm 20 mm 20 HPa nil
G1-a. PLACE GALINTEL T BAR OVER OPENING ALLOWING A MINIMUM OF
I 5H (mul • PIER TOPS ARE TO BE FINISHED SMOOTH ANO 20mm ABOVE TRENCH 200 mm ENO BEARING EACH END.
<I I
.,
I STEP TO SUIT
BRICK COURSES
LEVEL TO HELP PREVENT SILTATION- IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO ENSURE PIER TOPS ARE CLEM AND FREE OF FOREIGN G2-b. GALIN TEL T BAR HUST BE PROPPED BEFORE BRICKLAYING.
BED ,!H AS MATTEfl PRIOR TO THE LAYING OF THE MEMBRANE AND CONCRETE SLAB. 0. CLEAR CONCRETE COVER TO REINFORCEMENT SHALL BE AS ii FROM 2.4m TO l3m SPAN 2 PROPS.
SHOWN ENGINEERS SPOT CHECKS DOES NOT RELEASE THE CONTRACTOR FROM iij FROM 3.6m TO 4.Sm SPAN 3 PROPS,
I FOLLOWS UNLESS OTHERWISE SHOWN: ai) FROM 4.8m TO 5.7m SPAN 4 PROPS.
THIS RESPONSIBILITY.
I SPACED EQUALLY ALONG THE LENGTH ANO UNDER THE BASE OF THE BAR.
EXTEND 300mln PS. ALL PIERS TO BE POURED SEPER A TE TO RAFT OR WAFFLE SLABS. G3-c. WHEN LA YING BRICl<S MORTAR HUST BE APPLIED TO ALL BRICK FACES
SERVICE TRENCH P6. •Wllf.llE OEPTH OF PIERS EXCEED 1800mm. PIERS . ARE TO BE COMING IN CONTACT WITH THE 'T' BAR.
REINFORCED WITH 5 N12 FOR 400 DIAMETER PIERS AND 4 N12 {AST AGAINST FORMS COHPL YING WITH AS 1509 G4-d. PROPS TO REMAIN IN PLACE UNTIL MORT AR ACHIEVES FULL S TRENGTH
VERTICALLY FOR 300 DIAMETER PIERS. - EACH WITH R6-300 TIES. (7 DAYS).
FS. • THE SERVICE TRENCH CAN REMOVE SUPPORT FROM FOOTINGS WHICH ELEMENT IN SHELTERED EXPOSED TO CAST AGAINST GS-e. A MINIMUM 1:4 MORTAR HIX IS TO BE USED. AND APPLIED TO ALL
MAY RESULT IN SETTLEMENT OR ROTATION OF THE FOOTING. LOCATIONS GROUND OR OTHER FORM­ FACES BETWEEN STEEL AND BRICKS (VERTICAL ANO HORIZONTAL LEGS)
WEATHER WORK OR THE AND BETWEEN BRICKS ABOVE THE STEEL S[CT,ION,
x EXCAVA TION LOCATION AND DEPTH SHOULD BE SUCH THAT THE GROUND
EXCAV ATION IS NOT DEEPER THEN THE CRITICAL DEPTH LINE (CDL).
• WHEN TRENCHES ARE TO. BE EXCAVATED BELOW THE (CDL), THE REI NFORCEMENT: FOOTINGS
CRITICAL 8ACKFILL AREA SHOULD BE BACKFILLED WITH MATERIAL 65
Rt ENSURE MAX 20mm TOP COVER TO FABRIC RElflFDREMENT IN ORDER
15
Of ADEOUTE STRENGTH ANO LOW PERNEABILITY TD MINIMIZE WATER TO MINIMISE SHRINKAGE CRACKS.
MIGRATION AND BACKFILL SETTLEMENT OR P IERS SHALL BE PROVIDED SLABS & WALLS 20 30 65
TO FOOTINGS. R2. FABRIC REINFORCEMENT: ONE FULL S QUARE PLUS 25mm.

Approved & Signed

-
BUSBY NSW 2 1 68
0108-18
PAGE: 01 oF 08
Building Ceirtiifiers ;,,ru,1
DE'l'AUS NO'l'liJ> IMPORTANT NOTE: KEY:
Bwldmg Certifiers does not warrant tht; accuracy GEOTECHNICAL INVESTIGATION HAS NOT • PIERS
BEEN CARRIED our'. THE BUILDER MUST
of the Information contc'lmed. w1th1n the document.

. CONTACT THE ENGINEER FOR INSPECTION I () PIER OF ... MIN. DEPTH


CDC2018-0346
OF FOUNDATION BEFORE LA YING
ii\ny errors: or ornis�ions remain the responsibd1ty of
"the relevant consultant wh_o prepored this docwnent REINFORCEMENT FOR FOOTINGS

/ SL 72 MESH
IFt IF1 SLIP JOINT OF TWO TOP & BTM
��
.
LAYERS OF "ALCOR"¾
<
�= �� ��=��-=--!!'!!"'!e !!!!"'!!!! � �-=- � i'e!--=- �!!'!!"'!e
i.n
=��-=--��
N
-=-
'=""i

..
�-'

COMPACTED FILL COMPACTED FILL


· x
IV

IF1 BRICK WALL- ::r:


0
0
�[ -· :230 SQ. BRICK PIER -BRICK WALL
0

FOOTING LAYOUT PLAN I


SCALE 1:100

B... .
350 SQ. BRICK PIER

.. �
3-L 12TM TOP & BTM

SF1 400 DIA.


0
0
F , R10-600 TIES
/50 COVER
LAP 600

..
V,
4-L 12TM TOP & BTM � CONCRETE PIER TO
R10-600 TIES 400 DIA.
400
-.--
SHALE OR FI RM CLAY ---...; 400 DIA.
50 COVER - " '' .,, ·-CONCRETE PIER TD CONCRETE PIER TO
<t _,J,�l
LAP 600 SHALE OR FIRM CLAY
/ SHALE OR FIRM CLAY
LEGEND:
400
r1� 4 .,
125 SLAB THICKNESS
SL 72 TOP MESH
F'C = 32 MPA
DENOTES EXTENT OF TOP FABRIC SECTION 1
20MM INTERNAL TOP COVER SCALE 1:20
30MM EXTERNAL TOP COVER

SF1, SF2 DENOTES B.EAM TYPES (REFER TO OET AILS)

Approved a llan!:!I DA TE:

JOB No: 0108-18 ISSUE:A


BUSBY NSW :.i:168
PAGE: Q2 OF CD
.....ff
SL 12 MESH
TOP 8. BTM

IMPORTANT NOTE:
GEDTECHNICAL INVESTIGATION HAS NOT
BEEN CARRIED OUT. THE BUIL DER MUST
CONTACT THE ENGINEER FOR INSPECTION
Of FOUNDATION BEFORE LAYING
REINFORC EMENT FOR FOO TINGS
GROUND FLOOR SLAB LAYOUT PLAN
SCALE 1:100

SL 72 MESH SL 12 MESH
TOP & BTM TOP 8. BTM
----·-,-
, ,
- ·-----·-·-
Building Certifier§ l'ty Lt<]

COMPACTED FILL �- CO MPACTED FILL


SF B>E'.l'AUS NO'l'lm
0

L
0
V'I
Building Certifiers does not warrant the accuracy X
11)
cf the information contained within the document.
L
-230 SQ, BRICK PIER

0, /.
0
0
CDC2018-0346
BRICK WALL-:-
Any errors or omissions remain the t"espon$1b,hty of
the relevant consultant who prepured this document

350 SQ. BRICK PIER


PIER RED (IF H>2000) •r---'---1/
@)300 CTS
:c: 4N16, R10 HELIX TIES

8
,

3-L 12TM TOP & BTM RlO FITMENTS


R10-600 TIES- '. _ ---- 0900 (/(
50 C OVER ' o
SF1
0
LAP 600 �· 0
I.I') 4-L 12TM TOP & BTM
400 DIA. Rl0-600 TIES
- CONCRETE PIERS TO �=��··-SO COVER
� SHALE OR FIRM CLAY LAP 600
� "'·
f 3.00 400 DIA.
� · • ] �ONCRETE PiERS TO
SHALE OR FIRM CLAY

TYP. PIER DETAILS SECTION 2


'\J SCALE 1:20

SCALE 1:100

�-ti:
DATE:

JOB No: 0108-18 1 issUE :A


BUSBY NSW ·2 1 '8 PAGE: 08 OF 08

You might also like