EHS RISK

ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control
Additional Control Prob

Cons. Prob. Risk Cons. Risk

 Supervisor to ensure
approved PTW is available
prior to commencement of
the task and proper
coordination.
 Unautho  Activity shall be
rized supervised by receiving
workers at authority
working  Only competent and
6.1 area. authorized personnel to be
3 1 3
Preparations.
 Lack of deployed, supervisor to
coordination control.
with SLII
representati  Supervisor to give tool
ve box talk prior to start the
task and must be
documented, this shall
cover the method
statement and risk
assessment

503406-AD0000-68AF-12303_R01 (2012-01-30)
Page 1 of 6
EHS RISK
ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

 Only competent electricians


to be deployed for the
electrical works and for the
 Incompe operating of 110V
generator.
tent
 Ensure all workers received
workers.
the Big 5 training from SLII
 Electrocution training centre.
3 1 3
* Job execution. .  Supervisor to ensure that
 Lake of the power source to be
safety connected with ELCB and
coverage only 110V industrial socket
to be used at site.
 Ensure safety coverage
throughout the activity
Use of bad  Inspect all hand tools to be
condition used for the task, do not
2 1 2
hand tools. use homemade hand tools.

503406-AD0000-68AF-12303_R01 (2012-01-30)
Page 2 of 6
EHS RISK
ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

 Bad
 Supervisor to ensure
condition of
that the generator is in
portable
good condition and
generator. inspected prior to use at
 Bad site.
condition of  Ensure that the multi-

4 1 4
multi-meter meter tester is calibrated
tester for with valid certificate.
continuity  Supervisor to ensure
that temporary cable is in
test.
good management to avoid
 Cable creating hazards.
trailing.
 During crew meeting,
Manual Supervisor to discuss and
handling explain the hazards &
2 1 2
hazard precaution of manual
handling.
 Observe good
housekeeping around the
 Workers may working area.
Slip, Trip &  Walkway and gangway
Fall – same
to be kept free of
ground due
3 1 3
to poor obstruction, hand tools and
housekeepin toolbox to be kept in safe
g. position.
 Barricade the working area
as required.

503406-AD0000-68AF-12303_R01 (2012-01-30)
Page 3 of 6
EHS RISK
ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling


fan
PACKAGE NUMBER: CG-4750-Phase 1 upgrade

 All personnel involve in


the
 Working
activities must wear
P.P.E.'s
without
(e.g. hard hat,
appropriate
personal
2 1 2
safety glass, safety
shoes,
protective
appropriate hand gloves,
equipment.
long sleeve shirt etc.).

NOTE: All Current Risk ranked above C-15 must have additional control measures:
Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable
Risks (High) = 15 – 25 (Method Statement plus additional Control Measures in place)

Consequence
Consequence ( Severity) Rating Factors (5)
Probability Rating Factors (5)
Frequency/Probability

(Severity)
No Safety Health Environ. Financial No
Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1)
Practically impossible or Once in 10 years 5 5 10 15 20
25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2)
Not likely or Once per year 4 4 8 12 16
20

503406-AD0000-68AF-12303_R01 (2012-01-30)
Page 4 of 6
EHS RISK
ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling


fan
PACKAGE NUMBER: CG-4750-Phase 1 upgrade

3 Lost Time Short term Long term >AED300k 2-4 hrs C (3)
Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has
happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5)
Common or Daily 1 1 2 3 4 5

Risk assessment compiled by :

Risk Assessor:
JOSELITO SANGCO
SUPERVISOR 30-01-2014

Name
Designation Signature Date

Risk assessment approved by :

EHS Department:
SACHIN BABU
SR.EHS ADVISOR 30-01-2014

Name
Designation Signature Date

Construction:
SULFEEK
PROJECT ENGINEER 30-01-2014

Name
Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30)
Page 5 of 6
EHS RISK
ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

Management:
ANWAR SADATH SR.PROJECT
MANAGER 30-01-2014

Name
Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30)
Page 6 of 6