Surface Preparation:
Carrying out surfaced preparation work required for grinding the entire
surfaced with hand grinder.
Clean the surface thoroughly with mechanical means and make the surface
free from dirt and loose material.
Pound Test : Will keep 1 feet water for 48hrs on mother slab for checking the
leakage, if any leakage identified then below grouting process will be caried out.
Drill the 12mm dia hole near the honey comb / construction joint /
V Grove area.
Fix 10 mm dia PVC nozzles with epoxy based putty in the grout holes.
Prepare grout by mixing Pidicrete AM, non-shrink grout admixture in to the
neat cement. 225 gram packet of Pidicrete AM shall be mixed with 50 kg of
cement.
Grouting to be done @40Psi with grouting machine till the full saturation of
the grouting hole.
Fill the grove with PMM mixed with Dr.fixit pidicrete URP as per stranded
dosage.
PRIME CONSTRUCTION SERVICES
OFFICE ADDRES:- I Badari , 150-21-1,
Balaji Nager,Kukatapally,
Telangana-522003.
Mobile no:- 8317617125.
Crack Filling : Open all visible cracks and feel the same with PMM, ready to use
polymer modified non shrink mortar.
Polymer Coating : Mixer with required quantity of clean cement & mix Pidilite
URP,as per the dosages recommended by Pidilite, and one coat of same mixed
portion will be applied on entire prepared surface with bresh & rollers.
Using a slow speed mechanical mixer and a clean suitable mixing vessel,
slowly add the powder component to the liquid polymer and stir until a
smooth and homogenous slurry, is achieved.
Allow the mixed slurry to stand for 5 – 10 minutes before use.
Do not dilute the mixture with water.
Apply Dr. Fixit Pidifien 2K slurry by brush, roller or trowel.
PRIME CONSTRUCTION SERVICES
OFFICE ADDRES:- I Badari , 150-21-1,
Balaji Nager,Kukatapally,
Telangana-522003.
Mobile no:- 8317617125
Allow the first coat to dry completely for 4 – 6 hours before applying the
second coat.
Apply second coat at right angles to the first coat.
Fill the water over the protection screed & carry out curing for 7 days.