DAILY PLAN

PIT HCV KE
Daily Plan Pit HCV

Over Burden Removal Activity


Activity Activity Segment Description Distance Hauler Quantity Plan Pdyt Total Pdyt Dump
Plan Production Remarks
OB Removal HCV KE El. Plan El. Actual Dump Elev Zona LAT SUS MAT Ergusa Exca Exca Shift Location
EXCA 14 -55 -51 -35 Panel 48 1000 16 4 13 13 210 2100 Panel 43 4200
EXCA 11 -38 -37 -35 Panel 51 1000 stb stb stb stb 210 2100 Panel 43 4200
EXCA 03 -4 -6 40 Panel 51 2100 1 160 1600 Panel 34 3200
EXCA 403 9 40 Panel 44 1200 BD BD BD BD 210 2100 Panel 34 4200
EXCA 401 12 12 40 Panel 53 1000 7 6 3 210 2100 Panel 34 4200
EXCA 22 -4 -7 40 Panel 50 1600 210 2100 Panel 36 4200
EXCA 505 -16 -10 40 Panel 48 1500 210 2100 Panel 34 4200

Prepared by: Checked by: Recived by:

A.Saharuddin Irsyad Beni Erpin Siburian Anggiat Panjaitan


Pit Control Sr. Supervisor Short Term Sr.Supervisor Production Day Shift Sr.Supervisor Production Night Shift
PETA PIT HCV BAWAH

Exca 11 expose S3 panel 51

Exca 14 expose S3 top loading ke utara


PIT HCV GALUNGGUNG

Exca 401 stripping floor S2 panel 55

Exca 03 stripping floor S2 panel 51

Exca 22 strippping floor S2 panel 50

Exca 505 stripping floor S2 48


PIT HCV GALUNGGUNG

Exca 403 strippping regread jalan panel


44
DISPOSAL HCV GALUNGGUNG

Dumpingan pit galunggung di selatan naikkan elevasi kuncian lumpur Area dumpingan soil
DISPOSAL HCV BAWAH

Dumpingan pit hcv tutup void panel 44


naikkan elevasi

Aliran Air