1200 MM DIA.

PIPE DRAINS
Total Drain Length in
Sr. No. Ch. From Ch. To Side Total Footpath Length in M Remark
M
SECTION 1 (4 LANE FROM KM. 14+331 TO KM. 25+600)
1 14+331 15+080 BHS 1498.00 1498.00 Urban section
2 16+880 17+550 BHS 1340.00 Toll Plaza
3 17+550 22+000 BHS 8900.00 8900.00 Urban section
4 24+750 25+600 BHS 1700.00 1700.00 Urban section
SECTION - 1 TOTAL LENGTH= 13438.00 12098.00
SECTION 2 (2 LANE FROM KM. 25+600 TO KM. 25+600)
5 39+325 39+975 BHS 1300.00 1300.00 Urban section
6 41+460 42+130 BHS 1340.00 Toll Plaza
SECTION - 2 TOTAL LENGTH= 2640.00 1300.00
TOTAL LENGTH = 16078.00 13398.00

CONCRETE LINED OPEN DRAINS


Total Drain Length in
Sr. No. Ch. From Ch. To Side Remark
M
SECTION 1 (4 LANE FROM KM. 14+331 TO KM. 25+600)
1 15+080 16+880 BHS 3600.00 Urban section
2 22+000 24+750 BHS 5500.00 Toll Plaza
SECTION - 1 TOTAL LENGTH= 9100.00
SECTION 2 (2 LANE FROM KM. 25+600 TO KM. 25+600)
3 25+600 29+800 BHS 8400.00 Urban section
4 29+800 39+325 BHS 19050.00 Urban section
5 39+975 41+460 BHS 2970.00 Urban section
6 42+130 53+900 BHS 23540.00 Toll Plaza
SECTION - 2 TOTAL LENGTH= 53960.00
TOTAL LENGTH = 63060.00

EARTH RETAINING STRUCTURES


Sr. No. Ch. From Ch. To Side Length Structure Type
SECTION 1 (4 LANE FROM KM. 14+331 TO KM. 25+600)
1 15+575 15+710 LHS 135.00 Gabion Wall
SECTION 2 (2 LANE FROM KM. 25+600 TO KM. 25+600)
2 38+490 38+640 LHS 150.00 Gabion Wall
3 38+470 38+670 RHS 200.00 Gabion Wall