THA - RTs - MAintenance
THA - RTs - MAintenance
Hand pinching during barricade placement and Trained workers, PTW, TBT, Cut Resistance gloves Safety Shoes, Safety Helmet,
Contractor worker,
Barrication :
Barrication placement/ Installation and Removal
Work
Trained workers, PTW, TBT, Cut Resistance gloves Safety Shoes, Safety Helmet,
1 1-Barrication with portable GI sheets Cut from sharp edges of the GI sheets, structure inspected tools display safety sign board on the work place 2 4 8 L
2- Soft Barrication
3-Folding pipes Barrication
Trained workers, PTW, TBT, Cut Resistance gloves Safety Shoes, Safety Helmet,
Worker may hit with the scaffolding pipe
inspected tools display safety sign board on the work place
2 2 4 VL
Tools Shifting:
Material Shifting:
1- Material shifting from site to Scrape Yard Cut Resistance gloves Safety Shoes, Safety Helmet,
2- Material shifting to Engineering store
Slip/trip Trained workers, PTW, TBT, Trolley
Area house keeping
2 4 8 L
3- Material shifting to Engineering store
Jack failure 3P inspection, load testing Cut resistance gloved, safety shoes, safety helmet 2 4 8 L
Contractor worker, Pandora team, Operator
Load Wheels:
Load Wheels Replacement
Wooden/Metal block slip/damage Trained worker, TBT, PTW Cut resistance gloved, safety shoes, safety helmet 2 4 8 L
Hand pinching Trained worker, TBT, PTW Cut resistance gloved, safety shoes, safety helmet 2 2 4 VL
Final Risk
Action by who? Action by when? closing date Are the controls effective in
L S Risk controlling the risk?
What additional control measures
are required?