Unit 06 / MANAGING SUCCESSFUL BUSINESS

PROJECT
(MSBP)
BM 33

TRANSFORMATION IN WORKPLACE
OF HAMEEDIA ORGANZIATION DUE
TO COVID-19 PANDEMIC

NILAKSHAN RAJASEKARAN / KBM322111 1|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Acknowledgement
I'd like to express my gratitude for giving me the strength to complete my work on
time and with necessary power to support a quality project. Following that, I'd like to
express my gratitude to Ms. Samoo for guiding and supporting me during the
research and   Finally, I'd like to express my thanks for my parents' help.

NILAKSHAN RAJASEKARAN / KBM322111 2|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Table of Contents
TRANSFORMATION IN WORKPLACE OF HAMEEDIA ORGANZIATION DUE TO COVID-
19 PANDEMIC....................................................................................................................................1
Acknowledgement..............................................................................................................................2
LIST OF TABLE........................................................................................................................................4
FIGURES OF TABLE.........................................................................................................................4
LO1.......................................................................................................................................................6
Task 01.................................................................................................................................................6
1.1 Title of the project................................................................................................................6
1.2 Business case.....................................................................................................................8
1.3 Aims and objective of the project......................................................................................9
1.4 Purpose and benefit of the project..................................................................................11
1.5 Project Budget...................................................................................................................12
1.6 The project's scope...........................................................................................................12
1.7 Deliverable of the project.................................................................................................12
1.8 Risk management process..............................................................................................13
1.9 Communication plan.........................................................................................................14
1.10 Project constraint..............................................................................................................15
1.11 The project manager's responsibilities and roles..........................................................16
TASK 02.............................................................................................................................................18
2.1 Work breakdown structure and Gantt chart...................................................................18
2.2 Project milestones.............................................................................................................21
2.3 Change management register.........................................................................................21
2.4 Project control; cost, Quality............................................................................................21
2.5 Evaluate tools and techniques in the planning process...............................................23
LO2.....................................................................................................................................................25
Task 03...............................................................................................................................................25
3.1 Background study of research.........................................................................................25
3.2 Research objectives and Research questions..............................................................25
3.3 Literature review................................................................................................................26
3.4 Research strategy.............................................................................................................28

NILAKSHAN RAJASEKARAN / KBM322111 3|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
3.5 Sampling and data collection tool...................................................................................29
3.6 Carry out small-scale research by applying qualitative and quantitative research
method as a preliminary step of your project............................................................................31
LO3.....................................................................................................................................................32
Task 04...............................................................................................................................................32
Data analyzing technique and tools...........................................................................................32
Conclusion and recommendation...............................................................................................40
LO4.....................................................................................................................................................41
Task 05...............................................................................................................................................41
a. The Lessons Learned from the Preliminary Research.....................................................41
b. The learning of using quality research method.................................................................41
c. Personal Reflection...............................................................................................................42
References...........................................................................................................................................43
Appendix 1.........................................................................................................................................47
3.7 Project Template to be filled weekly...............................................................................48
Week 01...........................................................................................................................................48
Week 02...........................................................................................................................................51
Week 03...........................................................................................................................................53
Week 04...........................................................................................................................................55
Week 05...........................................................................................................................................57
Week 06...........................................................................................................................................59

LIST OF TABLE
Table 1 - Project Budget of my project...........................................................................................12
Table 2 -The project manager's responsibilities and roles..........................................................17
Table 3 - Work breakdown structure..............................................................................................18
Table 4 - Gantt chart of my project.................................................................................................20
Table 5 - Cost report of my project.................................................................................................22
Table 6 - Week 01................................................................................................................................50
Table 7 - Week 02................................................................................................................................52
Table 8 -- Week 03...............................................................................................................................54
Table 9 - Week 04................................................................................................................................57
Table 10 - Week 05..............................................................................................................................59
Table 11 - Week 06..............................................................................................................................61

NILAKSHAN RAJASEKARAN / KBM322111 4|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
FIGURES OF TABLE
Figure 1- Example of kanban............................................................................................................7
Figure 2- Quality Management.......................................................................................................23

NILAKSHAN RAJASEKARAN / KBM322111 5|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

LO1

Task 01
Project Initiation

1.1 Title of the project


Transformation in workplace of Hameedia organization due to covid – 19 pandemic

Project management process

A) Project Initiation
Initiation is the initial stage of the project management life cycle. This is the point at
which the project's worth and practicality are analyzed. During first stage of the
project, a group is created, and a business case is prepared that create the project
plan.

B) Project planning

Once a project is approved, project managers must have a good plan to lead its
team, complete the project before schedule, and then under budget.

This will guide you through the process of getting resources, gaining money, and
obtaining necessary components. The project plan directs the team's efforts to
produce high results, manage risk, get approval, communicate advantages to
stakeholders, and manage suppliers.

C) Project Execution

This is the phase which many people think of when they think of project
management. The goal of execution is to create customer satisfying deliverables.
This is achieved by team leaders assigning resources and insuring that team
members are engaged on respective given responsibilities.

D) Project Monitoring and Controlling


Teams should regularly monitor their own performance as they carry out their project
plan. Because they usually happen at the same time, monitoring and control are
commonly connected with execution.

To ensure that what was promised is delivered, teams must keep an eye on tasks to
avoid project scope, generate key performance measures, and monitor errors from

NILAKSHAN RAJASEKARAN / KBM322111 6|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
budgeted costs and timelines. This ongoing attention helps in the project's healthy
progress.

E) Project Closure
This key step in the project management helps the group to examine and
document the project before moving onto next, learning from former project
failures and achievements to create better procedures and much more successful
teamwork.

Project Methodology
A project management methodology is essentially a set of guiding principles and
processes for managing a project. Your choice of methodology defines how you
work and communicate. (Cohen, 2019).

Kanban Methodology
According to (TIT, 2019) Kanban is a project management tool that allows you to
gain a better understanding of the activities that need to be completed or have
already been completed. The project being monitored using the Kanban Methodology. It
includes a physical or digital platform with three columns (To Do, In Progress, Done).

What are the benefits of Kanban Methodology?

 To create a flow chart for your project - Objectivity in project management


might help your team become more engaged.
 To find and resolve obstacles - To reduce increased manufacturing and reduce
various types of waste during the project, set work limitations for an in column.
 Teamwork should be improved - This can help the organization to establish
more accurate time delivery estimations, resulting in a higher project positive
outcome.
 Your productivity will improve as a result of this - Clarity results in a quicker
procedure and less work.

Example of kanban

NILAKSHAN RAJASEKARAN / KBM322111 7|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Figure 1- Example of kanban

Introduction of Hameedia organization


Hameedia was founded in 1949 and has since grown to become a major menswear
brand known for its flair and performance. The company has developed greatly since
its beginning 71 years ago, and the Hameedia brand has now developed a global
superstar in Sri Lanka and is fast gaining popularity around the worldwide.

Hameedia has developed itself as a market leader in the performance of appropriate


custom-fit and ready-made apparel for men, helping them to appear their job
perfectly. The company has a large network of huge and beautiful showrooms
throughout Colombo and its surroundings, and is committed to providing clients with
a world-class shopping experience. Looking forward, Hameedia is well positioned to
maintain its position as Sri Lanka's leading menswear brand while also expanding its
global footprint and brand awareness.

Vision

 Empowering Men in a Fashionable Manner

Mission

 Our love for world-class creative menswear solutions will energize and enrich
your individuality.
 Employ, educate, and retain top individuals, as well as strengthen cross-
stakeholder relationships
 Establish socially and morally correct sustainability requirements.

NILAKSHAN RAJASEKARAN / KBM322111 8|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
1.2 Business case
A business case supports the performance of a project, program, or portfolio. It
examines the advantages, disadvantages, costs, and risks of many alternatives
before recommending one. A business case is a management tool that allows
decision makers, stakeholders, and the general public to make proof and informed
decisions. (Definition from APM Body of Knowledge 7th edition , n.d.)

In my project, I've provided details about the workplace transformation at Hameedia


as a result of Covid- 19. Since according my research, every one of the adjustments
that had occurred in the Hameedia organization's management environment as a
result of Covid -19. However, even when the pandemic situation becomes usual for
employee flexibility and corporate safety requirements, companies could continually
develop and practice the beneficial improvements.

The main goal of a business case:

 Project scope
 Benefit
 Deliverables
 Cost
 Budget
 Aims and objectives
 Internal and external stockholders
 Time

1.3 Aims and objective of the project


 The issue that it helps in solving is mentioned in the project's goals and
objectives. Objectives and goals are an approach for setting goals and
determining what the project should accomplish. Many of the objectives should
keep you on schedule and engaged in the aims.

Objectives
a) To find out what issues that Hameedia Organization had during the Covid 19
pandemic and how they managed them.
b) To learn about the advantages Hameedia organizations receive and how they
faced challenges during the Covid 19 pandemic.
c) To identify the economic expense control that Hameedia has been faced.
d) To increase awareness, improve perspectives, and strengthen actions to COVID-
19 prevention and control.

NILAKSHAN RAJASEKARAN / KBM322111 9|Page


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
e) To help the organization with COVID-19 prevention and control.

COVID-19 has had a significant impact on human life. Nowadays, people have
started to use the term "social distance" and should maintain it at all times. Who
would have believed that many places could even be closed down at once? It also
affects how people work, where they work, how they cooperate with others, and how
they reach their objectives. Many people are experiencing emotional suffering as a
result of the COVID-19 outbreak, which has impacted their daily lives in unexpected
ways.

Changes that have taken place in Hameedia organization during covid-19.

 Employees will be ready to work from home

Although the Covid -19 pandemic, sales of our organizations are reduced, and
managers and employees are increasingly working from home to promote their
sales. However, for customers the options available on the online orders are
exciting. We can find a variety of products and brands from a variety of sellers all in
one spot. Customers can see all of the latest trends without having to pay for a
ticket. We have a fantastic opportunity to shop from Hameedia during covid-19.

The skill of employees' behavior, mindsets, attitude, and beliefs to adjust to change
has been critical to their achievement. Having a fast and reliable internet connection
became one among the most difficult challenges. People had learned to build an
appropriate work environment at home based on their months of experience working
at home. We grow comfortable to completing daily duties without needing to visit an
actual workplace.

 Flexibility improvement

Because of the COVID-19 outbreak, Hameedia organizations have had to double-


check what our employees must achieve on a regular base. Flexibility does not
impact specific goals, but managers will think about whether the "where" for workers
might shift as well. Working from home full-time it's not the only option. That is what
the Hameedia organizations conform to. A responsibility of managing to a Work from
Home arrangement may not be practical, our employees are given the opportunity to
review why they needed to have been in the workplace and consider the lower
payments of having a shorter workspace.

 Another change that have taken place is, Hameedia organizations continue to
perform more maintenance and sanitary procedures in their buildings. It is also
helping COVID-19 relief operations in the area, intending to provide medical
supplies and help in the recovery of places impacted worst by the pandemic. As a
result of the corona virus's development, Hameedia organizations have increased
the number of high places, improved cleaning and sanitation procedures, and

NILAKSHAN RAJASEKARAN / KBM322111 10 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
good access to their facilities. In some instances, distribution drivers do not stop
their vehicles, reducing the number of accidents.

Challenges and achievements


This was a year of huge difficulty for Hameedia groups, but also of great opportunity.
The safety of our employees is critical at this difficult period. Hameedia employees
face various health risks, depending on the type of work they do, where they work,
and their personal health. Trying to distance, increased cleaning, and supplying
protective clothes were all taken into consideration in this case. Furthermore, it is
critical that all critical including essential contact details for all employees, been
maintained during this period.

During lockdown period, the customer situation shifted greatly, and our sales people
has continued to support each customers who's really able to service while staying in
touch with those are incapable. As they face their own issues created by quickly
changing demand habits, our groups has improved the performance of their
customer satisfaction, giving the finest help they can provide. During the COVID-19
pandemic, they were by their customers' sides. They continue providing help and
gain relationships as they reopened in time with less regulations, delivering masks
and hand sanitizer to meet increased environmental safety.

One of the challenges facing the Hameedia organization is how to work in a safe and
expense way. Health and safety rules, for example, make it more difficult to achieve
the same efficiency on the work area. Even if demand grows, this could have a sales
and profits.

1.4 Purpose and benefit of the project


Purpose of this Project -:

As a response to the COVID-19 pandemic, this project aims to finding ways to keep
the business running through covid 19 pandemic.  We plan to fill the workplace with
useful, accurate, and wanted to think information on all aspects of COVID-19
maintenance.

Benefit of this Project-:

Hameedia organization are charged for handling the company's most valuable
investment, its people, it performs an important step in every organization's business
plans. That's where organizations aim to get the best talent, maintain it, and boost
worker in order to achieve a challenging advantage in the organization.

Benefit to this Organization-:

NILAKSHAN RAJASEKARAN / KBM322111 11 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Our Hameedia employees enjoy the option to engage additional time with family and
home life, particularly since complete families are quarantining alongside.
Employees are much lesser stressed than they were before to the outbreak. We
provide rewards cards, monthly deals, and other advantages to our customer base
because they are the most important part of our business. Our company can re-
allocate budgets and reduce running expenditures. Costs are now regarded in a
"more reasonable and company perspective, yet the global financial situation is still
considered carefully. The cost of the office, equipment, and leasing costs can now
be used to aid with the current financial condition. Employee benefits have taken on
a new level as a result of the Covid pandemic. Job possibilities, employee migration,
job form and employment conditions, and laws have all contributed to the growth of
employee opportunities.

The project's personal advantage

Between setting up a date to creating a question to performing the interviews, I'd like
to use this opportunity to deliver my thanks and respect you all of the help and
knowledge I've gained as a result of this project. That provided a fantastic
experience for me to conduct an industrial interview and gain knowledge using the
suggestions of my teachers. I was having trouble linking the concept to the project
just at starting, but after I got start, I realized how and where to present and execute
it in a real; researching study. Interview method as part of a research assignment
provides an excellent way to improve interviewing abilities.

1.5 Project Budget


A project budget is the entire amount of money set aside for a specified project
objective over a given time period. Budget management's aim is to keep project
expenditures under control while still meeting the project's objectives.

Task Amount
Transportation expenses 10,000
Other expenses 27,000
Total 37,000
Project Budget of my project

1.6 The project's scope


Table 1 - Project Budget of my project According to (Lutkevich, 2021) Project
scope is the activity of defining and
documenting a list of specific project goals, objectives, features, functions, activities,

NILAKSHAN RAJASEKARAN / KBM322111 12 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
dates, and costs. To put it another way, it's the work that needs to be done in order
to finish a project.

The project will aid in determining how Covid 19 impacted Hameedia, as well as the
obstacles and benefits associated with the Corona pandemic and also finding ways
to keep the business running through covid 19 pandemic. By the 15th of October
2021, the project will be completed. This project will cover the changes that occurred
in the workplace at Hameedia during the Covid 19 pandemic, the employment
conditions provided to employees during the Covid 19 pandemic, and the challenges
that Hameedia had in adopting this technology and how they overcame them.
Finally, this project includes various changes that have been made for the
improvement of the Hameedia.

1.7 Deliverable of the project


The term "project deliverables" refers to the measurable goods or services which
should be supplied after a project is completed. Project deliverables are the items
that must be delivered in order for the project to fulfill its objectives and fulfill the
requirements of its stakeholders. They are really the final outcome of achieving the
final result. (Anon., n.d.)

 Customers nowadays choose to buy their necessary Hameedia clothes from


shopping websites, and hameedia's shift to online sales will gradually increase
the company's financial performance.
 Customers can trust Hameedia will deliver their requested clothes whenever
customers buy them online and have those done as soon as possible.
 Employees are able to work safely and conveniently from home, and that
employees will gain extra skills because they'll be working under different
situations. Since employees are able to work from home, the cost of the working
system can be reduced.

1.8 Risk management process


According to (O'Connor, 2020) Risk management is the process of detecting,
identifying, and minimizing or limiting risks to a project's anticipated results. Project
managers usually supervise the risk management process all interested groups the
project duration. To successfully manage risk, project managers should establish a
friendly and reliable of their goals in order to detect any potential obstacles that may
restrict the team's responsibility to generate outcomes.

We must inform employees understand we do have a risk plan, a business continuity


plan, and a conflict plan in place then take the time to go over it with them. Explain
what each plan comprises and how it will be implemented. While equally attempting
to elicit their participation and Impact. Each week during the project, the project risk
will be modified and reported in the weekly progress report. Planning risk, financial

NILAKSHAN RAJASEKARAN / KBM322111 13 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
risk, and employee risk, strategies to manage risks, and project deliverable risk.
People today are worried, overworked, stressed, afraid, and distracted. The costs of
failing to manage our employees during this period can be considerable (health and
safety, financial, legal, and operational).so this can be a risk matter during this
pandemic. The most difficult aspect of Covid-19 is the time it took to re-establish
creates the possibility when the company was restarted. As a result of the shutdown
of  store locations, customers are increasingly turning to online shopping, so at this
instance, although employees sell the product through online, he actually don’t know
whether this product has been reached safely to the customer during this time, so
this could be an risk management. As a result, Hameedia has continued to sell
through its online platform while enhancing customer satisfaction.

The need to manage the pandemic in the environment is reducing worker availability
and making it harder to work on-site. Due to the requirement to protect employee’s
teamwork, it is leading to growing acceptance of faraway working and social
distancing. All of this has changed and affected the way safety practices are
implemented on a daily basis in Hameedia.

Planning risk process-: Because of the COVID 19 outbreak, there may be


unexpected time limits and curfews, making preparation more difficult. Because most
of the scheduled work could be postponed, we need to focus mostly on performing
online interviews, discussions, and contact.

Interviews risk-: Because meetings were restricted owing to the current situation,
conducting interviews is more difficult; one approach to solve this challenge is to
schedule zoom meetings.

Time management risk -: It is possible that the research will lose time so the project
will not be completed within the time specified in the project scope. To reduce this
risk, the project should include a Gantt chart and a Work Breakdown Structure
(WBS) so the activity may be started and finished on period.

Because the project starts with people ordering clothes online, the organization
should choose and buy things instead of other customers, which takes a long time,
rather than clients coming to the shop and buying, where Hameedia delivers the
clothes product as quickly as possible, because time is of the essence at this point.

1.9 Communication plan


According to (TechTarget Contributor, 2015) A communication plan is a decision
method to sharing data with other users. The plans clearly states who must receive
detailed information, when it might get supplied, and which exchanges would be
engaged to communicate the details.

NILAKSHAN RAJASEKARAN / KBM322111 14 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
The purpose of the communication plan is to maintain all project team members up
to date through interview. Lecturer and Manager of Hameedia Apparel Kandy Branch
are among the audience members. In order to provide advice, the instructor, who is
an important part of finishing this project, must speak clearly. Next, we will provide a
clear understanding of the project through a proposal, and we will be able to
complete the project in a timely manner as a result of this approach. Hameedia must
offer regular updates, and at the end of the project, we must submit a report that
includes all of the data we gathered.

Internal communication

According to (Novak, 2021)Internal communication occurs when members of an


organization communicate and get information from one another. It is only open to
employees, coworkers, or anyone else who works for the company. Nothing is made
available to the general population.

At the workplace of Hameedia - :

Internal communication is performed at Hameedia to interact among employees


and key team members to learn about their perspectives and also where people
enjoy working, as well as when they can creative regarding workplace situations. The
data is suitable for creating a variety of positive suggestions and determining how to
increase satisfaction in a company.

External communication

According to (Novak, 2021)the exchange of information between a company and


then another entity outside the company is known as external communication. The
information may still be available within the company, but it is aimed at an audience.

At the workplace of Hameedia - :

External communication with stakeholders is being performed throughout the


study. The purpose of the research would be to analyze and fulfill expectations.
Online channels like surveys, questionnaires, mail, what’s app, and Telegram could
be used for external communication. Customers will be able to express their
problems using such communication methods, which are also applied to speed up
communication and better understand customer problems and recommendations.

Annual reports, research reports, budgeting reports, and staff ideas must all be
included. Communication process, or information moving from supervisors to
employees, makes employees feel important as well. We might also add a summary

NILAKSHAN RAJASEKARAN / KBM322111 15 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
of our company's operations, any communication issues, and risk management
approach.

To successfully communicate and maintain good on everyone's work, plans, and


difficulties, we must provide a weekly status report. Weekly status updates allow us
to have less discussions and increase Hameedia workplace communication. The
reports also make it possible for team to focus in an efficient way.

1.10 Project constraint


Project constraints are limitations including risks which may have an impact on the
project's quality, final outcomes, and satisfaction in the workplace. Schedule, scope,
and money are the three key restrictions that most project managers should examine
first. Quality, resources, and risk are all interlinked. (Anon., n.d.)

Time constraint -: Because the project begins with people ordering clothes online,
the organization should choose and buy things alternatively of another customers,
which takes a long time, instead of the clients come to the shop and buying, where
Hameedia delivers the clothes product as quickly as possible, because time is
limited at this point.

Cost constraint-: The project's cost, often defined as the budget, includes all of the
financial resources required to finish the project on time and within the specified
scope. The project budget would really be boosted regarding quality management
due to significant labor and safety considerations. Quality control and additional
labors such as delivery drivers, online customers, and a sales team recruited would
increase the project expense because of quality control and extra labors.

Scope constraint-: To meet the goals and grow sales of the Hameedia delivery, the
company must first obtain permission to delivery within in the pandemic shut downs.
Sales limits will originally be reduced until consumers accept the online ordering
system. Everything would be delivered to the consumer on time.

1.11 The project manager's responsibilities and roles


Project manager-:

According to (Coursera, 2021) , a project manager is a person who manages,


plans, and performs projects while following to budget and scheduling constraints.
Project managers are responsible for directing teams, creating goals, interacting with
stakeholders, and overseeing the project delivery.

Interviewers -: The interviewer is the person responsible with carrying out the
interview that is, presenting the questionnaires asking the questions, listening to and
recording the interviewees' responses in accordance with the rules and regulations
described in this instructions.

NILAKSHAN RAJASEKARAN / KBM322111 16 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Project manager Interviewer

The project manager must learn Interview questions must be connected


everything there is to know about to the study objectives and prepared by
project planning and management. the interviewer.

The project manager must verify that The samples for the interview must be
work is delivered on time. selected by the interviewer.

T
he interviewer should be chosen The interviewer can complete the
carefully by the project manager. samples and make plans for face-to-
face as well as online interviews.

The project manager must create The interviewer must prepare for the
interview questions in order to collect interviews in advance. dates and times
the necessary data for the project's
goals.

Must gather and analyze data, as well The interviewer must deliver the
as correctly arrange data in the interview questions in a straightforward
document and accurate way.

The project document must be printed Unless the interviewee's answer isn't
in the proper manner by the project accurate or straightforward, the
manager. interviewer must receive the suitable
answers right away after making that
clear.

Submissions must be made by the The interviewer must examine the data
deadline. in order to collect correct information
and determine the quality of the
information collected.
Table 2 -The project manager's responsibilities and roles

NILAKSHAN RAJASEKARAN / KBM322111 17 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

TASK 02
Initial Planning

2.1 Work breakdown structure and Gantt chart.


Work breakdown structure
A work breakdown structure (WBS) is a technique that may be applied to determine
what activity needs to be performed to properly generate a product for projects,
programme, and particularly events. The purpose of a work breakdown structure is
to make a complex project more accessible. (University of waterloo, n.d.)

Work breakdown structure

Initiation Planning Collecting Data Analysis Closeout


data

Selecting Background Starting the More data and Prepare the


an research on the research information on the project
organization organization project work pandemic and
current business
permission is
required.

Confirm the Identify the Find more Analyze the data. Changes
organization budget related should be
article made in
according with
the plan.

Develop Identify the risk Prepare Complete the


aims and interview. project
objectives Questions documentation.

Request Set a time to The document


permission to meet and should be
visit. perform the printed
interview. properly.

Submit the
project
Table 3 - Work breakdown structure

NILAKSHAN RAJASEKARAN / KBM322111 18 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Gantt chart
A Gantt chart is a widely used graphical depiction of a project timetable. It's a type of
bar chart that shows the beginning and ending dates of project elements such as
resources, scheduling, and dependencies. The Gantt chart is the most commonly
used chart in project management. These charts are helpful for planning a project
and establishing which activities must be accomplished in what order. Typically, the
chart is presented as a horizontal bar chart. (GRANT, 2021)

The diagram shows which tasks can be completed in parallel and which cannot be
begun or completed until the completion of others. It can support in the detection of
potential obstacles and the identification of tasks that may have been overlooked in
the project schedule. (GRANT, 2021)

Gantt chart of my project

TASK Start date End date Days to


finish

Initiation 01/09/2021 6/09/2021 06 days

Selecting an organization 01/09/2021 02/09/2021 02 days

Confirm the organization 03/09/2021 04/09/2021 02 days

Develop aims and objectives 5/09/2021 6/09/2021 02 days

Planning 7/09/2021 16/09/2021 10 days

Background research on the 8/09/2021 10/09/2021 03 days


organization

Identify the budget 11/09/2021 13/09/2021 03 days

Identify the risk 13/09/2021 15/09/2021 03 days

Request permission to visit. 16/09/2021 16/09/2021 01 days

NILAKSHAN RAJASEKARAN / KBM322111 19 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Collecting data 17/09/2021 31/9/2021 15 days

Starting the research project 17/09/2021 21/09/2021 05 days


work

Find more related article 22/09/2021 26/9/2021 05 days

Prepare interview. Questions 27/09/2021 28/9/2021 02 days

Set a time to meet and perform 29/9/2021 31/9/2021 03 days


the interview.

Data Analysis 1/10/2021 6/10/2021 07 days

More data and information on 1/10/2021 5/10/2021 05 days


the pandemic and current
business permission is required.

Analyze the data. 6/10/2021 7/10/2021 02 days

Closeout 8/10/2021 15/10/2021 08 days

Prepare the project 8/10/2021 9/10/2021 02 days

Changes should be made in 10/10/2021 12/10/2021 03 days


according with the plan.

Complete the project 13/10/2021 13/10/2021 01 days


documentation.

The document should be printed 14/10/2021 14/10/2021 01 days


properly.

Submit the project 15 /10/2021 15/10/2021 01 days

NILAKSHAN RAJASEKARAN / KBM322111 20 | P a g e

Table 4 - Gantt chart of my project


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
2.2 Project milestones
A project milestone is a management tool for identifying a certain point in a project's
timeline. Milestone points can be used to identify the beginning and end of a project,
as well as the conclusion of a key phase of the work. Milestones can be used to
represent anything that has begun or completed, although they are most commonly
used as a scheduling tool.

How this works?

A milestone is an exact moment in the life cycle of a project that is used to track
progress towards to the end goal. Milestones are used in project management to
mark the start or achievement of a project, external evaluations or feedback, budget
checks, the submission of a major deliverable, and so on.

Project milestones of my project


When all of the initiation phases have been performed then the project then
continues on to the planning phase, in which the project management strategy is
worked out, and the project reaches the second milestone. The project reached the
third milestone as we interviewed people and gathered the relevant data necessary
for the research.  When the project analyzes the data and draws a conclusion about
the results, the fourth milestone is completed. In the final milestone the
Project reaches the last milestone when he or she makes a decision with solutions
and communicates such in a research project.

2.3 Change management register


These Change Management Samples include all the key procedures,
documentation, and procedures you'll have to start managing transformation in your
company. The team can use the Modification Register to keep track of how the
change will affect the project. (Anon., n.d.)

The project's tasks were planned to be completed as expected, and no adjustments


were made to the activities.  The main challenge that we will face is determining
when the interview will take place, as there is a difficulty in getting permission to visit
the organization.

2.4 Project control; cost, Quality


Project management and control
The timeline for project management is determined with whether the milestones are
met. Milestones are important because they identify what actions are involved in
project implementation and whether it is on schedule. The goal of this project is to
determine the issues and challenges along the way that the Hameedia organization

NILAKSHAN RAJASEKARAN / KBM322111 21 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
faces. We've created a cost report to track the expenses generated during the
project.

Cost report of my project are as follow,

Date Activities Cost Incurred

18th sep - 20th sep The cost of using the Rs.2700 (Charges for Wi-
internet Fi may be more than
expected.
Tran
17th sep - 18th sep sportation cost Rs.1700( Transportation
cost will be charge in
case of visiting the
organization
25th sep- 30h sep Other expenses Rs.2500

Total Rs.6902

Quality Management
Quality management is the practice of keeping the project operations required to
develop, plan, and execute a project are productive and useful in terms of the goal
and its achievement. Quality control is a never-ending process that begins and
finishes with a project. (Anon., 2021)

Fishbone analysis could be employed as a quality control tool for identifying and
protect expected problems. This strategy help in the rethinking of all possible issues.

Table 5 - Cost report of my project

NILAKSHAN RAJASEKARAN / KBM322111 22 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Problems in data Covid -19 pandemic


collection issues

Social distancing
Transportation
 Find related articles Report on
 Developing exact the
Interview questions . Hameedia
organizatio
 on-time completion Lockdown n's
Language barriers challenges
Of the project and
obstacles.
Problems with time
management Interview issues

Figure 2- Quality Management

2.5 Evaluate tools and techniques in the planning process.


Project managers have the involvement of managing the planning and executing the
project, as well as ensuring that the project's overarching goals, as well as the
project's succeeding tasks and milestones, are all in line with the organizational
objectives.

The Work breakdown structure helped in understanding the overall scope. WBS
also provided in understanding the complete scope and identifying create social, as
well as ensuring that resources were handled properly. This enhanced action
management and timing, as well as expectations for resource intake. The WBS is a
technique for estimating project expenses. It ensures that no important tasks are
ignored. It can help with resource distribution. It gives a tried and true method for
project planning.

Gantt charts helps in the organization of projects, the improvement of entire project
awareness, and the keeping of everyone on task. Managers can also use Gantt
charts to deliver resources and when in which they are needed. They also promote

NILAKSHAN RAJASEKARAN / KBM322111 23 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
project team members to work together. Gantt charts are visual representations of a
task or activity's scheduled time in a simple to understand manner.

Project management is a difficult job with a lot of responsibility. Luckily, various


technologies are available to help in the performance of work and the execution of
responsibilities. Project managers should pick a project management solution that
best matches their management approach greatest.

Quality control and risk management plans are applied to detect any possible
dangers and possible solutions in the event of an issue. This enabled to conduct the
project easily, and altogether different methods were applied when risks developed.

NILAKSHAN RAJASEKARAN / KBM322111 24 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

LO2

Task 03
Market Research

3.1 Background study of research


Market research is the technique of informally interviewing target customers to
determine the usefulness of a new good or service. Market research helps a
business to identify its target market and obtain ideas and other information from
customers regarding actual involvement in a goods or services.

This research will investigate the challenges and obstacles that the Hameedia
organization faces, so that the company is aware of the issues. . The goal of the
study would have been to discover and understand what's really necessary in the
Hameedia organization, as well as the opportunities and drawbacks it faces, and to
determine the difficulties and problems it faces, as well as how it has solved them.
Hameedia has implemented adjustments in the workplace as a leading organization.
So if that country is now within the lockdown, Hameedia enterprises have employees
available continue providing 10-hours of service to their clients. To safeguard the
safety of Hameedia consumers, the company's goods are shipped straight to their
customer’s doorstep, and that they usually supplied inside 10 hours to boost
consumer happiness.

The goal of market research is to examine the market for a specific product or
service in order to determine how the target audience will react. Workers, customers,
and the company all gain from this research, because when the project is completed,
the organization may continue to operate without delay, because if the covid 19
outbreak survives. This included data collection for market segmentation and product
difference that can be used to adjust advertising campaigns or establish which
attributes are considered most important by customers.

3.2 Research objectives and Research questions


Research objectives -:

 To find out what issues that Hameedia Organization had during the Covid 19
pandemic and how they managed them in order to increase awareness, improve
perspectives, and strengthen actions to COVID-19 prevention and control.
 Employees' work placements have been moved as a result of the pandemic, but
work should continue as usual with the support of this organization. And they

NILAKSHAN RAJASEKARAN / KBM322111 25 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
must give recommendations to increase Hameedia's productivity and profit
development.
 To provide positive features and benefits that customers and organizations can
take advantage of during this period from the organization.
 As for technological advancements that support continued work efficiency under
pandemic scenarios, nobody really knows when the virus may finish. As a result,
new technology supports the organization and needs to move forward in order to
maintaining data flow, managing contacts, analyzing operations, and keeping
employee records up to date. Technology allows organization to function more
effectively and successfully.

Research questions -:

1) What challenges did the Hameedia organization have in making such changes,
and how did they overcome them?
2) What are the ideas and thoughts for improving Hameedia in the future?
3) What are the positive things and benefits that customers can enjoy during this
time period?
4) What technical tool improvements have occurred as a result of the pandemic?

3.3 Literature review


According to (McCombes, 2019) A literature review is an examination of scholarly
sources on a particular subject. It gives you a clear view of present understanding,
helping you to recognize relevant ideas, techniques, and research gaps.

According to (Berry, 2021) As a result of COVID-19, the conversation about


employee experience and digital tools has soon turned, going from attracting new
people to allowing and maintaining a totally distributed workforce using purpose skills
and technologies. Successful organizations must prepare for the complete workplace
ecosystem and motivate individuals to manage business operations in the new
distanced workplace.

According to (ONLINE, 2021) with the COVID-19 pandemic in 2020, digital


workplace transformation, which has been on the rise in recent years, will continue.
To keep the business going, companies have to make a major shift to distant work
and radically change established systems to welcome in the workplace. The new
workplace allows for unrestricted connection and increased productivity, as well as
flexible and flexible IT services based on intelligence and efficiency.

According to (Abdullah, 2020) Organizations and employees are faced to long


periods of insecurity as a result of rapid changes in customer demand. Organizations
here have started to make major changes to their staff in order to conform to the
Covid-19 environment. We predict a significant impact on workforce change in the
long run.   To confirm that the workforce is linked to business goals, it examines the

NILAKSHAN RAJASEKARAN / KBM322111 26 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
following major elements: Workforce Policy, Shaping, Scheduling & Monitoring,
Supplying, Employee Experience, Skill & Flexibility, and Analytics Tool.

According to (MILLER, 2020) Many businesses, for example, engaged in employee


tracking system and other advanced capabilities when COVID-induced working
remotely first started, disregarding decades of study on employee management
suggesting that key skills communicates distrust and increases employee
disapproval.

According to (Jr., n.d.) The change of the workplace has also occurred in businesses
may use to improve their plans and results. Combining technology and data
solutions successfully can support employers in addressing these emerging
concerns and managing the dangers that come with them. To successfully manage
the workplace impacts of new technology-related efforts, these concerns must be
identified and planned for from the start. This provides advice that helps business
leaders to anticipate and solve a wide variety of legal, economic, and human
resource concerns.

Employers want much more normal clear rules to address transformation issues.
When specific issues develop in the setting of management reforms, researchers
provide the customers with a clear overview of the situation and advice on how to
analyze the larger major challenges.

Research Methodology
According to (Jansen, 2020) The practical "how" of any certain research study is
referred to as research technique, But basically how a researcher plans a study in a
systematic manner to determine whether the results are accurate and believable and
therefore the research goals and targets are met.

The most important aspects of the research approach are presented. It explains the
research methods needed to conduct the study, as well as the numerous
instruments and approaches needed to collect data in order to come at successful
outcomes. The current study, titled "Challenges and Obstacles Faced in Hameedia
Organization," was performed.

The following are the research goals turned to research questions:

1) What challenges did the Hameedia organization have in making such changes,
and how did they overcome them?
2) What are the ideas and thoughts for improving Hameedia in the future?
3) What are the positive things and benefits that customers can enjoy during this
time period?
4) What technical tool improvements have occurred as a result of the pandemic?

NILAKSHAN RAJASEKARAN / KBM322111 27 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Research method
Methodologies for gathering and evaluating data are known as research methods.
Qualitative and quantitative research methods are two types of research methods.

According to (Streefkerk, 2019) Quantitative research focuses with numbers and


statistics while gathering and analyzing data, whereas qualitative research deals
with words and meanings. Both are necessary for obtaining various types of
information.

Research project managers are in charge of leading research projects that are
aimed to achieve a certain business goal. They are also in charge of analyzing data
analysis activities, verifying acquired data, writing reports, and engaging with various
research stakeholders.

The project manager will perform a small-scale study to gather information on the
issues and obstacles that Hameedia faces. The data for this study was gathered
using a qualitative research method.

Interviews with outstanding questions, written observations, and literature reviews


that investigate concepts and theories are all examples of qualitative techniques. We
can gain a better understanding of people's perceptions, feelings, and perspectives
by using qualitative data. Qualitative analysis will provide a more in-depth look at
situations, allowing us to learn more about people's perspectives and ideas.

3.4 Research strategy


According to (Jenny, 2014) A Research Strategy is a move action plan that guides
the ideas and actions, allowing anyone to do research in a structured and timely
manner to deliver high-quality data and accurate information.

The survey approach was the research strategy I selected for my project. During the
interview, the survey supported us in obtaining data about the behavior and
conditions at one particular moment in time. The results of the survey give
knowledge about the problem. It also improves the analysis of the scenario. Surveys
improve in the measurement of changes, which is why I selected the survey method
for my research. Individual perspectives and experiences can be measured through
surveys. Surveys, when done correctly, provide actual numbers on people's attitudes
and behaviors, which can be utilized to make crucial decisions in workplace.

NILAKSHAN RAJASEKARAN / KBM322111 28 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

3.5 Sampling and data collection tool


Sampling
The practice of making statistical judgments about a selected population is known as
sampling. This new and highly powerful business tool supports inside a better
knowledge of company activities, customer behavior, and quality and availability
management. (Taherdoost, 2020)

There are 2 types of samples in sampling: probability sampling and nonprobability


sampling.

1. Probability sampling

According to (McCombes., 2019) "Probability sampling" relates to the fact that each
and every member of a population does have an equal opportunity of being chosen.
It's mostly employed in quantitative studies. Probability sampling techniques are the
best option for producing results that really are typical of the entire population.

There are 4 types of Probability sampling, they are:

 Simple random sampling


 Systematic sampling
 Stratified sampling
 Cluster sampling
2. Non-Probability sampling

According to (McCombes., 2019) Individuals are chosen depending on non-criteria in


a non-probability sample, but not each person does have an opportunity to be
shown. This sample is quicker to obtain and less expensive, but it does have a
greater threat of sampling. As a result, the population analogies one can draw are
poorer than it is with probability sampling technique, and your findings could be more
restricted.

There are 4 types of Non-Probability sampling, they are:

 Convenience sampling
 Voluntary response sampling
 Purposive sampling
 Snowball sampling

Non-Probability sampling is the method I've chosen for this project. The reason for
choosing probability sampling is that because the samples represent a population

NILAKSHAN RAJASEKARAN / KBM322111 29 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
group, it will be easier to obtain the information needed. Purposive sampling and
convenience sampling were used to choose the nonprobability sample. Purposive
sampling was used to choose the manager of the Hameedia Kandy group. Purposive
sampling is preferred since it eliminates unnecessary data, produces better inquiry
outcomes, and takes little time.

In order to complete this study, I used convenience sampling to recruit 3 senior


managers for my interviews. We will conduct the interviews over business phone in
order to obtain their perspectives on the improvements in the workplace.
Additionally, this will make things possible for me to gain a thorough understanding
of the changes made in the workplace as a result of the Covid-19 pandemic and the
adjustments in work.

Data collection tool


Data collection methods are significant since the technique and analyzing viewpoint
mostly used by the researcher affect how the information obtained is used and
whatever conclusions it might provide. Data collecting allows for the gathering of
greater information. Because after data has been received, testing will take place,
during which the expectations will be debunked and the data will be judged with
explanations.

An interview consists of two parties: an interviewer who directs the chat and asks
questions, and an interviewee that answers to the questions. Structured, semi-
structured, and unstructured interviews are the three types of interviews.
(Easwaramoorthy, n.d.)

The interview method is a research method by where I, as a researcher, ask


questions of the company I'm interviewing and, ideally, receive responses. The
purpose for using an interview as a data gathering planning is because the
interviewer has complete management around the interview questions and can
acquire a thorough understanding of the participant's arguments. This process is
good for improvement and allows for the inclusion of challenges in data analysis.

This helps in gaining a thorough knowledge of data explaining it, next I have
selected questionnaire as our data collection methods because a questionnaire is a
quick and easy approach to get data from a big group of individuals in a short
amount of time. As a result, the questionnaire is necessary to confirm correct data
collection and understandable and useful outcomes. Dichotomous questions
become the type of questionnaire I've chosen for my project. Yes-or-No questions
are a type of dichotomous question. This type of inquiry allows for a simple and rapid
solution. It is simple to make comparisons with others. 

NILAKSHAN RAJASEKARAN / KBM322111 30 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

3.6 Carry out small-scale research by applying qualitative and


quantitative research method as a preliminary step of your
project

For this preliminary investigation, a qualitative research method was chosen. That


project manager would execute a small-scale research and gathering information
about the workplace's problems and potential challenges. Observation as well as
interviews were used in the research. A small and appropriate sample selection is
used most of the time. In order to gather in-depth knowledge and acknowledgment,
qualitative research methods were applied in this study. Face-to-face interviews
allow researchers to obtain a greater understanding of the concepts in order to
perform study on it. During the interview, the survey method supported us in
obtaining data about the behavior and conditions at one particular moment in time.
The results of the survey give knowledge about the problem. It also improves the
analysis of the scenario. Surveys improve in the measurement of changes, which is
why I selected the survey method for my research.

NILAKSHAN RAJASEKARAN / KBM322111 31 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

LO3

Task 04
Project execution and control stage

Data analyzing technique and tools

Qualitative and quantitative data analysis are two types of data analysis methods.
For this preliminary investigation, a qualitative research method was chosen in our
research .Qualitative data is a type of information that identifies attributes or
characteristics. It's gathered through questionnaires, interviews, or observation, and
it's usually presented in story form. The information could be in the form of qualitative
words which can be analyzed for patterns or significance using coding. (Anon., n.d.)
Interviews, notes, video and audio recordings, photographs, and documents all fall
under the category of qualitative data.

The organization must primarily and mainly concentrate on doing and developing
successful market research in order to understanding the nature of the market. The
following step is referred to as the initiation stage. This states that qualitative
research should be conducted before quantitative research, and also therefore the
results of the first can be applied in both.

The survey done in the following part with the purpose of obtaining basic data could
become highly useful for Hameedia's project. During the interview, the survey
method supported us in obtaining data about the behavior and conditions at one
particular moment in time. The results of the survey give knowledge about the
problem. It also improves the analysis of the scenario. Surveys improve in the
measurement of changes, which is why I selected the survey method for my
research. This became related to the reasons that it may be applied to properly
confirm target client wants and expectations, as well as many other customer needs.
This supports in connecting out to an increasing number of customers. The
information gathered was supposed to help in the data analysis. Research Design is
also relevant and appropriate for investigating a separate aspect and its impact on
the company. With concerns of qualitative study, the overview approach was
performed, and were in charge of specific good compared questions.

The project's research method was an interview. The researchers was capable of
learning more about the changeover of the Hameedia organization's workplace
because to the COVID-19 pandemic as a result of this. The total number of
employees in hameedia's workplace is 24.

NILAKSHAN RAJASEKARAN / KBM322111 32 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Because of security reasons, the interview was conducted over the phone. Three
employees from the Hameedia participated in the interview.

Analysis;
1) Objective 1: To identify what obstacles did Hameedia have in
implementing these improvements, and how managed they
manage them.

a. What challenges did the Hameedia organization have in making such


changes, and how did they overcome them?
 Interviewee 1: For Hameedia organizations, this was a year of severe difficulty,
but also of great opportunity. During this tough time, the safety of our personnel is
crucial.  Hameedia personnel are exposed to a variety of health risks. In this
scenario, attempts at distance, greater cleaning, and the provision of protective
clothing were all considered. Furthermore, it is crucial that all critical information,
including critical contact information for all personnel, be kept up to date during
this time.
 Interviewee 2: One of the issues facing Hameedia is determining how to work in
a safe and cost-effective manner. For example, health and safety regulations
make it more difficult to reach the same level of efficiency on the job. Even if
demand rises, sales and earnings may suffer and on the other hand selecting the
incorrect candidate for the business can also have major effects, not only
affecting the happiness of the other of your organization and their involvement,
but also increasing absenteeism, affecting customer support, decreasing
performance, and eventually affecting your income.
 Interviewee 3: There was no danger of COVID-19 transmission because the
company was set up without using any of these necessary safety safeguards.
Since all of the employees were provided their own hand sanitizers, throwaway
hand gloves, cleaned towels, and thin plastic face mask packets, there's no
reason to share, and this form of transfer could be prevented.

According to the interviewee 1, how many challenges did Hameedia face in


making these upgrades, and how did they overcome them? Things don't often go
as expected, therefore it takes a bit of time. Interviewee2 answered, but he
noted that choosing the wrong candidate for the task might have serious results,
like raising absences, impacting customer service, reducing ability, and affecting
earnings. According to Interviewee 3, the situation left him feeling protected and
allowed him manage his distance from everyone else.
b. What services were provided throughout the pandemic, and also how did
they support your work?
 Interviewee 1: Customers are fine with the Hameedia organization's time
constraints. Because the project starts with people ordering clothes online, the

NILAKSHAN RAJASEKARAN / KBM322111 33 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
organization will have to make sure and buy things instead of other customers
that also takes a long time, rather than the clients coming to the shop and buying.
 Interviewee 2: Hameedia needs to deliver the clothing product as early as
necessary and should meet customer demands on time, because time is of the
essence at this moment, and as a manager, we must be responsive in situations
like this, where we cannot be certain that everything will happen on time, so we
must provide safety precautions for the product that customers have ordered.
 Interviewee 3: The Company was concerned about the health and safety of the
personnel, therefore they established shipping and medical check-up services for
everyone. A quick test will be performed if the employee's temperature is
elevated in place to safeguard them, their relatives, and workmates from covid-19
virus.

According to interviewee 1, the company must ensure that it purchases items


rather than relying on other customers. This also takes a long time, as opposed
to customers walking into the store and purchasing them. Interviewee2 directly
responded, stating that Hameedia products must be supplied on schedule, as is
customary. Interviewee 3, The Company must be interested about the
employees' health and safety in the workplaces.

c. What steps does the organization take to reduce staff turnover?


 Interviewee 1: We will supply a variety of supporting advantages to our valued
employees, such as free lunches, additional bonuses, company picnics, and
holiday allowances. Employee turnover is reduced as a result of employees
feeling at comfortable in our workplace. We keep providing them benefits such as
inexpensive lunches, company trips and regular company visits for the relatives,
as well as a pleasant working atmosphere. Laborers are also rewarded with
advancements and acknowledgment.
 Interviewee 2: Employees' progress is reviewed, and they are made suggestions
and reward to help them succeed. We also use job rotation and giving them time
off again to sleep and enjoy. It helps benefitted in overcoming obstacles.
 Interviewee 3: Furthermore, we intend to provide computers for them to use in
their work. These adjustments were beneficial .We weren't allowed to eat lunch
together, so there was no way for us to communicate with one another. That fact
we still have to consider.

According to Interviewee 1 stated that the organization provides a number of


benefits to our qualified employees, whereas Interviewee 2 stated that employee
performance is examined and checked, and therefore that employees are also
received guidance. Employees are motivated by this, and they are occasionally
given time off to enjoy it. Interviewee 3 during the implementation of the COVID-
19 precaution, he took employee ideas into consideration.

NILAKSHAN RAJASEKARAN / KBM322111 34 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

2) Objective 2: To identify the Recommendation for the betterment


of Hameedia organization.
a. What are the ideas and thoughts for improving Hameedia in the future?
 Interviewee 1: I would advise Hameedia to set up a delivery service that includes
high-quality health and safety procedures. As a result of the pandemic, everyone
is in a position where they must take adequate health and safety protections in
order to adapt to experience and increases the potential. As a result, the
customer expects the goods to be delivered in a safe manner, and I recommend
that delivery services be provided within a timely manner.

 Interviewee 2: As we respond to the growing pandemic, keep an eye out for


chances for creativity. We must inform our clients about the new ways we plan to
service them. Some of these improvements may not be required once the
pandemic is ended, but many of them may establish new rules. Think of ways to
create that will continue to be successful and important once things have went
back to normal. We will consider it a point to inform our customers about our
efforts to improve service.

According to Interviewee 1, everyone in a position to respond to learning and


enhance their ability should undertake proper health and safety precautions. Like
a response, the consumer wants the product to be transported safely, and he
suggests that shipping solutions be supplied as soon as possible. Interviewee 2
Changes may not be necessary once the pandemic is over, according to
Interviewee 2, but several of these could set new guidelines. Consider how you
can continue to produce in ways that are both effective and valuable once things
have returned to normal. It must make it a priority to keep our consumers
informed regarding the strategies to correct services.

b. What budget does the organization set out for hiring and training?
 Interviewee 1: We make investments 4% of company pay budgets in
development, which is important since we need to maintain that our employees
are up to date on the current security regulations and production procedures, and
we want to bring better productive methods as time goes forward.
Interviewee 2: We invest 4% of our pay budgets on recruitment and training to
the Hameedia organization , which is important and we'd require to guarantee
that our recruiters are updated on the most recent security situation and
manufacturing practices.
Interviewee 3: We’ve done it successfully, so it gives your staff the knowledge
they need to perform their jobs well and have a good impact on the company. It

NILAKSHAN RAJASEKARAN / KBM322111 35 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
also sure that our new hires are aware of their duties and objectives inside the
company.

c. How did employees' work-life balance during the lockdown be affected by


the working situations provided at home?
 Interviewee 1: Yeah well! While the Covid -19 pandemic, our companies' sales
are down, and managers and employees are frequently working from home to
boost sales. Employees' company can correct their behavior, perspectives,
attitude, and understandings to change has been extremely important. One of the
most difficult challenges has become obtaining a fast and helpful internet
connection. Based on their months of experience working at home, employees
have learnt how to create an appropriate work situation at home. We become
adapted to increased confidence tasks without having to go to a busy job.

 Interviewee 2: Employee happiness is a top priority in the Hameedia


organization. We guarantee them benefits such as free food, company holidays,
and open company attendance for their friends and relatives, as well as a
pleasant working atmosphere. Workers are also rewarded with advancements
and rewards.
 Interviewee 3: Yes, however employees that work more than a kilometer distant
from the workplace were provided the opportunity to work at home. I live 5
kilometers first from workplace, and I had to drive to work.

According to Interviewee 1, they expressed their satisfaction in providing a


welcoming workplace for its employees and supporting their well-being. It also
improved their reduced income since employees want to work in an environment
in which they are recognized and where they can readily express their thoughts
and concerns. Interviewee 2 discussed the organization's benefits for
employees, emphasizing that the company promotes their health, and how
employees are acknowledged and awarded for their achievements.
Interviewee 3 states employees' safety and very well were considered, and
work-from-home options were provided to them when traveling risk was
considered.
3) Objective 3: To identify the favorable aspects and advantages
that consumers and organization can take during this time.

a. What are the positive things and benefits that customers can enjoy during
this time period?
 Interviewee 1: Our Hameedia employees appreciate the opportunity to spend
more time with their families and at home, especially because entire families are
quarantining together. Employees are less stressed now than they were
throughout the outbreak. Because our customers are the most important aspect

NILAKSHAN RAJASEKARAN / KBM322111 36 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
of our business, we provide them with loyalty cards, monthly deals, and other
benefits. As a result of the Covid epidemic, employee benefits have reached new
heights. Employee opportunities have grown as a result of increased job options,
employee migration, job form and employment conditions.

b. Do you think your service would be alright for customers?


 Interviewee 1: Yes, our service is excellent, and we hope that no further
problems develop. However, customers will like the lot of options provided on
online orders. We can locate a wide range of products and brands from a wide
range of sellers in one good place. Customers can view all of the most recent
trends without purchasing a ticket.
Interviewee 2: During covid-19, we have a fantastic opportunity to shop from
Hameedia. Hameedia delivers the clothes product as quickly as possible,
because time is of the essence at this point.
Interviewee 3: Temporarily, we have organized and signed a contract with daraz
service officers to provide transportation to people who place orders with our
company.

According to Interviewee 1 and Interviewee 2, they were impressed with how the
service was provided to customers by hameedia’s. Interviewee 3, giving a daraz
service to customers during this period would be ideal for running our business
as well.
c. How about the communication plan were implemented in order to run this
business?
 Interviewee 1: Our communication plan is simple, the communication plan's goal
is to keep all project team members informed through interviews. Among the
audience members are a lecturer and the manager of Hameedia Apparel Kandy
Branch. We must submit a weekly status report to effectively communicate and
keep track of everyone's work, plans, and challenges. We can have fewer
debates and improve Hameedia workplace communication by providing weekly
status reports. The reports also allow the team to concentrate more effectively.
The instructor, who is a crucial element of completing this project, must
communicate effectively in addition to the support.
 Interviewee 2: Following that, we would deliver a direct knowledge of the project
through a proposal, and as an outcome of this process, we will be able to finish
the work on time. Hameedia must provide regular updates, and we must present
a report at the completion of the project that contains all of the information we
collected.
 Interviewee 3: We can have fewer debates and improve Hameedia workplace
communication by providing weekly status reports. The reports also allow the
team to concentrate more effectively. The instructor, who is a crucial element of
completing this project, must communicate effectively in addition to the support.

NILAKSHAN RAJASEKARAN / KBM322111 37 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

According to Interviewee 1, Interviewee 2, Interviewee 3 in order to


successfully interact and maintain records of everybody's activities, plans, and
obstacles, they should produce a weekly status report. They say that with
delivering weekly progress reports, they may have fewer arguments and better
Hameedia workplace communication. The reports, likewise, allow the group to
focus better and more effectively

4) Objective 4: To identify technical tool improvements have


occurred as a result of the pandemic.

a. How have the physical modifications helped you in your daily activities?
Interviewee 1: "Yes! Working life have improved because many people now work
from home while others engage in a workplace."
Interviewee 2: "Yes! Only with pandemic, we've had to deal with a lot of adjustments
and problems, and functioning from home between several commitments has
become a problem for me as a Hameedia back-office manager."
Interviewee 3: "Yes! Acting as a customer service representative at Hameedia, I
found it simpler could engage with consumers in the beginning compared it is now
that I am interacting with covid."
According to Interviewee 1, Interviewee 2 and Interviewee 3, The COVID-19
pandemic had caused significant changes in everyday life and in business. Some
people find it uncomfortable, while others find it acceptable. Employees at Hameedia
have expressed their dissatisfaction with the situation. Some people are much less
adjusted to quick shifts, but some will dislike them. Lockdowns and restrictions put
on the consumers by countries to safeguard their protection have decreased every
day is go for work, and human connection with close ones.
b. What are the most effective methods/tools used for improving the
workplace?
Interviewee 1: The survey conducted with the goal of gathering basic data could be
extremely beneficial to Hameedia's project. The survey method greatly helped us in
getting data regarding the behavior and circumstances at a certain point in time
during the interview. Surveys are better at measuring changes, which is why I chose
the survey method for my study. This facilitates in reaching out to a larger customer
base. 

NILAKSHAN RAJASEKARAN / KBM322111 38 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Interviewee 2: On the hand we have selected to use a qualitative research method.
That project manager will conduct a small-scale investigation and collect data on the
workplace's difficulties and related issues. The investigation included both
observation and interviews. The majority of the instances, a small and acceptable
sample selection is chosen. Qualitative research methodologies were used in this
project to gain in-depth information and acknowledgement. 
Interviewee 3: Gantt charts are helpful for project planning. They support you in
identifying how duration of each activity, identifying the resources required, and
planning the order in which activities and tasks will be completed. WBS allows
workers to be given to particular tasks. It requires the project manager, teammates,
and customer base to describe the methods necessary to develop and deliver the
product in hameedia’s.

According to Interviewee 1, the survey supports researchers in gaining a huge


amount of information in a short time. This was quite helpful in gathering information
on the behavior and conditions at a certain moment in the interview. Changes can be
measured more accurately through surveys. Individual facts, attitudes, recent
activities, and opinions can all be collected through surveys. Interviewee 2 responds
that qualitative research wants to give important data used in product development,
such as information on consumer demands, ways of behaving, and use scenarios.
Many of these methods has advantages and disadvantages, and they can all benefit
from being combined. Interviewee 3 responds how WBS and grant charts
implemented during covid -19 to hameedia’s organization.

c. What impact does technology have on the business?

Interviewee 1: Our organization is heavily technically advanced. Because of the


growth of innovative technology, our company has taken on a new aspect.
Customers are extremely focused with specific advancements, as well as we are
always in the time continued of home step delivering in the upcoming years, for
example, the impact of online transactions just on existing consumers or even the
website visits has become a huge element of the impacts of technology. 

Interviewee 2: All enterprises will be affected by technological development.


Adjustments in basic functional areas will be forced by technological change.
Management will be held more accountable for the organization's results, putting a
greater plan into place, judgment, govern, and communication.

Interviewee 3: “yes well! The impact of technology on Hameedia has significantly


improved given the pace at which goods or services are sold, including both
production and communication. Because of technological advancements in the
workplace, employees have grown more productive than ever before during this
pandemic. Which used to take a lot of time, can now be completed in minutes.”

NILAKSHAN RAJASEKARAN / KBM322111 39 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
According to Interviewees 1, Interviewee 2 and Interviewee 3 simply state as
lacking technology, businesses will probably likely fail to reach everything that has to
be done. Therefore, Technology is used by hameedia’s to improve company
communication, manufacturing, stock control, and record keeping.

Conclusion and recommendation


As I have mentioned above, for Hameedia organizations, this was a year of severe
difficulty, but also of great opportunity. The company has been using a variety of
methods and approaches to build successful processes. Working from home offers
both benefits and drawbacks to employees. When an employee works from home,
and they are no longer isolated areas. It's possible that the current pandemic would
make an impact on how we operate in the future. Employees' perspectives and
interests about workplace flexibility and the distribution of duties for the future were
affected by their mostly positive experiences with home working during this time.
Employees are always looking for non-monetary rewards that help them succeed
while also helping them save money, thus the motivation methods used are
excellent. For example, we also supply them with loyalty cards, monthly promotions,
and other advantages. Employee benefits have risen to greater levels as a result of
the Covid outbreak. As a result of growing job possibilities, employee migration, job
forms, and employment conditions, employee opportunities have grown.

In case consideration for each picked tool is presented in order to acquire good
findings from analysis to this research project. The use of both qualitative and
quantitative research methods leads to a greater information about the research
target. We've decided to conduct our investigation in a qualitative manner. In order to
improve the workplace, that project manager must perform a research study and
collect data about the workplace's troubles and issues involving. Observation and
interviews were both used in the inquiry. In the majority of situations, a reasonable
and suitable sample size is chosen. In order to obtain in-depth data and
appreciation, qualitative research approaches were applied in this study.

However the organization has a strategy in place to ensure that employees are
capable of completing their responsibilities without difficulty. The researcher believes
that Hameedia organization should investigate further. More solutions are needed
because the product needs equally skilled labor personnel. More steps should be
taken by the company to address the issues. Employees generally choose to
perform duties for and they are also properly prepared and have a strong interest,
thus the researcher believes with the selected samples that supplying them with
better appropriate role will help them execute their tasks better happily and boost
profitability.

NILAKSHAN RAJASEKARAN / KBM322111 40 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
We hope that the recommendation and the chosen tool, along with the changes we
made during COVID 19, will assist the Hameedia organization in a better way than it
has been handled in the past.

LO4

Task 05
Project closure

Reflection on the report

a. The Lessons Learned from the Preliminary Research


I'd want to express my gratitude to my lecturer, MS. Samoo, who allowing me to
undertake preliminary research. She helped myself across the project by providing
me inspiration, making comments, and correcting any problems. The specific goal
defined by Hameedia can allow us to better understand the social, environment, and
economic impacts which would being placed on the organization in order to conduct
its commercial operations properly.

The assignment greatly supported me in identifying my skills and weaknesses, as


well as developing myself to conquer obstacles in general. Many of the faults that
occurred during this assignment will serve as useful lessons for my profession path. I
learned a lot about doing interviews and creating interview questions, and I acquired
a strong belief by performing the interview alone. While working on the project, I
faced certain difficulties, which happily my lecturer supported me with completely
overcome.

b. The learning of using quality research method


For review each area of the research investigation, an appropriate methodological
tool is used. Explanation against the other picked tool is presented in order to
achieve great findings from analysis. The nature of qualitative research study leads
to a better perception between research followers. The high-quality research strategy
I followed for my research proved to be quite beneficial to me during the process. I
selected to gather data through the qualitative method only with support of the
assessor because it is the best appropriate way for this assignment. Since it being
my first all go an interviewing, I was really stressed during the process. I were

NILAKSHAN RAJASEKARAN / KBM322111 41 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
managed to receive positive comments from the workers by doing the questionnaire
and interviews that proved truly beneficial to my project. After collecting the data, I
began studying it to confirm that the project's goals were met. I were prepared to
complete the project's goals and achieve my results inside the required format, along
with suggestions. I was indeed allowed to create a connections between staff and
customers, including way they communicate with one another as how personnel
support as concern for their clients.

c. Personal Reflection
The business management school I took at the British College of Applied Studies in
Kandy provided me with an absolutely clean motivation and development
perspective. I have gained a great deal of knowledge. I was concerned about
conducting this preliminary research at first. It can be investigated in addition to
making a research study more effective, and planned procedures and frameworks
are established within the project. The entire research is focused on the research's
declared objectives and goals. During this pandemic, a research project gave me
with an extremely demanding and exciting experience. By conducting this research, I
was ready to get back to improving my technical writing learning skills how and
where to effectively manage a project.

I realized that I needed to strengthen my work management skills and perform my


research in a much better organized manner in order to avoid any problems. From
now I’ll keep in mind I have a clear strategy in place, don't delay, and work on
exchanging ideas. My parents and sister, on the other hand, supported me in
properly overcoming these difficulties. Unless the interview was already over, I was
shocked that I had made it, that I had handled the situation well, and how I had
properly conducted a business interview. The interview is that more interesting and
risky aspect of the entire project. At first, I was afraid and worried. Making an
interviewing date is not the most difficult part. Preparing a questionnaire, on the other
hand, was the most difficult task. However, with the support from my lecturer and
classmates, I was managed to make a better questionnaire that allowed me to
collect condition that leads for my project.

Time managing is an important area of the project, and completing work allowed me
understand regarding arranging and actions, cost management, and working within
deadlines. By completing this report, I managed to understand quickly and in
scheduled. I realized that in order to avoid problems, I needed to enhance my time
management skills including doing my research in a much more arranged style. By
completing this assignment, I understood that my information gained is insufficient to
conduct research, I need some more practical experience.

NILAKSHAN RAJASEKARAN / KBM322111 42 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
I'd like to mention that every single task in this project took me one and a half months
to finish. I'm excited and grateful that I completed my project on schedule and in
keeping with the requirements. I was interested in determining my abilities and
drawbacks as a result of this research. I must also note that the lessons I learned
from this research project are useful. So, with this project management experience, I
would be qualified to perform many more projects similar in the future without even
getting concerned or besides myself, because it had allowed me increase my trust,
and my lecturer's amazing advice seems to have been important in finishing this task
on deadline. It gave me more personality. This assignment provided me with an
excellent aim to display my faults. And now I'm going to concentrate on my faults and
work on those. It will boost my confidence in my ability to achieve things in future.

References
Abdullah, N., 2020. The importance of workforce transformation during Covid-19. [Online]
Available at: https://home.kpmg/sa/en/home/insights/2020/05/the-importance-of-workforce-
transformation-during-covid-19.html
[Accessed 10 october 2021].

Anon., 2021. Project Quality Management. [Online]


Available at: https://www.workfront.com/project-management/knowledge-areas/quality-
management
[Accessed 11 November 2021].

Anon., n.d. Change Management Templates. [Online]


Available at: https://www.method123.com/change-management-kit.php
[Accessed 5 october 2021].

Anon., n.d. Qualitative vs. Quantitative Data. [Online]


Available at: https://libguides.macalester.edu/c.php?g=527786&p=3608639
[Accessed 29 september 2021].

Anon., n.d. Scope Planning. [Online]


Available at: https://opentextbc.ca/projectmanagement/chapter/chapter-9-scope-planning-project-
management/
[Accessed 8 Novemeber 2021].

Anon., n.d. WHAT ARE PROJECT CONSTRAINTS? SIX YOU NEED TO KNOW. [Online]
Available at: https://insightspotter.com/what-are-project-constraints/
[Accessed 5 October 2021].

Bernad, 2003. International Journal of Management and Economics. [Online]


Available at: http://www.managementjournals.net/article/view/7/1-2-11
[Accessed 18 September 2021].

NILAKSHAN RAJASEKARAN / KBM322111 43 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Berry, D., 2021. Workplace transformation in the wake of COVID-19. [Online]
Available at: https://advisory.kpmg.us/articles/2020/workplace-transformation-covid-19.html
[Accessed 10 October 2021].

Chappell, E., 2020. 10 Handy Project Management Templates (2021). [Online]


Available at: https://clickup.com/blog/project-management-template/
[Accessed 10 November 2021].

Cohen, E., 2019. Project Management Methodologies. [Online]


Available at: https://www.workamajig.com/blog/project-management-methodologies
[Accessed 5 october 2021].

Coursera, 2021. What Is a Project Manager? A Career Guide. [Online]


Available at: https://www.coursera.org/articles/what-is-project-manager
[Accessed 11 Novemebr 2021].

Definition from APM Body of Knowledge 7th edition , n.d. What is a business case?. [Online]
Available at: https://www.apm.org.uk/resources/what-is-project-management/what-is-a-business-
case/
[Accessed 5 october 2021].

Easwaramoorthy, M., n.d. INTERVIEWING FOR RESEARCH. [Online]


Available at:
http://sectorsource.ca/sites/default/files/resources/files/tipsheet6_interviewing_for_research_en_0
.pdf
[Accessed 20 September 2021].

Gold, B. &., 2007. International Journal of Management and Economics. [Online]


Available at: http://www.managementjournals.net/article/view/7/1-2-11
[Accessed 18 September 2021].

GRANT, M., 2021. Gantt Chart. [Online]


Available at: https://www.investopedia.com/terms/g/gantt-chart.asp
[Accessed 5 October 2021].

Jansen, D., 2020. What (Exactly) Is Research Methodology?. [Online]


Available at: https://gradcoach.com/what-is-research-methodology/
[Accessed 18 September 2021].

Jenny, 2014. Phase #2: Clearly Define Your Research Strategy. [Online]
Available at: https://www.mackenziecorp.com/phase-2-clearly-define-research-strategy/
[Accessed 19 September 2021].

Jr., M. A. C., n.d. Global Workplace Transformation Initiative. [Online]


Available at: https://www.littler.com/innovation/global-workplace-transformation-initiative
[Accessed October 2021].

NILAKSHAN RAJASEKARAN / KBM322111 44 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Lutkevich, B., 2021. What is project scope?. [Online]
Available at: https://searchcio.techtarget.com/definition/project-scope
[Accessed 8 November 2021].

McCombes., S., 2019. An introduction to sampling methods. [Online]


Available at: https://www.scribbr.com/methodology/sampling-methods/#:~:text=Probability
%20sampling%20means%20that%20every%20member%20of%20the%20target%20population,being
%20included%20in%20the%20sample.&text=In%20non%2Dprobability%20sampling%2C%20the,a
%20chance%20of%20b
[Accessed 5 October 2021].

McCombes, S., 2019. How to write a literature review. [Online]


Available at: https://www.scribbr.com/category/dissertation/
[Accessed 18 September 2021].

MILLER, J., 2020. 3 ways the pandemic could change our workplaces for the better. [Online]
Available at: https://www.fastcompany.com/90527607/3-ways-the-pandemic-could-change-our-
workplaces-for-the-better
[Accessed 10 October 2021].

Mueller, P. a., 1986. International Journal of Management and Economics. [Online]


Available at: http://www.managementjournals.net/article/view/7/1-2-11
[Accessed 18 September 2021].

Nawaz, 2009. International Journal of Management and Economics. [Online]


Available at: http://www.managementjournals.net/article/view/7/1-2-11
[Accessed 18 September 2021].

Novak, M. C., 2021. The Difference Between Internal and External Communication (+Examples).
[Online]
Available at: https://learn.g2.com/internal-and-external-communication
[Accessed 9 Novemeber 2021].

O'Connor, S. W., 2020. The Project Risk Management Process | 5 Tips for Success. [Online]
Available at: https://www.northeastern.edu/graduate/blog/project-risk-management/
[Accessed 5 October 2021].

ONLINE, D., 2021. COVID-19 brought workplace transformation and digitization to the fore. [Online]
Available at: https://www.dqindia.com/covid-19-brought-workplace-transformation-digitization-
fore/
[Accessed 10 october 2021].

Streefkerk, R., 2019. Qualitative vs. quantitative research. [Online]


Available at: https://www.scribbr.com/methodology/qualitative-quantitative-research/#:~:text=and
%20qualitative%20methods%3F-,Quantitative%20research%20deals%20with%20numbers%20and
%20statistics%2C%20while%20qualitative,deals%20with%20words%20and%20meanings.&text=In

NILAKSHAN RAJASEKARAN / KBM322111 45 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
%20mi
[Accessed 19 September 2021].

Taherdoost, H., 2020. Sampling Methods in Research Methodology; How to Choose a Sampling
Technique for Research. [Online]
Available at: https://hal.archives-ouvertes.fr/hal-02546796/document
[Accessed 20 September 2021].

TechTarget Contributor, 2015. communication plan. [Online]


Available at: https://whatis.techtarget.com/definition/communication-plan
[Accessed 5 October 2021].

TIT, M., 2019. What is Kanban?. [Online]


Available at: https://www.paymoapp.com/blog/what-is-kanban/
[Accessed 5 October 2021].

University of waterloo, n.d. IST PROJECT MANAGEMENT OFFICE. [Online]


Available at: https://uwaterloo.ca/ist-project-management-office/methodologies/project-
management/planning/work-breakdown-structure/wbs-benefits
[Accessed 9 Novemeber 2021].

NILAKSHAN RAJASEKARAN / KBM322111 46 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Appendix 1
1. What challenges did the Hameedia organization have in making such changes,
and how did they overcome them?
2. What services were provided throughout the pandemic, and also how did they
support your work?
3. What steps does the organization take to reduce staff turnover?
4. What are the ideas and thoughts for improving Hameedia in the future?
5. What budget does the organization set out for hiring and training?
6. How did employees' work-life balance during the lockdown be affected by the
working situations provided at home?
7. What are the positive things and benefits that customers can enjoy during this
time period?
8. Do you think your service would be alright for customers
9. How about the communication plan were implemented in order to run this
business?
10. How have the physical modifications helped you in your daily activities?
11. What are the most effective methods/tools used for improving the workplace?
12. What impact does technology have on the business?

NILAKSHAN RAJASEKARAN / KBM322111 47 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

3.7 Project Template to be filled weekly


According to (Chappell, 2020)A project management template is a blank sheet with
placeholders for various project operations, such as project planning. Setting
objectives. Creating work schedules is a common task. Keeping track of expenses.
When it comes to generating new projects, project management templates can save
a project manager a lot of time. The template saves them time and effort because
they shouldn't have to start fresh

Week 01
Name: NILAKSHAN RAJASEKARAN
Project title: Transformation in workplace of Hameedia organization due to covid – 19
pandemic
Date: 01/09/2021 – 07/09/2021 (first week)
Update on weekly research/tasks achieved

Points to consider:
What have you completed?
 I've finished the report of task 01
Did you fulfil task requirements?
 Yes.
Are you on track and within deadlines set?
 Yes.
Did you need to make any changes to your project management plan?
There have been no changes.
Any risks and/or issues identified?

Points to consider:
Did you identify risks/issues with a lack of skills required for undertaking research/tasks?
 No
Did you identify any additional risks/issues that have an impact on the project management plan?
 No

NILAKSHAN RAJASEKARAN / KBM322111 48 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Problems encountered

Points to consider:
What barriers did you
face?
 Travel restrictions
have been set as a
result of the covid
pandemic.
How did you overcome
them?
 I was able to
complete the work on
time as planned
New ideas and change of project direction
No

What have I learnt about myself this week?

Points to consider:
How did I feel when I had to deal with
tasks/problems?
 I was a little nervous, but anyhow, the tasks
that I had planned to complete in the project
were completed accurately.
Did I find it useful to complete the tasks?
 yes
How well have I performed? What did I
contribute?
 I had prepared properly because I related to
the project by correcting the section of the
project that was incorrect according to the
study.

What can I improve on next week?


 Next week, I'll be able to work more
efficiently than I did previously.
How might this learning apply in the future?
 Working effectively is important so that I may develop my time management skills, which will
raise my performance. It also allows me to complete more important tasks quickly and easily.
Tasks planned for next week

NILAKSHAN RAJASEKARAN / KBM322111 49 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Points to consider:
Which tasks are priority?
 nothing the important changes that have occurred inside the company
Have you set aside sufficient time for completion?
Yes. Weekly, I set a target for myself to complete specific activities, and each day, I search to
see if the daily activity is successfully completed.
Project plan status to
date (on, ahead,
behind)
 on
Supervisor comments to address
 Must focus on research activity.

Table 6 - Week 01

NILAKSHAN RAJASEKARAN / KBM322111 50 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Week 02
Name: NILAKSHAN RAJASEKARAN
Project title: Transformation in workplace of Hameedia organization due to covid – 19
pandemic

Date: 08/09/2021 – 14/09/2021 (second week)


Update on weekly research/tasks achieved

Points to consider:
What have you completed?
I've finished the report of task 02
Did you fulfil task requirements?
 Yes.
Are you on track and within deadlines set?
 Yes.
Did you need to make any changes to your project management plan?
There have been no changes.
Any risks and/or issues identified?

Points to consider:
Did you identify risks/issues with a lack of skills required for undertaking research/tasks?
 No
Did you identify any additional risks/issues that have an impact on the project management
plan?
 No
Problems encountered

Points to consider:
What barriers did you
face?
Unexpectedly, planning
has gone wrong.
How did you overcome
them?
 I was able to
complete the work on
time as planned
New ideas and change of project direction
No

NILAKSHAN RAJASEKARAN / KBM322111 51 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
What have I learnt about myself this week?

Points to consider:
How did I feel when I had to deal with
tasks/problems?
 I felt ok but had some issues with Identify
the budget 
Did I find it useful to complete the tasks?
 yes
How well have I performed? What did I
contribute?
 I have actually prepared since I was able to
connect to the project by fixing the area of
the project.

What can I improve on next week?


 Next week, I'll be able to improve my
communication.
How might this learning apply in the future?
 Because communication is such a vital aspect, I can learn how to communicate effectively in
order to reduce miscommunication.
Tasks planned for next week

Points to consider:
Which tasks are priority?
 locating the organization's key players
Have you set aside sufficient time for completion?
Yes. Weekly, I set a target for myself to complete specific activities, and each day, I search to
see if the daily activity is successfully completed.
Project plan status to
date (on, ahead,
behind)
 on
Supervisor comments to address
 Must focus on planning and research activity

NILAKSHAN RAJASEKARAN / KBM322111 52 | P a g e

Table 7 - Week 02
Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Week 03
Name: NILAKSHAN RAJASEKARAN
Project title: Transformation in workplace of Hameedia organization due to covid – 19
pandemic

Date: 15/09/2021 – 21/09/2021 (3rd week)


Update on weekly research/tasks achieved

Points to consider:
What have you completed?
I've finished the report of task 03
Did you fulfil task requirements?
 Yes.
Are you on track and within deadlines set?
 Yes.
Did you need to make any changes to your project management plan?
There have been no changes.
Any risks and/or issues identified?
Points to consider:
Did you identify risks/issues with a lack of skills required for undertaking research/tasks?
 No
Did you identify any additional risks/issues that have an impact on the project management plan?
 No
Problems encountered

Points to consider:
What barriers did you
face?
 The covid pandemic
caused a delay in
finding more related
articles and preparing
for interviews.
How did you overcome
them?
 I was able to handle in
collecting data in the
next day as we’ve
planned
New ideas and change of project direction
No

NILAKSHAN RAJASEKARAN / KBM322111 53 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
What have I learnt about myself this week?

Points to consider:
How did I feel when I had to deal with
tasks/problems?
 I felt ok but had some issues collecting data
Did I find it useful to complete the tasks?
 yes
How well have I performed? What did I
contribute?
 I have actually prepared since I was able to
connect to the project by fixing the area of
the project.

What can I improve on next week?


 Next week, I'll be able to improve my
decision making process.
How might this learning apply in the future?
 Decision making is important, I can learn how make decision making better in order to reduce
mistakes.
Tasks planned for next week

Points to consider:
Which tasks are priority?
 nothing the important changes that have occurred inside the company
Have you set aside sufficient time for completion?
Yes. Weekly, I set a target for myself to complete specific activities, and each day, I search to
see if the daily activity is successfully completed.
Project plan status to
date (on, ahead,
behind)
 on
Supervisor comments to address
 Must focus on decision making process in order to correcting the collecting data activity on
project.

NILAKSHAN RAJASEKARAN / KBM322111 54 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Week 04
Name: NILAKSHAN RAJASEKARAN
Project title: Transformation in workplace of Hameedia organization due to covid – 19
pandemic

Table 8 -- Week 03

NILAKSHAN RAJASEKARAN / KBM322111 55 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Date: 22/09/2021 – 28/09/2021 (4th week)
Update on weekly research/tasks achieved

Points to consider:
What have you completed?
I've finished the report of task 03
Did you fulfil task requirements?
 Yes.
Are you on track and within deadlines set?
 Yes.
Did you need to make any changes to your project management plan?
There have been no changes.
Any risks and/or issues identified?

Points to consider:
Did you identify risks/issues with a lack of skills required for undertaking research/tasks?
 No
Did you identify any additional risks/issues that have an impact on the project management
plan?
 No
Problems encountered

Points to consider:
What barriers did you
face?
 More information
and data on the
pandemic, as well as
current business
permission, are
needed as soon at
that period.
How did you overcome
them?
 Through phone
calls and data
analysis, I was able
to plan the interview.
New ideas and change of project direction
No

NILAKSHAN RAJASEKARAN / KBM322111 56 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

What have I learnt about myself this week?

Points to consider:
How did I feel when I had to deal with
tasks/problems?
 I was a little worried, but in the end, the
project duties that I had planned to perform
were completed correctly.
Did I find it useful to complete the tasks?
 yes
How well have I performed? What did I
contribute?
 I have actually prepared since I was able to
connect to the project by fixing the area of
the project.

What can I improve on next week?


 Next week, I'll be able to improve my
decision making process.
How might this learning apply in the future?
 In order to fix the project, it is necessary to concentrate on the time management method. It
eliminates delay by ensuring that we are well-versed in the activities on to-do list and when it
must be performed.
Tasks planned for next week

Points to consider:
Which tasks are priority?
 nothing the important changes that have occurred inside the company
Have you set aside sufficient time for completion?
Yes. Weekly, I set a target for myself to complete specific activities, and each day, I search to
see if the daily activity is successfully completed.
Project plan status to
date (on, ahead,
behind)
 on
Supervisor comments to address
 Must focus on Time management process.

NILAKSHAN RAJASEKARAN / KBM322111 57 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
Table 9 - Week 04

Week 05
Name: NILAKSHAN RAJASEKARAN
Project title: Transformation in workplace of Hameedia organization due to covid – 19
pandemic

Date: 28/09/2021 – 03/10/2021 (5th week)


Update on weekly research/tasks achieved

Points to consider:
What have you completed?
I've finished the report of task 04
Did you fulfil task requirements?
 Yes.
Are you on track and within deadlines set?
 Yes.
Did you need to make any changes to your project management plan?
There have been no changes.
Any risks and/or issues identified?

Points to consider:
Did you identify risks/issues with a lack of skills required for undertaking research/tasks?
 No
Did you identify any additional risks/issues that have an impact on the project management
plan?
 No
Problems encountered

Points to consider:
What barriers did you
face?
 Because of ongoing
restrictions, I was not
able to travel.
How did you overcome
them?
 Through phone
calls, I was able to
plan the interview.
New ideas and change of project direction
No

NILAKSHAN RAJASEKARAN / KBM322111 58 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

What have I learnt about myself this week?

Points to consider:
How did I feel when I had to deal with
tasks/problems?
 I was a little worried, but in the end, the
project duties that I had planned to perform
were completed correctly.
Did I find it useful to complete the tasks?
 yes
How well have I performed? What did I
contribute?
 I have actually prepared since I was able to
connect to the project by fixing the area of
the project.

What can I improve on next week?


 Next week, I’ll have to learn how should able
to manage the interview through phone with
the facilities we had.
How might this learning apply in the future?
 These types of difficulties will be beneficial in the future because planning an interview over
the phone and collecting data online is difficult.
Tasks planned for next week

Points to consider:
Which tasks are priority?
 nothing the important changes that have occurred inside the company
Have you set aside sufficient time for completion?
Yes. Weekly, I set a target for myself to complete specific activities, and each day, I search to
see if the daily activity is successfully completed.
Project plan status to
date (on, ahead,
behind)
 on
Supervisor comments to address
 Must focus on challenging activities like managing interviews through phone calls

NILAKSHAN RAJASEKARAN / KBM322111 59 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

Table 10 - Week 05

Week 06
Name: NILAKSHAN RAJASEKARAN
Project title: Transformation in workplace of Hameedia organization due to covid – 19
pandemic

Date: 04/10/2021 – 15/10/2021 (6th week)


Update on weekly research/tasks achieved

Points to consider:
What have you completed?
I've finished the report of task 05
Did you fulfil task requirements?
 Yes.
Are you on track and within deadlines set?
 Yes.
Did you need to make any changes to your project management plan?
There have been no changes.
Any risks and/or issues identified?

Points to consider:
Did you identify risks/issues with a lack of skills required for undertaking research/tasks?
 No
Did you identify any additional risks/issues that have an impact on the project management
plan?
 No
Problems encountered

Points to consider:
What barriers did you
face?
I didn’t face any kind of
barriers.
How did you overcome
them?
-
New ideas and change of project direction
No

NILAKSHAN RAJASEKARAN / KBM322111 60 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33
What have I learnt about myself this week?

Points to consider:
How did I feel when I had to deal with
tasks/problems?
 I was a little worried, but in the end, the
project duties that I had planned to perform
were completed correctly.
Did I find it useful to complete the tasks?
 yes
How well have I performed? What did I
contribute?
 I have actually prepared since I was able to
connect to the project by fixing the area of
the project.

What can I improve on next week?


How might this learning apply in the future?

Tasks planned for next week

Points to consider:
Which tasks are priority?
 nothing the important changes that have occurred inside the company
Have you set aside sufficient time for completion?
Yes. Weekly, I set a target for myself to complete specific activities, and each day, I search to
see if the daily activity is successfully completed.
Project plan status to
date (on, ahead,
behind)
 on
Supervisor comments to address
 Closeout must be handled, as well as project preparation on time.

Table 11 - Week 06

NILAKSHAN RAJASEKARAN / KBM322111 61 | P a g e


Unit 06 / MANAGING SUCCESSFUL BUSINESS
PROJECT
(MSBP)
BM 33

NILAKSHAN RAJASEKARAN / KBM322111 62 | P a g e