This document is a permit to work that outlines the requirements and safety precautions for a forklift to perform loading and unloading activities at the GPP4 water system. Key details include:
- The work is scheduled from June 11-17, 2023 and involves a forklift entering the GPP4 site.
- Hazards include falling, noise, ergonomics, and rotating equipment. Personal protective equipment like safety glasses and gloves must be worn.
- Supporting documents include a job hazard analysis and vehicle entry certificate.
- Precautions require barricading, securing tools, notifying parties, and covering drains.
- Gas tests found oxygen, flammable gases, hydrogen
This document is a permit to work that outlines the requirements and safety precautions for a forklift to perform loading and unloading activities at the GPP4 water system. Key details include:
- The work is scheduled from June 11-17, 2023 and involves a forklift entering the GPP4 site.
- Hazards include falling, noise, ergonomics, and rotating equipment. Personal protective equipment like safety glasses and gloves must be worn.
- Supporting documents include a job hazard analysis and vehicle entry certificate.
- Precautions require barricading, securing tools, notifying parties, and covering drains.
- Gas tests found oxygen, flammable gases, hydrogen
This document is a permit to work that outlines the requirements and safety precautions for a forklift to perform loading and unloading activities at the GPP4 water system. Key details include:
- The work is scheduled from June 11-17, 2023 and involves a forklift entering the GPP4 site.
- Hazards include falling, noise, ergonomics, and rotating equipment. Personal protective equipment like safety glasses and gloves must be worn.
- Supporting documents include a job hazard analysis and vehicle entry certificate.
- Precautions require barricading, securing tools, notifying parties, and covering drains.
- Gas tests found oxygen, flammable gases, hydrogen
This document is a permit to work that outlines the requirements and safety precautions for a forklift to perform loading and unloading activities at the GPP4 water system. Key details include:
- The work is scheduled from June 11-17, 2023 and involves a forklift entering the GPP4 site.
- Hazards include falling, noise, ergonomics, and rotating equipment. Personal protective equipment like safety glasses and gloves must be worn.
- Supporting documents include a job hazard analysis and vehicle entry certificate.
- Precautions require barricading, securing tools, notifying parties, and covering drains.
- Gas tests found oxygen, flammable gases, hydrogen
NO WORK IS SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY
SECTION 1 - REQUISITION HOT WORK CERTIFICATE CONFINED SPACE ENTRY CERTIFICATE
Applicant's Name: M Farid Amin Mohamad Department/Company: PETRONAS Gas Berhad AREA CLASSIFICATIONS CONDITIONS TO BE IMPLEMENTED BY RECEIVING AUTHORITY / WORK LEADER Nalawi Safe Zone 2 Staff No/IC No: 1064787 Location/Facility: GPK-GPP4 Equipment No: Q4-711A Area: WATER SYSTEM Vehicle Entry Into The Operating Unit Fire Extinguisher S.No Name Spark Arrestor Work Description: Planned Start Date: 11 Jun 2023 Locate Spark producing equipment GPP4-MMSSB-Q4-711A- Vehicle entry for forklift to loading/unloading activity (VE CERT will be attach Expected End Date: 17 Jun 2023 away from sewer/trench/pipe rack later) Cover Sewer/Drain/Sump I have personally checked that all control measures to prevent release of hazard have been put in place
S.No Name Combustible
RA Name: Mohd Afandi B Ahmad Before Work Start SECTION 2 - HAZARDS/HAZARDOUS ACTIVITIES After Break Toxic Falling Noise Ergonomic Hand Tools Rotating Equipment Before Work Start Loading/Unloading After Break Others: Every 4 Hours SECTION 3: PERSONAL PROTECTION EQUIPMENT Oxygen Before Work Start Other Specify: Please Gen purpose gloves After Break Safety Glass follow JHA and HSE Dust Mask/ Pre-filter Ear muff Cotton Gloves Every 4 Hours Safety Helmet requirement (N95) Ear plugs Coverall Special precautions: Follow JHA & safety requirements Other Specify: Please follow JHA and HSE This permit is approved provided the above conditions and precautions are requirement implemented
Safety Shoes/Boot Seat Belt APPROVING AUTHORITY APPROVING AUTHORITY
Other Specify: Please follow JHA and HSE Name: Syamsul Anuar B M Sidik Name: requirement Department: Gas Processing Designation: Department: Designation: Special Precautions: Kerteh Date: Date: 09 Jun 2023 SECTION 4 – SUPPORTING CERTIFICATES / DOCUMENT GAS TEST RESULTS Vehicle Entry Certificate Job Hazard Analysis Tests Standard for CSE Standard for Non- Initial result VE CERT 0015879 Work CSE Work 0018714 AGT Name: Sy Izlan Sy Ahmad Radzi Date: 11/06/2023 Oxygen 20% - 20.9% 20% - 20.9% 20.9 (GPU/PGB) SECTION 5 - WORKSITE PREPARATION / PRECAUTIONS Flammable < 1% LEL < 10% LEL 0 Time: 8:23 AM Gases Barricade & Place Warning Sign Notify Surrounding Parties HS < 50% PEL < PEL 0 Secure Tools/ Materials Against Falling Available Tagging Contact Area/ Panel Operator/ PGCC Before Work Start Others: Follow JHA CO < 50% PEL < PEL 0 Contact Area/ Panel Operator/ PGCC On Completion Available Tagging VOC < 50% PEL < PEL 0 Cover Sewer/ Drain/ Sump SECTION 7 – PERMIT REVALIDATION Fire Blanket (Note: This PTW form can be used for a maximum of 7 days, subject to daily revalidation by each shift . Nevertheless, for confined space entry it is only valid for 12 hours per Fire Extinguisher day) Locate Spark Producing Equipment Away From Sewer/ Trench/ Pipe/ Rack RA/RAR AA Return By RA/RAR Acknowledge By AA/AAR Remove Combustible Material Date Remove Flammable Material Day Shift Night Shift Day Shift Night Shift Day Shift Night Shift Day Shift Night Shift Spark Arrestor 11/06/2023 Availability of Signalman / Traffic Controller SECTION 6 – JOINT SITE VISIT BEFORE WORK START / APPROVAL 12/06/2023 I have personally checked the area and equipment to be worked on and am satisfied the work requested can be carried out safely. 13/06/2023 14/06/2023 Name: Name: 15/06/2023 Designation: Designation: 16/06/2023 A G R EED B Y R EC EIVIN G A U T H O R IT Y A PPR O VED B Y A PPR O VIN G A U T H O R IT Y A G R EED B Y W O R K L EA D ER 17/06/2023 Name: M Farid Amin Mohamad Name: Low Wei Jin (GPU/PGB) Name: Fadil SECTION 8 – HAND BACK Nalawi Date: 11 Jun 2023 Time: 8:38 am Signature: Date: 11 Jun 2023 Time: 8:26 am Company/ Dept.: RECEIVING AUTHORITY APPROVING AUTHORITY Date: Time: Name: Name: Date: Time: Date: Time: STOP WORK AND EVACUATE AREA ON HEARING ALARM THIS IS A COMPUTER-GENERATED DOCUMENT. NO SIGNATURE IS REQUIRED. PLEASE ENSURE THIS PERMIT IS DISPLAYED AT WORK SITE GAS TEST RESULTS Date Time Oxygen Flammable H2S CO VOC AGT Name Remarks Gas
11/06/2023 08:23 20.9 0 0 0 0 Sy Izlan Sy Ahmad Radzi (GPU/PGB)