Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14

H
G

B
10275 8963 750 6188 750 5250 750 8400 750 8400 750 8400 750 8400 750 8400 750 5250 750 9750 900
J

3350 3575 3350 1200 1425 5012 1325 750 1050 3338 1800 750 1050 3150 1050 750 1050 5250 2100 750 1050 5250 2100 750 1050 5250 2100 750 1050 5250 2100 750 1050 5250 2100 750 1050 3150 1050 750 1050 2375 1800 3475 1050 900 2394
125 125 125
125 125 125 125 FIRE DISCHARGE (+0.0m)
500 (LEVEL +0.0) 500 500 650

125
BLOWUP 06 BLOWUP 05 BLOWUP 05 BLOWUP 05 BLOWUP 05 BLOWUP 05 BLOWUP 06 BLOWUP 07 BLOWUP 08-A

125

175
125

175
175

175

175
350

225
BLOWUP 11

125
350
FIRE DISCHARGE (+0.00m)

125
125
(LEVEL +0.0)

125
BLOWUP 03

125
425

175

300

400
(LEVEL +0.15) (LEVEL +0.15)

475
300

900

900
(LEVEL +0.15)

125
250

325 775
388

725
125

725

725

725

725
850

125
(LEVEL +1.2m) (LEVEL +1.2m) (LEVEL +1.2m) (LEVEL +1.2m) (LEVEL +1.2m)

425
A

300

125
FIRE

125

750
500 325

938

750
EXIT FIRE HOSE

650 1050 325


125
1688
REEL CABINETS
FIRE

125

125
125
125
1050 1163 1500 1650 1650

775

775

775

775

775
125

125
2375
125 250 125 125 EXIT

1975
TOILET
125

TOILET
FIRE

750

750

125
FIRE FIGHTING CABINET

2000

2000
LIFT LIFT TOILET ZONE

1450

1975
DN

DN
C.TOILET (F)
1200
125

1825
2350
125 125 125 125 125 250 SERVICE ZONE EXIT
STAIR 1300 1050 1300 1300 1325 2050 3100 SMOKE FREE STAIR

1575
1800@300X6 900

688 750

688 750

5500
300
C.TOILET (F) ZONE

250
500 1050 1400 1800@300X6 2437 200

325
1050 650

1438
125
COMMON

4300
1000 (+1.2m) 3150

125
250

300

750 575 750 575

125
250

250

(LEVEL +0.15)
250 2150 350

750 575 750 575


125
LIFT

125

HAND WASH
750

125
1200

125
5500
(+0.15m) (+1.2m)

1200

1875
LOBBY (+1.2m)

125
125
2700@300X9

6100

1550
125 WC (09)
STAIR

2000

2000

(LEVEL +0.15)
625 1250

UP
UP
1200 1500 838 1500 1188 1050 1188

1150
URINALS (12)
F

1900 1000 1600 1500 1050


LIFT LIFT 125 125 125 125 1500 1500 50 1200 2700@300X9 2050 250

SERVICE CORRIDOR
SMOKE FREE

125 125

1875
1200

50
0 250 250 150

450
630

300
125

4000
250

1200
ZONE 1200 175

125
250

BLOWUP 01-A

125

2250@250X9
3450

125
FIRE FIGHTING CABINET

250
4600
1550 2000@250X8 1688 250 1200 500 TOILET

125

450 750
UP

1850
FIRE

125
HANDWASH

1325
1200
WAITING LOUNGE

1500 100 1500

1000 450 750


TO BASEMENT 1
4875
250 ZONE (04)

DN

REEL CABINETS

1200

1325
FIRE HOSE
EXIT

200

125
LAN

125

250 SERVICE LOBBY


2450
SERVICE LIFT

300 2450
2450
2650
1700

STAIR
325
LOW V.
DSC

ELECTRICAL

DATA
125
602

CABINET 2900 750 750 750 850

500 500 1200

125
265 235 SERVICE 250
APE

125
SMOKE FREE CORRIDOR STORE 250 DN

750 675

1750

500 1150
1650
250 125

1500
2615

1750

1725
C

250
50
TO BASEMENT 01

250

900
625
PARTITION STORE

475
750

750

600
LOW V.
250
ELECTRICAL

DATA
CABINET
5261

250

SERVICE ENTRY
FIRE

250
125
FIRE

125
BLOWUP 10 125

1500
250
2000
EXIT EXIT
SERVICE CORRIDOR BLOWUP 09-A

2000

2000
1500

1500
2600 3310 750 2865 1200 5400 1800 750 3687 1050 1050 500 1050 3500 1050 2275 425 1050 2000 250 250 125SERVICE ENTRY

UP
125

1800
450 125 437 250 250 250
1:1

250 3500 1500 750 2075 1625 1500 1000 2900 1800 650

250

250
3500

3500

250
0S

250
CIRCULATION LOBBY 150 450 (LEVEL +1.2m)

250
LOP

250

250
4650 14365
ER

250
250

250
935

250 025

7650
AM

2000
1500
375

2250
1 ESCALATOR FROM 1ST TO GROUND
6

250
P

250 025

1800

250
3000
1 DISH WASHING AREA
0 (+1.2m)
280
UP
425

UP

4500

4500
125

525

600
250

750
125
3250

3250
450

(LEVEL +0.15)
PANTRY

2750
CONVENTION HALL A (CAPACITY 750)
125
125

250 250 250 375

1800
UP

900
UP

1500

1500
KITCHEN
RAM

500 5250 500 2725 600 2500 750 3325 500


(+1.2m)
P

5775
D
418

750

750

750

750

750

750
750
125
114

0
6

585
5

ENTRANCE LOBBY

1225
FOOD PROCESSING ZONE

125
UP

2275
UP
(+1.2m)

3250

3875
3250

3250
5 250

3454
12 0 250 125 250 125
180

500

250
125 3500 1500 750 3700 1500 5575 525
0
ENT

UP

UP

250

250
RAN

17

WALKWAY
250

250
4050

2200
6750
1700
0
CE

180

600

A
1

K'

250
ESCALATOR FROM 1ST TO GROUND
7477 4650 6885
125

125
FOOD PROCESSING ZONE

3250

3250

3250
500

3875

2275
(+1.2m)
(+1.2m)

1225
SLO
(+

PE

E
PANTRY
630
1.0
6.0

5375
125
750

750

750

750

750
750
0
5m
mW

)
IDE

500 5250 500 2725 600 2500 750 3325 625

1400

1500
250
DR

1800

1500
KITCHEN

2350
OP

250 125 375


-OF

C
206

FZ

750

4100

250
1500
600
ON
13

18
6.0

250

2600
250 250 DISH WASHING AREA 125 250 125
mW

180

1850
1800

5750 3700 7075 525

1500

2000
0 ANCE
IDE

1200
ENT

(+1.2m)

7650
DR

250

250

250
R

250

250
OP
-OF

K
180

450

250
(+1.2m)
2

CONVENTION HALL B (CAPACITY 750)


FZ

300
250 3775 1800@300 1200
0
ON

1800

250

2400

2400

2400

2400
1500

1800
1050
E

BLOWUP 02 (+1.2m)

UP
FIRE150 450 FIRE VIP CORRIDOR
250 125 250 BLOWUP 09
19 250 250 250 125 125 450

450
EXIT EXIT

300

125
7510 5737 1050 500 3500 1050 2425 500 2400 1400 1200 375 1350 4225 2900 1475
1200 500 500

900
429

LOW V.

DATA
ELECTRICAL

600
475
250

750
855

PARTITION STORE

900
125

1150 500

250
125 250
CABINET
1

375

450

1950
0

1650

1650
STORE
280 BLOWUP 01
OFFICER'S LIFT

OFFICER'S LIFT

300 2450 300


450
600
269

300
VIP LOBBY

125
SMOKE FREE CORRIDOR

125
250
250

0
585 5 VIP LIFT SHAFT
250

102
FIRE FIGHTING

2450

2450
(+1.2m)
125

FIRE HOSE

250
REEL CABINETS
775 750 825 750 750 975
125

575 750 575 750 750 450

5
250

102
225

HANDWASH
1475

125

1325

1325
1200

DN 125 TOILET 125


1200

FIRE

(LEVEL +0.15)
250

4500
ZONE (06)

250
1875

125
1300 1050 1300 1300 1325 2075 775 750 575 750 750 750 600 1825 EXIT

G
125

5
120
425

125
125

625
125
500 250
WC (09)

250
125 125
250

50
1200

1775
500
NAM

2000

1400 1200 375 750 2000 1050 1175 175 2525 2050
UP

250

1775
250
118

125 250

UP
800 1150
SMOKE FREE
ES

125 DISABLE'S

125

125

125
2700@300X9
1850
4

250

2000
0 ZONE URINALS (12) 125 300
TON

600
(+0.15m)

TOILET SMOKE FREE


1200
3950
LAN

525

125

ZONE

4300
150
STAIR
125

300
925

950
1900 1000 2850 1800

125

125

5650
DSC

DN (+1.2m) 250 (+1.2m) 125 STAIR


746

20 SERVICE ZONE 2700@300X9


APE
SLO

2050 900 1800@300X9 2437 1300 1050 1300 1300 1325 750 1325 5425 (+1.2m)
7

1325

1200
2000

2000
1050
FIRE
1325

1175
125 TOILET ZONE 125
PE

250 125
DN

250
1650

125 EXIT BLOWUP 08


RAM

375
H
325
125

FIRE FIGHTING CABINET

375
300
125
P

625 750

625 750
FIRE HOSE
FIRE

750
125

REEL CABINETS

125 125

1500
EXIT
500 625
625

550
175
125

425

125

675
FIRE
125

1951
DISCHARGEBLOWUP 03
864

(+1.2m) FIRE DISCHARGE


3050

BLOWUP 06 HAND WASH BLOWUP 06 BLOWUP 07


125

125
(+0.15m)

DN
5

(LEVEL +0.15)
1075

1575
2425

(+0.8m)

125

1326
1675

1700
500 1050 3338 1800 500 1050 3150 1050 625 1525 1050 5700 625 500 1050 3150 1050 500 1050 2125 1050 750 1800@300X6 1375 1050 650
863
SLO

125 (+0.8m) 125 125 125 125 250 300 125


125

125 125 250


725
PE
RAM

375
P

D 2400 2350 250 200

FROM BASEMENT
6000
TO BASEMENT

0
630

4300
4200

4200

4675
4525
603

(+0.0) 1:8 SLOPE RAMP 1:8 SLOPE RAMP

(LEVEL +1.2m)
325
125

425

450 375
125
J'

325
300

425
1200

1200
775

775

775

775
775

0 SEE DETAIL: [D-001] (LEVEL +0.15) (LEVEL +0.15) SEE DETAIL: [D-001] (LEVEL +0.15)
600 (LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15)

300
F'

325
125

300

125
RAMP ENRTANCE SHADE RAMP EXIT SHADE RAMP'S WATER STOP DRAIN

325
450

BLOWUP 04 BLOWUP 04 BLOWUP 04 BLOWUP 04 BLOWUP 04


300

125
500 500 500 500 500 650 SEE RAMP DETAILS (AWD-110)
RAMP'S WATER STOP DRAIN
SEE RAMP DETAILS (AWD-110) 125 125 125 125 125 125

H'
G'

750 7438 750 1050 1800 750 2700 2100 750 1050 1800 750 2700 2100 750 1050 1800 750 2700 2100 750 1050 1800 750 2700 2100 750 1050 1800 750 2700 2100 750 18088 750

7438 750 8400 750 8400 750 8400 750 8400 750 8400 750 18838
B'

GROUND FLOOR WORKING PLAN


SCALED TO FIT
CONSULTANT DETAILS
CONSTRUCTION OF 1 X ARMY MULTIPURPOSE COMPLEX CAD BY SAIFUL ISLAM DRG. NO. -
PROJECT TITLE OFFICE OF THE GRAVITY ARCHITECTURE STUDIO
WITH 3000 CAPACITY AUDITORIUM WITH ANCILLARY SERVICES HOUSE: 268 (4TH FLOOR-RIGHT), ROAD: 19, HD. DTMN
DW & CE (ARMY) NEW DOHS MOHAKHALI, DHAKA-1206
SCALE SCALED TO FIT SHEET NO. A.WD-019
AT MATIKATA MP CHECK POST AREA, DHAKA CANTONMENT DHAKA CANTT. E-MAIL: r ity. sb @ m i .com
CONSULTANT'S NAME & SIGNATURE FILE NO. - AMDT NO.
DRAWING TITLE GROUND FLOOR WORKING PLAN DO NOT SCALE. CONTRACTOR MUST VERIFY ALL MD. NAHID HASAN SUB.DATE 14 MAY 2023 CT.DATE 15 DECEMBER 2021
DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK Architect (B.Arch, IAB Membership No: H-186) SDO-T (B/R) SO- III (ARCH) SO-II (ARCH) SO- II (D) SO- I (D&C) DW & CE (Army)

You might also like