NO.

URAIAN PEKERJAAN VOL SATUAN

a b c d
A PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 156.00 M²
2 Pek. Pasang Bouwplank 38.00 M
Sub Jumlah
B PEKERJAAN TANAH & PONDASI
1 Galian Tanah Pondasi 11.52 M³
2 Pas. Pondasi batu kali 7.51 M
3 Pondasi Plat Setempat 2.30 M³
4 Timbunan Kembali Galian 9.21 M³
5 Urugan Pasir Bawah Pondasi Foot Plat T = 10 cm 0.58 M³
6 Rabatan dibawah Pondasi Foot Plat T = 5 cm 0.29 M³
7 Rabatan Lantai T = 5 cm 2.00 M³
8 Urugan Pasir Bawah Lantai T = 10 cm 4.00 M³
9 Urugan Tanah Bawah Lantai. T = 35 cm 16.00 M³
Sub Jumlah
C PEKERJAAN PASANGAN
1 Pek. Pas. Dinding Trasram 27.60 M²
2 Pek. Pas. Dinding hebel 182.00 M²
3 Pek. Pas. Plesteran & Acian Dinding 267.00 M²
4 Pek. Benangan 64.50 M
Sub Jumlah
D PEKERJAAN BETON
1 Pek. Pas. Sloof 1.09 M³
2 Pek. Pas. Balok 1.51 M³
3 Pek Kolom 2.21 M³
4 Pek. Dak Beton 2.52 M³
5 Pek. Beton Tangga 0.59 M³
Sub Jumlah
E PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 cm 8.34 M²
2 Pek. Lantai Granit Tile 60 x 60 cm 34.90 M²
3 Pek. Lantai Kramik 20 x 20 cm 2.10 M²
4 Pek. Kramik Dinding 20 x 30 cm 8.70 M²
Sub Jumlah
G PEKERJAAN ATAP DAN PLAFOND
2 Pek. Usuk & Reng Galvalume 25.00 M²
3 Pek. Pas. Penutup Atap Genteng Karang Pilang Hitam 25.00 M²
4 Pemasangan Listplank Aluminium Kamper 2 / 20 cm 28.60 M
5 Pek. Pas. Rangka Plafond Besi Hollow & Plafond Gypsum 37.50 M²
Sub Jumlah
I PEKERJAAN INSTALASI LISTRIK
1 Pek. titik Lampu 7.00 Titik
2 Pek. Pas. Stop Kontak 6.00 Titik
3 Pek. Pas. Saklar Ganda 1.00 Titik
4 Pek. Pas. Saklar Tunggal 5.00 Titik
5 Pek. Pas. Sekering 1.00 Titik
Sub Jumlah
J PEKERJAAN SANITASI
1 Pek. Pas. Closet Duduk 1.00 Unit
2 Pek. Pas. Bak Kontrol Drainase 4.00 Unit
3 Pek. Pas. Kitchen Sink 1.00 Unit
4 Pek. Pas. Tandon Air Bawah 1.00 Unit
5 Pek. Pas. Bio Septicktank 1.00 Unit
6 Pek. Pas. Floor Drain 1.00 Unit
7 Pek. Pas. Instalasi Air Bersih (Pipa 3/4'') 20.00 M
8 Pek. Pas. Instalasi Air Kotor (Pipa 3'') 35.00 M
9 Pek. Pas. Instalasi Air Limbah (Pipa 4'') 15.00 M
10 Pek. Pas. Keran 2.00 Unit
11 Pek. Pas Shower 1.00 Unit
Sub Jumlah
K PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding 267.00 M²
2 Pek. Pengecatan Plafond 37.50 M²
3 Pek. Pengecatan Daun Pintu 6.90 M²
4 Pas. Roaster 4.60 M²
5 Pek. Railling Tangga 4.50 M²
Sub Jumlah
M PEKERJAAN AKHIR
1 Pek. Pembersihan Akhir 78.00 M²
Sub Jumlah

TOTAL
106,530,740.58

B0B0T JUMLAH UPAH UPAH

0.70% 255,918.88 106,530,740.58


1.96% 714,303.49 -
2.66% 30,000,000.00 970,222.37 -
-
0.32% 118,075.39 -
3.68% 1,338,637.82 -
2.60% 944,931.24 -
0.56% 204,646.24 -
0.05% 19,686.07 106,530,740.58
0.16% 59,058.20 -
1.13% 410,126.41 -
0.38% 136,708.80 -
0.11% 38,989.35 -
8.98% 30,000,000.00 3,270,859.52 -
-
1.55% 565,974.44 -
28.80% 10,484,169.99 106,530,740.58
3.76% 1,368,796.88 -
0.61% 220,442.94 -
34.71% 30,000,000.00 12,639,384.25 -
-
1.23% 447,858.03 -
1.70% 619,701.00 -
2.49% 906,789.48 -
2.83% 1,031,878.04 106,530,740.58
0.66% 240,793.42 -
8.92% 30,000,000.00 3,247,019.97 -
-
0.31% 114,015.14 -
2.29% 834,949.01 -
0.06% 21,531.64 -
0.29% 104,069.58 -
2.95% 30,000,000.00 1,074,565.36 106,530,740.58
-
1.64% 598,101.01 -
1.84% 668,164.27 106,530,740.58
1.72% 625,579.48 -
2.29% 833,069.26 -
7.48% 30,000,000.00 2,724,914.02 -
-
0.99% 358,860.60 -
0.84% 307,594.80 -
0.04% 15,379.74 -
0.17% 63,227.82 -
0.19% 68,354.40 -
2.23% 30,000,000.00 813,417.37 106,530,740.58
-
1.03% 375,949.21 -
0.94% 341,772.00 -
0.14% 51,265.80 -
1.03% 375,949.21 -
1.78% 649,366.81 -
0.05% 17,088.60 -
0.42% 153,899.93 106,530,740.58
1.31% 477,515.65 -
0.66% 239,462.30 -
0.05% 17,088.60 `
0.23% 85,443.00 -
7.65% 30,000,000.00 2,784,801.11 -
-
3.18% 1,157,454.64 -
0.45% 162,563.85 106,530,740.58
0.26% 95,543.56 -
0.66% 240,539.14 -
1.90% 692,088.31 `
6.45% 30,000,000.00 2,348,189.50 -
-
0.35% 30,000,000.00 126,626.53 -
-
30,000,000.00 106,530,740.58
82.40%
-
PEKERJAAN : IGC TYPE 40
LOKASI : B17
MINGGU PERTAMA

NO. URAIAN PEKERJAAN VOL SATUAN

a b c d
A PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 156.00 M²
2 Pek. Pasang Bouwplank 38.00 M
Sub Jumlah
B PEKERJAAN TANAH & PONDASI
1 Galian Tanah Pondasi 11.52 M³
2 Pas. Pondasi batu kali 7.51 M
3 Pondasi Plat Setempat 2.30 M³
4 Timbunan Kembali Galian 9.21 M³
5 Urugan Pasir Bawah Pondasi Foot Plat T = 10 cm 0.58 M³
6 Rabatan dibawah Pondasi Foot Plat T = 5 cm 0.29 M³
7 Rabatan Lantai T = 5 cm 2.00 M³
8 Urugan Pasir Bawah Lantai T = 10 cm 4.00 M³
9 Urugan Tanah Bawah Lantai. T = 35 cm 16.00 M³
Sub Jumlah
C PEKERJAAN PASANGAN
1 Pek. Pas. Dinding Trasram 27.60 M²
2 Pek. Pas. Dinding hebel 182.00 M²
3 Pek. Pas. Plesteran & Acian Dinding 267.00 M²
4 Pek. Benangan 64.50 M
Sub Jumlah
D PEKERJAAN BETON
1 Pek. Pas. Sloof 1.09 M³
2 Pek. Pas. Balok 1.51 M³
3 Pek Kolom 2.21 M³
4 Pek. Dak Beton 2.52 M³
5 Pek. Beton Tangga 0.59 M³
Sub Jumlah
E PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 cm 8.34 M²
2 Pek. Lantai Granit Tile 60 x 60 cm 34.90 M²
3 Pek. Lantai Kramik 20 x 20 cm 2.10 M²
4 Pek. Kramik Dinding 20 x 30 cm 8.70 M²
Sub Jumlah
G PEKERJAAN ATAP DAN PLAFOND
2 Pek. Usuk & Reng Galvalume 25.00 M²
3 Pek. Pas. Penutup Atap Genteng Karang Pilang Hitam 25.00 M²
4 Pemasangan Listplank Aluminium Kamper 2 / 20 cm 28.60 M
5 Pek. Pas. Rangka Plafond Besi Hollow & Plafond Gypsum 37.50 M²
Sub Jumlah
I PEKERJAAN INSTALASI LISTRIK
1 Pek. titik Lampu 7.00 Titik
2 Pek. Pas. Stop Kontak 6.00 Titik
3 Pek. Pas. Saklar Ganda 1.00 Titik
4 Pek. Pas. Saklar Tunggal 5.00 Titik
5 Pek. Pas. Sekering 1.00 Titik
Sub Jumlah
J PEKERJAAN SANITASI
1 Pek. Pas. Closet Duduk 1.00 Unit
2 Pek. Pas. Bak Kontrol Drainase 4.00 Unit
3 Pek. Pas. Kitchen Sink 1.00 Unit
4 Pek. Pas. Tandon Air Bawah 1.00 Unit
5 Pek. Pas. Bio Septicktank 1.00 Unit
6 Pek. Pas. Floor Drain 1.00 Unit
7 Pek. Pas. Instalasi Air Bersih (Pipa 3/4'') 20.00 M
8 Pek. Pas. Instalasi Air Kotor (Pipa 3'') 35.00 M
9 Pek. Pas. Instalasi Air Limbah (Pipa 4'') 15.00 M
10 Pek. Pas. Keran 2.00 Unit
11 Pek. Pas Shower 1.00 Unit
Sub Jumlah
K PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding 267.00 M²
2 Pek. Pengecatan Plafond 37.50 M²
3 Pek. Pengecatan Daun Pintu 6.90 M²
4 Pas. Roaster 4.60 M²
5 Pek. Railling Tangga 4.50 M²
Sub Jumlah
M PEKERJAAN AKHIR
1 Pek. Pembersihan Akhir 78.00 M²
Sub Jumlah

TOTAL

UPAH BORONGSN TUKANG


09 NOVEMBER - 19 NOVEMBER 2022
BOBOT
TERHADAP
PEKERJAAN UPAH SATUAN PROGRES UPAH sisa pekerjaan

0.70% 255,918.88 100% 255,918.88 0%


1.96% 714,303.49 100% 714,303.49 0%
2.66% 970,222.37 970,222.37

0.32% 118,075.39 100% 118,075.39 0%


3.68% 1,338,637.82 100% 1,338,637.82 0%
2.60% 944,931.24 100% 944,931.24 0%
0.56% 204,646.24 100% 204,646.24 0%
0.05% 19,686.07 100% 19,686.07 0%
0.16% 59,058.20 100% 59,058.20 0%
1.13% 410,126.41 100% 410,126.41 0%
0.38% 136,708.80 100% 136,708.80 0%
0.11% 38,989.35 100% 38,989.35 0%
8.98% 3,270,859.52 3,270,859.52

1.55% 565,974.44 - 100%


28.80% 10,484,169.99 - 100%
3.76% 1,368,796.88 - 100%
0.61% 220,442.94 - 100%
34.71% 12,639,384.25 - 100%
-
1.23% 447,858.03 - 100%
1.70% 619,701.00 - 100%
2.49% 906,789.48 - 100%
2.83% 1,031,878.04 - 100%
0.66% 240,793.42 - 100%
8.92% 3,247,019.97 -
- 100%
0.31% 114,015.14 - 100%
2.29% 834,949.01 - 100%
0.06% 21,531.64 - 100%
0.29% 104,069.58 - 100%
2.95% 1,074,565.36 - 100%
-
1.64% 598,101.01 - 100%
1.84% 668,164.27 - 100%
1.72% 625,579.48 - 100%
2.29% 833,069.26 - 100%
7.48% 2,724,914.02 - 100%
-
0.99% 358,860.60 - 100%
0.84% 307,594.80 - 100%
0.04% 15,379.74 - 100%
0.17% 63,227.82 - 100%
0.19% 68,354.40 - 100%
2.23% 813,417.37 -
-
1.03% 375,949.21 - 100%
0.94% 341,772.00 - 100%
0.14% 51,265.80 - 100%
1.03% 375,949.21 - 100%
1.78% 649,366.81 - 100%
0.05% 17,088.60 - 100%
0.42% 153,899.93 - 100%
1.31% 477,515.65 - 100%
0.66% 239,462.30 - 100%
0.05% 17,088.60 - 100%
0.23% 85,443.00 - 100%
7.65% 2,784,801.11 -
-
3.18% 1,157,454.64 - 100%
0.45% 162,563.85 - 100%
0.26% 95,543.56 - 100%
0.66% 240,539.14 - 100%
1.90% 692,088.31 - 100%
6.45% 2,348,189.50 -
-
0.35% 126,626.53 100%
-
30,000,000.00
82.40%
6,000,037.20
SISA 25,758,918.11 TERBAYAR 4,241,081.89
PEKERJAAN : IGC TYPE 40
LOKASI : B20

NO. URAIAN PEKERJAAN VOL SATUAN

a b c d
A PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 156.00 M²
2 Pek. Pasang Bouwplank 38.00 M
Sub Jumlah
B PEKERJAAN TANAH & PONDASI
1 Galian Tanah Pondasi 11.52 M³
2 Pas. Pondasi batu kali 7.51 M
3 Pondasi Plat Setempat 2.30 M³
4 Timbunan Kembali Galian 9.21 M³
5 Urugan Pasir Bawah Pondasi Foot Plat T = 10 cm 0.58 M³
6 Rabatan dibawah Pondasi Foot Plat T = 5 cm 0.29 M³
7 Rabatan Lantai T = 5 cm 2.00 M³
8 Urugan Pasir Bawah Lantai T = 10 cm 4.00 M³
9 Urugan Tanah Bawah Lantai. T = 35 cm 16.00 M³
Sub Jumlah
C PEKERJAAN PASANGAN
1 Pek. Pas. Dinding Trasram 27.60 M²
2 Pek. Pas. Dinding hebel 182.00 M²
3 Pek. Pas. Plesteran & Acian Dinding 267.00 M²
4 Pek. Benangan 64.50 M
Sub Jumlah
D PEKERJAAN BETON
1 Pek. Pas. Sloof 1.09 M³
2 Pek. Pas. Balok 1.51 M³
3 Pek Kolom 2.21 M³
4 Pek. Dak Beton 2.52 M³
5 Pek. Beton Tangga 0.59 M³
Sub Jumlah
E PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 cm 8.34 M²
2 Pek. Lantai Granit Tile 60 x 60 cm 34.90 M²
3 Pek. Lantai Kramik 20 x 20 cm 2.10 M²
4 Pek. Kramik Dinding 20 x 30 cm 8.70 M²
Sub Jumlah
G PEKERJAAN ATAP DAN PLAFOND
2 Pek. Usuk & Reng Galvalume 25.00 M²
3 Pek. Pas. Penutup Atap Genteng Karang Pilang Hitam 25.00 M²
4 Pemasangan Listplank Aluminium Kamper 2 / 20 cm 28.60 M
5 Pek. Pas. Rangka Plafond Besi Hollow & Plafond Gypsum 37.50 M²
Sub Jumlah
I PEKERJAAN INSTALASI LISTRIK
1 Pek. titik Lampu 7.00 Titik
2 Pek. Pas. Stop Kontak 6.00 Titik
3 Pek. Pas. Saklar Ganda 1.00 Titik
4 Pek. Pas. Saklar Tunggal 5.00 Titik
5 Pek. Pas. Sekering 1.00 Titik
Sub Jumlah
J PEKERJAAN SANITASI
1 Pek. Pas. Closet Duduk 1.00 Unit
2 Pek. Pas. Bak Kontrol Drainase 4.00 Unit
3 Pek. Pas. Kitchen Sink 1.00 Unit
4 Pek. Pas. Tandon Air Bawah 1.00 Unit
5 Pek. Pas. Bio Septicktank 1.00 Unit
6 Pek. Pas. Floor Drain 1.00 Unit
7 Pek. Pas. Instalasi Air Bersih (Pipa 3/4'') 20.00 M
8 Pek. Pas. Instalasi Air Kotor (Pipa 3'') 35.00 M
9 Pek. Pas. Instalasi Air Limbah (Pipa 4'') 15.00 M
10 Pek. Pas. Keran 2.00 Unit
11 Pek. Pas Shower 1.00 Unit
Sub Jumlah
K PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding 267.00 M²
2 Pek. Pengecatan Plafond 37.50 M²
3 Pek. Pengecatan Daun Pintu 6.90 M²
4 Pas. Roaster 4.60 M²
5 Pek. Railling Tangga 4.50 M²
Sub Jumlah
M PEKERJAAN AKHIR
1 Pek. Pembersihan Akhir 78.00 M²
Sub Jumlah

TOTAL

UPAH BORONGAN TUKANG


09 NOVEMBER - 19 NOVEMBER 2022

BOBOT
TERHADAP
PEKERJAAN UPAH SATUAN PROGRES UPAH sisa pekerjaan

0.70% 255,918.88 100% 255,918.88 0%


1.96% 714,303.49 100% 714,303.49 0%
2.66% 970,222.37

0.32% 118,075.39 100% 118,075.39 0.00%


3.68% 1,338,637.82 50.1% 670,657.55 49.90%
2.60% 944,931.24 - 100%
0.56% 204,646.24 - 100%
0.05% 19,686.07 - 100%
0.16% 59,058.20 - 100%
1.13% 410,126.41 - 100%
0.38% 136,708.80 - 100%
0.11% 38,989.35 - 100%
8.98% 3,270,859.52

1.55% 565,974.44 - 100%


28.80% 10,484,169.99 - 100%
3.76% 1,368,796.88 - 100%
0.61% 220,442.94 - 100%
34.71% 12,639,384.25 - 100%
-
1.23% 447,858.03 - 100%
1.70% 619,701.00 - 100%
2.49% 906,789.48 - 100%
2.83% 1,031,878.04 - 100%
0.66% 240,793.42 - 100%
8.92% 3,247,019.97 - 100%
-
0.31% 114,015.14 - 100%
2.29% 834,949.01 - 100%
0.06% 21,531.64 - 100%
0.29% 104,069.58 - 100%
2.95% 1,074,565.36 - 100%
-
1.64% 598,101.01 - 100%
1.84% 668,164.27 - 100%
1.72% 625,579.48 - 100%
2.29% 833,069.26 - 100%
7.48% 2,724,914.02 -
-
0.99% 358,860.60 - 100%
0.84% 307,594.80 - 100%
0.04% 15,379.74 - 100%
0.17% 63,227.82 - 100%
0.19% 68,354.40 - 100%
2.23% 813,417.37 -
-
1.03% 375,949.21 - 100%
0.94% 341,772.00 - 100%
0.14% 51,265.80 - 100%
1.03% 375,949.21 - 100%
1.78% 649,366.81 - 100%
0.05% 17,088.60 - 100%
0.42% 153,899.93 - 100%
1.31% 477,515.65 - 100%
0.66% 239,462.30 - 100%
0.05% 17,088.60 - 100%
0.23% 85,443.00 - 100%
7.65% 2,784,801.11 -
-
3.18% 1,157,454.64 - 100%
0.45% 162,563.85 - 100%
0.26% 95,543.56 - 100%
0.66% 240,539.14 - 100%
1.90% 692,088.31 - 100%
6.45% 2,348,189.50 -
-
0.35% 126,626.53
-
30,000,000.00 100%
82.40%

SISA 28,241,044.69 TERBAYAR 1,758,955.31


upah per 09 november 2022 - 19 november 2022
B17

NO. URAIAN PEKERJAAN VOL


SATUAN
A PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 156 M²
2 Pek. Pasang Bouwplank 38 M
Sub Jumlah
B PEKERJAAN TANAH & PONDASI
1 Galian Tanah Pondasi 11.516 M³
2 Pas. Pondasi batu kali 7.512 M
3 Pondasi Plat Setempat 2.304 M³
4 Timbunan Kembali Galian 9.212 M³
5 Urugan Pasir Bawah Pondasi Foot Plat T = 10 cm 0.576 M³
6 Rabatan dibawah Pondasi Foot Plat T = 5 cm 0.288 M³
7 Rabatan Lantai T = 5 cm 2 M³
8 Urugan Pasir Bawah Lantai T = 10 cm 4 M³
9 Urugan Tanah Bawah Lantai. T = 35 cm 16 M³
Sub Jumlah
B20

NO. URAIAN PEKERJAAN VOL SATUAN

A PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 156.00 M²
2 Pek. Pasang Bouwplank 38.00 M
Sub Jumlah
B PEKERJAAN TANAH & PONDASI
1 Galian Tanah Pondasi 11.52 M³
2 Pas. Pondasi batu kali 7.51 M
Sub Jumlah
TOTAL UPAH
9 november 2022

BOBOT
TERHADAP
PEKERJAAN UPAH SATUAN PROGRES UPAH

0.70% 255918.87714278 100% 255,918.88


1.96% 714303.489888367 100% 714,303.49
2.66% 970222.367031147

0.32% 118075.392194561 100% 118,075.39


3.68% 1338637.82358086 100% 1,338,637.82
2.60% 944931.238681033 100% 944,931.24
0.56% 204646.240992994 100% 204,646.24
0.05% 19686.0674725215 100% 19,686.07
0.16% 59058.2024175645 100% 59,058.20
1.13% 410126.405677532 100% 410,126.41
0.38% 136708.80189251 100% 136,708.80
0.11% 38989.350299744 100% 38,989.35
3270859.52320932 4,241,081.89

BOBOT
TERHADAP
UPAH SATUAN PROGRES UPAH
PEKERJAAN

0.70% 255,918.88 100% 255,918.88


1.96% 714,303.49 100% 714,303.49
2.66% 970,222.37

0.32% 118,075.39 100% 118,075.39


3.68% 1,338,637.82 50.1% 670,657.55