Bom
1”
U- Bolt G.I. 3/4”
Automatic fire sprinkler system
Angular Bracket 1- ½ x 1- ½ x 1.5mm]
Pipe Adjustable clevis hanger 3”
Adjustable clevis hanger 2”
BI Pipe Schedule 40 4” Adjustable clevis hanger 1”
BI Pipe Schedule 40 3” Adjustable clevis hanger ¾ ”
BI Pipe Schedule 40 2” Loop Hanger 3”
BI Pipe Schedule 40 1” Loop Hanger 2”
BI Pipe Schedule 40 ¾” Loop Hanger 1”
BI Flange Schedule 40 4” Loop Hanger 3/4”
BI Flange Schedule 40 3” Stud bolt
BI Flange Schedule 40 2”
BI Flange Schedule 40 1” Sprinkler
BI Flange Schedule 40 ¾“
Pendent type sprinkler head
Blind Flange 4”
Upright type sprinkler head
Seamless Connection Fittings Standard silver escutcheon plate
Siamese connection line brass type
Tee non-reducer FDC name plate
Tee reducer 4”-3”
Tee reducer 3”-2” Pump
Tee reducer 2”-1”
2- 400Gpm pump End Suction type
Tee reducer 1”-3/4”
2- 3 phase 60Hz 35 Hp pump electric
Elbow 90
motor
Reducer 4”-3”
2 Jockey pump 3 Hp 30Gpm
Reducer 3”-2”
2 Supervisory panel with switch &
Reducer 2”-1”
Settings for Fire Pump
Reducer 1”-3/4”
2 Supervisory panel with switch &
Threaded connection Fittings Settings for Jockey Pump
Catch Basin
CHB 4”
Deformed bars- rebar (10mm)
Sand
Cement
Water Proofing materials
G.I. Angular bars (1.5mmx 1 ½ x 1 ½ )
Septic Tank
Excavation
Backfill
CHB 4”
Cement
Gravel
Sand
10mm Deformed bars
Water proofing works/ materials
4” PVC series 1000
Sanitary Tee series 1000
Phenolic boards
Clean outs with cap series 1000