A-FF03 - 13F Plan Floor Finish - Door Mark - Tender
A-FF03 - 13F Plan Floor Finish - Door Mark - Tender
General notes:
concealed timber door with painted finish and 1. All legends are to be read in
heavy duty soft-closing hinges and conceal conjunction with other tender
door handle and mechanical lock system typ documents including but not limited to
MEP and builders work drawings,
B C D E F specifications and schedules. GC to
DISCUSSION CORNER LECTURE ROOM 2 LECTURE ROOM 1
10000 10000 10000 10000 2 inform the Architect of any
A-FF03 descrepancies for clarifications prior to
DISCUSSION AREA LIFT LOBBY 2
procurements.
2. All existing items at the premises,
unless noted otherwise, are to remain
and to be protected. GC is to discuss
and agree all existing items to be
7 demolished prior to demolition.
3. Make good any damage and level the
existing floor slab as required to
receive the new raised floor system
and new floor finish, typical.
4. Provide 3mm grade 316 s.steel strip at
transition of different types of floor
finishes, e.g from carpet to tile.
5. Exact floor pattern and setting out to
be confirmed on site with Architect.
6. Provide screeding as necessary to
Provide continuous
ensure same FFL for all site areas.
perimeter curbs inside F2a RF1
9500
D10 7. Screeding and finishes at the toilets
the base cabinet
W Vending F3b are to lay to fall to floor drains typical.
under the sink with machine MCB
8. All material to be as per the latest
waterproofing to wrap RF1
EX FD
s
RF1 RF1 provisions required in Building
up min. 50mm from
F1 F2b F2b Regulations / Lingnan / M+
the SFL. Refer to the F3b
D11 D11
D8 requirements.
Technical HR
s
New AV AV
HR
Specifications for F5 EX FD F5 F1 D4
cabinet cabinet
D4 D4
watertightness test
D1d
requirements. FE F2a F2a D4 F2a
F2a RF1
RF1 RF1 F2a RF1
RF1
F G
1 COMMON CORRIDOR 3 10000 10000 1
A-FF03 A-FF04 Project Manager and Architect
13F ELV RM
MUSA Limited
D3
FE F2a F2b
RF1 RF2
Project
DE2
Fitting-out Works at 12/F and 13/F
9500
8
Scale: 1:100 @A2
Drawn by: KC
Checked by: BH/MT
Date: 4 April 2023
CORRIDOR SEATING
2
-
13/F Furniture Layout Drawing no.
1:100 @A2
A-FF03