MITRA KERJA : MITRA KERJA MITRA KERJA INTRACO INTRACO

LINGKUP PEKERJAAN :
PENANGGUNG JAWAB : HP :

SKEDUL PEKERJAAN INTEGRATED TEACHING LABORATORY & WORKSHOP FTUI PROJECT


FEBRUARI 2020 MARET 2020
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NO KEGIATAN LOKASI DURASI
J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M S S R K J S M

A BAYUTAMA ( PINTU ROLLING DOOR )


Fabrikasi & Pengecatan Lt 2 Lab
Pengecatan Lt 2 Lab
Delivery Lt 2 Lab
Instalasi Lt 2 Lab
B TRIAS CIPTA ( PINTU KAYU )
Delivery + Instalsi Lt 7-8 5
Delivery + Instalsi Lt 5-6 5
Delivery + Instalsi Lt 3-4 5
C INDOPUTRA ( HOIST CRANE )
Fabrikasi & Pengecatan WS
Delivery + Instalsi Electrical + Test Beban WS
D METALINDO
Delivery Lt 1-10
Instalsi Lt 1-10
E MITSUBISHI ( LIFT )
Delivery
Instalsi + Power Test + Commissioning 60
Sparator Beam
Opening Pintu Lift
Ruang Mesin Lantai 10
Pit Lift Clean + Watertight
Hand Over
Pintu Lift (Granit)
F METADATA ( IT )
1 Delivery 100%
Intalasi
Terminasi
Test Com
Ruang Kontrol Lt1 (Bawah tangga 3 ) Lt 1-9
Expose Tangga type III Lt 1-9
Ruang Panel Elektrical (Pintu) Lt 1-9
Plafon Toilet Lt 1-9
G PRABU MITRA TEK ( ELEC & AC )
ELECTRICAL
Delivery 100% (Excl Kabel Feeder & Lampu ) Lt 1-9
Intalasi Lt 1-9
Terminasi Lt 1-9
Test Com Lt 1-9
Ruang Panel Elektrical (Pintu) Lt 1-9
Balkon ( Skim Coat + Water Proof ) Lt 2-8
AC
Delivery 100% (BJLS, Pipa Refrigrant, Freon, PU )
Fabrikasi Ducting
Intalasi
Test Com
Persiapan Ruangan ( Kaca, Pintu, Jendela)
H SINDO WAHANA (Plumbing & Hydrant)
Plumbing
Delivery 100% Lt 1-9
Intalasi Lt 1-9
Tapping Ke Existig UI
Test Com Lt 1-9
Pemasangan sanitair
Ruang Pompa
Hydrant
Delivery 100% Lt 1-9
Intalasi Lt 1-9
Tapping Ke Existig UI
Test Com Lt 1-9
I PRIMA ALUMITRA ( Alumunium )
Kusen Pintu
Delivery 100% ( Excl Diluar Kontrak )
Intalasi 12 set P2
Opening , Keramik lantai
Balkon ( Skim Coat + Water Proof ) Lt 2-8
Jendela Alexindo
Delivery 100% ( Excl J7 )

Jendela YKK