Beam Girder Foundation 5000-BG-F2 & F2a - Rev-0

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

MACMET INDIA LIMITED

Overland Conveying System for sourcing of Bauxite


NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

Design Calculation of Beam Girder Foundation

MKD. 5000-BGF-2 & BG-F2A For OLBC

Note :
1 These Foundations are in Between Chainage 5000 To Chainage 6000).
2 For Foundation Mkd 500-BG-F2 : 6M SPAN HC BEAM GIRDER SUPPORTED FROM BOTH SIDE.
3 For Foundation Mkd 500-BG-F2A : 6M SPAN HC BEAM GIRDER SUPPORTED FROM ONE SIDE.

Page 1 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

CASE -1 101 DL + LL
Horizontal Vertical Horizontal Moment
Node L/C Fx Mton Fy Mton Fz Mton Mx MTon-m My MTon-m Mz MTon-m

28+32 101 DL + LL
0.043 7.929 -5.5 0 0 0
19+23 101 DL + LL
0.012 5.767 5.5 0 0 0

CASE -2 102 DL + WL(+Z)


Horizontal Vertical Horizontal Moment
Node L/C Fx Mton Fy Mton Fz Mton Mx MTon-m My MTon-m Mz MTon-m
28+32 102 DL + WL(+Z) 0.003 3.202 -1.059 0 0 0
19+23 102 DL + WL(+Z) -0.003 2.772 3.253 0 0 0

CASE -3 104 DL + LL + WL(+Z)


Horizontal Vertical Horizontal Moment
Node L/C Fx Mton Fy Mton Fz Mton Mx MTon-m My MTon-m Mz MTon-m
P1 104 DL + LL + WL(+Z) 0.043 7.928 -4.40 0 0 0
P2 104 DL + LL + WL(+Z) 0.011 5.766 6.60 0 0 0

Page 2 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

1000

300

𝑷𝟏 450

0
x
1710

2300
𝑷𝟐

c/c distance of trestle legs = 3m

Determination of area and section modulus


Width of footing in longer side( Along z direction ), A= 2.30 m
Length of footing ( Along x direction ), L = 1.00 m Zzz= 0.39 m2
Thickness of footing raft, T = 0.30 m Zxx= 0.89 m2
2
Depth of footing below NGL, H = 2.50 m Area of Footing= 2.3x1= 2.3 m
Height of Pedestal above NGL 0.400 m
Length of Pedestal P1 = 0.45 m
Width of Pedestal P1 0.45 m
Length of Pedestal P2 = 0.45 m
Width of Pedestal P2 0.45 m
Self weight of pedestal P1 = 1.32 T
Self weight of pedestal P2 = 1.32 T
Width of fdn.beam FB= 0.00 m
Depth of fdn.beam FB = 0.00 m
Depth of fdn.beam above raft 0.00 m
Safe ( Net ) bearing capacity of soil 29 T/m²
Unit wt. of soil = 1.8 T/m³
Unit wt. of concrete= 2.5 T/m³
Clear cover at bot of footing slab = 50 mm
Grade of Concrete= M 25
Grade of Reinforcement Steel= Fe 500
Allowable Gross bearing capacity at the bottom of fdn. (For DL+ LL) = 29x1+1.8x2.5= 33.50 T/mm²
Allowable Gross bearing capacity at the bottom of fdn. (For DL+ WL/SL) = 29x1.25+1.8x2.5= 40.75 T/mm²

Weight of bottom slab = 2.3x1x0.3x2.5= 1.7 T


Weight of outstanding beam = 0x0x(2.3-2x0.45)x2.5= 0.00 T
Weight of soil = ((2.3x1-2x0.45x0.45)x(2.5-0.3))x1.8-(1.4x0x0x1.8)= 7.5042 T
Hence total self wt. of fdn. beam + slab= 1.73 T
Co-efficient of friction= 0.3

Page 3 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

CASE -1 101 DL + LL
Calculation Of Ecentricity in +X Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 101 DL + LL 0.043 7.929 0.5 2.90 0.1247 3.96
P2 101 DL + LL 0.012 5.767 0.5 2.90 0.035 2.88
Self weight of pedestal P1 1.32 0.5 0.658
Self weight of pedestal P2 1.32 0.5 0.658
P1 Moment from staad 0
P2 Moment from staad 0
S/W of Slab+fdn beam 1.73 0.5 0.870
Self Weight of Soil 7.50 0.5 3.750
Total= 25.56 0.16 12.776

So, Total Vertical Load(P)= 25.56 T

Net Moment(M)=Restoring Moment-Overturning Moment= 12.77625-0.16= 12.62 T-m


X= Mz/P= (12.61625)/25.56= 0.49 m
ex= L/2 - x= 0.010 m
Calculation Of Ecentricity in +Z Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 101 DL + LL -5.499 7.93 2.005 2.90 31.84
P2 101 DL + LL 5.5 5.77 0.295 2.90 15.95 1.7
Self weight of pedestal P1 1.32 2.005 2.64
Self weight of pedestal P2 1.32 0.295 0.39
S/W of Slab+fdn beam 1.73 1.150 1.99
Self Weight of Soil 7.50 1.150 8.63
Total= 25.56 15.95 47.19
So, Total Vertical Load(P)= 25.56 T
Net Moment(M)=Restoring Moment-Overturning Moment= 47.19-15.95= 31.24 T-m
Z= Mx/P= (31.24)/25.56= 1.22222 m
ez= L/2 - z= 0.070 m
F.O.S Against Overturning= (47.19/15.95)= 2.96 > 1.5 safe

CALCULATION OF BASE PRESSURE


P= 25.6 MT
MX = P x ez = (25.6*0.07)= 1.792 T-m

Mz = P x ex = (25.6*0.01)= 0.3 T-m


Maximum Base Pressure = P/A + Mz/Zzz+ Mx/Zxx=
(25.6/(2.3))+(0.3/(0.39))+(1.792/(0.89))=
13.91 T/m² < 33.50 T/sq.m Safe

Mniimum Base Pressure = P/A - Mz/Zzz-Mx/Zxx=


(25.6/(2.3))-(0.3/(0.39))-(1.792/(0.89))=
8.35 T/m² < 33.50 T/sq.m

Page 4 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

CASE -2 102 DL + WL(+Z)


Calculation Of Ecentricity in +X Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 102 DL + WL(+Z) 0.003 3.202 0.5 2.90 0.000 1.609
P2 102 DL + WL(+Z) -0.003 2.772 0.5 2.90 -0.009 1.390
Self weight of pedestal P1 1.32 0.5 0.658
Self weight of pedestal P2 1.32 0.5 0.658
P1 Moment from staad 0
P2 Moment from staad 0
S/W of Slab+fdn beam (W4) 1.73 0.5 0.870
Self Weight of Soil (W5) 7.50 0.5 3.750
Total= 17.84 -0.010 8.940

So, Total Vertical Load(P)= 17.84 T


Net Moment(M)=Restoring Moment-Overturning Moment= 8.94--0.01= 8.95 T-m
X= Mz/P= (8.95)/17.84= 0.5 m
ex= L/2 - x= 0.000 m
Calculation Of Ecentricity in +Z Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 102 DL + WL(+Z) -1.059 3.20 2.005 2.90 9.4911
P2 102 DL + WL(+Z) 3.253 2.77 0.295 2.90 9.43 0.82
Self weight of pedestal P1 1.32 2.005 2.64
Self weight of pedestal P2 1.32 0.295 0.39
S/W of Slab+fdn beam (W4) 1.73 1.15 1.99
Self Weight of Soil (W5) 7.50 1.15 8.63
Total= 17.84 9.43 23.96
So, Total Vertical Load(P)= 17.84 T
Net Moment(M)=Restoring Moment-Overturning Moment= 23.96-9.43= 14.53 T-m
Z= Mx/P= (14.53)/17.84= 0.81446 m
ez= L/2 - z= 0.340 m
F.O.S Against Overturning= (23.96/9.43)= 2.54 > 1.5 safe
F.O.S Against Sliding= Vertical load x frictional co-eff./total. horizontal load= (17.84x0.3)/2.194= 3.0 > 1.4 safe
CALCULATION OF BASE PRESSURE
P= 17.8 MT
MX = P x ez = (17.8*0.34)= 6.052 T-m

Mz = P x ex = (17.8*0)= 0 T-m
Maximum Base Pressure = P/A + Mz/Zzz+ Mx/Zxx=
(17.8/(2.3))+(0/(0.39))+(6.052/(0.89))=
14.54 T/m² < 40.75 T/sq.m Safe
Mniimum Base Pressure = P/A - Mz/Zzz-Mx/Zxx=
(17.8/(2.3))-(0/(0.39))-(6.052/(0.89))=
0.94 T/m² < 40.75 T/sq.m
So Tension develops
Contact Length = 3 x (L/2-e) 3x(2.3/2-0.34)= 2.43 m
Modified Pressure = 17.84/(0.5x2.43x1)= 14.683 T/m² < 40.8 T/sq.m Safe

Page 5 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
CASE -3 104 DL + LL + WL(+Z)
Calculation Of Ecentricity in +X Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 104 DL + LL + WL(+Z) 0.043 7.928 0.5 2.90 0.125 3.96
P2 104 DL + LL + WL(+Z) 0.011 5.766 0.5 2.90 0.032 2.88
Self weight of pedestal P1 1.32 0.5 0.658
Self weight of pedestal P2 1.32 0.5 0.658
P1 Moment from staad 0
P2 Moment from staad 0
S/W of Slab+fdn beam (W4) 1.73 0.5 0.87
Self Weight of Soil (W5) 7.50 0.5 3.75
Total= 25.56 0.16 12.78

So, Total Vertical Load(P)= 25.56 T

Net Moment(M)=Restoring Moment-Overturning Moment= 12.77625-0.16= 12.62 T-m


X= Mz/P= (12.61625)/25.56= 0.49 m
ex= L/2 - x= 0.010 m
Calculation Of Ecentricity in +Z Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 104 DL + LL + WL(+Z) -4 7.93 2.005 2.90 28.67
P2 104 DL + LL + WL(+Z) 7 5.77 0.295 2.90 19.13 1.7
Self weight of pedestal P1 1.32 2.005 2.64
Self weight of pedestal P2 1.32 0.295 0.39
S/W of Slab+fdn beam (W4) 1.73 1.15 1.99
Self Weight of Soil (W5) 7.50 1.15 8.63
Total= 25.56 19.13 44.01
So, Total Vertical Load(P)= 25.56 T
Net Moment(M)=Restoring Moment-Overturning Moment= 44.01-19.13= 24.88 T-m
Z= Mx/P= (24.88)/25.56= 0.9734 m
ez= L/2 - z= 0.180 m
F.O.S Against Overturning= (44.01/19.13)= 2.3 > 1.5 safe
F.O.S Against Sliding= Vertical load x frictional co-eff./total horizontal load= (25.56x0.3)/2.192= 3.4982 > 1.4 safe
CALCULATION OF BASE PRESSURE
P= 25.6 MT
MX = P x ez = (25.6*0.18)= 4.608 T-m

Mz = P x ex = (25.6*0.01)= 0.3 T-m


Maximum Base Pressure = P/A + Mz/Zzz+ Mx/Zxx=
(25.6/(2.3))+(0.3/(0.39))+(4.608/(0.89))=
17.08 T/m² < 40.75 T/sq.m Safe

Mniimum Base Pressure = P/A - Mz/Zzz-Mx/Zxx=


(25.6/(2.3))-(0.3/(0.39))-(4.608/(0.89))=
5.18 T/m² < 40.75 T/sq.m

Maximum Gross Bearing Pressure = 17.1 T/sq.m


Net Design pressure = Gross pressure - s/w of footing - wt of soil
= (17.08-0.3x2.5-2.2x1.8)=
= 12.37 T/m²

Page 6 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

0.45

Design of Raft in Tranverse Direction 0.275


Overall Depth ,D= 300 m
Clear Cover = 50 mm
Effective Depth= 233 mm
Design Pressure = 12.37 T/m² 1.00 0.042
Max cantilever Distance from face of foundation beam along X axis= 0.275 m 0.233
BM max= 12.37x0.275^2/2= 0.47 T-m
Mu/bd^2= (0.47x1.5x10^7)/(1000*233^2)= 0.130
Pt= 0.03 Ast = 70.01 Sq.mm
Minimum Ast required = 0.12*1000*300/100 = 360.0 mm²
Provide 10 φ @ 200 c/c at bottom in shorter directions
Area of Steel provd, Ast = 393 mm²/m > 360.00 mm²/m ok
Percentage of Steel provided, Pt = 0.161 %
τc= 0.303 (From Table 19 of IS456 )

Distribution reinforcement
Distribution steel = 0.12bD/100= 360 mm²/m
On each face = 180 mm²/m
Provide 10 φ @ 200 c/c at top in shorter direction
Area of Steel provd, Ast = 392.7 mm²/m > 180 mm²/m ok

Check for One way shear (at 'd' dist from face of pedestal)

Dist from edge of footing to section at 'd' from face of pedestal = 0.275-0.233= 0.042 m
Shear at the critical section = 12.37*0.042= 0.52 T
Design S.F., Vu = 1.5*0.52= 0.78 T
τv = Vu/bd = 0.030 < 0.303 ok

Page 7 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

0.30 Ra 1.710 Rb 0.30


Design of Slab in Longitudianal Direction as a beam
Width of Foundation Slab = 1.00 m
Thk of raft = 0.30 m

UDL for Beam for width of footing slab = 12.37x1=


12.37 T/m C 12.4
2.300 T/m
Cantilever Distance from edge of the Footing to face of the column = 0.295-0.225= 0.07 m
Rb= 12.37x2.3x(2.3/2-0.295)/1.71= 14.23 T
Ra= 12.37x2.3-14.23 14.22 T
Maximum BM at Face of Pedestal = 12.37x0.07^2/2= 0.03 T-m
Maximum bending moment at Centre
Maximum bending moment at Centre i.e. 1.15 M Dist from "C" 1.15 m
Maximum BM at at centre of Footing = 12.37x(1.15^2)/2-14.22x0.855= 3.98 T-m
Overall Depth ,D= 300 m
Clear Cover = 50 mm
Effective Depth= 244 mm
Width of Fdn. Beam= 1000 mm
Reinforcement at Bottom=
Mu/bd^2= (0.03x 10^7 x 1.5)/(1000X244^2)= 0.0076
Pt= 0.002 Ast = 4.24 Sq.mm
Min. reinforcement As = 0.85xbxd/fy = (0.85x1000x244)/500= 415 mm2 (CL.26.5.1.1 IS 456-2000)
Provide 12 φ @ 150 c/c at Bottom
2
Ast provided = 753.98 mm > 415 ok
Reinforcement at Top=
Mu/bd^2= (3.98x 10^7 x 1.5)/(1000X244^2)= 1.0028
Pt= 0.242 Ast = 591.42 Sq.mm
Min. reinforcement As = 0.85xbxd/fy = (0.85x1000x244)/500= 415 mm2 (CL.26.5.1.1 IS 456-2000)

Provide 12 φ @ 150 c/c at Top


2
Ast provide = 753.98 mm > 591.4 ok

Design of Shear Reinforcement


Max, S.F.(Vmax) at distance "d" towards right from face of Pedestal (i.e. at distance 714 mm from point c)=
12.37x0.764-14.23 = 4.77 t
2
τv = Vu/bd = 4.76932x1.510^4/(1000x244) = 0.290 N/mm
pt = 100Ast/bd = 0.31

2
From Table 61 of SP-16 tc = 0.404 N/mm

τc= > τv No Shear reinf reqdt

Page 8 of 11
MACMET ENGINEERING LIMITED
Overland Conveying System for sourcing of DOC. NO. DATE
NATIONAL ALUMINIUM Bauxite from Panchpatmali Mines for
Client: Project:
COMPANY LIMITED Alumina Refinery, M & R Complex at JN2682-DC-C-020_Rev-0 24.05.2023
Damanjodi, Odisha.

Designed Checked Appvd


Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
Design of Pedstal (450 mm x 450 mm)
(Node No 19+23 & 28+32)
Length of Pedestal = = 450 mm
Width of Pedstal = 450 mm
Height of Pedestal above FFL= 0.000 m
Height of Pedestal above FGL = 0.400 m
Height of Pedestal below FGL = 2.20 m
Grade of concrete = M 25
Grade of reinforcement = Fe 500
fck= 25 Mpa
fy= 500 Mpa
unit wt of conc. = 2.5 T/m³
Clear Cover = 50 mm
d'= 60 mm
CASE :1 Design for Compression & Bending
Load Case : 201 DL + LL Node 28+32
Axial Load, Pu = 11.89 T
Mz= 0.17 T-m
Mx= 21.4 T-m
PRELIMINARY ASSESMENT OF REINFORCEMENT
Pu / fckbD = (11.893*10^4)/(25*450*450)= 0.023 N/mm²
Mu / fckbD² =[(0.1664)*10^7]/(25*450*450^2)+(21.4474)*10^7/((25*450*450^2)= 0.095 N/mm²
d'/D= 0.1 from Chart-48 of SP-16,
p/fck= 0.058 p= 1.45 % Ast reqd = 2936.25 mm²
Provide 12 nos 20 φ bar
Ast provided = 3769.9 mm² > 2936.25 mm² ok pt provided = 1.86 %
Min Ast reqd.
Area of conc. reqd. to resist direct load = (11.893x10³)/(6.0x10.2)= 194.33 cm 2
2 2
Ast reqd. for above area = (0.8/100)x194.33= 1.56 cm << 37.6991 cm
CHECK FOR BI AXIAL BENDING
Mux = 21.45 T-m Mux1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16

Muz = 0.17 T-m Muz1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 11.893/364.94 = 0.03
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
(Mux/Mux1)αn +(Muz/Muz1)αn= (21.45/28.48)^1+(0.17/28.48)^1= 0.76 < 1.0 ok

Page 9 of 11
MACMET ENGINEERING LIMITED
Overland Conveying System for sourcing of DOC. NO. DATE
NATIONAL ALUMINIUM Bauxite from Panchpatmali Mines for
Client: Project:
COMPANY LIMITED Alumina Refinery, M & R Complex at JN2682-DC-C-020_Rev-0 24.05.2023
Damanjodi, Odisha.

Designed Checked Appvd


Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
CASE :2 Design for Compression & Bending
Load Case : 202 DL + WL(+Z) Node 19+23
Axial Load, Pu = 4.16 T
Mz= 0.0 T-m
Mx= 12.7 T-m

PRELIMINARY ASSESMENT OF REINFORCEMENT


Pu / fckbD = (4.158*10^4)/(25*450*450)= 0.008 N/mm²
Mu / fckbD² =[(0.013)*10^7]/(25*450*450^2)+(12.6854)*10^7/((25*450*450^2)= 0.056 N/mm²
d'/D= 0.1 from Chart-47 of SP-16,
p/fck= 0.030 p= 0.75 % Ast reqd = 1518.75 mm²
Provide 12 nos 20 φ bar
Ast provided = 3769.91 mm² > 1518.75 mm² ok pt provided = 1.86 %
Min Ast reqd.
Area of conc. reqd. to resist direct load = (4.158x10³)/(6.0x10.2)= 67.94 cm 2
2 2
Ast reqd. for above area = (0.8/100)x67.94= 0.54 cm << 37.6991 cm
CHECK FOR BI AXIAL BENDING
Mux = 12.69 T-m Mux1 = 27.3 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.120 Ref Chart 47/48 of SP 16

Muz = 0.01 T-m Muz1 = 27.3 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.120 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 4.158/364.94 = 0.01
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
(Mux/Mux1)αn +(Muz/Muz1)αn= (12.69/27.34)^1+(0.01/27.34)^1= 0.47 < 1.0 ok

CASE :3 Design for Compression & Bending


Load Case : 204 DL + LL + WL(+Z) Node 19+23

Axial Load, Pu = 6.92 T


Mz= 0.0 T-m
Mx= 20.6 T-m
PRELIMINARY ASSESMENT OF REINFORCEMENT
Pu / fckbD = (6.92*10^4)/(25*450*450)= 0.014 N/mm²
Mu / fckbD² =[(0.04)*10^7]/(25*450*450^2)+(20.5816)*10^7/((25*450*450^2)= 0.091 N/mm²
d'/D= 0.13 from Chart-47 of SP-16,
p/fck= 0.055 p= 1.38 % Ast reqd = 2784.375 mm²
Provide 12 nos 20 φ bar
Ast provided = 3769.91 mm² > 2784.375 mm² ok pt provided = 1.86 %

Page 10 of 11
MACMET ENGINEERING LIMITED
Overland Conveying System for sourcing of DOC. NO. DATE
NATIONAL ALUMINIUM Bauxite from Panchpatmali Mines for
Client: Project:
COMPANY LIMITED Alumina Refinery, M & R Complex at JN2682-DC-C-020_Rev-0 24.05.2023
Damanjodi, Odisha.

Designed Checked Appvd


Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC

Min Ast reqd.


Area of conc. reqd. to resist direct load = (6.92x10³)/(6.0x10.2)= 113.07 cm 2
2 2
Ast reqd. for above area = (0.8/100)x113.07= 0.91 cm << 37.6991 cm
CHECK FOR BI AXIAL BENDING
Mux = 20.58 T-m Mux1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16
Muz = 0.04 T-m Muz1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 6.92/364.94 = 0.02
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
αn αn
(Mux/Mux1) +(Muz/Muz1) = (20.58/28.48)^1+(0.04/28.48)^1= 0.72 < 1.0 ok
CASE :4 Design for Compression & Bending
Load Case : 204 DL + LL + WL(+Z) Node 28+32
Axial Load, Pu = 9.51 T
Mz= 0.14 T-m
Mx= 13.7 T-m
PRELIMINARY ASSESMENT OF REINFORCEMENT
Pu / fckbD = (9.514*10^4)/(25*450*450)= 0.019 N/mm²
Mu / fckbD² =[(0.14)*10^7]/(25*450*450^2)+(13.7384)*10^7/((25*450*450^2)= 0.061 N/mm²
d'/D= 0.13 from Chart-48 of SP-16,
p/fck= 0.040 p= 1.00 % Ast reqd = 2025 mm²
Provide 12 nos 20 φ bar
Ast provided = 3769.91 mm² > 2025 mm² ok pt provided = 1.86 %
CHECK FOR BI AXIAL BENDING
Mux = 13.74 T-m Mux1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16

Muz = 0.14 T-m Muz1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 9.514/364.94 = 0.03
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
αn αn
(Mux/Mux1) +(Muz/Muz1) = (13.74/28.48)^1+(0.14/28.48)^1= 0.49 < 1.0 ok
CHECK FOR EMBEDDED LENGTH OF BOLT
Minimum Dia of bolt provided=
20 mm Bond strength for M25 concrete with plain bar= 0.9 N/sq.m
No. of bolt provided= 4 Maximum Unfactored Uplift per bolt= 0/(4x1.5)= 0 Ton= 0N
2 x π x r x l x 1.33 x 0.9 = uplift per bolt
l= 0 mm
Provided minimum embedded length 300 mm Hence Ok

Page 11 of 11

You might also like