Beam Girder Foundation 5000-BG-F2 & F2a - Rev-0
Beam Girder Foundation 5000-BG-F2 & F2a - Rev-0
Beam Girder Foundation 5000-BG-F2 & F2a - Rev-0
Note :
1 These Foundations are in Between Chainage 5000 To Chainage 6000).
2 For Foundation Mkd 500-BG-F2 : 6M SPAN HC BEAM GIRDER SUPPORTED FROM BOTH SIDE.
3 For Foundation Mkd 500-BG-F2A : 6M SPAN HC BEAM GIRDER SUPPORTED FROM ONE SIDE.
Page 1 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
CASE -1 101 DL + LL
Horizontal Vertical Horizontal Moment
Node L/C Fx Mton Fy Mton Fz Mton Mx MTon-m My MTon-m Mz MTon-m
28+32 101 DL + LL
0.043 7.929 -5.5 0 0 0
19+23 101 DL + LL
0.012 5.767 5.5 0 0 0
Page 2 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
1000
300
𝑷𝟏 450
0
x
1710
2300
𝑷𝟐
Page 3 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
CASE -1 101 DL + LL
Calculation Of Ecentricity in +X Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 101 DL + LL 0.043 7.929 0.5 2.90 0.1247 3.96
P2 101 DL + LL 0.012 5.767 0.5 2.90 0.035 2.88
Self weight of pedestal P1 1.32 0.5 0.658
Self weight of pedestal P2 1.32 0.5 0.658
P1 Moment from staad 0
P2 Moment from staad 0
S/W of Slab+fdn beam 1.73 0.5 0.870
Self Weight of Soil 7.50 0.5 3.750
Total= 25.56 0.16 12.776
Page 4 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
Mz = P x ex = (17.8*0)= 0 T-m
Maximum Base Pressure = P/A + Mz/Zzz+ Mx/Zxx=
(17.8/(2.3))+(0/(0.39))+(6.052/(0.89))=
14.54 T/m² < 40.75 T/sq.m Safe
Mniimum Base Pressure = P/A - Mz/Zzz-Mx/Zxx=
(17.8/(2.3))-(0/(0.39))-(6.052/(0.89))=
0.94 T/m² < 40.75 T/sq.m
So Tension develops
Contact Length = 3 x (L/2-e) 3x(2.3/2-0.34)= 2.43 m
Modified Pressure = 17.84/(0.5x2.43x1)= 14.683 T/m² < 40.8 T/sq.m Safe
Page 5 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
CASE -3 104 DL + LL + WL(+Z)
Calculation Of Ecentricity in +X Direction(Taking moment about 'O')
Horizontal Vertical Overturning Restoring
Horizontal Vertical Load
Node L/C Distance From Distance From Moment Moment
load (MT) (MT)
'O' (m) 'O' (m) (MO) (T-m) (MR) (T-m)
P1 104 DL + LL + WL(+Z) 0.043 7.928 0.5 2.90 0.125 3.96
P2 104 DL + LL + WL(+Z) 0.011 5.766 0.5 2.90 0.032 2.88
Self weight of pedestal P1 1.32 0.5 0.658
Self weight of pedestal P2 1.32 0.5 0.658
P1 Moment from staad 0
P2 Moment from staad 0
S/W of Slab+fdn beam (W4) 1.73 0.5 0.87
Self Weight of Soil (W5) 7.50 0.5 3.75
Total= 25.56 0.16 12.78
Page 6 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
0.45
Distribution reinforcement
Distribution steel = 0.12bD/100= 360 mm²/m
On each face = 180 mm²/m
Provide 10 φ @ 200 c/c at top in shorter direction
Area of Steel provd, Ast = 392.7 mm²/m > 180 mm²/m ok
Check for One way shear (at 'd' dist from face of pedestal)
Dist from edge of footing to section at 'd' from face of pedestal = 0.275-0.233= 0.042 m
Shear at the critical section = 12.37*0.042= 0.52 T
Design S.F., Vu = 1.5*0.52= 0.78 T
τv = Vu/bd = 0.030 < 0.303 ok
Page 7 of 11
MACMET INDIA LIMITED
Overland Conveying System for sourcing of Bauxite
NATIONAL ALUMINIUM COMPANY DOC. NO. Date
Client: Project: from Panchpatmali Mines for Alumina Refinery, M &
LIMITED JN2682-DC-C-020_Rev-
R Complex at Damanjodi, Odisha. 24.05.2023
0
Designed by Checked by Appvd by
Title: Design Calculation of Beam Girder Foundation Mkd 500-BG-F2 & F2A
ARC AP AC
2
From Table 61 of SP-16 tc = 0.404 N/mm
Page 8 of 11
MACMET ENGINEERING LIMITED
Overland Conveying System for sourcing of DOC. NO. DATE
NATIONAL ALUMINIUM Bauxite from Panchpatmali Mines for
Client: Project:
COMPANY LIMITED Alumina Refinery, M & R Complex at JN2682-DC-C-020_Rev-0 24.05.2023
Damanjodi, Odisha.
Muz = 0.17 T-m Muz1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 11.893/364.94 = 0.03
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
(Mux/Mux1)αn +(Muz/Muz1)αn= (21.45/28.48)^1+(0.17/28.48)^1= 0.76 < 1.0 ok
Page 9 of 11
MACMET ENGINEERING LIMITED
Overland Conveying System for sourcing of DOC. NO. DATE
NATIONAL ALUMINIUM Bauxite from Panchpatmali Mines for
Client: Project:
COMPANY LIMITED Alumina Refinery, M & R Complex at JN2682-DC-C-020_Rev-0 24.05.2023
Damanjodi, Odisha.
Muz = 0.01 T-m Muz1 = 27.3 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.120 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 4.158/364.94 = 0.01
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
(Mux/Mux1)αn +(Muz/Muz1)αn= (12.69/27.34)^1+(0.01/27.34)^1= 0.47 < 1.0 ok
Page 10 of 11
MACMET ENGINEERING LIMITED
Overland Conveying System for sourcing of DOC. NO. DATE
NATIONAL ALUMINIUM Bauxite from Panchpatmali Mines for
Client: Project:
COMPANY LIMITED Alumina Refinery, M & R Complex at JN2682-DC-C-020_Rev-0 24.05.2023
Damanjodi, Odisha.
Muz = 0.14 T-m Muz1 = 28.5 T-m for, pt = 1.86 % p/fck= 0.074 d'/D= 0.13
Mu/fckDb²= 0.125 Ref Chart 47/48 of SP 16
A s= 3769.91 mm²
Ac= (450*450)-3769.91= 198730 mm²
Puz = 0.45fck Ac + 0.75fy As =(0.45*25*198730+0.75*500*3769.91)/10^4 = 364.94 T
Pu/Puz = 9.514/364.94 = 0.03
αn = 1.0 (Pu / Puz ≤ 0.2 αn = 1.0 Pu / Puz ≥ 0.8 αn = 2.0 )
αn αn
(Mux/Mux1) +(Muz/Muz1) = (13.74/28.48)^1+(0.14/28.48)^1= 0.49 < 1.0 ok
CHECK FOR EMBEDDED LENGTH OF BOLT
Minimum Dia of bolt provided=
20 mm Bond strength for M25 concrete with plain bar= 0.9 N/sq.m
No. of bolt provided= 4 Maximum Unfactored Uplift per bolt= 0/(4x1.5)= 0 Ton= 0N
2 x π x r x l x 1.33 x 0.9 = uplift per bolt
l= 0 mm
Provided minimum embedded length 300 mm Hence Ok