SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.

00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW

Cable and Conduit Seal To be Reviewed and Approved Prior to Electrical Work at
1.01
Installation Procedure
SAIC-P-3004 SAIC-P-3004 RH R Jobsite.

2.00 RECEIVING INSPECTION

Storage, Handling and Preservation Visual


See
2.01 Inspection SAIC-T-5001
Remarks I S Weekly Inspection by Contractor QC
for Electronic Equipment

Storage, Handling and Preservation Visual


See
2.02 Inspection SAIC-P-3002
Remarks I S Weekly Inspection by Contractor QC
for Electrical Equipment

Material Receiving
Visual Inspection for Manufactured
2.03
Instrument Enclosures, Panels and Racks
SAIC-J-6025 H W
MR

Material Receiving
2.04 Visual Inspection for Instrument Rack / SAIC-J-6028 H W
Panel Fabrication

Material Receiving
2.05 Visual Inspection for Boxes, Enclosures SAIC-P-3007 H W
and Access

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Instrument enclosure and support accessories include


mechanical fasteners, gaskets, terminal blocks & points,
sub-panels, door/panel hardware, drain fittings, box ID,
labels, manufacturer nameplates, terminal block & point
labels, warning signs, external/internal grounding &
Accessories
bonding hardware and mounting lugs.
Material Receiving See
2.06
Visual Inspection for Channel and Strut
SAIC-P-3005
Remarks H W
Channel and strut materials include all mechanical
Materials & Access.
fasteners, anchors, threaded rods, fittings and brackets
required to provide supplemental supports.

Notify SA by RFI of initial receipt of each listed accessory


(by type or manufacturer).

Instrument enclosure and support accessories include


mechanical fasteners, gaskets, terminal blocks & points,
sub-panels, door/panel hardware, drain fittings, box ID,
labels, manufacturer nameplates, terminal block & point
labels, warning signs, external/internal grounding &
Accessories
bonding hardware and mounting lugs.
Material Receiving See
2.07
Visual Inspection for Boxes, Enclosures
SAIC-P-3007
Remarks H W
Channel and strut materials include all mechanical
and Access.
fasteners, anchors, threaded rods, fittings and brackets
required to provide supplemental supports.

Notify SA by RFI of initial receipt of each listed accessory


(by type or manufacturer).

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Instrument enclosure and support accessories include


mechanical fasteners, gaskets, terminal blocks & points,
sub-panels, door/panel hardware, drain fittings, box ID.
labels, manufacturer nameplates, terminal block & point
labels, warning signs, external/internal grounding &
Accessories
bonding hardware and mounting lugs.
Material Receiving See
2.08
Visual Inspection for Metallic Wireways
SAIC-P-3008
Remarks H W
Channel and strut materials include all mechanical
and Access.
fasteners, anchors, threaded rods, fittings and brackets
required to provide supplemental supports.

Notify SA by RFI of initial receipt of each listed accessory


(by type or manufacturer).

Instrument enclosure and support accessories include


mechanical fasteners, gaskets, terminal blocks & points,
sub-panels, door/panel hardware, drain fittings, box ID.
labels, manufacturer nameplates, terminal block & point
labels, warning signs, external/internal grounding &
Accessories
bonding hardware and mounting lugs.
Material Receiving See
2.09
Visual Inspection for Non-metallic
SAIC-P-3009
Remarks H W
Channel and strut materials include all mechanical
Wireways and Access.
fasteners, anchors, threaded rods, fittings and brackets
required to provide supplemental supports.

Notify SA by RFI of initial receipt of each listed accessory


(by type or manufacturer).

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

3.00 INSTALLATION

Supplemental Support
Fabrication and Installation SA PID to be notified on start of this activity for each
3.01
Visual Inspection
SAIC-J-6031 SAIC-J-6031 H W process system and plant area.
(Before Installation)

Instrument Rack / Panel


Fabrication SA PID to be notified on start of this activity for each
3.02
Visual Inspection
SAIC-J-6028 SAIC-J-6028 H W process system and plant area.
(Before Installation)

Instrument Rack / Panel


Installation See SA PID to be notified on start of this activity for each
3.03
Visual Inspection for General - Inst.
SAIC-J-6030
Remarks H W process system and plant area.
Enclosures, Racks and Panels

Instrument Rack / Panel


Installation See SA PID to be notified on start of this activity for each
3.04
Visual Inspection for Class I, Div 1, Zone
SAIC-P-3016
Remarks H W process system and plant area.
0&1, Hazardous Location Enclosures

Instrument Rack / Panel


Installation See SA PID to be notified on start of this activity for each
3.05
Visual Inspection for Class I, Div 2, Zone
SAIC-P-3017
Remarks H W process system and plant area.
2, Hazardous Location Enclosures

Instrument Rack / Panel


Installation See SA PID to be notified on start of this activity for each
3.06
Visual Inspection for Non-Hazardous
SAIC-P-3014
Remarks H W process system and plant area.
Indoor Enclosures

Instrument Rack / Panel


Installation See SA PID to be notified on start of this activity for each
3.07
Visual Inspection for Non-Hazardous
SAIC-P-3015
Remarks H W process system and plant area.
Outdoor Enclosures

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Hazardous Location
Hold point includes cable connectors, conduit hubs,
Enclosure Installation
conduit unions, box drainage and conduit seal fitting
and Identification Numbering See
3.08
Visual Inspection
SAIC-J-6030
Remarks H H installation.
SA PID to be notified on completion of this activity for each
(Before Cable Pulling) for General - Inst.
process system and plant area.
Enclosures, Racks and Panels

Hazardous Location
Enclosure Installation Hold point includes cable connectors, conduit hubs,
and Identification Numbering conduit unions, box drainage and conduit seal fitting
See
3.09 Visual Inspection SAIC-P-3016
Remarks H H installation.
(Before Cable Pulling) for Class I, Div 1, SA PID to be notified on completion of this activity for each
Zone 0&1, Hazardous Location process system and plant area.
Enclosures

Hazardous Location
Enclosure Installation Hold point includes cable connectors, conduit hubs,
and Identification Numbering conduit unions, box drainage and conduit seal fitting
See
3.10 Visual Inspection SAIC-P-3017
Remarks H H installation.
(Before Cable Pulling) SA PID to be notified on completion of this activity for each
for Class I, Div 2, Zone 2, Hazardous process system and plant area.
Location Enclosures

Non-Hazardous Location
Enclosure Installation Hold point includes cable connectors, conduit hubs,
and Identification Numbering conduit unions, box drainage, conduit seal fittings and
See
3.11 Visual Inspection SAIC-J-6030
Remarks H W cable tray interface installation.
(Before Cable Pulling) SA PID to be notified on start of this activity for each
for General - Inst. Enclosures, Racks and process system and plant area.
Panels

Non-Hazardous Location
Hold point includes cable connectors, conduit hubs,
Enclosure Installation
conduit unions, box drainage, conduit seal fittings and
and Identification Numbering See
3.12
Visual Inspection
SAIC-P-3014
Remarks H W cable tray interface installation.
SA PID to be notified on start of this activity for each
(Before Cable Pulling)
process system and plant area.
for Non-Hazardous Indoor Enclosures

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Non-Hazardous Location
Hold point includes cable connectors, conduit hubs,
Enclosure Installation
conduit unions, box drainage, conduit seal fittings and
and Identification Numbering See
3.13
Visual Inspection
SAIC-P-3015
Remarks H W cable tray interface installation.
SA PID to be notified on start of this activity for each
(Before Cable Pulling)
process system and plant area.
for Non-Hazardous Outdoor Enclosures

Cable Gland Installation Activity for enclosure, panel or rack with cable connectors.
Visual Inspection Hold point after cable pulling and prior to cable dressing
See
3.14 (Before Cable Termination) SAIC-P-3017
Remarks H W and termination.
for Class I, Div 2, Zone 2, Hazardous SA PID to be notified on start of this activity for each
Location Enclosures process system and plant area.

Activity for enclosure, panel or rack with cable connectors.


Cable Gland Installation
Hold point after cable pulling and prior to cable dressing
Visual Inspection See
3.15
(Before Cable Termination)
SAIC-P-3014
Remarks H W and termination.
SA PID to be notified on start of this activity for each
for Non-Hazardous Indoor Enclosures
process system and plant area.

Activity for enclosure, panel or rack with cable connectors.


Cable Gland Installation
Hold point after cable pulling and prior to cable dressing
Visual Inspection See
3.16
(Before Cable Termination)
SAIC-P-3015
Remarks H W and termination.
SA PID to be notified on start of this activity for each
for Non-Hazardous Outdoor Enclosures
process system and plant area.

4.00 PRE-COMMISSIONING

Hazardous Location Hold point (each panel or cabinet) after fiber damming and
4.01 Enclosure Sealing SAIC-P-3209 SAIC-P-3209 H H prior to cement pouring for conduit hubs, conduit seals and
Visual Inspection cable seals.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Final Inspection Hold point includes inspection of installed weather-proof


(Before Energization) See sealing.
4.02
for General - Inst. Enclosures, Racks and
SAIC-J-6030
Remarks H H SA PID to be notified on start of this activity for each
Panels process system and plant area.

Final Inspection Hold point includes inspection of installed weather-proof


(Before Energization) See sealing.
4.03
for Class I, Div 1, Zone 0&1, Hazardous
SAIC-P-3016
Remarks H H SA PID to be notified on start of this activity for each
Location Enclosures process system and plant area.

Final Inspection Hold point includes inspection of installed weather-proof


(Before Energization) See sealing.
4.04
for Class I, Div 2, Zone 2, Hazardous
SAIC-P-3017
Remarks H H SA PID to be notified on start of this activity for each
Location Enclosures process system and plant area.

Hold point includes inspection of installed weather-proof


Final Inspection
See sealing.
4.05 (Before Energization) SAIC-P-3014
Remarks H H SA PID to be notified on start of this activity for each
for Non-Hazardous Indoor Enclosures
process system and plant area.

Hold point includes inspection of installed weather-proof


Final Inspection
See sealing.
4.06 (Before Energization) SAIC-P-3015
Remarks H H SA PID to be notified on start of this activity for each
for Non-Hazardous Outdoor Enclosures
process system and plant area.

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018) Rev.2018.06.00 30-Jun-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Instrumentation Racks and Panels (open);
SATIP-J-902-06 24-Jul-18 INSTRUMENTATION
Terminal Boxes and Instrument Cabinets (enclosed)
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018)

Saudi Aramco: Company General Use


Rev.2018.06.00 30-Jun-18

###

Saudi Aramco: Company General Use


24-Jul-18 24-Jul-18

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 24-July-2018 - REV. 2018.06.00(Standards Cutoff -June 30,2018)

Saudi Aramco: Company General Use


Rev.2018.06.00 30-Jun-18

###

Saudi Aramco: Company General Use


24-Jul-18 24-Jul-18

Saudi Aramco: Company General Use

You might also like