Apollo Site Commission Test
Table of Contents
2. Stability Test.................................................................12
3. Summary.......................................................................13
2
Apollo Site Commission Test
Introduction
Once the customer has signed this form, it constitutes the customer’s
approval of the sites installation and tests: mechanical, electrical and
functional.
3
Apollo Site Commission Test
The use of those tests is to verify normal operation of all OPT Network Elements
General Information
NE Name: HR_BWNK_B2304_T01_C_O_EA96002
NE Type: OPT9603
NE ID: 9624
4
Apollo Site Commission Test
NE Cards Inventory
Card / Module Type Slot # Boot Version Serial #
5
Apollo Site Commission Test
6
Apollo Site Commission Test
Remark:
Make sure the Boot Version of each card is as required according to the embedded version.
7
Apollo Site Commission Test
NE Techanical Tests
Results
No. Description
(Pass / Failed / Value)
3 All the power cables properly terminated with suitable lugs PASS
4 Ground cables at Rack and at the sub rack are properly Terminated PASS
Perform slot assignment for all relevant card (according to the Installation
13
book)
8
Apollo Site Commission Test
Sr.
No. Description Expected Result Actual
1 Check Power supply Input Redundancy Redundant Power
2 DCDB Redundancy
2.1 Switch off MCB-A power supply Shelf working with MCB – B 16 AMP
2.2 Switch off MCB-B power supply Shelf working with MCB – A 16 AMP
Power A and Power B are coming from two
2.3 different Power Plants
Power A and Power B are coming from two
2.4 different DCDBs
NE Booting Time
Sr.
No. Description Expected Result Actual
Turn off the both Power Supply (Main & Stand
1 by) of subrack, turn ON the NE, and Check the (Appx. 3 min). 180 SEC
rebooting time
9
Apollo Site Commission Test
Specifications:
Max. Launch RX sensitivity Overload (dBm)
Min LaunchPower(dBm) (dBm)
SFP Type
power (dBm)
OTP10T_ALLN -1 +3 -22 -7
OTR64_PI3 -6 -1 -11 +0.5
10
Apollo Site Commission Test
Specifications:
11
Apollo Site Commission Test
MUX/DMUX Type Input channel power Line Out power Total insertion loss
Specifications:
MUX/DMUX Type Insertion Loss(dB) Range
MXD8 0 to 2.8
MXD16 0 to 5.5
DCF range
DCF Type Input power Output power Total insertion loss
Specifications:
DCF Type Insertion Loss(dB)
Range
DCF 5 0 to 0.9
DCF 10 0 to 1.3
DCF 20 0 to 1.8
DCF 30 0 to 2.5
DCF 40 0 to 2.9
DCF 50 0 to 3.4
DCF 60 0 to 4.1
DCF 70 0 to 4.8
DCF 80 0 to 5.4
12
Apollo Site Commission Test
Perform slot assignment for all Make sure no abnormal alarms on any
relevant cards in the shelf (according card (Fail card, bit fail, type
to the installation book). mismatch…) .
2. Stability Test
24Hrs Link stability test to be done for each new link implemented. Test Doc to be attached along
with ATP sheet.
13
Apollo Site Commission Test
3. Summary
The customer’s representative hereby declares that the installation, commissioning and test
results of all sites are to his satisfaction.
The following signature and date represent customer’s commissioning of all sites and the start of
the warranty period.