Apollo Site Commission Test

Site
Commission
Tests

PROPRIETARY DATA

This controlled document is the property of Network Solutions Department. Any


duplication, reproduction or transmission to unauthorized parties without the prior
permission of
ECI Telecom Ltd. is prohibited.

1
Apollo Site Commission Test

Table of Contents

1. Site Installation Tests.....................................................4


General Information..................................................................................................4
NE Cards Inventory..................................................................................................5
NE Mechanical Tests................................................................................................7
Power Supply Test....................................................................................................8
Power Redundancy Test............................................................................................8
NE Booting Time......................................................................................................8
NE Optical Power Measurements (OPM)..................................................................9
Amplifier Gain Range.............................................................................................10
MUX/DE-MUX Insertion Loss Test.......................................................................11
DCF range..............................................................................................................11
NE CARD Assignment/Alarm Check.....................................................................12

2. Stability Test.................................................................12
3. Summary.......................................................................13

2
Apollo Site Commission Test

Introduction

This document consists of the following sections:

Site installation commission form.

This section includes site details, information and tests.


Those tests need to be done on every NE and in all site, in order to
verify normal operation of each NE.

Once the customer has signed this form, it constitutes the customer’s
approval of the sites installation and tests: mechanical, electrical and
functional.

Appendix A – Standard Warranty Terms

3
Apollo Site Commission Test

1. Site Installation Tests


All the tests mention in the following section need to be done for all NE’s and for all sites

The use of those tests is to verify normal operation of all OPT Network Elements

General Information

Customer Name: VIL

Location/Site Name: Bawanikhera

Project Name: ECI

NE Name: HR_BWNK_B2304_T01_C_O_EA96002

NE Type: OPT9603

NE ID: 9624

NE Emb Version: V9.1MR1

Node IP: 10.251.219.166

NE Serial No: 6700817828

Date of Testing: 15-03-2023

4
Apollo Site Commission Test

NE Cards Inventory
Card / Module Type Slot # Boot Version Serial #

FCM03 fan 6700828286


OA_DPR Np1:phy 5503558067

PFM03 pfm-a 6700828101

PFM03 pfm-b 6700828081


RCP03 rcpa 6700827869
OPT9603 so 6700828795

5
Apollo Site Commission Test

6
Apollo Site Commission Test

Card / Module Type Slot # Boot Version Serial #

Remark:
Make sure the Boot Version of each card is as required according to the embedded version.

7
Apollo Site Commission Test

NE Techanical Tests
Results
No. Description
(Pass / Failed / Value)

1 Rack mechanical mounting PASS

2 DC Power cable installation (Mains to Equipment XINF) PASS

3 All the power cables properly terminated with suitable lugs PASS

4 Ground cables at Rack and at the sub rack are properly Terminated PASS

5 Sub rack installed as per Planned Document PASS

6 All patch cords routed, terminated and Labeled properly PASS

7 ODF Installation N/A

8 Cards / Modules unpacking and insertion to NE PASS

9 Check DC power Voltage -54.3 V

10 Check if the AC power supplied if RAW or UPS N/A

11 Check if the mains is Three / Single Phase supply N/A

12 Communication to eCraft via Slip PASS

Perform slot assignment for all relevant card (according to the Installation
13
book)

14 Check that there are no abnormal alarms PASS

15 LED Test PASS

8
Apollo Site Commission Test

Power Supply Test

Item Planned Actual


Main PS -48V DC or -60V
Rack Power Test DC Standby PS -48V DC or -
60V DC
MCB rating Required 1 Shelf 2*16Amp 16AMP
Actual Measurement at DCDB MCB 1 16 Amp 16 AMP
MCB 2 16 Amp 16 AMP

Power Redundancy Test

Sr.
No. Description Expected Result Actual
1 Check Power supply Input Redundancy Redundant Power
2 DCDB Redundancy
2.1 Switch off MCB-A power supply Shelf working with MCB – B 16 AMP
2.2 Switch off MCB-B power supply Shelf working with MCB – A 16 AMP
Power A and Power B are coming from two
2.3 different Power Plants
Power A and Power B are coming from two
2.4 different DCDBs

NE Booting Time

Sr.
No. Description Expected Result Actual
Turn off the both Power Supply (Main & Stand
1 by) of subrack, turn ON the NE, and Check the (Appx. 3 min). 180 SEC
rebooting time

9
Apollo Site Commission Test

NE Optical Power Measurements (OPM)

Slot Card Port TX Optical RX Optical RX Sensitivity*


type / Wavelength ALS
# no. Level * Level * (dbm) Level (dbm)
module
(dbm)

Specifications:
Max. Launch RX sensitivity Overload (dBm)
Min LaunchPower(dBm) (dBm)
SFP Type
power (dBm)
OTP10T_ALLN -1 +3 -22 -7
OTR64_PI3 -6 -1 -11 +0.5

10
Apollo Site Commission Test

Amplifier Gain Range

Test Submit Optical Amplifier Gain Test


Amplifier Power IN Power Out Amplifier Gain Range
Slot No. Test result
Type (dBm) (dBm) Gain (dB) (dB)

Specifications:

Amplifier specification OA_PA


Max. total output power(dBm) +16
Gain (dB) 12-21
Spectrum (nm) 1530-1563
Gain flatness (dB) <+/-0.6
Noise Figure(dB) <6.5
Return Loss <45

11
Apollo Site Commission Test

MUX/DE-MUX Insertion Loss Test

MUX/DMUX Type Input channel power Line Out power Total insertion loss

Specifications:
MUX/DMUX Type Insertion Loss(dB) Range
MXD8 0 to 2.8
MXD16 0 to 5.5

DCF range
DCF Type Input power Output power Total insertion loss

Specifications:
DCF Type Insertion Loss(dB)
Range
DCF 5 0 to 0.9
DCF 10 0 to 1.3
DCF 20 0 to 1.8
DCF 30 0 to 2.5
DCF 40 0 to 2.9
DCF 50 0 to 3.4
DCF 60 0 to 4.1
DCF 70 0 to 4.8
DCF 80 0 to 5.4

12
Apollo Site Commission Test

NE CARD Assignment/Alarm Check


Test Procedure Expected Results Results
(Pass / Failed)

Perform slot assignment for all Make sure no abnormal alarms on any
relevant cards in the shelf (according card (Fail card, bit fail, type
to the installation book). mismatch…) .

2. Stability Test
24Hrs Link stability test to be done for each new link implemented. Test Doc to be attached along
with ATP sheet.

13
Apollo Site Commission Test

3. Summary
The customer’s representative hereby declares that the installation, commissioning and test
results of all sites are to his satisfaction.
The following signature and date represent customer’s commissioning of all sites and the start of
the warranty period.

CUSTOMER Representative Comments:


_ _

ECI Representative Comments:


_

ECI REPRESENTATIVE VIL REPRESENTATIVE

Name: SAURAV PAL Name: Mr, Sansar Chand

Title: 6392381926 Title: 9991234659


Signature Saurav Pal Signature
Date: 27-02-2023 Date: 27-02-2023