Professional Documents
Culture Documents
Dar Measurement and Labour Charges
Dar Measurement and Labour Charges
SUMMARY
1.1 SUBSTRUCTURE
Concrete Works
50 mm blinding m2 160
Concrete to trench m3 48
Concrete to Column Bases m3 23
Concrete Footing m3 10
Starter Columns m3 1
Formworks
Sides of strip foundation m2 116
Sides of strip column bases m2 78
Sides of starter column m2 78
Sides of ground beams m2 139
Reinforcements
12mm bars kg 1,648
Steel ups kg 1,263
Blockwork
foundation wall; 230mm thick wall m2 255
Plinth Finishes
Rendering,Externally m2 104
Three coats weather guard paints m2 104
Blockwork
superstructure wall; 230mm thick wall m2 230
Concrete Works
Columns m3 15
Formworks
Sides of columns m2 171
Reinforcements
16mm bars kg 3,119
WALL FINISHING
Plastering
Plaster to walls; internally m2 256
Plaster to walls; externally m2 256
Painting
Paint to walls; internally m2 256
Paint to walls;Externally m2 256
Plastering
Painting
19,939,191.96
3,821,197.67
3,840,000.00
10,171,097.50
37,771,487.13
500.00 1,681,641.60
4,000.00 960,273.00
4,000.00 550,800.00
500.00 93,534.13
250.00 57,987.50
250.00 57,987.50
50,000.00 8,002,275.00
50,000.00 2,400,682.50
50,000.00 1,164,000.00
50,000.00 477,480.00
50,000.00 51,975.00
5,000.00 579,875.00
5,000.00 391,600.00
5,000.00 391,600.00
5,000.00 695,850.00
350.00 576,770.21
350.00 442,154.27
3,500.00 893,007.50
2,500.00 260,943.75
2,000.00 208,755.00
19,939,191.96
3,500.00 804,405.00
50,000.00 762,300.00
5,000.00 856,125.00
350.00 1,091,483.75
350.00 306,883.92
3,821,197.67
1,140,000.00 1,140,000.00
36,000.00 2,700,000.00
3,840,000.00
7,500.00 1,921,950.00
7,500.00 1,921,950.00
7,000.00 1,793,820.00
7,000.00 1,793,820.00
7,500.00 132,825.00
7,500.00 521,887.50
7,500.00 762,300.00
7,000.00 123,970.00
7,000.00 487,095.00
7,000.00 711,480.00
10,171,097.50
Item Description No. Length
3 1
4 Backfilling
4 DPC 231.95
CONCRETE WORKS
F1&C1 3 1.2
F2 &C2 74 1
9 Starter Columns
F1&C1 3 0.3
F2&C2 74 0.3
BLOCKWORK
FORMWORK
F1 &C1 3 1.2
F2&C2 74 1
Reinforcement
15 12mm Bars; high yield steel; cold worked; B.S. 4461
16 Steel ups
21 Plinth finishing
a Walls 1 231.95
b Walls 1 231.95
Breadth Height Quantity Unit
56.64 3363.28 M2
TOTAL 240.06825 M3
1 1.50 133.20 M3
1 1.50 4.50 M3
TOTAL 137.70 M3
187.06825 M3
231.95 M
231.95 M
0.69 160.05 M2
48.01 M3
1 0.30 1.08 M3
1 0.30 22.20 M3
23.28 M3
1.04 M3
1.10 255.15 M2
0.25 115.98 M2
1.2 4.32 M2
1 74.00 M2
TOTAL 78.32 M2
1.2 4.32 M2
1 74.00 M2
TOTAL 78.32 M2
0.3 139.17 M2
0.888 823.95744 Kg
0.888 823.95744 Kg
1647.91488 Kg
0.888 631.6489632 Kg
0.888 631.6489632 Kg
1263.2979264 Kg
0.45 104.3775 M2
0.45 104.3775 M2
Remark
FRAME
CONCRETE WORK
1 Columns
F1 &C1 3 0.3
F2&C2 74 0.3
2 Beam 231.95
FORMWORK
REINFORCEMENT
5 Column 77 13.6
6 Beam 1 927.8
STEEL UP
TOTAL 15.25 M3
0.30 101.64 M2
0.15 69.59 M2
TOTAL 171.23 M2
1.579 1653.5288 kg
1.579 1464.9962 kg
TOTAL 3118.525 M2
0.888 261.4272 kg
0.888 615.384 Kg
TOTAL 876.8112 Kg
No Description No. Length Breadth Height
WALLING BLOCKS
DDT
278.34 m2
-48.51 m2
229.83 M2
No Description No.
METAL GATE
METAL GRILLS
1 No
75 No
No Description
WALL FINISHING
Internally
Externally
Internally
Externally