Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

DRAWING LIST VAC

SCALE : PAPER SIZE : A3

MAC-01-01
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

SYMBOL & LEGEND

SCALE : PAPER SIZE : A3

MAC-02-01
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

PIPE DETAIL

SCALE : PAPER SIZE : A3

MAC-02-02
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

DUCT DETAIL

SCALE : PAPER SIZE : A3

MAC-02-03
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

AIR CONDITIONING
EQUIPMENT SCHEDULE-1

SCALE : PAPER SIZE : A3

MAC-03-01
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

AIR CONDITIONING
EQUIPMENT SCHEDULE-2

SCALE : PAPER SIZE : A3

MAC-03-02
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

VENTILATION
EQUIPMENT SCHEDULE

SCALE : PAPER SIZE : A3

MAC-03-03
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

AIR CONDITIONING
SCHEMATIC DIAGRAM

SCALE : PAPER SIZE : A3

MAC-03-04
OWNER :

PROJECT NAME :

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

REMARKS :

contractor must remeasure on site and produce


shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

NO. REVISION DATE SIGN

KEYPLAN :

APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

DRAWING TITLE :

VENTILATION
SCHEMATIC DIAGRAM

SCALE : PAPER SIZE : A3

MAC-03-05
OWNER :

PROJECT NAME :

ISD-M01
KAPASITAS = 68.000 BTU/H
POWER = 8.6 KW

ARCHITECTURE CONSULTANT :

2.198 CFM 2.750 CFM


mp PT. Makmur Sistimindo Perkasa
Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :
2WV
VD VD VD VD

RETURN
SUPPLY

687 CFM 687 CFM 687 CFM 687 CFM REMARKS :

A2030 A2027 A2028 A2029


R. MULTIPURPOSE RESTING AREA OPEN DESK MEDIA (COMPUTER)

T = 25±2°C T = 25±2°C T = 25±2°C T = 25±2°C


VD PRESS. = 7,5 Pa PRESS. = 7,5 Pa PRESS. = 7,5 Pa PRESS. = 7,5 Pa

VD VD VD VD

549 CFM 549 CFM 549 CFM 549 CFM

VD

ISD-M02 ISD-M03 contractor must remeasure on site and produce


KAPASITAS = 68.000 BTU/H KAPASITAS = 136.000 BTU/H shopdrawing to record any discrepancies between
POWER = 8.6 KW POWER = 17.86 KW drawing dimension and actual site dimension.

NO. STATUS DATE SIGN

2.200 CFM 2.750 CFM 4.688 CFM 5.860 CFM 2

2WV 2WV 5
VD VD VD
4
RETURN RETURN
SUPPLY SUPPLY 3

1
1.375 CFM 1.375 CFM 5.860 CFM
NO. REVISION DATE SIGN
A2036 A2037 A2042
COMPUTER MEDIA COMPUTER BALL ROOM KEYPLAN :
SOFTWARE

T = 25±2°C T = 25±2°C T = 25±2°C


VD PRESS. = 7,5 Pa PRESS. = 7,5 Pa VD PRESS. = 7,5 Pa

APPROVAL :

DRAWN : DATE SIGN

VD VD VD SUB MANAGER

CHECKED

1.100 CFM 1.100 CFM 4.688 CFM PROJECT MANAGER

FILE NAME

VD VD DRAWING TITLE :

PACKAGED DUCT
FLOW DIAGRAM

SCALE : PAPER SIZE : A3

MAC-03-06
OWNER :

G J'
A B C D E F H I J K L
PROJECT NAME :
58900
4400 6000 6000 6000 6000 600 6000 6000 6000 6000 5900

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


1 1 Wijaya Grand Centre
Blok G 12 a/b, 3rd Floor
Jl. Wijaya II, Kebayoran Baru
Phone: (62-21) 721 0356 (Hunting)
(62-21) 739 8938 (Direct)
Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com
Storage Sewing Beauty Cooking Storage
7200

7200
A1039 A1040 A1032 A1035 A1036
ARCHITECT :
3,000 3,000 3,000 3,000 2,700
Store Store
A1033 A1034
3,000 3,000
2 Staircase-3 Staircase-4 Corridor-2 Staircase-2 2
4000

4000
REMARKS :
A1038 A1041 A1031 A1037
- - 3,000 -
23400

3 Tester Room
3
Storage Wood working (Machine) Storage A1027
Conference Room
3,000
7200

7200
A1042 A1043 A1045 A1026
- 3,000 3,000 3,000
Conselling Room
A1028
3,000
4 Wood working (Assembly)
Wudhu area-2 4
A1025
5000

Loading Area A1044 Musholla - Male Toilet-1 Female Toilet-1


3,000

8000
A1023 A1029 A1030
3,000 2,700 2,700
5 Wudhu area-1
A1024
- Difable Toilet-2
A1013
6

54200
3,000

Admin Office Head of Admin Head office-1 Head Office-2


시스템책상 개인석
Male Toilet-2 Female Toilet-2

7200
A1008 A1009 A1010 A1011 A1016 A1017 contractor must remeasure on site and produce
3,000 3,000 3,000 3,000 2,700 2,700 shopdrawing to record any discrepancies between
Difable Toilet-1 Dishwasher drawing dimension and actual site dimension.

A1012
3,000
Corridor-3 Cafetaria 8 NO. STATUS DATE SIGN

2400
Staircase-1 A1019 1
A1015 Kitchen
3,000
Rest room
A1014
-
3,000

Staff Room
A1022
3,000
9 2

A1006 4
Corridor-1 Social Service Dev Head of Panti 2,700 A1018
5

7200
3,000
A1003 A1004 A1005
3,000 3,000 3,000 Bathroom
Kitchen Staff Kitchen Storage
A1007 5

2,700 A1020 A1021


4
3,000 3,000
11 3

2
Lobby Area Recepcionist
1

6000
A1001 A1002
4,000 4,000 NO. REVISION DATE SIGN

KEYPLAN :

Entrance 12
A1000

5000
-

13 APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

6000 6000 6000 6600 6000 6000 5600 6000 PROJECT MANAGER

FILE NAME
48200
DRAWING TITLE :

1 F AC EQUIPMENT LAYOUT

G H I J K' L' M N O BUILDING A&B

J' SCALE : PAPER SIZE : A3

MAC-04-01
OWNER :

PROJECT NAME :

G J'
A B C D E F H I J K L
ARCHITECTURE CONSULTANT :

58900
4400 6000 6000 6000 6000 600 6000 6000 6000 6000 5900
mp PT. Makmur Sistimindo Perkasa
Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

1 Meeting Room
1
Band Dance Studio Fitness A2040 Ball Room (Event Hall) REMARKS :
3,000
7200

7200
A2031 A2033 A2034 A2042
3,000 3,000 3,000 Instructor office 3,000
Sound Room
A2039
A2032 3,000
Staircase-3 3,000
2 A2025 Staircase-4 Corridor-2 Staircase-2 2
Multipurpose Lounge
4000

4000
-
A2035 A2041 A2043
Storage A2030 - 3,000 -
A2026 3,000
3 3,000
3
26400

Resting Area Open Desk Media (computer) Computer (Software) Media (computer) Handphone
7200

7200
A2027 A2028 A2029 A2036 A2037 A2045
3,000 3,000 3,000 3,000 3,000 Storage Storage 3,000

A2038 A2044
3,000 3,000

4 4

43200
Bridge Male Toilets-3 Female Toilet-3
8000

8000
A2024 A1046 A1047
3,000 2,700 2,700 contractor must remeasure on site and produce
shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

6 6 NO. STATUS DATE SIGN

1
Dormitory (univ)-1 Dormitory (univ)-2 Dormitory-1 Dormitory-2 Dormitory-3 Dormitory-4 Dormitory-5 Dormitory-6 Dormitory-7
2
7200

7200
A2008 A2009 A2010 A2011 A2012 A2013 A2014 A2015 A2016
Drying area-1 3
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000
2017 4
4,000
5

8 Corridor-3
8
16800
2400

2400
A2006 Staircase-1 5
3,000
9 A2007
-
Janitor
9 4

2
Dormitory-8 Dormitory-9 Dormitory-10 Dormitory-11 Isolation Room-1 Isolation Room-2 Dormitory-12 Shower-1
1
7200

7200
A2001 A2002 A2003 A2004 A2005 A2023 A2022 2018 NO. REVISION DATE SIGN
3,000 3,000 3,000 3,000 3,000 3,000 3,000 2,700
KEYPLAN :

11 11
Toilets Toilets Female Toilets-4 Female Toilets-5 Laundry-1
2021 2020 2019
2,700 2,700 4,000
APPROVAL :

6000 6000 6000 6600 6000 6000 5600 6000


48200 DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

G H I J K' L' M N O FILE NAME

DRAWING TITLE :

J' 2 F AC EQUIPMENT LAYOUT


BUILDING A&B

SCALE : PAPER SIZE : A3

MAC-04-02
OWNER :

G J'
A B C D E F H I J K L
PROJECT NAME :
58900
4400 6000 6000 6000 6000 600 6000 6000 6000 6000 5900

ARCHITECTURE CONSULTANT :

mp PT. Makmur Sistimindo Perkasa


1 1 Wijaya Grand Centre
Blok G 12 a/b, 3rd Floor
Jl. Wijaya II, Kebayoran Baru
Phone: (62-21) 721 0356 (Hunting)
(62-21) 739 8938 (Direct)
Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com
Storage Sewing Beauty Cooking Storage
7200

7200
A1039 A1040 A1032 A1035 A1036
ARCHITECT :
3,000 3,000 3,000 3,000 2,700
Store Store
A1033 A1034
3,000 3,000
2 Staircase-3 Staircase-4 Corridor-2 Staircase-2 2
4000

4000
REMARKS :
A1038 A1041 A1031 A1037
- - 3,000 -
23400

3 Tester Room
3
Storage Wood working (Machine) Storage A1027
Conference Room
3,000
7200

7200
A1042 A1043 A1045 A1026
- 3,000 3,000 3,000
Conselling Room
A1028
3,000
4 Wood working (Assembly)
Wudhu area-2 4
A1025
5000

Loading Area A1044 Musholla - Male Toilet-1 Female Toilet-1


3,000

8000
A1023 A1029 A1030
3,000 2,700 2,700
5 Wudhu area-1
A1024
- Difable Toilet-2
A1013
6

54200
3,000

Admin Office Head of Admin Head office-1 Head Office-2


시스템책상 개인석
Male Toilet-2 Female Toilet-2

7200
A1008 A1009 A1010 A1011 A1016 A1017 contractor must remeasure on site and produce
3,000 3,000 3,000 3,000 2,700 2,700 shopdrawing to record any discrepancies between
Difable Toilet-1 Dishwasher drawing dimension and actual site dimension.

A1012
3,000
Corridor-3 Cafetaria 8 NO. STATUS DATE SIGN

2400
Staircase-1 A1019 1
A1015 Kitchen
3,000
Rest room
A1014
-
3,000

Staff Room
A1022
3,000
9 2

A1006 4
Corridor-1 Social Service Dev Head of Panti 2,700 A1018
5

7200
3,000
A1003 A1004 A1005
3,000 3,000 3,000 Bathroom
Kitchen Staff Kitchen Storage
A1007 5

2,700 A1020 A1021


4
3,000 3,000
11 3

2
Lobby Area Recepcionist
1

6000
A1001 A1002
4,000 4,000 NO. REVISION DATE SIGN

KEYPLAN :

Entrance 12
A1000

5000
-

13 APPROVAL :

DRAWN : DATE SIGN

SUB MANAGER

CHECKED

6000 6000 6000 6600 6000 6000 5600 6000 PROJECT MANAGER

FILE NAME
48200
DRAWING TITLE :

1 F FAN EQUIPMENT LAYOUT

G H I J K' L' M N O BUILDING A&B

J' SCALE : PAPER SIZE : A3

MAC-05-01
OWNER :

G J' PROJECT NAME :

A B C D E F H I J K L
58900 ARCHITECTURE CONSULTANT :

4400 6000 6000 6000 6000 600 6000 6000 6000 6000 5900
mp PT. Makmur Sistimindo Perkasa
Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

1 Meeting Room
1
Band Dance Studio Fitness A2040 Ball Room (Event Hall)
3,000
7200

7200
A2031 A2033 A2034 A2042 REMARKS :
3,000 3,000 3,000 Instructor office 3,000
Sound Room
A2039
A2032 3,000
Staircase-3 3,000
2 A2025 Staircase-4 Corridor-2 Staircase-2 2
Multipurpose Lounge
4000

4000
-
A2035 A2041 A2043
Storage A2030 - 3,000 -
A2026 3,000
3 3,000
3
26400

Resting Area Open Desk Media (computer) Computer (Software) Media (computer) Handphone
7200

7200
A2027 A2028 A2029 A2036 A2037 A2045
3,000 3,000 3,000 3,000 3,000 Storage Storage 3,000

A2038 A2044
3,000 3,000

4 4

43200
Bridge Male Toilets-3 Female Toilet-3
8000

8000
A2024 A1046 A1047
3,000 2,700 2,700
contractor must remeasure on site and produce
shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

6 6
NO. STATUS DATE SIGN
Dormitory (univ)-1 Dormitory (univ)-2 Dormitory-1 Dormitory-2 Dormitory-3 Dormitory-4 Dormitory-5 Dormitory-6 Dormitory-7
1
7200

7200
A2008 A2009 A2010 A2011 A2012 A2013 A2014 A2015 A2016
Drying area-1 2
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000
2017 3
4,000
4

8 Corridor-3
8 5
16800
2400

2400
A2006 Staircase-1
3,000
9 A2007
-
Janitor
9 5

3
Dormitory-8 Dormitory-9 Dormitory-10 Dormitory-11 Isolation Room-1 Isolation Room-2 Dormitory-12 Shower-1
2
7200

7200
A2001 A2002 A2003 A2004 A2005 A2023 A2022 2018 1
3,000 3,000 3,000 3,000 3,000 3,000 3,000 2,700
NO. REVISION DATE SIGN

KEYPLAN :

11 11
Toilets Toilets Female Toilets-4 Female Toilets-5 Laundry-1
2021 2020 2019
2,700 2,700 4,000

6000 6000 6000 6600 6000 6000 5600 6000 APPROVAL :

48200
DRAWN : DATE SIGN

SUB MANAGER

CHECKED

G H I J K' L' M N O PROJECT MANAGER

FILE NAME

DRAWING TITLE :

J' 2 F FAN EQUIPMENT LAYOUT


BUILDING A&B

SCALE : PAPER SIZE : A3

MAC-05-02
OWNER :

G J'
A B C D E F H I J K L PROJECT NAME :

58900
4400 6000 6000 6000 6000 600 6000 6000 6000 6000 5900

Male Toilets-4 Male Toilets-5 Shower -2 Laundry -2 Toilets ARCHITECTURE CONSULTANT :

A3009
2,700
A3010
2,700
A3011
2,700
A3012
2,700 mp PT. Makmur Sistimindo Perkasa
Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

1 1
ARCHITECT :
Dormitory (Univ)-3 Isolation Room-3 Dormitory -1 Dormitory -2 Dormitory -3 Dormitory -4 Dormitory -5 Dormitory -6
7200

7200
A3013 A3014 A3016 A3017 A3018 A3019 A3020 A3021
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000

Drying Area-2
Staircase-3 REMARKS :

2 A3001
Storage
Staircase-4 Corridor-4 Staircase-2
A3032
4,000
2
-
4000

4000
A3015 A3023 A3022
A3002 Janitor
- - -
3,000
Janitor
23400

3 3
Dormitory-7 Dormitory-8 Dormitory-9 Dormitory-10 Dormitory-11 Isolation Room-4 Dormitory (univ)-4 Dormitory-12 Dormitory-13 Dormitory-14
Shower-3
7200

7200
A3003 A3004 A3005 A3006 A3007 A3008 A3024 A3025 A3026 A3027
A3031
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000
4,000

4 4
Toilets
5000

Male Toilets-6 Male Toilets-7 Laundry-3

8000
A3028 A3029 A3030

5 2,700 2,700 4,000

54200
contractor must remeasure on site and produce
shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

7200
NO. STATUS DATE SIGN

8 2

2400
3

9 4

7200
5

11 1

NO. REVISION DATE SIGN

KEYPLAN :

6000
12

5000
APPROVAL :

13 DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

FILE NAME

6000 6000 6000 6600 6000 6000 5600 6000 DRAWING TITLE :

48200 3 F FAN EQUIPMENT LAYOUT


BUILDING A&B

G O I J K' L' M N O SCALE : PAPER SIZE : A3

J' MAC-05-03
OWNER :

PROJECT NAME :

G J'
A B C D E F H I J K L
ARCHITECTURE CONSULTANT :
58900
4400 6000 6000 6000 6000 600 6000 6000 6000 6000 5900 mp PT. Makmur Sistimindo Perkasa
Wijaya Grand Centre Phone: (62-21) 721 0356 (Hunting)
Blok G 12 a/b, 3rd Floor (62-21) 739 8938 (Direct)
Jl. Wijaya II, Kebayoran Baru Fax : (62-21) 739 8403
Jakarta Selatan 12160 INDONESIA Email : mspform@gmail.com

ARCHITECT :

1 Meeting Room
1
Band Dance Studio Fitness A2040 Ball Room (Event Hall)
3,000 REMARKS :
7200

7200
A2031 A2033 A2034 A2042
3,000 3,000 3,000 Instructor office 3,000
Sound Room
A2039
A2032 3,000
Staircase-3 3,000
2 A2025 Staircase-4 Corridor-2 Staircase-2 2
Multipurpose Lounge
4000

4000
-
A2035 A2041 A2043
Storage A2030 - 3,000 -
A2026 3,000
3 3,000
3
26400

Resting Area Open Desk Media (computer) Computer (Software) Media (computer) Handphone
7200

7200
A2027 A2028 A2029 A2036 A2037 A2045
3,000 3,000 3,000 3,000 3,000 Storage Storage 3,000

A2038 A2044
3,000 3,000

4 4

43200
Bridge Male Toilets-3 Female Toilet-3
8000

8000
A2024 A1046 A1047
3,000 2,700 2,700 contractor must remeasure on site and produce
shopdrawing to record any discrepancies between
drawing dimension and actual site dimension.

6 6 NO. STATUS DATE SIGN

Dormitory (univ)-1 Dormitory (univ)-2 Dormitory-1 Dormitory-2 Dormitory-3 Dormitory-4 Dormitory-5 Dormitory-6 Dormitory-7 1
7200

7200
2
A2008 A2009 A2010 A2011 A2012 A2013 A2014 A2015 A2016
Drying area-1
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3
2017
4
4,000
5

8 Corridor-3
8
16800
2400

2400
A2006 Staircase-1 5
3,000
9 A2007
-
Janitor
9 4

2
Dormitory-8 Dormitory-9 Dormitory-10 Dormitory-11 Isolation Room-1 Isolation Room-2 Dormitory-12 Shower-1
7200

7200
1
A2001 A2002 A2003 A2004 A2005 A2023 A2022 2018
3,000 3,000 3,000 3,000 3,000 3,000 3,000 NO. REVISION DATE SIGN
2,700
KEYPLAN :

11 11
Toilets Toilets Female Toilets-4 Female Toilets-5 Laundry-1
2021 2020 2019
2,700 2,700 4,000
APPROVAL :
6000 6000 6000 6600 6000 6000 5600 6000
48200 DRAWN : DATE SIGN

SUB MANAGER

CHECKED

PROJECT MANAGER

G H I J K' L' M N O FILE NAME

DRAWING TITLE :

J' 2 F PACKAGED DUCT


BUILDING A

SCALE : PAPER SIZE : A3

MAC-06-01

You might also like