Professional Documents
Culture Documents
MMP-CKL-0009 Design - Safety - Review
MMP-CKL-0009 Design - Safety - Review
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
Part A : ACTION LIST X All Detail Design deliverables / EPI QK / Nominated Contractor
1 Process Conditions
1.1 Temperature
1.2 Pressure
1.3 Flow and Relief Rate
1.4 Level
1.5 Compatibility / Composition
1.8 Reaction conditions
3 ACCESS
3.1 Operation of equipment
3.2 Maintenance of equipment
3.3 Vehicles/cranes/hoists
3.4 Fire-fighting
3.5 Means of escape
3.6 Ladders and cat ladders
3.7 Walk-ways, Tripping Hazards
3.8 Handrails and machine guards
1 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
4 ADVERSE CONDITIONS
4.1 Fire / Auto Ignition
4.2 Vapour Cloud / Explosion
4.3 Toxicity
4.4 Reverse flow
4.5 Under or over pressure
4.6 Increased/decreased temperatures
2 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
5 SAFETY EQUIPMENT
5.1 Fire-fighting and detection
5.3 Safety equipment for personnel
5.4 Occupational Heath and Hygiene
5.5 Snuffing and purging devices
5.6 Intrinsic safety devices
6 ENVIRONMENTAL CONDITIONS
6.1 Liquid effluent
6.2 Solid effluent
6.3 Gas / Toxic emissions
6.4 MSDS update
6.5 Noise - in plant/ at unit boundary
6.6 Waste: Reduce / Re-Use
6.7 Waste: Recycle / Removal
7 ELECTRICAL
7.1 Motors / MCC
7.2 Switchgear / Lock Out
7.3 Cables
7.4 Transformer loading in substation
7.5 Overall power requirement
7.6 Plant Outlet / Small Tools
7.7 Earthing and static electricity
7.8 Lightning protection
7.9 Motorised valves
7.1 Hazardous area classification
8 INSTRUMENTATION
8.1 Software: Control loops
8.2 Software: Logic
8.3 Hardware / Firmware
3 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
8.4 VDU Configuration
8.5 Field Instrument
8.6 Restriction plates / Measurement
8.7 Analyser
8.8 Fire & Gas Detection
4 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
9.5 Fire-protection of structures/ valves.
10 MECHANICAL
10.1 Pressure vessels and vessels
10.2 Piping & Supports
10.3 Valves, vent & drain
10.4 Check valves
10.5 Bursting discs / relief valves
10.6 Pump or Compressor
10.7 Fan or blower
10.9 Filters
10.8 Isolation/protection devices
11 SERVICES REQUIREMENTS
11.1 Plant Air / Instrument Air
11.2 Nitrogen
11.3 Cooling water
11.4 Fire-water
11.5 Steam/condensate/boiler feed water
5 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
12.4 Inspection procedures
12.5 Spares stocks
12.6 Construction constraints
13 BUSINESS RISK
13.1 Guarantee / Licensor /
13.2 Insurance / Operating Permit
6 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
Part B : PUNCH LIST
14 PUNCH LIST
14.1
14.2
15 PRE-COMMISSIONING REPORT
15.1 Tie-ins as per line diagram.
15.2 Construction as per line diagram
15.3 Equipment inspected and tested
15.4 Safety and fire audit completed
15.5 Outstanding reservations completed
16 POST-COMMISSIONING
16.1 Site Change Registered
16.2 Data book received and reviewed.
16.3 Vendor manuals received
16.4 All DRAWINGS "As-Built" updated
16.5 Plant equipment register updated
16.6 Maintenance Strategies updated
16.7 Inspection requirement updated
16.8 Spares holding revised
16.9 SMP, Source documents updated
16.10 Task list & schedules updated
16.11 PFD, P&ID, Plot Plan updated
16.12 ILD updated
16.13 Area classification updated
16.14 Earthing schedule updated
16.15 Update status on MOC Database.
7 of 8 Rev. 0
DESIGN SAFETY REVIEW (DSR) PROCEDURE
Note: DSR to be undertaken in a workshop environment facilitated by an experienced Process Engineer. All parts A, B and C and
Impact of Change under each field to be discussed and Actions / Recommendations agreed to reduce or eliminate potential HAZARDS
identified.
SITE CHANGE: SAFETY REVIEW WORKSHOP
SC TITLE:
ITEM CAN THE CHANGE AFFECT/CAUSE ACTION TO BE TAKEN TO REDUCE ACTION BY Response COMPLETED
YES
NO
Nr OR ELIMINATE HAZARD signature &
date
16.16 Site Change Filed at Documentation Control
8 of 8 Rev. 0