Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

TYPICAL INSPECTION FREQUENCY

SL NO Item Frequency Remarks

1.0 EFCV of TT loading gantry Once in six months

2.0 Jockey pump start & stop pressure Once in a week

3.0 Main fire pump set pressure Once in a month

4.0 Earthing interlock test in TT Once in a week


loading/ unloading gantry

5.0 ESD system in control room Once in a month

6.0 Alarms and trips in pipeline Once in a month


transfer system

7.0 Leak detection system of pipeline Once in a quarter


transfer

8.0 Pipeline transfer high pressure or Once in a month


low-pressure alarm

9.0 Low pressure alarm in fire hydrant Once in a week


control room

10.0 ESD in pipeline transfer system Once in a month

11.0 Emergency Push button or break Once in two


glass in the field months

12.0 Heat detector functionality test Once in a quarter

13.0 Electric siren interlock test Once in a month

14.0 GMS alarm/ Sensor Calibration Once in a month/


Once in three
months

15.0 Sprinkler system check for Once in a quarter


blockage or effectiveness

16.0 ROV emergency Shut off Once in a month


17.0 Jetty ROV closure test Once in a month

18.0 ERC or break away coupling Once in six months

19.0 Manual call points Once in a month

20.0 High level alarms in control room Once in a month

21.0 High level switches (85%) Once in three


months

22.0 Radar gauge calibration Once in five years

23.0 Servo Gauge Calibration Once in five years

24.0 Mass flow meter calibration Once in a year

25.0 CP system potential check by Once in a quarter


reference electrode

26.0 Interlock carousel and vapor Once in a month


extraction system

27.0 TT Unloading/ Loading Hose at Once in Four


Gantry the Hydrotest frequency months

28.0 Unloading gantry TSVs, POP off Once in a year


safety release Valves testing
Frequency

29.0 LPG Carousals Filling Hoses Once in Four


Periodical Testing Frequency Months.

30.0 Earthing Interlocks with LPG Filling Once in Month


Carousal testing Frequency

31.0 ROVs with High level Alarm Switch Once in Three


(85%) Trips Check months

32.0 Deluge Valves with Power Shut off, Once in Three


Alarms, Siren Checks months

33.0 Hydro testing of Pipelines Once in Five year

34.0 Hydrostatically testing of Tank or Once in Five year


bullet mounted on the chassis

35.0 Fire extinguisher Once in a month

36.0 Fire Hose Once in six months

You might also like