Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NZ07 / NZ070836 / 19791 Vp°ffiV `phf

Zone Naranpura lh° hpμVπkA°` `f


T. No. 3000672990 D`gÂO k°hpAp°:
rbg_u _Lg rbg_u QyLhZu
Billing mode 60 days
Scan to register duVf fuXvN Ap`hp aqfep] _u _p¢OZu
Distribution date 10/11/22 OR say hi to 6356070070 kyfnp k¨b¨r^[ dprl[u Ap`hp Afie k°hpAp° dpV°

YOUR DETAILS

e-Bill
Mr. CHANDER CHANDUMAL MURJANI
0702/A STATUS1,MANILAXMI CHS LTD
CATEGORY
RGP Residential
BILLING MONTH
November 2022 LT
OPP:DOOR DARSHAN KENDRA,
SUPPLY TYPE READING DATE CUSTOMER ID
THALTEJ,
Three Phase 02/11/22
AHMEDABAD 3117161
SANCTIONED LOAD BILL DATE
Registered Mobile: ******5476 5.990 kW 07/11/22
Registered Email: cm****i1@gmail.com

YOUR BILL Thank you for your previous payment of R 2,400.00 on 03/06/22 .
Payment received through Bill Desk.
SECURITY ADDITIONAL SECURITY
R 3,790.00 DUE BY
21/11/22
DEPOSIT HELD
R 3,600.00
DEPOSIT REQUIRED
R 0.00

METER DETAILS MAJOR BILL COMPONENTS

R 2235.00
Meter No. Energy charges
1428826
Present
Reading
279200 R 130.00
R Fixed charges
Previous 4,421.36
Reading - 278654
R 576.70
Multiplier x 1.00 Government duty

Consumption 546
R 1479.66
FPPPA charges

You consumed 546 units this billing cycle.

CONSUMPTION TREND (IN UNITS)

546

147

6 11 17 5 18 5 5
# 1 0
2021 2022 2021 2022 2021 2022 2021 2022 2021 2022 2021 2022
Jan Mar May Jul Sep Nov

# Not billed in the same month last year.


PAYMENT OPTIONS
1. SCAN THIS QR CODE TO PAY USING MOBILE WALLETS 2. PAY BY CASH / CHEQUE
OR PAY ONLINE
You can pay by Cash/Cheque at any of the following Authorised
Torrent Power Collection Centres near you.

Naranpura Plug Point


Sola Road, Naranpura
Shri Dariapur Sarvodaya Consumers Co Op Society Ltd
and many more! 35/3,Parul Nagar Soc,Bhuyangdev
Pay online on: connect.torrentpower.com
NET BANKING DEBIT/CREDIT CARD ALL MOBILE WALLETS
BILL DETAILS
R Call our 24x7 helpline:
Energy charges 2235.00 19129 (toll free) | 2255 1912 | 6655 1912
WhatsApp 63560 70070
FPPPA charges @ 271 (paise/unit) 1479.66

Fixed charges 130.00


1. COMPLAINT / QUERY
Total energy charges without government duty 3844.66 Torrent Power service centre:
Govt duty @ 15.00% 576.70 Plug Point Naranpura Zonal Office,
Sola Road, Naranpura,
Billed components for GST 0.00 Ahmedabad - 380013
You can also reach out to us by
Bill amount including GST 4421.36
: connect.ahd@torrentpower.com
Previous dues Credit: 626.50 : connect.torrentpower.com
Torrent Power mobile app
Other debit or credit 0.00
2. CONSUMER GRIEVANCE REDRESSAL FORUM*
Delayed payment charges 0.00
The Chairman,
Amount due 3794.86 Consumer Grievance Redressal Forum (CGRF)
Torrent Power Limited, Plug Point Naranpura
Important Bill Message: Ahmedabad - 380013
(1) Bill amount is rounded down for convenience, Phone: 079-27492222 Extn: 5940
adjusted amount will be carried forward in next bill. Email: consumerforum@torrentpower.com
Timings 10 AM to 5 PM on all working days.

3. ELECTRICITY OMBUDSMAN*

Electricity Ombudsman
Barack no. 3, Polytechnic, Ambawadi
Ahmedabad - 380015
Email: ombudsman@gercin.org

* Matters falling under section 126,127, 135 to 139, 152 and 161 of the Electricity
TARIFF STRUCTURE Act, 2003 are not within the purview of CGRF and Ombudsman.
MONTHLY FIXED
RATE / UNIT CHARGES /
TARIFF UNITS / MONTH (R) INSTALLATION( R )
GOVERNMENT DUTY
Single Three
Phase Phase Residential and approved educational institutions 15 %
RGP 0-50 units 3.20
Residential 51-200 units 3.95 25.00 65.00
Remaining units
Commercial 20 %
5.00
GLP 0-200 units 4.10
30.00 70.00 Industrial 10 %
Remaining units 4.80
BPL 0-50 units 1.50 Religious place 15 %
51-200 units 3.95 5.00
Remaining units 5.00
Hostel 11.25 %
CONNECTED RATE / UNIT MONTHLY FIXED
TARIFF LOAD (R) CHARGES / KW

THIS BILL IS NOT A PROOF OF PROPERTY OWNERSHIP.


Non-RGP Upto and
4.60 70.00
including 5 kW TORRENT POWER LIMITED
More than 5 kW REGD. OFF.: "SAMANVAY", 600, TAPOVAN, AMBAWADI,
4.60 90.00
& upto 15 kW
AHMEDABAD - 380015.
RATE / UNIT MONTHLY MIN.
TARIFF (R) CHARGES CIN: L31200GJ2004PLC044068

LTP-AG Agricultural 3.40 10.00 / BHP


Electric Vehicle Charging Station 4.20 25.00 / Installation
Temporary 5.10 25.00 / kW / Day

PLEASE ATTACH THIS COUPON WITH CHEQUE/DD FOR PAYMENT AT DROP BOX.

G R O U P N O . : NZ07 / 67 C U S T O M E R I D : 3117161 D U E D A T E : 21/11/22 B I L L A M O U N T : R 3790.00


Chq/DD should be in favour of Torrent Power Limited

You might also like