Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

Item No.

SAP code Item Description Design RC QA RC CSD RC

10 BPCBHRGP0000000036 MAIN WIRE HARNESS M1


20 SF13AB21XDCCVOFR01 DC DC CONVERTER__48V10A W/ USB
110 BPSPEVGP0000000005 FRONT AXLE M14X1.5X240 TL26
160 BPSPEVGP0000000010 REAR WHEEL AXLE M16X1.5PX304 TL27
SCM RC Plant RC Qty. / Veh UOM Item Drawing ECN status Proto date TP1 Date
Category Availability

1 EA EL Yes
1 EA EL Yes
1 EA Fastners Yes
1 EA Fastners Yes
TP2 Date PP Date Rev. Date Master Sample Decision to refer Vendor QA R&D Vendor
Availability Drg/Master Sample Nomination Vendor Vendor Finalised
Audit Audit

02.06.2023 Yes Dwg


10.04.2022 Yes Master Sample
08.05.2023 Yes
08.05.2023 Yes
Proto Development
Commercial Vendor 2 Commercial Decision for PR Release Component Component Component Decision of
settlement Finalised settlement Vendor X part for Proto development Submission PDIR report CSD for part
to be used in initial date date at availibility (drg / use
event location Master sample)
Proto Parts Decision QA Decision Parts Part Testing Part Testing Testing Part Final Decision Capex Capax
GRN R&D Testing R&D Vendor QA Approval on ordering Readiness
Part/Assembly
Proto event /
Feedback by
R&D
Trial Production
Line Line Trail TP Parts Part handover QA PPAP TP Part TP Part TP Parts PDIR CSD/Vendor
Installation Trial at from CSD to Ordering Receipt (drg / Master Parts check
Supplier by SCM (Y/N) date sample
SCM comparison)
QA Parts QA Part RCA / Feedback Trial Prod QA decision Plant R&D Component PP lot parts
Check Decision Testing QA for PP Decision for decision for Subimission for PDIR
PP PP PP lot Availability
SCM Part QA Parts Decision PP Pilot Pilot lot Pilot lot SOP SOP SOP
Check Check parts by QA Production Testing by parts decision by decision by decision by
by Plant QA decision QA R&D Plant

You might also like