Laying of 18" OD Approx.

282 km Cross Country LPG Pipeline


from PHDPL Haldia Pump station to PHDPL Durgapur Delivery
Station under PHDPL-AUG Project. Group-B: From Mahishrekha
T-point (Ch. 87 Km) to Dattapur SV Station (Ch. 181 Km)
DOC: NIPL/CIVIL/PHDPL-AUG, GROUP B/IR/ Rev-00, F-01

INSPECTION REPORT: POUR CARD


WORK ORDER NO: 26287562 Dated : 25.01.2020

CLIENT: INDIAN OIL CORPORATION LIMITED Date:22/06/2022

CONTRACTOR: NANDINI IMPEX PVT. LIMITED Report No:

A Details

1 Structure/Location:T-POINT Cable Trench PCC 3 Grid No’s. :

2 Drawing No. Rev. : 4 Level From : To:

B Observation Before Concreting :

1 Grade of Concrete : M20(1:4:8) 8 Machinery mobilization:

2 Quantity of Concrete :0.145M3 a Mixer machine/batching:

3 W/c Ratio : b Concrete pump/placer boom/hoist:

4 Aggregate size: 40 MM DN c Vibrators:

5 Quality & source of water: BOREWALL d Any others:

6 Type of Cement Used: PPC 43 9 Correctness of openings, inserts, bolts, pockets etc:

7 Correctness & Rigidity of Shuttering: 10 Correctness of reinforcement cover:

11 Extra reinforcement provided if any:

12 Special observations if any:

C Observation during / after concreting

1 Compaction of concrete: 6 Time of Concreting:

Correctness of openings,
2 a Start:
inserts, bolts, pockets etc:

3 Rigidity of shuttering: b Completion:

4 Quantity of concrete poured: 0.145 M3 7 Workability/slump:

5 Cube marks: 8 Obstacles if any:

9 Special observations if any:


Remarks: (1X0.965X.15)=0.145 M3

CHECKED & VERIFIED BY

NIPL IOCL

Sign: Sign:

Name: Name:

Date: Date: