Sutera Safety Inspection Report-Ph21-07062023
Project Title: Phase 21, Parcel 3, Shop (Section 1 & Section 2) Inspected by: Luqman Hakim
S/No Type of Hazards Hazard Count No. of On-time rectification Demerit Points Remarks Type of Hazards
1 Fall from height 4 9.51
2 Falling object 1 0.59
Housekeeping, 3, 22%
3 Electrocution 1 1 0.30
4 Lifting operations 0.00
Fall from height, 4, 29%
5 Fire and explosion 1 0.59
6 Collapse of structure 1 0.59
7 Machinery and equipment 0.00
8 Step on, strike against objeect 2 1 1.05 Expose to hazardous
9 Expose to hazardous substances 1 1 0.17 substances, 1, 7%
10 PPE compliance 0.00
11 Housekeeping 3 2 2.10
Falling object, 1, 7%
12 Permit-to-work system 0.00
13 Environmental 0.00 Step on, strike against
objeect, 2, 14% Electrocution, 1, 7%
14 Documentation 0.00
Fire and explosion, 1, 7%
Hazard counts and total demerit points 14 5 14.91 Collapse of structure, 1,
7%
4
Construction areas
description Underground structure construction stage: underground building area 3.5 A+ S≤5 Very Satisfactory Many advantages, only a few small weakness need to be improved.
3
Main structure construction stage: the total construction area (ground and 2.5 More advantages, but there are still some weaknesses that need to be
underground construction at the same time); Construction area above A 5<S≤10 Satisfactory
improved.
ground zero (underground construction stopped) 2
1.5
Site on-time rectification: before closing meeting Some advantages, but there are still some minor weaknesses that
On-time rectification 1 A- 10<S≤15 Fairly Satisfactory
Documentation on-time rectification: Before closing meeting need to be improved.
0.5
0
P1 Closure priority - immediate B+ 15<S≤20 Acceptable Many advantages, but there is at least one major weakness. Monthly Basis Weekly Basis
P2 Close priority - within 24 hours B 20<S≤25 Fairly Acceptable More advantages, but there is at least one major weakness.
D Close priority - within 1 week B- 25<S≤30 Narrowly Acceptable Some advantages, but there are several major weaknesses.
Hazard Count No. of On-time rectification
C 30<S≤40 Need Improvement Several advantages, and there are several weaknesses.
D 40<S; Finding≥10 Poor There are few advantages, and there are many major weaknesses. Twice per Month Twice per Week
Site EHS Inspection Report(Good Practice)
S/No Good Practice Photo S/No Good Practice Photo
1 Nil 2 Nil
3 Nil 4 Nil
Site EHS Inspection Report(Demerit and Rating)
S/No Type of Hazards Demerit Points Severity Frequency Scores Rating Final Demerit Points Final Scores Final Rating
Action by Kimlun
Scaffolding used to install
Safety. The sub-
column formwork was
contractor
found to be sub-
1 Block 4 immediately 8/6/2023
standard. No double
dismantled the
working boards, access
improper
and guardrail. [1]
scaffolding.
Action by Kimlun
Safety. The sub-
Protruding starter bars contractor
3 Block 4 were observed not immediately install 12/6/2023
covered/capped. [8] cover protection
for protunding
rebar
Action by Kimlun
Safety. The sub-
Chemical barrels contractor
observed to be immediately
4 Block 4 8/6/2023
improperly stored and removed the
unlabeled. [9] chemical barrel
and stored it in the
chemical storage.
Action by Kimlun
Safety. The sub-
A shelf without a fire
contractor
5 Block 3 extinguisher was found. 8/6/2023
immediately
[5]
provided a fire
extinguisher.
Action by Kimlun
Access to the working Safety. The sub-
unit observed to be contractor
7 Block 3 8/6/2023
blocked by loose housekeeping
material. [11] immediately in the
access area.
Improper scaffolding
foundations were
Action by Kimlun
observed as follows:
Safety. The sub-
1. The jack base is not
contractor
placed on a solid ground.
8 Block 3 immediately 8/6/2023
2. The plank is not
reinstalls the
properly extended and
scaffolding
supported over the
foundations.
opening.
[6]
Action by Kimlun
Poor housekeeping.
Safety. The sub-
Observation of remaining
contractor
concrete waste and
immediately
9 Block 2 construction material left 12/6/2023
cleaned up the
on external scaffolding
debris of the
without cleaning up after
external
work. [11]
scaffolding.
Action by Kimlun
Cloth was observed
Safety. The sub-
hanging from live
10 Block 2 contractor 7/6/2023
extension cables of
removed the the
power tools. [3]
cloth immediately.
Observation of wall
ducting installation as
follows:
Action by Kimlun
1. M&E worker was
Safety. The sub-
observed cutting walls
contractor
using grinder power
12 Block 2 immediately 12/6/2023
cutter extended to pole.
removed the
2. The grinder power
extended pole and
cutter without guarding.
installed guarding.
3. No equipment
inspection tagging.
[8]
During the demolition of
formwork activities, the Action by Kimlun
worksite was poorly Safety. The sub-
managed and there was contractor
13 Block 2 12/6/2023
no protection at the immediately
edges of the building carried out the
from possible falling housekeeping.
objects. [2]
Action by Kimlun
Safety. The sub-
The guardrails was found
14 Block 2 contractor 8/6/2023
missing. [1]
installed the