Comparative Statement of Konark Virtue

As per SEAC
No. Details As per 2018 EC Completed work EC Sought for Remark
Recommendation

1 Project “Konark Virtue”

2 Proponent Mr. Deepak Rachh

Location of the
3 S. No 41/12/13A, S. No 41/13B, S. No 41/13C, S. No 41/13D
project

4 Type of project Residential project

Total Plot: 20,152.00 sq. m


5 Plot area (m2) Deductions: 4424.62 sq. m (Road widening + Existing Road + Amenities)
Net plot area:15,727.38 sq. m
As per SEAC
As per 2018 EC Completed work EC Sought for
Recommendation
6
Proposed FSI
23,532.43 sq. m 23,535.31 sq. m 24,804.91 sq. m.
(m2)

Proposed Non-
7 10,534.22 sq. m 5,825.03 sq. m 13,690.00 sq. m.
FSI (m2)

FSI: 23,532.43
Total construction Non FSI: FSI: 23,535.31 FSI: FSI: 24,804.91
8 Non FSI: 5,825.03 Non FSI: Non FSI: 13,690.00
area (m2) 10,534.22
Total: 29,360.34 Total: Total: 38,494.91
Total: 34,066.65
Ground Coverage 1949.63 sq. m 2129.90 sq. m 2069.82 sq. m
9
(%) (12.39 %) (13.54%) (11.18 %)
As per SEAC
No. Details As per 2018 EC Completed work EC Sought for Remark
Recommendation
10 Green belt (m2) Provided: 1,850.00 1,850.00 1,850.00

Change by Cr.
11 Estimated Cost Rs. 121 Cr. Rs. 121 Cr. Rs. 000 Cr. Rs. 121 Cr.
or no change
Tower 1 (P+18) Tower 1 (P+14) Tower 1 (P+18)
144 Flats 112 Flats 144 Flats
Tower 2 (P+18) Tower 2 (P+18) Tower 2 (P+18)
144 Flats 144 Flats 144 Flats
Tower 3 (P+12) 96 Tower 3 (P+12) Tower 3 (P+12) 96
No. of Buildings Flats 96 Flats Flats
12 with
configuration Tower 4 (P+ 9) 68 Tower 4 (P+ 9) 72 Tower 4 (P+ 9) 72
Flats Flats Flats
Club House 1 Club House 1 Club House 1
(G+1) (G+1) (G+1)
Club House 2 Club House 2 Club House 2
(G+1) (G+1) (G+1)
Club House 3 Club House 3 Club House 3
(G+1) (G+1) (G+1)
Changed by
4-wheeler- 105 4-wheeler- 105 4-wheeler: 4-wheeler- 105
4-wheeler:
13 No. of Parking 2-wheeler- 657 2-wheeler- 657 2-wheeler: 2-wheeler- 657
2-wheeler:
Cycle- 657 Cycle- 657 Cycle: Cycle- 657
Cycle:
Changed by:
14 No. of tenements Flats 452 Flats 424 Flats 456
As per SEAC
No. Details As per 2018 EC Completed work EC Sought for Remark
Recommendation
Residential: 2260 Residential: 2120 Residential: 2280
15 No. of Persons Residential: Changed by
nos. nos. nos.

Domestic: 203.4 Domestic: 191 Domestic: Domestic: 205 Domestic:


Water Demand
16 Flushing: 101.7 Flushing: 95 Flushing: Flushing: 103 Flushing:
(m3/day)
Gardening: 13 Gardening: 13 Gardening: Gardening: 13 Gardening:

Sewage Changed by XX
17 275 m3 257 m3 000 m3 277 m3
Generation m3
18 STP Capacity 290 m3 275 m3 290 m3 No Change
Wet- 000 kg/day
Wet- 678 kg/day Wet- 636 kg/day
Dry- 000 kg/day Wet- 684 kg/day
Municipal Solid Dry- 452 kg/day Dry- 424kg/day Changed by -
E-Waste- 000 Dry- 456 kg/day
19 Waste E-Waste- E-Waste- Wet –
kg/day E-Waste- 3 kg/day
(kg/day) Negligible Negligible Dry –
Sludge- 000 Sludge- 3 kg/day
Sludge- 3 kg/day Sludge- 3 kg/day
kg/day

20 OWC Capacity 750 kg/ day 750 kg/ day 750 kg/ day

21 Electricity Source: MSEDCL Source: MSEDCL Source: Source: MSEDCL Revision in


Connected Load: During MSEDCL During Electricity load
2130.04 kW Construction During Construction and D.G.
Maximum demand: Phase (Demand Construction Phase (Demand Capacity
1302.55 kW Load): 48kVA Phase (Demand Load): 48kVA
D.G. Sets: 1 no. of DG set as Power Load): 00 kVA DG set as Power
320 kVA and 1 no. back-up during DG set as Power back-up during
of 100 kVA construction back-up during construction phase:
As per SEAC
No. Details As per 2018 EC Completed work EC Sought for Remark
Recommendation
construction
phase: 25 kVA 25 kVA
phase: 00 kVA
Connected Load: Connected Load:
Connected Load:
1701 kW 1701 kW
00 kW
Maximum Maximum demand:
Maximum
Transformers: 2 demand: 1009 kW 1009 kW
demand: 00 kW
nos. of 630 kVA D.G. Sets: 1 no. of D.G. Sets: 1 no. of
D.G. Sets: 00 no.
380 kVA and 1 380 kVA and 1 no.
of 00 kVA and 00
no. of 100 kVA of 100 kVA
no. of 00 kVA
Transformers: 2 Transformers: 2
Transformers: 00
nos. of 630 kVA nos. of 630 kVA
nos. of 00 kVA