Professional Documents
Culture Documents
8013-TSA-016-DW-1463-C-201 Rev.0
8013-TSA-016-DW-1463-C-201 Rev.0
110
120
L L B (SEE SPEC. NOTE 2)
℄
G
Ø19 B/5 B/5
K
70 H J
A/5
A/5
250
E 27 mm DIA. HOLES
300
SQUARE
E FOR 19mm DIA. ANCHOR BOLTS
=
A P-01 / P-02
P-03 / P-04 / P-07 ℄
14
60
℄ C
G
D
A
=
3 POINTS
.000000
.000000
5 DETAIL ℄
G
HOLE LOCATIONS IN BEAM SUPPORT FOR Ø18" PIPE
D
A
H J
=
1:10
1
=
1:25
K
K
H J K
L L S (SEE
SPEC. = =
NOTE 6
= = )
A/5
A/5
ELEVATION
B/5 B/5
T.O.S. ℄
PLAN - PRECAST FND. FA-001 TO FA-035, H200x200x48.7
FB-001 TO FB-016, FC-001 TO FC-029, α
G
FD-001 TO FD-005 AND FE-001 TO FE-003 PLAN - PRECAST FND. FF-001 TO FF-012, FG-001 TO FG-007 AND FK-001 TO FK-002
K
1:25 27 mm DIA. HOLES
FOR 19mm DIA. ANCHOR BOLTS
1:25
SECTION ℄ ℄
PIPE Ø18" PIPE Ø6"
℄ 1:25
X.1
PIPE Ø18"
SEE SUPPORT DETAIL - 1
500 950 500 HOLE LOCATIONS IN BEAM SUPPORT FOR Ø6" PIPE
430 430 (SEE SPEC. NOTE 5) 430 430
SEE SUPPORT
(SEE DETAIL
SPEC. NOTE 5) -1 S (SEE SEE SUPPORT DETAIL - 2 1:25
SPEC. (SEE SPEC. NOTE 5)
NOTE 6
) 290 290
ELEVATION
ELEVATION
ELEVATION T.O.S.
T.O.S. ELEVATION SPECIFIC NOTES
T.O.C. ELEVATION
(SEE SPEC. NOTE 6) T.O.C. 1. FOR CONCRETE GENERAL NOTES AND ABBREVIATIONS SEE DRAWINGS
T.O.C. 25800-220-D0-0000-00001 AND 25800-220-D0-0000-00002.
200
2. FOR STRUCTURAL PRECAST CONCRETE GENERAL & INSTALLATION NOTES SEE
2 DRAWING 25800-220-DA-000-00001. FOR LIFTING INSERT SEE DRAWING
25800-220-DA-0000-00022, DETAIL 1.
GROUT
3. FOR BEDDING MATERIAL SEE DRAWING 25800-220-DA-0000-00001, NOTE 2.
e=50
4. FOR Ø19 ANCHOR BOLTS SEE DETAIL 1 .
5. VERTICAL PROFILES C175x100x21.7 APPLY ON SUPPORTS ONLY WHEN IN DRAWING
1
F
F
F
C
B A B
LEVELLING COURSE (SEE SPEC. NOTE 3) LEVELLING COURSE (SEE SPEC. NOTE 3) LEVELLING COURSE (SEE SPEC. NOTE 3)
SECTION SECTION SECTION
1:25 1:25 1:25
A B C
TYP. TYP.
.000000
.000000
250
PROJECT TITLE
THIS DRAWING AND THE INFORMATION
CONTAINED IN IT ARE THE PROPERTY OF QUEBRADA BLANCA PHASE 2 TAILINGS MANAGEMENT FACILITY
TECK. USE OF THE CONTENTS IS COMPAÑIA MINERA TECK QUEBRADA BLANCA GOLDER ASSOCIATES
AUTHORIZED ONLY FOR THE PROJECT FOR DETAILED ENGINEERING /
WHICH IT WAS ISSUED AND UNDER THE
PROVISIONS AGREED BY GOLDER AND TECK NAME SIGN DATE NAME SIGN(*) DATE
SEEPAGE WATER PIPELINE/
IN THE RESPECTIVE AGREEMENT. SUPPORTS - FORMS 1/2 /
REVIEW /
REFERENCES /