Professional Documents
Culture Documents
ITP - Subbase
ITP - Subbase
ITP - Subbase
Inspection / Test
Item Task / Activity
No. Description Reference Inspection Survey Responsibility Comments
Frequency Acceptance Criteria
Documents Location
A quality document has NATA
been supplied for base cerificate or
1 material As per AS code Foreman to verify and sign A Surveyor Adjustments & Approvals
Geotech
approval
NATA
As per AS code cerificate or
2 CBR test As per AS code A Geo tech NATA certification or Geotech approval
Geotech
approval
NATA
Base layers trimmed,
cerificate or
3 copmacted and tested As per AS code As per AS code N/A Geo tech NATA certificate or Geotech approval
Geotech
approval
LEGEND: IP Inspection Point An inspection point that may be witnessed by the client
HP Hold Point An identified point in a process past which the Contractor shall not proceed without a direction from a Nominated Authority
WP Witness Point An identified point in a construction process at which an activity is observed
TP Test Point Product compliance test to be undertaken and recorded / reported
INSPECTION AND TEST PLAN
Project: Wacol Logistics Hub
Construction Process: Subgrade Prepared By: Demex Pty Ltd
Client: LOGOS Specification: Subgrade preparation work Approved By: Garren Holdsworth
Approval Date: 09/08/2021
Signature
Item Task / Activity
Comments
No. Description GEO TECH / SURVEYOR / OTHER
DEMEX CLIENT
THIRD PARTY
Subgrade trimmed,
2
compacted, and tested
4 Crushed concrete
Subgrade depth
5
verification survey.
Subsoil Services –
7
excavate and backfill
LEGEND: IP Inspection Point An inspection point that may be witnessed by the client
HP Hold Point An identified point in a process past which the Contractor shall not proceed without a direction from a Nominated Authority
WP Witness Point An identified point in a construction process at which an activity is observed
TP Test Point Product compliance test to be undertaken and recorded / reported