Weekly Construction Work Plan - 1
Weekly Construction Work Plan - 1
Weekly Construction Work Plan - 1
Excavation for Soil Sampling Sta. 05+600 - Sta. 06+400 FE Fajardo & FE Grace
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 6
2 7
3 8
4 9
5 10
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 6
2 7
3 8
4 9
5 10
Additional Manpower Requirement
Position No. Position No.
1 6
2 7
3 8
4 9
5 10
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
Environment
Environmental Impact Type of Control Assigned Person/s
Form No. F-CON-001 Rev. No. 2 Issued 11/17/2020 Attach additional sheets if necessary
Distribution Batching, Warehouse, Equipment, HRAD, MTQC, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CAVITE-LAGUNA EXPRESSWAY PROJECT (Cavite Segment)
26-Sep-20
For the Period: September 28 - 26, 2020 Page 1
Contract Details
Owner Project Manager ANTONIO P. AGUILAR
Materials Engineer ELADIO S. LIMOS Quantity Engineer YANIE V. DE VERA
HSE Manager Field Engineer
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit
100(1) Clearing and Grubbing Sta. 05+000 - Sta. 06+000 FE Fajardo & FE Grace
Excavation for Soil Sampling Sta. 05+600 - Sta. 06+400 FE Fajardo & FE Grace
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 6
2 7
3 8
4 9
5 10
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 6
2 7
3 8
4 9
5 10
Additional Manpower Requirement
Position No. Position No.
1 6
2 7
3 8
4 9
5 10
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
Environment
Environmental Impact Type of Control Assigned Person/s
Form No. F-CON-001 Rev. No. 2 Issued 11/17/2020 Attach additional sheets if necessary
Distribution Batching, Warehouse, Equipment, HRAD, MTQC, File