Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ALFREDO ZAFRA LAS PIÑAS BUSINESS CENTER

0010 LT BLOCK 2 ST ALABANG-ZAPOTE


VERAVILLE TOWNHOMES ALEGRIA TALON IV LAS PINAS CITY
LAS PINAS CITY METRO MANILA TIN 000-101-528-000-VAT
Billing Statement No.: 4213016636326
Meter No.: 33SJN36733
Route Seq.: 4210 51 0004 Print Seq.: 275302 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1361976729 08 Feb 2023
28 Dec 2022 to 27 Jan 2023 27 Jan 2023
Date of Meter Reading Electric Meter Number
27 Jan 2023 33SJN36733 Please Pay
Date of Next Meter Reading Current Reading
26 Feb 2023
Customer Type -
8,823
Previous Reading
� 2,676. 96

Residential 8,585
=
Actual Consumption Bill Computation Summary
Your rate this month 238 kWh Remaining Balance from previous bill 0.00
� 11.25 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 2,676.96
Please see the back page of your bill for more details about your Generation 1,700.99
meter reading and consumption. Transmission 205.87
System Loss 150.77
Distribution (Meralco) 275.04
Subsidies 22.68
Your monthly consumption Government Taxes
Universal Charges
268.58
53.03
FiT-All (Renewable) 0.00
kWh

Total Amount Due � 2,676.96

kWh 238 - - - - - - - - - - -

260 296 315 354 296 340 292 258 260 287 272 263

Your consumption explained Your typical consumption


This bill is 10% lower (-25kWh) vs 289 kWh 7.68 kWh � 86.4
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 8% lower (-22kWh) vs same consumption consumption cost this bill
period last year (last 11 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
238 kWh 0.1695 tCO * 2 8 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
Qn:9BD33f4Z
cScb:iBBc4X
1361976729 � 2,676.96
Zs:ZCPI4fER
ucSZ;fHPlQP Bfw:fbZcEYFvwDwuqE;JbwIJUw
Payment made after 27 Jan 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23016931880 Local Application No.: 768985367 Billing Period: 28 Dec 2022 to 27 Jan 2023 Print Seq. 275302 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
28 Nov-27 Dec 2022 30 Dec 2022 Meralco Online � 2,793.56 Missionary Elec for NPC-SPUG 238 kWh 0.1783 42.44
28 Oct-27 Nov 2022 29 Nov 2022 Meralco Online � 2,798.58 Missionary Elec for REDCI 238 kWh 0.0017 0.40
28 Sep-27 Oct 2022 29 Oct 2022 Bayad Partner � 2,927.33 Environmental Fund 0.00
28 Aug-27 Sep 2022 30 Sep 2022 Bayad Partner � 2,673.41 NPC Stranded Contract Costs 0.00
28 Jul-27 Aug 2022 31 Aug 2022 Bayad Partner NPC Stranded Debts 238 kWh 0.0428 10.19
� 2,552.15 DU Stranded Contract Costs 0.00
28 Jun-27 Jul 2022 06 Aug 2022 Bayad Partner � 2,948.30 Equalization Taxes & Royalties 0.00

What remains unpaid FiT-All (Renewable) 0.00%


FiT-All (Renewable)
0.00
0.00
No unpaid bill, thank you!
Energy Bill Amount
Base VAT
How your bill was computed VAT Sales
VAT Zero Rated
2,356.56
0.00
267.37

Service ID Number: 424972620101 Non-VAT 53.03


Contract Holder: ZAFRA, ALFREDO Total Energy Amount 2,676.96
Service Address: 0010 LT BLOCK 2 VERAVILLE TOWNHOMES
ALEGRIA TALON IV LAS PIÑAS ME Charges for this billing period � 2,676.96

Metering Information Additional Bill Information


Previous Current
Meter Number Reading Reading Multi Registered Voltage Level Class : Secondary

Previous Service ID Number (SIN) : 473683001


33SJN36733 8585 8823 1 238 kWh
Your rate this month (price per kWh) is computed as Total Energy Amount
Rate Components Base Price Amount divided by the Actual Consumption (in kWh)

Generation 63.54% 1,700.99


Generation Charge (PhP/kWh) 238 kWh 7.1291 1,696.73
Power Act Reduction 0.00
ACRM Recovery (PhP/kWh) 238 kWh 0.0213 5.07
ICERA Refund (PhP/kWh) 238 kWh -0.0034 -0.81
Transmission 7.69% 205.87
Transmission Charge(PhP/kWh) 238 kWh 0.8650 205.87
System Loss 5.63% 150.77
System Loss Charge (PhP/kWh) 238 kWh 0.6335 150.77
Distribution (Meralco) 10.27% 275.04
Distribution Charge (PhP/kWh) 238 kWh 1.2908 307.21
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 238 kWh 0.3350 79.73
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 238 kWh 0.4979 118.50
Dist True-Up 2 (PhP/kWh) 238 kWh -0.1923 -45.77
Dist True-Up 4 (PhP/kWh) 238 kWh -0.8656 -206.01
Subsidies 0.85% 22.68
Lifeline Rate Subsidy (PhP/kWh 238 kWh 0.0952 22.66
Senior Citizen Subsidy 238 kWh 0.0001 0.02
Government Taxes 10.03% 268.58
Current RPT (PhP/kWh) 238 kWh 0.0051 1.21
Local Franchise Tax 0.00
VALUE ADDED TAX
Generation Charge 1696.73 11.2700% 191.22
Power Act Reduction 0.00
ACRM Recovery 5.07 7.8000% 0.40
ICERA Refund -0.81 17.3300% -0.14
Transmission Charge 205.87 11.1900% 23.04
System Loss Charge 150.77 11.2600% 16.98
Distribution Charge 275.04 12.0000% 33.00
Subsidies and Others 23.89 12.0000% 2.87
Universal Charges 1.98% 53.03

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like