Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Sub-Vendor: Vendor: EP Contractor: Owner/Purchaser:

EO PURIFICATION UNIT

P&ID for Package and Auxiliary Units


Petrochemical
TAPCO Industries Design & MARUN Petrochemical
Polar Refrigeration Engineering Co. Company (MPC)
GmbH PIDEC Doc. No.: VD-1233-330-PID-001 Rev.: 05
PROJ. NO. :1233 PROJ. NO. :1226

PROJECT REQ. NO. : 1233-DE-00-RE-REQ-330

ITEM NO. : 20-PK-9010

TOTAL Sheets : 8 (Excluding Attachements)

□ No Comment To Vendor

□ Comment as marked, manufacturing may proceed To Vendor


□ Major Comment as marked, manufacturing is on hold for the next
rev To Vendor
□ Rejected, new document with the same rev. no. To Vendor
□ Used as for information To Vendor

Name : Req. No.: Seq. No.:


Signature :
Date:
PIDEC review & comments does not absolve the vendor of the responsibility
for the correct design, manufacturing and operation of the equipment�

DE EXT A

Eng. Phase Purpose Of Distribution (POD) Purpose Of Issue (POI)

05 02/05/22 Issued for Approval SvK IS IS SK

04 07/03/22 Issued for Approval SvK IS IS SK

03 25/11/21 Issued for Approval � SvK� IS� IS� SK�

02 08/11/21 Issued for Approval � SvK� IS� IS� SK�

01 08/11/21 Issued for Approval � SvK� IS� IS� SK�

00 03/04/21 Issued for Approval SvK IS IS SK


Rev Date Description Prepared by Checked by Approved by Authorized by

This document with all its rights is the property of MPC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of MPC
Sub-Vendor: Vendor: EO PURIFICATION UNIT EP Contractor: Owner/Purchaser:

P&ID for Package and Auxiliary Units


Petrochemical
TAPCO Industries Design & MARUN Petrochemical
Polar Refrigeration Engineering Co. Company (PMC)
GmbH PROJ. NO. :1233
PIDEC Doc. No.: VD-1233-330-PID-001 Rev.: 05 PROJ. NO. : 1226

Change Index During Formal Issues


Internal
Sheet First Second Third Fourth Fifth Sixth
Issue Reason of Latest Change
No. Issue Issue Issue Issue Issue Issue
Rev. 0A Rev.00 Rev.01 Rev.02 Rev.03 Rev.04 Rev.05
1 X X X X X X
2 X X X X X X
3 X X X X X X
4 X X X X X X
5 X X X X X X
6 X X X X X X
7 X X X X X X
8 X X X X X X

This document with all its rights is the property of MPC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of MPC
Sub-Vendor: Vendor: EP Contractor: Owner/Purchaser:
EO PURIFICATION UNIT

P&ID for Package and Auxiliary Units


Petrochemical
Polar Refrigeration TAPCO Industries MARUN Petrochemical
GmbH Design & Company (MPC)
PIDEC Doc. No.: VD-1233-330-PID-001 Rev.: 05 Engineering Co. PROJ. NO. : 1226
PROJ. NO. : 1233

Index Page

P&ID for Package and Auxiliary Units

1. P&ID 4
2. Symbol & Legends 8

This document with all its rights is the property of MPC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of MPC
REFERENCE DRAWING DWG. NO.
PROCESS FLOW DIAGRAM VD-1233-330-PFD-001
VD-1233-330-PID-001

P&ID FOR BRINE PUMP VD-1233-330-PID-002

NOTES:

PDAHH (as per C&E diagram)

PDALL(as per C&E diagram)

The relation between high


temp. of oil heater and
compressor shut down to be
clarified & shown in the C&E
TAHH (as per C&E diagram) diagram (if applicable)

MARUN Petrochemical
Company (MPC)

EO PURIFICATION UNIT

PETROCHEMICAL INDUSTRIES DESIGN


& ENGINEERING COMPANY (PIDEC)

POLAR REFRIGERATION GmbH


These items to be
considered in C&E POLAR
diagram
P&I DIAGRAM
P&ID FOR PACKAGE & AUXILIARY UNITS

VD-1233-330-PID-001 04
VD-1233-330-PID-001 A1
REFERENCE DRAWING DWG. NO.
PROCESS FLOW DIAGRAM VD-1233-330-PFD-001
VD-1233-330-PID-001

Refer to our comments on the PID of skid A P&ID FOR BRINE PUMP VD-1233-330-PID-002

NOTES:

MARUN Petrochemical
Company (MPC)

EO PURIFICATION UNIT

PETROCHEMICAL INDUSTRIES DESIGN


& ENGINEERING COMPANY (PIDEC)

POLAR REFRIGERATION GmbH


POLAR
P&I DIAGRAM
P&ID FOR PACKAGE & AUXILIARY UNITS

VD-1233-330-PID-001 04
VD-1233-330-PID-001 A1
REFERENCE DRAWING DWG. NO.
PROCESS FLOW DIAGRAM VD-1233-330-PFD-001
VD-1233-330-PID-001

P&ID FOR BRINE PUMP VD-1233-330-PID-002

Highlighted interlocks haven't


been considered in C&E
diagram, vendor to recheck and
correct this matter.
NOTES:

Not considered in the C&E diagram,


discrepancy between documents should be
removed. However, if this valve is required
to close with the interlock, a reset switch to
be considered to open the valve in case the
interlock become healthy.

With accordance to
IS
C&E diagram, PID
960101B
shall be modified
IS

960101A

TALL
960129

4"-VNT-20-9602-511C(N)

With respect to C&E


diagram, this valve will
not affected by
IS-960101A/B The nitrogen line will be
delivered to the package just
at one tie point and the vendor
shall distribute it in his
package, therefore, TP 9 & TP
12 should be merged to one
tie point.

1"-NL-20-9637-511C(N)

MARUN Petrochemical
Company (MPC)

EO PURIFICATION UNIT

PETROCHEMICAL INDUSTRIES DESIGN


BATTERY LIMITS LIST & ENGINEERING COMPANY (PIDEC)

POLAR REFRIGERATION GmbH


POLAR
P&I DIAGRAM
P&ID FOR PACKAGE & AUXILIARY UNITS

VD-1233-330-PID-001 04
VD-1233-330-PID-001 A1
REFERENCE DRAWING DWG. NO.
PROCESS FLOW DIAGRAM VD-1233-330-PFD-001
VD-1233-330-PID-001

P&ID FOR BRINE PUMP VD-1233-330-PID-002

NOTES:

The nitrogen line will be


delivered to the package just
at one tie point and the vendor
shall distribute it in his
package, therefore, TP 9 & TP
12 should be merged to one
tie point.

All instrument symbols


should have the same size.
To be specified.

Necessity of considering
manhole on vessel for
maintenance should be
study by vendor.

Vendor shall take care of all interlock tag numbers which may
be in contrast to the C&E diagram as well as the other PIDs.

All interlocks which are specified


in this PID should be added to
the C&E diagram. MARUN Petrochemical
Company (MPC)

EO PURIFICATION UNIT

PETROCHEMICAL INDUSTRIES DESIGN


& ENGINEERING COMPANY (PIDEC)

POLAR
P&I DIAGRAM
P&ID FOR PACKAGE & AUXILIARY UNITS

VD-1233-330-PID-001 04
VD-1233-330-PID-001 A1
REFERENCE DRAWING DWG. NO.
PROCESS FLOW DIAGRAM VD-1233-330-PFD-001
VD-1233-330-PID-001

P&ID FOR BRINE PUMP VD-1233-330-PID-002

NOTES:

MARUN Petrochemical
Company (MPC)

EO PURIFICATION UNIT

PETROCHEMICAL INDUSTRIES DESIGN


& ENGINEERING COMPANY (PIDEC)

POLAR REFRIGERATION GmbH


POLAR
P&I DIAGRAM
P&ID FOR PACKAGE & AUXILIARY UNITS

VD-1233-330-PID-001 04
VD-1233-330-PID-001 A1
d D Ed s E Ed s E Ed E E E

K
E

d
E
W

E
D
/
/
/

E Z
E Z
Wd dd E Z
d E Z

d W d
Z Wd
d E Z d /W
/W

W W /W

Wz W E Z
Wz

& E Z
Z
E Z
d W/ Wd

Z W d KDD Ed
W E

&

W s
W
E Z
W ,
t, d Khd WZKy/D/dz / E
E Z
,

PAGE 1 OF 2
d D Ed s E Ed s E Ed E E E

,
W / E Z
d
d

E Z
d E Z
E
W
E Z
& W
E Z
K E
d
d

Z
E

E Z
W s
T d
E W/

Please Clarify: Push button for RESET ALARM is the same as push button ALARM ACCEPTED. What is the difference?