A-Pe-Ms Qty: 1 Unit: South Coast Rail Phase 1
A-Pe-Ms Qty: 1 Unit: South Coast Rail Phase 1
A-Pe-Ms Qty: 1 Unit: South Coast Rail Phase 1
Approved
Approved As Noted
Not Approved
Date:
Signature:
A-PE-MS
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
QTY: 1 UNIT
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 1
Project:
8'-9 9/16"
[105.5700]
1/4"x1/4"
Main unit South Coast Rail
1'-6 5/8"
[18.6250]
5'-0"
[60.0000]
1'-6 5/8"
[18.6250]
Phase 1
1 7/8"
[1.8750]
2'-4 1/16"
2'-0" 1'-6 1/2"
[28.0600]
[24.0000] [18.5000]
Wing
Date:
Signature:
Please confirm engineering; we cannot
8'-9 9/16"
Wing begin production unless your signed and
[105.5700] Type A PE isometric view top
scale 1"=2'-0" dated confirmation is marked on each page.
8'-1 1/4" 2'-0"
[97.2500] [24.0000]
Date:
05.02.2022
1'-3 3/4" 1'-3 3/4"
[15.7500] [15.7500]
Wing
Main unit
7'-3 1/4"
4'-10 1/4" 4'-10 1/4"
[87.2500]
[58.2500] [58.2500]
Wing
1 5/8"
[1.6350] 1/4"x3" HDG 1/4"x3" HDG 1/4"x3" HDG
steel bar steel bar 1/4"x3" HDG steel bar
steel bar
SECTION H-H
SCALE 1"=1'-6"
Approved
Approved As Noted
Not Approved
A page 4
3/16"x3/16"
4'- 1/2"
3/16"x3/16" [48.5000]
4'- 1/2" 4'- 1/2"
[48.5000] [48.5000]
4'- 1/2" 7'-3 1/4" 7'-2"
[48.5000] [87.2500] [86.0000]
H H
3/16"x3/16"
9 3/4"
[9.7500]
1'-9 3/4"
3/16"x3/16" 3/16"x3/16" 3 [21.7500]
8 1/2"
sides
1'-0" [8.5000]
[12.0000] 3/16"x3/16" Signage
5 1/2"
[5.5000]
Submittal by: F. Caffroni
1/4"x1/4"
1"
9"
[9.0000]
2'-0"
[24.0000]
2'-0"
[24.0000]
2 1/2" 1/4"x1/4" 1"
Checked by: M. Fernandes
[1.0000] [2.5000] 1'-1 5/8" 5'-0" [1.0000]
[13.6250] [60.0000]
5'-0"
[60.0000]
1'-11 5/8"
[23.6250]
SO No.: SAL-20-0299
A page 4
Main unit front elevation Main unit back elevation Assembly: A-PE
scale 1"=1'-6" scale 1"=1'-6"
Dwg. No.: 3
Project:
1'-4"
[16.0000] 3/16"x3/16" 1/4"x3" HDG
3/16"x3/16" steel bar WT 4x6.5
HDG steel
3/16"x3/16"
3/16"x3/16"
3/16"x3/16" 3/16"x3/16"
1'-4"
[16.0000]
3/16"x3/16" 3/16"x3/16" Approved
Approved As Noted
#10-3/4" long
HDG steel pin Not Approved
WT 4x6.5 12"x4"x1/4"
#10-1 3/4" long HDG steel
HDG steel
HDG steel pin rectangular tube
Date:
WT 4x6.5
HDG steel
4'- 1/2"
[48.5000] 5/16"-5/16"
7'-3 1/4"
5/16"-5/16" Signature:
[87.2500]
DETAIL B Please confirm engineering; we cannot
1/16" thick SCALE 1"=6" begin production unless your signed and
gasket dated confirmation is marked on each page.
Date:
3/16"x3/16"
1" thick
HDG steel 05.02.2022
base plate
7 1/2"
F DETAIL C
[7.5000]
SCALE 1 / 6
3/16"x3/16"
7 1/4"
[7.2500]
1'- 1/2"
[12.5000]
1'-0"
[12.0000]
6 1/2"
[6.5000] 3/16"x3/16"
F
1/4" thick HDG
steel plate
1"
[1.0000]
C
1'-7 7/8"
[19.8450]
F1 H1
F1
T1
SP
F1
H1 F1
F1
T2.1 F1 Approved
Approved As Noted
F1
Not Approved
F1
F5 F1
M1 TP
TP
Date:
CS F1
F5
F5 T1
T2.1
F5 Signature:
Please confirm engineering; we cannot
begin production unless your signed and
M1 dated confirmation is marked on each page.
F5
SP Date:
F5
SP
05.02.2022
T3 H1 F5
F5
F2
F2
F2
T4
F2
SH
F2
BP
F2
HB
BP
HB F2
F2
T5 RT1
F2
T4
RT1 F2
SH
T3 SP
T4
Signage
T5
BP
Submittal by: F. Caffroni
Checked by: M. Fernandes
H1
BP
Main unit front isometric view
scale 1"=1'-0" Main unit back isometric view T4
SO No.: SAL-20-0299
scale 1"=1'-0"
Assembly: A-PE
Dwg. No.: 5
Project:
Approved
Approved As Noted
1 1/2"
Not Approved
[1.5000]
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
10"
[10.0000] 7"
[7.0000]
05.02.2022
1 THRU
[ 1.0000 THRU]
1 1/2"
[1.5000]
10"
[10.0000]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 6
Project:
4 3/16"
Approved
[4.1600] Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
3 1/16" begin production unless your signed and
[3.0600] dated confirmation is marked on each page.
Date:
4 1/16"
[4.0600] 05.02.2022
1"
[1.0000]
2 1/16" 2 1/16"
[2.0800] [2.0800]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 7
Project:
Approved
Approved As Noted
Not Approved
1/4"
[.2500]
G
1/16" 7/16" 1/16"
1/16" [.0313] [ .4375] [.0313] SECTION G-G
[.0313] SCALE 6"=1"
1/2"
[ .5000]
CS HDG steel matte black finish front elevation
scale 6"=1"
1/2"
[ .5000]
7/16"
[ .4375]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
CS HDG steel matte black finish bottom plan
scale 6"=1" Dwg. No.: 8
Project:
Approved
Approved As Noted
Not Approved
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
1 7/8"
[1.8900] 1 5/8"
[1.6400]
05.02.2022
3 1/2"
[3.4700]
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 9
Project:
1'-1 1/2"
Approved
[13.5000] Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
3" begin production unless your signed and
[3.0000]
dated confirmation is marked on each page.
Date:
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 10
Project:
Approved
Approved As Noted
Not Approved
8 1/2"
[8.5000]
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
3"
[3.0000] 05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 11
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
4'- 1/2"
[48.5000] Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
3"
[3.0000] 05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 12
Project:
Approved
Approved As Noted
Not Approved
Date:
4'- 1/2"
[48.5000]
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
4" dated confirmation is marked on each page.
[4.0000]
Date:
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 13
Project:
Approved
Approved As Noted
Not Approved
Date:
Date:
05.02.2022
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8"
[6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250]
2 3/4"
[2.7500]
1/4 THRU
4" 3/8 X 82.0000
[4.0000] .2210 THRU 5/8"
[ .3850 X 82.0000 ] T1 HDG steel WT4x6.5 matte black finish top plan
scale 1"=9"
[.6250]
Signage
T1 HDG steel WT4x6.5 matte black finish front elevation
scale 1"=9"
T1 HDG steel WT4x6.5 matte black finish right elevation Submittal by: F. Caffroni
scale 1"=9"
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 14
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
T2.1 HDG steel WT4x6.5 matte black finish isometric view dated confirmation is marked on each page.
scale 1"=9"
Date:
05.02.2022
1 1/4"
4" 1/4 THRU [1.2500] 1 1/2"
[4.0000] [ .2210 THRU] [1.5000]
10-24 UNC - 2B
[10-24 UNC - 2B]
1 1/4"
8'-1 1/4"
[1.2500]
[97.2500]
4" 4"
[4.0000] [4.0000]
Signage
Submittal by: F. Caffroni
8'-1 1/4" 4"
[97.2500] [4.0000] Checked by: M. Fernandes
T2.1 HDG steel WT4x6.5 matte black finish front elevation
scale 1"=9"
T2.1 HDG steel WT4x6.5 matte black finish right elevation
scale 1"=9"
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 15
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
1/4 THRU
3/8 X 82.0000
10-24 UNC - 2B
.2210 THRU
[ .3850 X 82.0000 ] [10-24 UNC - 2B]
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8" 1 1/4"
[6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250] [1.2500]
2 3/4" 1 1/2"
[2.7500] [1.5000]
4"
[4.0000] 5/8" 1 1/4"
8'-1 1/4"
[.6250] [1.2500]
[97.2500]
SO No.: SAL-20-0299
T3 HDG steel WT4x6.5 matte black finish front elevation T3 HDG steel WT4x6.5 matte black finish right elevation
scale 1"=9" scale 1"=9" Assembly: A-PE
Dwg. No.: 16
Project:
3/4"
2 1/4" 6 1/2" 6 1/2" 4 5/8"
[.7500]
[2.2500] [6.5000] [6.5000] [4.6250]
Approved
Approved As Noted
4" 2 1/2" Not Approved
[4.0000] 9/16 THRU [2.5000]
[ .5312 THRU]
Date:
3/4"
1'-7 7/8"
[.7500]
[19.8750]
Date:
05.02.2022
1'-7 7/8"
[19.8750]
1" 4"
1" [1.0000] [4.0000]
[1.0000]
4" 4"
R1" [4.0000] [4.0000]
[R1.0000]
7.6240 4"
[4.0000]
T4 HDG steel WT4x6.5 matte black finish right elevation
scale 1"=4"
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 17
Project:
Approved
Approved As Noted
3/4"
1'-7 7/8"
[19.8750]
[.7500] Not Approved
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1'-7 7/8"
[19.8750]
1" 4"
1" [1.0000] [4.0000]
[1.0000]
4" 4"
[4.0000] [4.0000]
R1"
[R1.0000]
7.6240 4"
[4.0000]
T5 HDG steel WT4x6.5 matte black finish right elevation
T5 HDG steel WT4x6.5 matte black finish front elevation scale 1"=4" Signage
scale 1"=4"
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 18
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
4"
[4.0000] Please confirm engineering; we cannot
7/16"
[.4500] begin production unless your signed and
dated confirmation is marked on each page.
1/2 THRU
Date:
[ .5310 THRU] 7/8"
[.9000]
05.02.2022
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 19
Project:
Approved
Approved As Noted
Not Approved
RT1 HDG steel rectangular tube matte black finish 12"x4" isometric view
Date:
scale 1"=1'-0"
Signature:
6 5/8" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 6 5/8" 5/8" Please confirm engineering; we cannot
4" [6.6250] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [12.0000] [6.6250] [.6250] begin production unless your signed and
[4.0000] 2 3/4"
[2.7500] dated confirmation is marked on each page.
Date:
05.02.2022
RT1 HDG steel rectangular tube matte black finish 12"x4" top plan 5/8"
scale 1"=9" [.6250]
8'-1 1/4"
[97.2500] 1/16"x1/16"
1/16"x1/16"
1'-0"
[12.0000]
RT1 HDG steel rectangular tube matte black finish 12"x4" front elevation
scale 1"=9" RT1 HDG steel rectangular tube matte black finish 12"x4" right elevation
scale 1"=9"
2"
[2.0000] 6 5/8" 3'-6" 3'-6" 6 5/8"
[6.6250] [42.0000] [42.0000] [6.6250] Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
1 1/4
[ 1.0000 .2500]
SO No.: SAL-20-0299
RT1 HDG steel rectangular tube matte black finish 12"x4" bottom plan
scale 1"=9" Assembly: A-PE
Dwg. No.: 20
Project:
Approved
Approved As Noted
Not Approved
Date:
4 1/16"
[4.0600]
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
7'-2"
[86.0000] dated confirmation is marked on each page.
Date:
H1 HDG steel W4x13 matte black finish top plan
scale 1"=8" 05.02.2022
4 1/16"
[4.0600]
4 3/16" 4 3/16"
[4.1600] [4.1600]
7'-2"
[86.0000]
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 21
Project:
7 1/4"
[7.2500]
South Coast Rail
Phase 1
3/4"
[ .7500]
7 1/4" R1 1/8"
[7.2500] [R1.1250] 3/4"
[ .7500]
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
Signage
3/4" Submittal by: F. Caffroni
[ .7500]
Checked by: M. Fernandes
6 1/2"
[6.5000]
SO No.: SAL-20-0299
SH HDG steel 3/4" matte black finish right elevation
scale 1"=2"
SH HDG steel 3/4" matte black finish front elevation
scale 1"=2"
Assembly: A-PE
Dwg. No.: 22
1/4"
[.2650] Project:
1 7/8" 2'-0"
[1.8900] [24.0000]
D page 21 Approved
Approved As Noted
Not Approved
1/4x1/4
3 sides
3"
[2.9700]
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1/4x1/4
3 sides
Signage
Submittal by: F. Caffroni
D page 21
4"
3/4" [4.0000]
[.7500]
Date:
1 1/2"x1/4"
Signature:
HDG steel
rectangular bar Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
11 ga.
HDG steel
perforated panel
#10 countersunk tamperproof screw
DETAIL E
SCALE 1"=1"
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 24
L4
2'-0"
T7
Project:
[24.0000]
T6
F4
F4
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
T6
begin production unless your signed and
dated confirmation is marked on each page.
Date:
4'-10 1/4"
[58.2500] 05.02.2022
Signage
Submittal by: F. Caffroni
F3 Checked by: M. Fernandes
L4
SO No.: SAL-20-0299
Assembly: A-PE
Wing front elevation T7
scale 1"=6"
Dwg. No.: 25
Project:
Approved
Approved As Noted
Not Approved
Date:
Date:
4'-10 1/4"
[58.2500]
05.02.2022
4"
[4.0000]
4'-5 3/4"
[53.7500]
1/2" 8 3/8" 9" 9" 9" 9" 8 3/8" 1/2"
[.5000] [8.3750] [9.0000] [9.0000] [9.0000] [9.0000] [8.3750] [.5000]
2 1/4"
[2.2500]
Signage
Submittal by: F. Caffroni
10-24 UNC - 2B
[10-24 UNC - 2B] 2 1/4"
4'-10 1/4"
1 1/2"
4"
[2.2500] Checked by: M. Fernandes
[1.5000]
[58.2500] [4.0000]
SO No.: SAL-20-0299
T6 HDG steel modified WT3x6 matte black finish right elevation
T6 HDG steel modified WT3x6 matte black finish front elevation
scale 1"=6"
scale 1"=6" Assembly: A-PE
Dwg. No.: 26
Project:
Approved
2'-0" Approved As Noted
[24.0000]
Not Approved
4"
Date:
[4.0000]
Signature:
Please confirm engineering; we cannot
T7 HDG steel modified WT3x6 matte black finish top plan begin production unless your signed and
scale 1"=4" dated confirmation is marked on each page.
Date:
05.02.2022
10-24 UNC - 2B
[10-24 UNC - 2B]
1'-7 1/2"
[19.5000]
2 1/4"
[2.2500]
2'-0" 4"
Signage
[24.0000] [4.0000]
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 27
Project:
Approved
Approved As Noted
Not Approved
Date:
1'-7 1/2"
[19.5000]
Signature:
1/2" 9 1/4" 9 1/4" 1/2" Please confirm engineering; we cannot
[.5000] [9.2500] [9.2500] [.5000] begin production unless your signed and
3/4"
[.7500] dated confirmation is marked on each page.
Date:
1/4 THRU
1 1/2" 3/8 X 82.0000 1 1/2" 05.02.2022
[1.5000] .2210 THRU [1.5000]
[ .3850 X 82.0000 ]
1'-10 1/2"
[22.5000]
F3 HDG steel 1 1/2"x1/4" flat bar matte black finish front elevation
scale 1"=2"
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 28
Project:
Approved
Approved As Noted
Not Approved
Date:
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
Date:
05.02.2022
1/2" 8 3/8" 9" 9" 9" 9" 8 3/8" 1/2"
[.5000] [8.3750] [9.0000] [9.0000] [9.0000] [9.0000] [8.3750] [.5000]
1 1/2" 3/4"
[1.5000] [.7500]
4'-8 3/4"
[56.7500]
1/4 THRU
3/8 X 82.0000
.2210 THRU
[ .3850 X 82.0000 ]
F4 HDG steel 1 1/2"x1/4" flat bar matte black finish front elevation
scale 1"=6"
Signage
Submittal by: F. Caffroni
Checked by: M. Fernandes
SO No.: SAL-20-0299
Assembly: A-PE
Dwg. No.: 29
Project:
3 1/2"
[3.4700]
South Coast Rail
Phase 1
1 3/4"
[1.7350]
1 1/4"
[1.2500]
1 5/8"
1 7/8" 1"
[1.6400]
[1.8900] [ 1.0000]
Approved
R1/4" Approved As Noted
[R.2500]
Not Approved
3"
[2.9700]
L4 HDG steel angle 3"x3x1/4" modified matte black finish top plan
4 pieces per sign Date:
scale 1"=1"
Signature:
Please confirm engineering; we cannot
begin production unless your signed and
dated confirmation is marked on each page.
L4 HDG steel angle 3"x3x1/4" modified matte black finish isometric view
scale 1"=1" Date:
05.02.2022
3 1/2" 1 7/8"
1/4"
[3.4700] [1.8900]
[.2500]
3" 3"
[3.0000] 2 3/4" [3.0000]
[2.7500]
Signage
Submittal by: F. Caffroni
1/4" 3" 1/4"
Checked by: M. Fernandes
[.2500] [2.9700] [.2500]
L4 HDG steel angle 3"x3x1/4" modified matte black finish right elevation
scale 1"=1" SO No.: SAL-20-0299
L4 HDG steel angle 3"x3x1/4" modified matte black finish front elevation
scale 1"=1"
Assembly: A-PE
Dwg. No.: 30