Instruction To Bidders SMPP
Instruction To Bidders SMPP
These Instructions to Bidders are hereby made part of the proposal and contract documents and
the Bidders are hereby advised to consider the same in the preparation of their bid.
1.0 RESPONSIBILITIES
The bidder should include in their bid cost proposal the provision of temporary
power to be used during the entire duration of construction.
1.6 Cost of testing for welded connection shall be considered on the bid by the
STRUCTURAL STEEL CONTRACTOR.
3.21 ALL PROGRESS BILLINGS to be submitted shall bear a copy of partial AS-
BUILT PLANS covering billed period.
3.24 Failure to submit the as-built drawings together with your billings, our
recommendation will impose additional 10% retention (now a total of 20%).
The same will be released only when the updated as-built plan is submitted.
3.25 The collected partial as-built plans will be used as reference in validating the
final and complete as-built plans submitted upon project completion.
4.5 All above bonds (items 4.1 to 4.4) shall be secured from insurance Banco De Oro
Insurance Brokers, Inc.
Cost of securing the above bonds/insurances shall be considered in the bid. Opening of
policy and payment of premium shall be made thru the General Contractor (KBI).
5.0 Bids shall be fixed and shall not be subject to escalation regardless of increase in price of
labor and materials and fuel devaluation.
6.2 Workers in construction sites should wash or bath in enclosed areas away from
public view. DAAA shall call the attention or impose fines on habitual offenders.
6.4 Gambling, drinking intoxicating liquor at the construction site are not allowed.
Violators shall be penalized accordingly.
6.6 Barracks as living quarters for workers/personnel are not allowed within the
construction site due to limited space.
6.7 The STRUCTURAL STEEL CONTRACTOR shall be held responsible for the
performance and attitude of all his workers concerned within the project. The
STRUCTURAL STEEL CONTRACTOR shall provide protective gadgets such
as hard hats, uniforms, safety shoes, gloves of their workers.
8.0 INCLUSIVE
8.1 The STRUCTURAL STEEL CONTRACTOR shall assign on full time duty for
this particular project the following construction personnel who shall be under
the direct supervision of the GENERAL CONTRACTOR.
8.2 The STRUCTURAL STEEL CONTRACTOR shall be held responsible for the
performance and attitude to all his workers concerned within the project. The
Contractor shall provide protective gadgets such as hard hats, uniforms, safety
shoes, gloves of his workers.
9.0 Bidders are hereby advised to do actual site inspection to ascertain actual condition
therein.
10.0 No value engineering of plans will be followed after award without prior review/approval
by Structural Designer.
12.1 In case of additional work, or variation order due to revision of plans, the
corresponding cost per variation shall be determined as follows:
12.1.1 Compute the net additive or net deductive quantity of work or items
resulting from the Change Order.
12.1.2 Apply the approved bid unit cost regardless of whether the work item is
additive or deductive.
13.0 MISCELLANEOUS
13.1 Bid proposal shall be submitted in triplicate copies under the Bidder’s letterhead
following the proposal form issued to them.
Prepared by :