MATACOT 07/25/22
ACTIVITIES
07/25/22
Learnings
- I was learned and familiarized how to assemble & disassemble and output shaft and how to use
angle finder
07/26/22
Learnings
- familiarization of parts of B-3402 and I was learned the difference of sealed and shielded
bearings.
07/27/22
Learnings
- familiarized in which parts of pump need to get the reference data for temperature monitoring of
seal oil
07/28/22
- Switching of P-3602 B to A.
- Replacement of seal oil from kero to spinol.
- Close the spare valve first.
- Open the suction valve of seal pot prior to draining and filling of lube oil.
- Loosening of cap nut in suction and the side of pressure gauge.
- Open the draining valve. Drain the seal pot until it becomes empty.
- Filled the suction pipe of seal pot with spinol till reaches the high level of sight glass.
- 2 times flushing of seal pot with spinol until remove the presence of kero.
- After 2 times of flushing filled the spinol of sealpot until reaches the high level of sight glass.
- Temperature monitoring of seal gland and seal pot also the auxiliary pipes if there is a
temperature change
- Tightening bolt of rotor box preservation and leak test performing prior to vacuum and insert of
nitrogen in B-3402/B
Learnings
07/29/22
- G-2180/b2
- Inspection of fan blade of gearbox 2180 due to fan blade damage
- Continuation of temperature monitoring in P-3602/B (seal pot, seal chamber, seal gland in &
out, cooler)
- Vacuum of preservation box prior to filling of nitrogen.
Learnings