Professional Documents
Culture Documents
Abandonship Drill and LSA Training With Newly Join Crew
Abandonship Drill and LSA Training With Newly Join Crew
Abandonship Drill and LSA Training With Newly Join Crew
Rev.06/22
Drill/Exercise Evaluation
Vessel Name: Tamerlane
Vessel location:(At Sea or Name
At Sea, Enroute from Hitachinaka to Balboa
of Port)
Type of drill/exercise Abandonship drill with LSA Training
Date /time (incl. duration) 02 June 2023 / 1028 - 1105 H LT
Scenario / Agreed goals Abandonship drill with Life raft launching Training and Testing of Portable
VHF Radio and SART
Involved parties All crew members.
Evaluation carried out by
Capt. Awadesh Kumar Singh & Ch. Off. Curt Are Langbach / 02 June 2023
(Name/Rank(s) and when
Brief description included Drill participated by the entire crew members as per SOLAS Chapter III
timings made in Deck Log Book Reg. 19 Emergency Training and Drills (Newly joined crew participated
actively and brief on their assigned duties as per Muster List)
Effectiveness of procedures / Achieved goals (Attach VCM Checklist and/or other procedures tested)
Drill is efficient and procedures are as per VCM Checklist followed
Effectiveness/Performance of equipment. (Indicate also equipment tested)
Lifejacket lights and whistle tested. Engine tested ahead and astern propulsion. Steering tested hard port and
starboard. Lifeboat emergency lights outside were tested. All lightings system if Lifeboat were tested. All found in
good working condition. Portable VHF Radio and SART was found satisfactory and in good working condition.
Personnel Performance
Crew were pro-active during the drill and familiarization.
Effectiveness of scenario / General comments
Satisfactory and Deemed Effective.
Lessons Learnt
Reminded all crew to remove helmet & lifejacket before boarding the lifeboat. Helmets, lifejackets and immersion
suits to be place at the forward part of the lifeboat. Safety pin on release hook to be detached after drill or
maintenance.
Corrective Actions Implemented:
None
Note: Attach Drill Evaluation report with DE50 and submitted in Docmap
Drill Photos
D52
Rev.06/22