Professional Documents
Culture Documents
Technical Questionaire ŠKODA AUTO 8th Floor
Technical Questionaire ŠKODA AUTO 8th Floor
QUESTIONAIRE
FOR REQUIREMENT SPECIFICATION OF
OFFICE INTERIOR FIT OUT CREATION
BASE INFORMATION
Viettel Building 70 Nguyen Van Cu Street, Hong Hai, Ha Long city,
Building
Quang Ninh Province
Floor number 8th floor
The following list of questions is intended to clarify the client's requirements for changes and specifications of
non-standard or atypical elements. The given answers and technical clarifications will serve as supporting
material for the next stages of preparation for project implementation. In the event that the specified element is
not specified, the solution will be designed in accordance with the building standard.
CONTACTS
Name, company E-mail Phone
Building xxx
Client ŠKODA AUTO a.s.
Architect Vlastimil Pacek vlastimil.pacek@skoda-auto.cz
NOMINATED SUPPLIERS
Verify the requirement for the necessity of using nominated suppliers of individual professions, add contacts if
possible.
Contacts:
Profession Name, company E-mail Telefon
o SPATIAL ACOUSTICS
- based on the study
02 ARCHITECTURAL-BUILDING PART
SPACEPLAN
The number of workers in permanent workplaces and in meeting rooms corresponds to the
layout of the furniture
Numbers of men and women in permanent workplaces: men = 60 %, women = 40 %
PLASTERBOARD PARTITIONS
standard plasterboard partitions will be used for all solid non-bearing walls
Specification:
Partitions without acoustic requirements:
E.g. W 111-75(100) mm, CW 50 (CW75), 50 mm mineral wool, 1 x Knauf / Rigips WHITE 12.5
Partitions will be built on a raised floor
Fire partitions:
According to the manufacturer's certified systems – for example Knauf / Rigips:
Type: aluminum frame RAL anthracite in the same shade as the building's window profiles, double
glazing, glazed or solid doors (with regard to acoustics) - full height,
Sound attenuation requirements Rwmin = 37 - 45 dB, depending on the purpose of the room
Glazing type – double
Design type – frame, glass to meet with 3M tape
Frame color – anthracite/black in the same shade as the building's window profiles
Partition height – 2700mm
Built-in blinds – no
Sticking of glazed parts of partitions - own supply
Design of the installation post - no
Door in a glass partition
o Sound attenuation requirements - according to the type of partition
o Full and glass frameless
o Surface finish – HPL Pfleiderer R5623 ŠKODA elm / clear glass
o Door handle fittings
for full Lienbacher model Metro in stainless steel surface, metal center
for glass Dorma TGLH01 in stainless steel surface, CISA insert, lock TGL35S
stainless steel surface
o to full height
DOORS
Sound attenuation requirements Rwmin = 27 - 32 dB, depending on the purpose of the room
Full x glass frameless
Surface finish – HPL Pfleiderer R5623 ŠKODA elm / HPL Pfleiderer U11026 SD / clear glass
for full Lienbacher model Metro in stainless steel surface, metal center
for glass Dorma TGLH01 in stainless steel surface, CISA insert, lock TGL35S stainless
steel surface
Full height
No door threshold, drop bar for full doors
Frame type in SDK – steel / AL from the profile of system partitions
Surface treatment, frame color – black in the same shade as the window profiles of the building
Fire resistance – results from FSSB (fire safety solution of the building)
General key – own delivery
Additional requirements
FLOATING CEILING
Floating ceiling Ecophone SOLO/Matrix, Hunter Duglas – Hardfelt, Knauf REcleaneo
The ventilation ducts must correspond artistically with the suspended ceiling - they must be
processed in synergy
FLOORS
Double floors – leave as is now
The required type of covering – according to the architect's design will be specified in the study
o Covering in the office – Tarkett Desso Airmaster carpet tiles
o Covering in the meeting room – Tarkett Desso Airmaster carpet tiles
o Corridor covering – Tarkett Desso Airmaster carpet tiles
o Covering in the kitchen - Tarkett iD Square vinyl slats 24576305
o Covering in WC – leave as is now
o Covering in the server room – Tarkett, iQ Toro SC 3094578, squares 50x50cm
KITCHEN
Location – highlighted in the space plan attachment
Specification – will be specified in the equipment project
Appliances (refrigerators, dishwashers, microwave ovens, kettles)
Appliances will be connected behind the kitchen
o open kitchen:
dishwasher, 2x refrigerator, battery with flow heater - 5x230V, soda bar connected to
water and sewage
o closed kitchen:
dishwasher, 1x refrigerator, battery with flow heater - 3x230V
Coffee machines and kettles will be connected above the worktop
o open kitchen:
4x230V
o closed kitchen:
3x230V
Range hoods
o a requirement for separate, increased air extraction flow
o automatically controlled
TOILETS
As is, without change
SUNBLINDS
Current sunblinds
03 SERVER ROOM
BUILDING REQUIREMENTS
• without soffit
• covering in the server room – Tarkett, iQ Toro SC 3094578, 50x50cm square
• Door - security, access system, sound attenuation Rwmin = 32 Db
• Paint repair
COOLING
According to SLP designer - heat loss power of electrical equipment approx. up to 3kW
One cooling unit
04 SMART INSTALATION
o There will be NONE, only circuits and high current requirements from AV technology
o Lighting control (dimming, scenes, etc.) will be refined
o Control of lighting/blinds/blinds and connectivity in meeting rooms no,
o Heating/cooling control – will be addressed by the project
o Central shutdown of specified light/socket circuits, so-called exit button – no
in the event that no presence is detected in the entire area, the lights will be switched off
o Timetables - yes
o Switched sockets - no
o Operation costs tracking - no
o No over-the-top requirements
o SHZ
o Requirements for EFA above the basic solution according to FSSB (fire safety solution of the
building)
SWITCHBOARD CABINET
o Location of the switchboard – in the technical room, core of the building
o Expansion of the existing switchboard according to the project
o Existing electricity meter
o Other requirements according to the project
LIGHTING
o Lighting control
o Open space – presence radar
o Communication - switching by motion radar / standard dimmed light after movement is detected, full
lighting, if no presence is detected in the whole area, the lights will be switched off
o WC – switching by motion radar
o Central switch – no
o Lighting intensity control – according to the daylight sensor
o Meeting rooms - according to the AVT project (possibility of turning off the first segment of lights at
the projection surface in the auditorium space or the possibility of dimming the lights in this space)
o Emergency lighting – type and position according to the designer, according to the building standard
o Logo and other devices lightning requirements – TBD
o CONFERENCE ROOM
o Floorboxes + batiboxes (e.g. Legrand 80195)
o Floorbox/fitment: 2x 230V + 2x data
o batibox in SDK divider 2x 230V + 1x data
Audio / video
o Processed by AVTG, will provide strong current requirements, building based on AV equipment project if
needed
o TV a STA signal - no
o Low Voltage requirements for AV equipment will be specified by „strong current“ designer after SLP
project is made (in which batiboxes/protection devices/… will be designed).
o Separate meeting with Low Voltage designer is suggested for this profession set up streamlining
OTHER AREAS
o BACKUP – UPS
To be dealt within SLP project
o STRUCTURED CABLING
To be dealt by Škoda supplier
o TELEPHONES
To be dealt within the scope of structured cabling
10 OTHER REQUIREMENTS
no