Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 66

EARTHWORKS CONCRETE WORKS

ITEM Length Width Height # of Sets VOLUME


EXCAVATION FOOTING 1 2 3 3 18
VOLUME= LENGTH X WIDTH X (HEIGHT + 0.1m gravel bed allowance) C1 1 1 1 2 2
ITEM COLUMN
ITEM Length Width Depth QUANTITY VOLUME C2 1 1 1 3 3
FOOTING 4 5 6 4 480 Wall Footing 1 1 1 1 1
WALL FOOTING 2 3 3 4 72 Beam 1 1 1 1 1
VOLUME 552 VOLUME 0
HAULING AND DISPOSAL
VOLUME= EXCAVATED SOIL * (1+Swell Percentage)
Swell Perceetage 30% MASONRY WORKS
Area of
VOLUME 717.6 GRID LINE Length Height Opening AREA
BACKFILL AND COMPACTION 1 3 2 1
VOLUME= EXCAVATED SOIL / [(1-Shrink%) *(1+Swell%)] 1 2 1 1
Swell % 30% Shrink % 15% 1 1 1 0
VOLUME 844.2353 4 1 1 3
TOTAL VOLUME 2113.835 1 1 1 0
1 1 1 0
TOTAL AREA 5
FORMWORKS (Plywood)
FOOTING: Area = [(2(a+b)+0.2)* height]*number of sets
a b height Lapping (m) # of sets AREA
F-1 2 3 4 0.2 5 204
Column: Area = [(2(a+b)+0.2)* height]*number of sets
a b height Lapping (m) # of sets AREA
F-1 2 3 4 0.2 5 204
BEAM: Area = [(2d+b+0.1)* Beam Length]*number of sets
Depth Base Length Lapping (m) # of sets AREA
B-1 2 3 4 0.1 5 142
TOTAL AREA 550
REINFORCEMENTS REINFORCEMENTS
WALL FOOTING FOOTING
Bar Dia. Bar Length Mass
(Total Wall Length) Quantity kg /m BAR DIAMETER: 10 mm
(mm) (m) (kg)
Hook Concrete Bar
FOOTING Length Quantity kg/m Mass
122 10 3 122 0.6165 225.639 Length Cover Length(m)

F-1
TOTAL MASS: 225.639 (Along X) 0 125 75 0.1 8 0.6165 0.4932
(Along Y) 300 125 75 0.4 8 0.6165 1.9728
TOTAL MASS: 2.466

REINFORCEMENTS
COLUMN (Vertical Bars)
End Hook Mass
COLUMN Bar Dia.
(mm) Height
(m) Base Concrete
Upper CC.
Bar Length
Quantity kg /m
(16db)
Cover (m) (kg)
C-1 12 6 0.192 0.075 0.04 6.077 4 0.88776 21.57967
C-2 12 0 0.88776 0
C-3 12 0 0.88776 0
TOTAL MASS: 22
COLUMN (LATERAL TIES Cutting Length)
Concrete BAR DIA. Hooks 90° Bend 135° CUTTING
COLUMN Length WIDTH (m) Cover
Tie Tie
Bend LENGTH
(m) (m) Length (m) Width (m) (m) (10d) (2d) (3d) (m) WALL REINFORCEMENTS
Area of
C-1 0.215 0.15 0.025 0.157 0.092 0.008 2 3 2 0.562 GRID LINE Length Height Opening AREA
C-2 0.215 0.15 0.025 0.157 0.092 0.008 2 3 2 0.562 A 0
C-3 0.215 0.15 0.025 0.157 0.092 0.008 2 3 2 0.562 B 0
COLUMN (LATERAL TIES ) C 0
COLUMN CUTTING Bar
SPACING kg per Total mass
HEIGHT
(m)
QUANTITY LENGTH Diameter
meter (kg) D
(m) (m) (mm) 0
C-1 E 0
1.61 0.2 8 0.562 8 0.39424 1.772503 F 0
C-2 TOTAL AREA 0
2.9 0.2 14 0.562 8 0.39424 3.10188 Bar Diameter:
C-3 Vertical Bars (m)
2.02 0.2 10 0.562 8 0.39424 2.215629 Horizontal Bars (m)
TOTAL MASS: 7.1 TOTAL LENGTH: 0
TOTAL MASS: 0

REINFORCEMENTS
BEAM (VERTICAL BARS)
End Hook Mass
COLUMN Bar Dia.
(mm) Height
(m) Base Concrete Upper CC.
Bar Length
Quantity kg /m
(16db)
Cover (m) (kg)
C-1 12 6 0.192 0.075 0.04 6.077 4 0.88776 21.57967
C-2 12 0 0.88776 0
C-3 12 0 0.88776 0
TOTAL MASS: 22
BEAM (STIRRUPS Cutting Length)
BEAM
BEAM
Concrete Stirrup Stirrup BAR DIA. Hooks 90° Bend 135° CUTTING
COLUMN Length WIDTH (m) Cover Length (m) Width (m) Bend LENGTH
(m) (m) (m) (10d) (2d)
(3d) (m)

C-1 0.215 0.15 0.025 0.157 0.092 0.008 2 3 2 0.562


C-2 0.215 0.15 0.025 0.157 0.092 0.008 2 3 2 0.562
C-3 0.215 0.15 0.025 0.157 0.092 0.008 2 3 2 0.562

BEAM (STIRRUPS ) PAINTING WORKS


BEAM SPACING QUANTIT CUTTING Bar kg per Total
Area of
LENGTH LENGTH Diameter mass GRID LINE Length Height AREA
(m) (m) Y (m) (mm) meter (kg)
Opening

C-1 A 0
1.61 0.2 8 0.562 8 0.39424 1.772503 B 0
C-2 C 0
2.9 0.2 14 0.562 8 0.39424 3.10188 D 0
C-3 E 0
2.02 0.2 10 0.562 8 0.39424 2.215629 F 0
TOTAL MASS: 7.1 TOTAL AREA 0
MATERIAL DESCRIPTION
EMBANKMENT
COMMON BORROW
SELECTED BORROW
MIXED SAND & GRAVEL
ROCK
AGGREGATE SUBBASE COURSE
AGGREGATE SUBBASE COURSE MATERIAL
AGGREGATE BASE COURSE
CRUSHED GRADING A
UNCRUSHED GRADING A
CRUSHED GRADING B
UNCRUSHED GRADING B
BLENDED WEATHERED LIMESTONE AND CRUSH STONE
FILLER MATERIAL
CRUSHED AGGREGATE BASE COURSE
CRUSHED GRADING A
CRUSHED GRADING B
LIME STABILIZED ROAD MIX BASE COURSE
LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE CRUSHED GRADING A
LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE CRUSHED GRADING B
LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE UNCRUSHED GRADING A
LIME STABILIZED MIX SOIL AGGREGATE BASE COURSE UNCRUSHED GRADING B
AGGRAGATE SURFACE COURSE
CRUSHED GRADING A
CRUSHED GRADING B
CRUSHED GRADING C
CRUSHED GRADING D
UNCRUSHED GRADING A
UNCRUSHED GRADING B
UNCRUSHED GRADING C
UNCRUSHED GRADING D
BITUMINOUS SURFACE TREATMENT
CRUSHED STONE GRADING A
CRUSHED STONE GRADING B
CRUSHED STONE GRADING C
CRUSHED SLAG GRADING A
CRUSHED SLAG GRADING B
CRUSHED SLAG GRADING C
CRUSHED GRAVEL GRADING A
CRUSHED GRAVEL GRADING B
CRUSHED GRAVEL GRADING C
PORTLAND CEMENT CONCRETE PAVEMENT
READY MIX CONCRETE 3000PSI @ 28 DAYS
READY MIX CONCRETE 3000PSI @ 14 DAYS
READY MIX CONCRETE 3000PSI @ 7 DAYS
READY MIX CONCRETE 3000PSI @ 3 DAYS
READY MIX CONCRETE 3500PSI @ 28 DAYS
READY MIX CONCRETE 3500PSI @ 14 DAYS
READY MIX CONCRETE 3500PSI @ 7 DAYS
READY MIX CONCRETE 3500PSI @ 3 DAYS
READY MIX CONCRETE 4000PSI @28 DAYS
READY MIX CONCRETE 4000PSI @ 14 DAYS
READY MIX CONCRETE 4500PSI @ 28 DAYS
READY MIX CONCRETE 5000PSI @ 28 DAYS
CURING COMPOUND
POLYETHYLENE SHEET (PLASTIC COVER)
STEEL FORMS 15 CM WIDTH
STEEL FORMS 20 CM WIDTH
STEEL FORMS 23 CM WIDTH
STEEL FORMS 25 CM WIDTH
STEEL FORMS 28 CM WIDTH
STEEL FORMS 30 CM WIDTH
PILING
PRECAST CONCRETE PILES 350MM X 350MM
PRECAST CONCRETE PILES 400MM X 400MM
PRECAST CONCRETE PILES 450MM X 450MM
PRESTRESSED CONCRETE PILES 350MM X 350MM
PRESTRESSED CONCRETE PILES 400MM X 400MM
PRESTRESSED CONCRETE PILES 450MM X 450MM
STEEL SHEET PILES FY36
STEEL SHEET PILES FY50
PRECAST CONCRETE SHEET PILES 200MM X 400MM
PRECAST CONCRETE SHEET PILES 200MM X 450MM
PRECAST CONCRETE SHEET PILES 200MM X 500MM
PRECAST CONCRETE SHEET PILES 250MM X 400MM
PRECAST CONCRETE SHEET PILES 250MM X 450MM
PRECAST CONCRETE SHEET PILES 250MM X 500MM
STEEL SHELL PIPES 400MM
STEEL SHELL PIPES 500MM
STEEL PIPE/TUBULAR PILES FY36
STEEL PIPE/TUBULAR PILES FY50
PILE SHOES
STEEL SPLICE CAN
STEEL CASING 10mm thick @ 600mm Dia.
STEEL CASING 10mm thick @ 700mm Dia.
STEEL CASING 10mm thick @ 800mm Dia.
STEEL CASING 10mm thick @ 900mm Dia.
STEEL CASING 10mm thick @ 1000mm Dia.
STEEL CASING 10mm thick @ 1100mm Dia.
STEEL CASING 10mm thick @ 1200mm Dia.
STEEL CASING 10mm thick @ 1300mm Dia.
STEEL CASING 10mm thick @ 1400mm Dia.
STEEL CASING 10mm thick @ 1500mm Dia.
STEEL CASING 10mm thick @ 1600mm Dia.
STEEL CASING 10mm thick @ 1700mm Dia.
STEEL CASING 10mm thick @ 1800mm Dia.
STEEL CASING 10mm thick @ 1900mm Dia.
STEEL CASING 10mm thick @ 2000mm Dia.
STEEL CASING 10mm thick @ 2500mm Dia.
STEEL CASING 10mm thick @ 3000mm Dia.
STEEL CASING
ACETYLENE
BENTONITE
CONCRETE EPOXY (A & B)
OXYGEN
SILICA SAND
SUPER MUD
TENDON HIGH TENSILE WIRE STRAND 12MM
WELDING ROD
TIMBER STRUCTURES
BOLTS WITH NUTS & WASHERS
YAKAL
GUIJO
TANGUILE
APITONG
RED OR WHITE LAUAN
METAL STRUCTURES
MILLED STEEL PLATES CHECKERED FY36
MILLED STEEL PLATES PLAIN FY36
STEEL SHEET STAINLESS
BRIDGE ROLLERS AND ROCKERS
PINS AND PIN HOLES FY60
SLIDING BEARINGS
STRUCTURAL STEEL ANGULAR BAR (A36)
STRUCTURAL STEEL CHANNEL BAR (A36)
STRUCTURAL STEEL SQUARE BAR (A36)
STRUCTURAL STEEL I-BEAM (A36)
STRUCTURAL STEEL WIDE FLANGE (A36)
RIVETS HIGH TENSION
WASHERS HIGH TENSION
CORK EXPANSION JOINT FILLER (.019m x1.2m x 2.44m)
BOLTS HIGH TENSION
REINFORCING STEEL
REINFORCING STEEL BARS PLAIN GRADE 40
REINFORCING STEEL BARS PLAIN GRADE 60
REINFORCING STEEL BARS DEFORMED GRADE 40
REINFORCING STEEL BARS DEFORMED GRADE 60
GI TIE WIRE #12
GI TIE WIRE #16
RUST CONVERTER/REMOVER
STRUCTURAL CONCRETE
CONCRETE NAILS ASSORTED
COMMON NAILS ASSORTED
GI SHEET PLAIN GAUGE 16 x 8' (1.613 mm thick)
GI SHEET PLAIN GAUGE 20 x 8' (1.006 mm thick)
GI SHEET PLAIN GAUGE 26 x 8' (0.551 mm thick)
GRAVEL G1
GRAVEL G1-1/2
GRAVEL G2
STONE MASONRY
HAND-LAID ROCK EMBANKMENT
HAND-LAID ROCK EMBANKMENT (0.015 CBM./PC)
GABIONS & MATTRESSES
GABIONS METALLIC COATED, 0.5M X 1M X 3m
GABIONS METALLIC COATED, 0.5M X 1M X 4m
GABIONS METALLIC COATED, 1M X 1M X 2M
GABIONS METALLIC COATED, 1M X 1M X 3M
GABIONS METALLIC COATED, 1M X 1M X 4M
GABIONS PVC COATED 0.5M X 1M X 3M
GABIONS PVC COATED 0.5M X 1M X 4M
GABIONS PVC COATED 1M X 1M X 2M
GABIONS PVC COATED 1M X 1M X 3M
GABIONS PVC COATED 1M X 1M X 4M
MATTRESS METALLIC COATED 0.3M X 2M X 6M
MATTRESS PVC COATED 0.3M X 2M X 6M
FILTER CLOTH
CURB AND/OR GUTTER
PRECAST CONCRETE CURB (3000 PSI)
PRECAST CONCRETE GUTTER (3000 PSI)
PRECAST CONCRETE CURB & GUTTER (3000 PSI)
MONUMENTS, MARKERS AND GUIDE POSTS
CONCRETE MAINTENANCE MARKER POST
CONCRETE GUIDE POST
RIGHT OF WAY MONUMENT POST
GI PIPE SCHEDULE 40 DIA (19mm)
GI PIPE SCHEDULE 40 DIA (25.4mm)
GI PIPE SCHEDULE 40 DIA (38mm)
GI PIPE SCHEDULE 40 DIA (50.8mm)
GI PIPE SCHEDULE 40 DIA (76mm)
GI PIPE SCHEDULE 40 DIA (102mm)
GI PIPE SCHEDULE 40 DIA (127mm)
GI PIPE SCHEDULE 40 DIA (152mm)
CONCRETE KILOMETER POST
DRAINAGE MARKER
CONCRETE GUID POST
ROAD RIGHT OF WAY MARKER
GUARDRAIL
GUARDRAIL POST PRECAST CONCRETE
GUARDRAIL POST GI PIPE (102mm Dia. X 16.4m)
GUARDRAIL TIMBER GOOD LUMBER (152mm x 152mm)
GUARDRAIL TIMBER YAKAL OR EQUIV. (152mm X 152mm)
WIRE ROPE OR CABLE DIA (0.125mm)
WIRE ROPE OR CABLE DIA (19mm)
WIRE ROPE OR CABLE DIA (25.4mm)
GUARDRAIL METAL BEAM (254mm) WIDTH
GUARDRAIL METAL BEAM (305mm) WIDTH
METAL BEAM END PIECE
GUARDRAIL METAL BEAM (355mm) WIDTH
METAL FLEX BEAM GUARDRAIL CLASS A 2.67mm. THICK/TYPE 1-ZINC COATED AT 1.80 ounces/sq.ft.
METAL FLEX BEAM GUARDRAIL CLASS A 2.67mm. THICK/TYPE 1-ZINC COATED AT 3.60 ounces/sq.ft.
METAL FLEX BEAM GUARDRAIL CLASS A 3.43mm. THICK/TYPE 1-ZINC COATED AT 1.80 ounces/sq.ft.
METAL FLEX BEAM GUARDRAIL CLASS A 3.34mm. THICK/TYPE 1-ZINC COATED AT 3.60 ounces/sq.ft.
GUARDRAIL BOLT NUT & WASHER (16mm dia. X 25.4m)
GUARDRAIL BOLT NUT & WASHER (16mm dia. X 152m)
GUARDRAIL BOLT NUT & WASHER (16mm dia. X 229m)
FENCING
BARBED WIRE GALVANIZED 2 STRANDS GA 12.5
BARBED WIRE GALVANIZED 3 STRANDS GA 12.5
CYCLONE WIRE GALVANIZED 3' GAUGE 10
CYCLONE WIRE GALVANIZED 4' GAUGE 10
CYCLONE WIRE GALVANIZED 5' GAUGE 10
CYCLONE WIRE GALVANIZED 6' GAUGE 10
CHAIN LINK FENCE FABRIC
ROAD SIGN
DANGER/WARNING SIGN, 3MM THICK ALUMINUM SHEET 60CM TRIANGLE
DANGER/WARNING SIGN, 3MM THICK ALUMINUM SHEET 90CM TRIANGLE
REGULATORY SIGN, 3MM THICK ALUMINUM SHEET 60CM TRIANGLE
REGULATORY SIGN, 3MM THICK ALUMINUM SHEET 90CM TRIANGLE
REGULATORY SIGN, 3MM THICK ALUMINUM SHEET 60CM OCTAGON
REGULATORY SIGN, 3MM THICK ALUMINUM SHEET 90CM OCTAGON
PROHIBITORY/ RESTRICTIVE SIGN, 3MM THICK ALUMINUM SHEET 60CM TRIANGLE
PROHIBITORY/ RESTRICTIVE SIGN, 3MM THICK ALUMINUM SHEET 90CM TRIANGLE
PROHIBITORY/ RESTRICTIVE SIGN, 3MM THICK ALUMINUM SHEET 60CM CIRCLE
PROHIBITORY/ RESTRICTIVE SIGN, 3MM THICK ALUMINUM SHEET 60CM CIRCLE
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (304mm X 610mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (304mm X 1219mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (457mm X 610mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (457mm x 1219mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (610mm x 1219mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (610mm x 1828mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (91mm x 1828mm)
INFORMATIVE SIGN, 3MM THICK ALUMINUM SHEET (1219mm x 1828mm)
CHEVRON DIRECTIONAL SIGN, 3MM THICK ALUMINUM SHEET (457mm x 610mm)
CHEVRON DIRECTIONAL SIGN, 3MM THICK ALUMINUM SHEET (610mm x 914mm)
CHEVRON DIRECTIONAL SIGN, 3MM THICK ALUMINUM SHEET (1219mm x 1828mm)
PAVEMENT MARKINGS
GLASS BEADS (PRE-MIX)
PRIMER WHITE
PRIMER YELLOW
LPG CYLINDER
PAINT ROLLERS (152mm)
PAINT THERMOPLASTIC WHITE
PAINT THERMOPLASTIC YELLOW
REFLECTORIZED TRAFFIC PAINT WHITE
REFLECTORIZED TRAFFIC PAINT YELLOW
REFLECTIVE PAVEMENT STUDS
REFLECTIVE STUD CATCH'EYE FLUSH SURFACE 180MM x 140MM
REFLECTIVE STUD CATCH'EYE RAISED SURFACE 100MM x 100MM
RAISED REFLECTIVE PAVEMENT STUD (RPS1 A2R TRAPEZOIDAL TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS2 A1R TRAPEZOIDAL TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS3 ABS RECTANGULAR TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS4 A2R RECTANGULAR TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS4 A1R RECTANGULAR TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS20 A2R RECTANGULAR TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS20 A1R RECTANGULAR TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS21 ABS SQUARE TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS22 A2R SQUARE TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS22 A1R SQUARE TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS23 OPTICAL CONDENSING)
RAISED REFLECTIVE PAVEMENT STUD (RPS25 ABS SQUARE TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS26 ABS SQUARE TYPE)
RAISED REFLECTIVE PAVEMENT STUD (RPS27 RSE HARDMAN CAT'S EYE SQUARE TYPE)
TOP SOIL
TOP SOIL (GARDEN SOIL)
SODDING
SODDING
TREE PLANTING
TREE EUCALYPTUS (0.91m)
TREE MAHOGANY (0.91m)
TREE NARRA (0.91m)
TREE PINE (0.91m)
FERTILIZER ORGANIC
FERTILIZER NON-ORGANIC
FUNGICIDE
HERBICIDE
INSECTICIDE
BAMBOO (STAKES) (1.52m)
BIO-ENGINEERING SOLUTION
COCO-NET CGN 400
COCO-NET CGN 700
COCO-LOGS/FASCINE, CGR 200
COCO-LOGS/FASCINE, CGR 300
VEGETATION (HYDROSEEDING)
VEGETATION (VETIVER GRASS SYSTEM)
GRASS CARABAO
HYDRAULIC CEMENT
HYDRAULIC CEMENT
PORTLAND CEMENT
POZZOLANG CEMENT
BITUMINOUS MATERIALS
ASPHALT CEMENT PENETRATION GRADE 40-50
ASPHALT CEMENT PENETRATION GRADE 60-70
ASPHALT CEMENT PENETRATION GRADE 85-100
ASPHALT CEMENT PENETRATION GRADE 120-150
ASPHALT CUT-BACK (RC70)
ASPHALT CUT-BACK (RC250)
ASPHALT CUT-BACK (RC800)
ASPHALT CUT-BACK (RC3000)
ASPHALT CUT-BACK (MC30)
ASPHALT CUT-BACK (MC70)
ASPHALT CUT-BACK (MC250)
ASPHALT CUT-BACK (MC800)
ASPHALT CUT-BACK (MC3000)
ASPHALT EMULSIFIED ANIONIC
ASPHALT EMULSIFIED CATIONIC CRS-1
ASPHALT EMULSIFIED CATIONIC CRS-2
ASPHALT EMULSIFIES CATIONIC SS1
ASPHALT PLANT MIX COLD
ASPHALT PLANT MIX HOT
JOINT MATERIALS
RUBBER GASTKET DIA (19mm)
RUBBER GASTKET DIA (25.4mm)
RUBBER GASTKET DIA (32mm)
RUBBER GASTKET DIA (50mm)
RUBBER GASTKET DIA (76mm)
RUBBER GASTKET DIA (101mm)
RUBBER GASTKET DIA (127mm)
RUBBER GASTKET DIA (152mm)
CONCRETE CURING MATERIALS AND ADMIXTURES
CONCRETE ADMIXTURE ACCELERATING
CONCRETE ADMIXTURE ACCELERATING
CONCRETE ADMIXTURE RETARDING
CONCRETE ADMIXTURE RETARDING
CONCRETE ADMIXTURE WATER-REDUCING
CONCRETE ADMIXTURE WATER-REDUCING
CONCRETE ADMIXTURE WATER-REDUCING AND ACCELERATING
CONCRETE ADMIXTURE WATER-REDUCING AND ACCELERATING
CONCRETE ADMIXTURE WATER-REDUCING HIGH RANGE
CONCRETE ADMIXTURE WATER-REDUCING HIGH RANGE
CONCRETE ADMIXTURE WATER-REDUCING AND RETARDING
CONCRETE ADMIXTURE WATER-REDUCING AND RETARDING
CONCRETE ADMIXTURE WATER-REDUCING HIGH RANGE AND RETARDING
CONCRETE ADMIXTURE WATER-REDUCING HIGH RANGE AND RETARDING
WATER PROOFING CEMENT (SAHARA OR EQUIVALENT)
PAINTS
PAINTS TINTING COLOR
PAINT ALUMINUM
PAINT ENAMEL
PAINT LATEX GLOSS
PAINT LATEX SEMI GLOSS
PAINT RED LEAD
THINNER PAINT
THINNER LACQUER
PAINT METAL EPOXY
PAINT PRIMER SOLVENT
BRUSH PAINT (101mm)
BRUSH ROLLER (152mm)
BRUSH STEEL (101mm)
OIL PAINT
SPAR VARNISH
LACQUER PUTTY
TREATED AND UNTREATED TIMBER
TIMBER PILES TREATED COCO LOGS
TIMBER PILES UNTREATED COCO LOGS
TIMBER PILES TREATED GUIJO
TIMBER PILES UNTREATED GUIJO
TIMBER PILES TREATED TANGUILI
TIMBER PILES UNTREATED TANGUILI
TIMBER PILES UNTREATED YAKAL
TIMBER PILES UNTREATED YAKAL
WATER
WATER
CHEMICALS AND TERMITE CONTROL PESTICIDE
CONCRETE NEUTRALIZER
FUEL GASOLINE PREMIUM
FUEL GASOLINE REGULAR
FUEL GASOLINE UNLEADED
FUEL DIESEL
FUEL KEROSENE
FUEL LIQUIFIED PETROLEUM GAS
LUBRICANTS
DIESEL GEAR OIL
GREASING
BREAK FLUID
MOTOR OIL SPECIAL
MOTOR OIL REGULAR
PESTICIDE (SOIL POISONING)
SOLIGNUM (TERMITE CONTROL) - CLEAR
PLUMBING & FIXTURES
WATER CLOSET INCLUDING FITTING AND ACC (ELONGATED) AMERICAN STD OR EQUIVALENT
WATER CLOSET INCLUDING FITTING AND ACC (ROUND) AMERICAN STD OR EQUIVALENT
LAVATORY INCLUDING FITTINGS AND ACC AMERICAN STD OR EQUIVALENT
URINAL INCLUDING FITTINGS AND ACC. AMERICAN STD OR EQUIVALENT
BRONZE FAUCETS (12.7mm D)
G.I. PIPES (12.7mm D)
G.I. PIPES (19mm D)
G.I. PIPES (25.4mm D)
G.I. PIPES (38mm D)
G.I. PIPES (50mm D)
G.I. PIPES (63mm D)
G.I. PIPES (76mm D)
G.I. PIPES (89mm D)
G.I. PIPES (101mm D)
G.I COUPLING ELBOW (12.7mm D)
G.I COUPLING ELBOW (19mm D)
G.I COUPLING ELBOW (25.4mm D)
G.I COUPLING ELBOW (38mm D)
G.I COUPLING ELBOW (50mm D)
G.I COUPLING ELBOW (63mm D)
G.I COUPLING ELBOW (76mm D)
G.I COUPLING ELBOW (89mm D)
G.I COUPLING ELBOW (101mm D)
G.I. TEE, BANDED (12.7mm D)
G.I. TEE, BANDED (19mm D)
G.I. TEE, BANDED (25.4mm D)
G.I. TEE, BANDED (38mm D)
G.I. TEE, BANDED (50mm D)
G.I. TEE, BANDED (63mm D)
G.I. TEE, BANDED (76mm D)
G.I. TEE, BANDED (101mm D)
G.I. CAPS, BANDED (12.7mm D)
G.I. CAPS, BANDED (19mm D)
G.I. CAPS, BANDED (25.4mm D)
G.I. CAPS, BANDED (38mm D)
G.I. CAPS, BANDED (50mm D)
G.I. CAPS, BANDED (63mm D)
G.I. CAPS, BANDED (76mm D)
G.I. CAPS, BANDED (101mm D)
G.I. PLUGS (12.7mm D)
G.I. PLUGS (19mm D)
G.I. PLUGS (25.4mm D)
G.I. PLUGS (38mm D)
G.I. PLUGS (50mm D)
G.I. PLUGS (63mm D)
G.I. PLUGS (76mm D)
G.I. PLUGS (101mm D)
G.I. UNIONS, FLAT SEAT (12.7mm D)
G.I. UNIONS, FLAT SEAT (19mm D)
G.I. UNIONS, FLAT SEAT (25.4mm D)
G.I. UNIONS, FLAT SEAT (38mm D)
G.I. UNIONS, FLAT SEAT (50mm D)
G.I. UNIONS, FLAT SEAT (63mm D)
G.I. UNIONS, FLAT SEAT (76mm D)
G.I. UNIONS, FLAT SEAT (101mm D)
G.I. REDUCER (12.7mm D)
G.I. REDUCER (19mm D)
G.I. REDUCER (25.4mm D)
G.I. REDUCER (38mm D)
G.I. REDUCER (50mm D)
G.I. REDUCER (63mm D)
G.I. REDUCER (76mm D)
G.I. REDUCER (101mm D)
PVC PIPES (12.7mm D)
PVC PIPES (19mm D)
PVC PIPES (25.4mm D)
PVC PIPES (38mm D)
PVC PIPES (50mm D)
PVC PIPES (63mm D)
PVC PIPES (76mm D)
PVC PIPES (89mm D)
PVC PIPES (101mm D)
PVC COUPLING (12.7mm D)
PVC COUPLING (19mm D)
PVC COUPLING (25.4mm D)
PVC COUPLING (38mm D)
PVC COUPLING (50mm D)
PVC COUPLING (63mm D)
PVC COUPLING (76mm D)
PVC COUPLING (89mm D)
PVC COUPLING (101mm D)
PVC TEE (12.7mm D)
PVC TEE (19mm D)
PVC TEE (25.4mm D)
PVC TEE (38mm D)
PVC TEE (50mm D)
PVC REDUCER (19mm x 12.7mm)
PVC REDUCER (25.4mm x 19mm)
PVC REDUCER (25.4mm x 12.7mm)
PVC REDUCER (38mm x 25.4mm)
PVC REDUCER (38mm x 19mm)
PVC REDUCER (50mm x 25.4mm)
PVC 45deg. (3mm BEND x 50mm)
PVC 45deg. (3mm BEND x 76mm)
PVC 45deg. (3mm BEND x 101mm)
PVC 87.5deg. (6mm BEND x 50mm)
PVC 87.5deg. (6mm BEND x 76mm)
PVC 87.5deg. (6mm BEND x 101mm)
PVC 45deg. SINGLE BRANCH, WYE (50mm x 50mm)
PVC 45deg. SINGLE BRANCH, WYE (76mm x 50mm)
PVC 45deg. SINGLE BRANCH, WYE (76mm x 76mm)
PVC 45deg. SINGLE BRANCH, WYE (101mm x 50mm)
PVC 45deg. SINGLE BRANCH, WYE (101mm x 76mm)
PVC 45deg. SINGLE BRANCH, WYE (101mm x 101mm)
PVC 87.5deg. SINGLE BRANCH, SEEP, TEE (50mm x 50mm
PVC 87.5deg. SINGLE BRANCH, SEEP, TEE (76mm x 50mm)
PVC 87.5deg. SINGLE BRANCH, SEEP, TEE (76mm x 76mm)
PVC 87.5deg. SINGLE BRANCH, SEEP, TEE (101mm x 50mm)
PVC 87.5deg. SINGLE BRANCH, SEEP, TEE (101mm x 76mm)
PVC 87.5deg. SINGLE BRANCH, SEEP, TEE (101mm x 101mm)
PVC DOUBLE BRANCH, TEE (50mm)
PVC DOUBLE BRANCH, TEE (76mm)
PVC DOUBLE BRANCH, TEE (101mm)
PVC P-TRAP W/PLUG & SEALING RING (50mm)
PVC P-TRAP W/ PLUG & SEALING RING (76mm)
PVC P-TRAP W/ PLUG & SEALING RING (101mm)
PVC CLEAN-OUT W/ PLUG & SEALING RING (50mm)
PVC CLEAN-OUT W/ PLUG & SEALING RING (76mm)
PVC CLEAN-OUT W/ PLUG & SEALING RING (101mm)
PVC CONCENTRIC BUSHING REDUCER (76mm x 50mm)
PVC CONCENTRIC BUSHING REDUCER (101mm x 50mm
PVC CONCENTRIC BUSHING REDUCER (101mm x 76mm)
PVC MALE THREADED ADAPTOR (12.7mm)
PVC MALE THREADED ADAPTOR (19mm)
PVC MALE THREADED ADAPTOR (25.4mm)
PVC MALE THREADED ADAPTOR (38mm)
PVC MALE THREADED ADAPTOR (50mm)
PVC87.5deg. SANITARY TAP TEE W/ SEAL RING (50mm x 25.4mm)
PVC87.5deg. SANITARY TAP TEE W/ SEAL RING (50mm x 38mm)
SHOWER HEAD WITH VALVE
SOAP HOLDER
CYLINDRICAL WATER TANK (500 GALS
STAINLESS LADDER RUNG
KITCHEN SINK
FLOOR DRAIN
PAPER HOLDER
MIRROR
GATE VALVE 25MM DIA
UNION PATENTEE 13MM DIA
WATER METER
SOLVENT
TEFFLON TAPE
GI NIPPLE 13MM DIA
HARDWARE
ANCHOR VOLTS WITH NUTS AND WASHER
MACHINE BOLTS WITH NUTS AND WASHER
TENSION RODS (38mm D)
TENSION RODS (16mm D
TENSION RODS (19mm D)
TURN BUCKLES (12.7mm D)
TURN BUCKLES (16mm D)
TURN BUCKLES (19mm D)
W.I, STRAP
HINGE (50mm x 101mm)
SAND PAPER
DOOR LOCKS ( SCHLAGE OR EQUIVALENT))
AUTOMATIC DOOR CLOSER (YALE OR EQUIVALENT)
TAR PAINT
STEEL CABLE
STEEL GRATING FRAME
WOODEN DOORS AND WINDOWS
FLUSH HOLLOW CORE DOOR
FLUSH TYPE SOLID CORE DOOR
NARRA PANELED DOOR
TANGUILE PANELED DOOR
ALUMINUM GLASS DOOR
GLASS TRANSCOM ON WOOD
ACCORDION TYPE DOOR
VARIFOLD TYPE DOOR
AWNING TYPE STEEL CASEMENT WINDOWS
SWING TYPE STEEL CASEMENT WINDOWS
GLASS JALOUSIE WINDOW
FIXED GLASS WINDOW ON METAL FRAME
FIXED LOUVERED STEEL WINDOW
ALUMINUM CASEMENT WINDOW
SLIDING ALUMINUM WINDOW
METAL ROOFING
CORRUGATED ROOFING GAUGE 26 (.551 mm x 2.44 m)
PRE-PAINTED METAL ROOFING SHEET GA. 26 LONG SPAN
PRE-PAINTED METAL ROOFING SHEET GA. 26 x 2.44 m
PRE-PAINTED GUTTER, GA 24 (.701mm) x 2.44 m
ORDINARY GUTTER, GA 24 (.701mm) x 2.44 m
PRE-PAINTED FLASHING, GA 24 (.701mm) x 2.44 m
ORDINARY FLASHING, GA 24 (.701mm) x 2.44 m
PRE-PAINTED RIDGE ROLL, GA 24 (.701mm) x 2.44 m
ORDINARY RIDGE ROLL, GA 24 (.701mm) x 2.44 m
ROOF VENTILATORS
CERAMIC TILES
CERAMIC GLAZED TILES
CERAMIC UNGLAZED TILES
WOOD TILES
NARRA WOOD TILE
TANGUILE WOOD TILE
VINYL FLOOR TILES
VINYL TILES 1/16'' THICKNESS
VINYL TILES 1/14'' THICKNESS
VINYL TILES 1/12'' THICKNESS
CONDUIT, BOXES AND FITTINGS
ELECTRICAL RIGID STEEL CONDUIT (12.7 mm D)
ELECTRICAL RIGID STEEL CONDUIT (19 mm D)
ELECTRICAL RIGID STEEL CONDUIT (25.4 mm D)
BUSHING AND LOCKNUT (12.7 mm D)
BUSHING AND LOCKNUT (19 mm D)
BUSHING AND LOCKNUT (25.4 mm D)
ELBOW 90 DEG (RIGID STEEL) (25.4mm D)
PVC CONDUIT PIPE ( 3 m x 12.7 mm D)
PVC CONDUIT PIPE ( 3 m x 19 mm D)
PVC CONDUIT PIPE ( 3 m x 25.4 mm D)
PVC CONDUIT ELBOW 90 DEG (25.4 mm D)
PVC ADAPTER WITH LOCKNUT (12.7 mm D)
PVC ADAPTER WITH LOCKNUT (19 mm D)
PVC ADAPTER WITH LOCKNUT ( 25.4 mm D)
RS CONDUIT COUPLING (12.7 mm D)
RS CONDUIT COUPLING (25.4 mm D)
PVC CONDUIT COUPLING (12.7 mm D)
PVC CONDUIT COUPLING (19 mm D)
PVC CONDUIT COUPLING (25.4 mm D)
OCTAGONAL JUNCTION BOX TYPE GAUGE #16 (101mm x 101mm x 53mm) DEEP TYPE
UTILITY BOX GAUGE #16 (50mm x 101mm, 53mm) DEEP TYPE
SQUARE BOX (101mm x 53mm) DEEP TYPE GAUGE #16
SQUARE BOX (101mm x 63mm) DEEP TYPE GAUGE #16
METAL PULL BOX (152mm x 152mm x 101mm) GAUGE #16
METAL PULL BOX (304mm x 304mm x 101mm) GAUGE #16
TELEPHONE CABINET (304mm x 457mm x 127mm) GAUGE #16
TELEPHONE CABINET (304mm x 610mm x 152mm) GAUGE #16
CONDULET TYPE 'F' (12.7 mm)
CONDULET TYPE 'F' (19 mm)
SERVICE ENTRANCE CAP (12.7 mm D)
SERVICE ENTRANCE CAP (19 mm D)
SERVICE ENTRANCE CAP (25.4 mm D)
MICA TUBING
ELECTRICAL WIRES THWN/THHN 2.0 mm2
ELECTRICAL WIRES THWN/THHN 3.5 mm2
ELECTRICAL WIRES THWN/THHN 5.5 mm2
TELEPHONE JACKETED WIRE CAT 5E
SINGLE GANG SWITCH
TWO-GANG SWITCH
THREE-GANG SWITCH
TWO-WAY SWITCH
DUPLEX CONVINIENT OUTLET
HEAVY DUTY OUTLET
POLARIZED 3-PRONGS (ACU OUTLET)
ENCLOSED AIR CIRCUIT BREAKER 100AF, 3P, 220V, 70AT NEMA I
ENCLOSED AIR CIRCUIT BREAKER 50AF, 3P, 220V, 40AT NEMA I
ENCLOSED AIR CIRCUIT BREAKER 50AF, 2P, 220V, 40AT NEMA I
ELECTRICAL TAPE 3/4'' x 20 YRDS
PANELBOARD & CABINETS ( ENCLOSED 30AMP, 2 PST)
PANELBOARD & CABINETS ( ENCLOSED 60AMP, 2 PST)
1 x 20 W BOX TYPE FLF
1 x 40 W BOX TYPE FLF
2 x 40 W BOX TYPE FLF
1 x 20 W INDUSTRIAL TYPE FLF
2 x 40 W INDUSTRIAL TYPE FLF
1 x 40 W TROFFER TYPE ALUMINUM LOUVER RECESS
2 x 40 W TROFFER TYPE ALUMINUM LOUVER RECESS
2 x 40 W TROFFER TYPE ALUMINUM LOUVER SURFACE
2 x 40 W TROFFER TYPE ALUMINUM LOUVER SURFACE
6'' D PINLIGHT WITH 18W 220V CFL
EQUIPMENT FOR FIRE ALARM STATION (MANUAL)
EQUIPMENT FOR FIRE ALARM BELL (VIBRATING 6'' D)
EQUIPMENT FOR FIRE ALARM ANNUCIATOR
EQUIPMENT FOR FIRE ALARM CONTROL PANEL
EQUIPMENT FOR FIRE ALARM SMOKE DETECTOR
FLOOR OUTLET POP-UP
TELEPHONE OUTLET RJ 45
OTHER CONSTRUCTION MATERIALS
NIPA SHINGLES CLASS I
NIPA SHINGLES CLASS II
SAWALI 2m X 2m WITH SKIN
SAWALI 2m X 2m SKINLESS
MECHANICAL EQUIPMENTS
GENERATOR 220V 100KW CAPACITY
AIR CONDITIONER WINDOW TYPE 1.0HP 220V
AIR CONDITIONER WINDOW TYPE 1.5HP 220V
AIR CONDITIONER WINDOW TYPE 2.0HP 220V
NUEVA ECIJA 1ST NUEVA ECIJA 2ND
UNIT
DEO DEO

CUM 355.00 355.00


CUM 350.00 365.00
CUM 285.00 322.00
CUM 514.00 550.00

CUM 572.00 572.00

CUM 453.00 453.00


CUM 441.00 444.00
CUM 392.00 412.00
CUM 300.00 377.00
CUM 685.00 685.00
CUM 590.00 620.00

CUM 675.00 675.00


CUM 645.00 658.00

CUM 755.00 755.00


CUM 730.00 730.00
CUM 658.00 658.00
CUM 612.00 612.00

CUM 565.00 579.00


CUM 550.00 578.00
CUM 500.00 542.00
CUM 490.00 515.00
CUM 550.00 565.00
CUM 525.00 537.00
CUM 520.00 540.00
CUM 470.00 488.00

CUM 710.00 756.00


CUM 690.00 725.00
CUM 670.00 707.00
CUM 745.00 745.00
CUM 713.00 713.00
CUM 712.00 712.00
CUM 735.00 735.00
CUM 710.00 710.00
CUM 700.00 700.00

CUM 4,735.00 4,735.00


CUM 4,900.00 4,900.00
CUM 5,395.00 5,395.00
CUM 5,700.00 5,700.00
CUM 4,825.00 4,825.00
CUM 5,285.00 5,285.00
CUM 5,720.00 5,720.00
CUM 6,000.00 6,000.00
CUM 5,260.00 5,260.00
CUM 5,585.00 5,585.00
CUM 5,750.00 5,750.00
CUM 6,100.00 6,100.00
LTR 73.00 78.00
LNM 81.00 81.00
LNM 51.00 53.00
LNM 60.00 62.00
LNM 68.00 70.00
LNM 68.00 73.00
LNM 75.00 77.00
LNM 73.00 80.00

LNM 1,400.00 1,400.00


LNM 1,640.00 1,640.00
LNM 1,980.00 1,980.00
LNM 2,920.00 2,920.00
LNM 3,145.00 3,145.00
LNM 3,320.00 3,320.00
KG 59.00 59.00
KG 60.00 60.00
LNM 1,620.00 1,665.00
LNM 1,755.00 1,795.00
LNM 1,965.00 2,050.00
LNM 2,040.00 2,250.00
LNM 2,340.00 2,420.00
LNM 2,388.00 2,485.00
LNM 2,850.00 3,105.00
LNM 3,585.00 3,700.00
KG 60.00 62.00
KG 62.00 64.00
KG 67.00 67.00
KG 67.00 69.00
LNM 9,768.00 9,965.00
LNM 11,400.00 11,680.00
LNM 13,128.00 13,400.00
LNM 14,530.00 14,820.00
LNM 15,605.00 16,000.00
LNM 17,456.00 18,000.00
LNM 19,210.00 20,000.00
LNM 20,286.00 21,000.00
LNM 20,675.00 22,800.00
LNM 22,790.00 22,750.00
LNM 24,966.00 25,850.00
LNM 26,980.00 27,800.00
LNM 28,330.00 28,900.00
LNM 31,709.00 32,520.00
LNM 33,900.00 34,850.00
LNM 41,155.00 42,000.00
LNM 52,503.00 53,960.00
KG 64.00 66.00
KG 65.00 65.00
BAG 620.00 620.00
GAL/SET 460.00 460.00
KG 56.00 58.00
KG 44.00 44.00
KG 36.00 36.00
KG 65.00 65.00
KG 85.00 88.00

KG 163.00 163.00
BDFT 86.00 86.00
BDFT 86.00 86.00
BDFT 51.00 51.00
BDFT 51.00 51.00
BDFT 51.00 51.00

KG 56.00 56.00
KG 72.00 72.00
KG 127.00 127.00
PC 4,800.00 4,800.00
KG 83.00 83.00
PC 5,250.00 5,250.00
KG 69.00 69.00
KG 70.00 70.00
KG 72.00 72.00
KG 68.00 68.00
KG 73.00 73.00
KG 78.00 78.00
KG 78.00 78.00
PC 685.00 685.00
KG 157.00 157.00

KG 42.00 42.00
KG 43.00 43.00
KG 42.00 42.00
KG 43.00 43.00
KG 73.00 76.00
KG 83.00 85.00
GAL 625.00 620.00

KG 100.00 104.00
KG 85.00 87.00
PC 1,700.00 1,740.00
PC 1,130.00 1,170.00
PC 665.00 685.00
CUM 660.00 690.00
CUM 690.00 715.00
CUM 677.00 698.00
CUM 815.00 815.00

CUM 785.00 785.00

PC 1,830 1830
PC 2,350.00 2,350.00
PC 2,530.00 2,530.00
PC 3,000.00 3,100.00
PC 3,420.00 3,580.00
PC 2,098.00 2,098.00
PC 2,420.00 2,420.00
PC 2,400.00 2,485.00
PC 3,090.00 3,185.00
PC 3550 3550
PC 3,700.00 3,850.00
PC 4,300.00 4,500.00
SQM 165.00 170.00

LMN 285.00 295.00


LMN 330.00 345.00
LMN 512.00 522.00

PC 1,425.00 1,425.00
PC 880.00 880.00
PC 780.00 810.00
PC 390.00 385.00
PC 590.00 590.00
PC 965.00 965.00
PC 1,340.00 1,340.00
PC 2250 2250
PC 3,240.00 3,240.00
PC 7,680.00 7,680.00
PC 8,800.00 8,800.00
PC 835.00 835.00
PC 710.00 710.00
PC 1,400.00 1,400.00
PC 830.00 830.00

PC 1,245.00 1,275.00
PC 915.00 935.00
LNM 260.00 270.00
LNM 415.00 430.00
LNM 98.00 100.00
LNM 230.00 240.00
LNM 425.00 445.00
LNM 1,400.00 1,468.00
LNM 1720 1755
PC 2,075.00 2,075.00
LNM 2,000.00 2,080.00
LNM 1,380.00 1,400.00
LNM 1,450.00 1,485.00
LNM 1,788.00 1,820.00
LNM 1,860.00 1,920.00
PC 28.00 29.00
PC 77.00 79.00
PC 88 90

LNM 26 27
LNM 36.00 35.00
LNM 79 79
LNM 101 101
LNM 125 125
LNM 163 163
LNM 165 165

PC 5740.00 5850.00
PC 8450.00 8450.00
PC 3570.00 3570.00
PC 7999.00 7999.00
PC 3395.00 3395.00
PC 8100.00 8100.00
PC 3450.00 3450.00
PC 7680.00 7680.00
PC 7700 7700
PC 7,995.00 7995
PC 3,100.00 31000
PC 3,250.00 3,250.00
PC 6,200.00 6,200.00
PC 7,250.00 7,250.00
PC 7,490.00 7,490.00
PC 10,900.00 10,900.00
PC 13,700.00 13,700.00
PC 21,344.00 21,344.00
PC 4,650.00 4,650.00
PC 5,350.00 5,350.00
PC 21,730.00 21,730.00

BAG 1,285.00 1,285.00


LTR 137.00 139.00
LTR 137.00 139.00
KG 64.00 66.00
PC 90 93
BAG 1,520.00 1,582.00
BAG 1,562.00 1,625.00
LTR 467.00 482.00
LTR 456.00 505.00

PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00
PC 577.00 577.00

CUM 242.00 250.00

SQM 107.00 100.00

PC 99.00 100.00
PC 58.00 60.00
PC 115.00 115.00
PC 353.00 353.00
BAG 1,300.00 1,200.00
BAG 1,150.00 1,150.00
LTR 54.00 54.00
LTR 250.00 250.00
LTR 310.00 310.00
PC 150.00 150.00

SQM 110.00 110.00


SQM 156.00 156.00
LNM 410.00 410.00
LNM 450.00 450.00
SQM 80.00 80.00
SQM 70.00 70.00
SQM 60.00 60.00

BAG 258.00 265.00


BAG 248.00 255.00
BAG 210.00 215.00

MTON 47,590.00 49,500.00


MTON 48,400.00 50,300.00
MTON 46,100.00 47,500.00
MTON 45,900.00 47,800.00
MTON 47,100.00 48,750.00
MTON 46,000.00 47,800.00
MTON 45,000.00 46,850.00
MTON 44,000.00 45,750.00
MTON 47,220.00 47,900.00
MTON 80,500.00 82,400.00
MTON 45,000.00 46,900.00
MTON 44,150.00 45,850.00
MTON 37,900.00 39,000.00
MTON 44,720.00 48,850.00
MTON 61,300.00 63,000.00
MTON 63,400.00 65,000.00
MTON 72,100.00 74,800.00
MTON 6,580.00 6,800.00
MTON

PC 82.00 82.00
PC 98.00 98.00
PC 108.00 108.00
PC 124.00 124.00
PC 206.00 206.00
PC 330.00 330.00
PC 558.00 558.00
PC 876.00 876.00

LTR 125.00 129.00


BAG 300.00 310.00
LTR 48.00 50.00
BAG 396.00 408.00
LTR 69.00 72.00
BAG 310.00 323.00
LTR 123.00 128.00
BAG 482.00 501.00
LTR 75.00 78.00
BAG 268.00 280.00
LTR 129.00 135.00
BAG 578.00 600.00
LTR 102.00 107.00
BAG 480.00 500.00
BAG 48.00 50.00

LTR 182.00 187.00


GAL 597.00 621.00
GAL 605.00 630.00
GAL 640.00 553.00
GAL 637.00 605.00
GAL 442.00 460.00
GAL 255.00 260.00
GAL 166.00 169.00
GAL 845.00 875.00
GAL 646.00 668.00
PC 60.00 61.00
PC 70.00 73.00
PC 23.00 23.00
LTR 94.00 98.00
LTR 383.00 398.00
KG 600.00 600.00

BDFT 42.00 43.00


BDFT 36.00 37.00
BDFT 94.00 98.00
BDFT 57.00 59.00
BDFT 94.00 98.00
BDFT 57.00 59.00
BDFT 94.00 96.00
BDFT 90.00 94.00

LTR 1.00 1.00

LTR 115.00 115.00


LTR
LTR
LTR
LTR
LTR
KG 60.00 60.00
LTR 220.00 220.00
LTR 240.00 240.00
LTR 245.00 245.00
LTR 280.00 280.00
LTR 195.00 195.00
LTR 185.00 185.00
LTR 320.00 320.00
LTR 335.00 335.00

SET 7,055.00 7,055.00


SET 4,635.00 4,635.00
SET 6,695.00 6,695.00
SET 4,944.00 4,944.00
PCS 170.00 170.00
PCS 250.00 250.00
PCS 354.00 354.00
PCS 610.00 610.00
PCS 1,050.00 1,050.00
PCS 1,425.00 1,425.00
PCS 1,985.00 1,985.00
PCS 2,400.00 2,400.00
PCS 3,100.00 3,000.00
PCS 3,800.00 3,800.00
PCS 11.00 12.00
PCS 13.00 21.00
PCS 24.00 24.00
PCS 27.00 27.00
PCS 63.00 62.00
PCS 72.00 75.00
PCS 79.00 80.00
PCS 100.00 100.00
PCS 130.00 128.00
PCS 22.00 22.00
PCS 26.00 26.00
PCS 27.00 27.00
PCS 66.00 66.00
PCS 67.00 66.00
PCS 75.00 77.00
PCS 83.00 82.00
PCS 190.00 189.00
PCS 32.00 33.00
PCS 42.00 42.00
PCS 46.00 46.00
PCS 62.00 62.00
PCS 65.00 65.00
PCS 62.00 62.00
PCS 129.00 129.00
PCS 263.00 263.00
PCS 22.00 22.00
PCS 28.00 29.00
PCS 27.00 27.00
PCS 30.00 30.00
PCS 37.00 37.00
PCS 38.00 38.00
PCS 66.00 68.00
PCS 76.00 77.00
PCS 34.00 34.00
PCS 38.00 38.00
PCS 80.00 79.00
PCS 95.00 97.00
PCS 120.00 120.00
PCS 160.00 160.00
PCS 240.00 240.00
PCS 360.00 373.00
PCS 22.00 23.00
PCS 25.00 26.00
PCS 26.00 27.00
PCS 34.00 35.00
PCS 57.00 59.00
PCS 70.00 73.00
PCS 72.00 75.00
PCS 88.00 92.00
PCS 71.00 71.00
PCS 93.00 97.00
PCS 95.00 99.00
PCS 180.00 188.00
PCS 250.00 260.00
PCS 370.00 365.00
PCS 450.00 463.00
PCS 639.00 659.00
PCS 900.00 898.00
PCS 5.00 5.00
PCS 10.00 10.00
PCS 14.00 14.00
PCS 18.00 18.00
PCS 33.00 34.00
PCS 38.00 39.00
PCS 57.00 59.00
PCS 58.00 60.00
PCS 76.00 79.00
PCS 7.00 7.00
PC 9.00 9.00
PC 13.00 13.00
PC 33.00 34.00
PC 39.00 39.00
PC 6.00 6.00
PC 9.00 9.00
PC 19.00 19.00
PC 38.00 39.00
PC 30.00 30.00
PC 43.00 44.00
PC 23.00 23.00
PC 40.00 40.00
PC 64.00 64.00
PC 28.00 28.00
PC 54.00 52.00
PC 87.00 85.00
PC 87.00 87.00
PC 95.00 95.00
PC 87.00 87.00
PC 108.00 108.00
PC 130.00 130.00
PC 136.00 136.00
PC 37.00 37.00
PC 101.00 101.00
PC 108.00 108.00
PC 118.00 118.00
PC 138.00 138.00
PC 152.00 152.00
PC 79.00 79.00
PC 186.00 186.00
PC 290.00 290.00
PC 115.00 115.00
PC 209.00 209.00
PC 297.00 297.00
PC 23.00 23.00
PC 38.00 38.00
PC 64.00 64.00
PC 34.00 34.00
PC 50.00 50.00
PC 56.00 56.00
PC 6.00 6.00
PC 7.00 7.00
PC 11.00 11.00
PC 23.00 23.00
PC 45.00 45.00
PC 95.00 95.00
PC 95.00 95.00
SET 1,920.00 1,920.00
SET 1,435.00 1,435.00
SET 17,450.00 17,450.00
KG 107.00 107.00
SET 5,400.00 5,400.00
PC 292.00 292.00
SET 308.00 278.00
SQFT 538.00 538.00
PC 415.00 415.00
PC 36.00 36.00
PC 1,710.00 1,710.00
CAN 199.00 199.00
ROLL 12.00 12.00
PC 23.00 23.00
None
KG 210.00 208.00
KG 109.00 112.00
LNFT 52.00 52.00
LNFT 26.00 26.00
LNFT 32.00 32.00
PC 165.00 173.00
PC 191.00 197.00
PC 237.00 245.00
KG 65.00 65.00
PR 70.00 70.00
ROLL 1,700.00 1,700.00
SET 1,596.00 1,645.00
SET 2,834.00 2,975.00
GAL 463.00 480.00
KG 127.00 127.00
KG 90.00 90.00

SQM 920.00 945.00


SQM 1,783.00 1,783.00
SQM 5,400.00 5,400.00
SQM 4,650.00 4,500.00
SQM 6,720.00 7,000.00
SQM 1,980.00 1,980.00
SQM 2,200.00 2,200.00
SQM 3,148.00 3,148.00
SQM 1,920.00 1,920.00
SQM 1,950.00 2,040.00
SQM 695.00 695.00
SQM 485.00 485.00
SQM 588.00 610.00
SQM 5,100.00 5,300.00
SQM 5,780.00 6,000.00

SQM 272.00 272.00


SQM 385.00 385.00
SQM 395.00 412.00
LNM 178.00 185.00
LNM 107.00 107.00
LNM 178.00 178.00
LNM 106.00 110.00
LNM 177.00 182.00
LNM 107.00 107.00
LNM 1,395.00 1,440.00

SQM 777.00 795.00


SQM 885.00 905.00

SQM 1,570.00 1,570.00


SQM 815.00 780.00

SQM 330.00 309.00


SQM 395.00 370.00
SQM 406.00 386.00

LGHT 235.00 225.00


LGHT 503.00 480.00
LGHT 730.00 730.00
PR 6.00 7.00
PR 9.00 10.00
PR 12.00 12.00
PC 201.00 190.00
PC 73.00 70.00
PC 96.00 92.00
PC 128.00 122.00
PC 19.00 20.00
PC 9.00 9.00
PC 14.00 14.00
PC 16.00 17.00
PC 15.00 10.00
PC 23.00 22.00
PC 4.00 8.00
PC 5.00 5.00
PC 8.00 9.00
PC 34.00 32.00
PC 33.00 31.00
PC 33.00 31.00
PC 39.00 38.00
PC 370.00 355.00
PC 787.00 755.00
SET 1,720.00 1,650.00
SET 2,000.00 1,900.00
PC 70.00 67.00
PC 103.00 100.00
PC 64.00 45.00
PC 100.00 62.00
PC 199.00 75.00
M 26.00 17.00
M 26.00 22.00
M 24.00 26.00
M 37.00 42.00
M 29.00 25.00
SET 96.00 67.00
SET 132.00 112.00
SET 178.00 132.00
SET 128.00 130.00
SET 135.00 135.00
SET 200.00 208.00
SET 450.00 467.00
SET 1,410.00 1,410.00
SET 1,287.00 1,287.00
SET 566.00 590.00
PC 31.00 31.00
SET 1,310.00 1,310.00
SET 1,610.00 1,610.00
SET 318.00 318.00
SET 350.00 350.00
SET 650.00 650.00
SET 490.00 490.00
SET 960.00 950.00
SET 955.00 955.00
SET 1,155.00 1,155.00
SET 955.00 955.00
SET 1,210.00 1,155.00
SET 152.00 152.00
SET 1,350.00 1,350.00
SET 1,450.00 1,450.00
SET 1,610.00 1,610.00
SET 2,065.00 2,065.00
SET 1,475.00 1,475.00
SET 3,865.00 3,865.00
SET 212.00 212.00

SQM 23.00 23.00


SQM 25.00 36.00
SQM 25.00 52.00
SQM 52.00 52.00

UNIT 780,000.00 780,000.00


UNIT 17,840.00 17,840.00
UNIT 22,000.00 22,000.00
UNIT 27,100.00 27,100.00
AVERAGE LABOR PRODUCTIVITY
ITEM SCOPE OF WORKS UNIT
OUTPUT RATE PER UNIT PER DAY

I SITE WORKS
1. Lay - out & Staking sq. m. 50.00
2. Demolition works
a. Drywall sq. m. 20.00
b. CHB Wall sq. m. 50.00
c. RC Wall cu. m. 5.00
d. RC Floor sq. m. 50.00
e. Dismantling of Roofing Sheet sq. m. 100.00

II EARTHWORKS
1. Excavation works
a. Manual cu. m. 1.33
b. Equipment - Backhoe 0.5 cu.m. capacity cu. m. 200.00

2. Backfilling ( Manual ) cu. m. 10.00


3. Compaction ( Manual ) cu. m. 10.00
4. Gravel Bedding cu. m. 10.00
5. Embankment cu. m. 10.00
6. Hauling of excess soil cu. m. 10.00
7. Soil poisoning sq. m. 100.00

III CONCRETING WORKS


1. Job Site Mix (1 Bagger Mixer)
a. Lean Concrete cu. m. 10.00
b. Footing Tie Beam cu. m. 10.00
c. Wall Footing cu. m. 10.00
d. Slab on Fill/Grade cu. m. 10.00
e. Stair cu. m. 10.00

2. Ready Mix Concrete


a. Footing cu. m. 10.00
b. Column cu. m. 10.00
c. Suspended Beam cu. m. 10.00
d. Suspended Slab cu. m. 10.00

IV REBAR WORKS
1. Footing kgs 200.00
2. Column kgs 200.00
3. Footing Tie Beam kgs 200.00
4. Wall Footing kgs 200.00
5. Slab on Fill/Grade kgs 200.00
6. Suspended Beam kgs 200.00
7. Suspended Slab kgs 200.00
8. Stair kgs 200.00

V FORMWORKS
1. Fabrication & installation
a. Footing sq. m. 50.00
b. Column sq. m. 50.00
c. Footing Tie Beam sq. m. 50.00
d. Wall Footing sq. m. 50.00
e. Suspended Beam sq. m. 50.00
f. Suspended Slab sq. m. 50.00
g. Stair sq. m. 50.00

2. Shuttering / Stripping of Formworks


a. Footing sq. m. 50.00
b. Column sq. m. 50.00
c. Footing Tie Beam sq. m. 50.00
d. Wall Footing sq. m. 50.00
e. Suspended Beam sq. m. 50.00
f. Suspended Slab sq. m. 50.00
g. Stair sq. m. 50.00

VI STAGING/SCAFFOLDING
1. Installation and Dismantling of LUMBER Scaffolding sq. m. 50.00
2. Installation and Dismantling of H-FRAME Scaffolding sq. m. 50.00
3. Installation and Dismantling of B.I. PIPE Scaffolding sq. m. 50.00

VII ROOF / ROOF FRAMING WORKS


1. Fabrication and Installation of Steel Framing Truss kgs 50.00
2. Installation of Roof Sheet with Insulation sq. m. 50.00
3. Installation of Roof Bended Sheet lin. M. 50.00

VIII WELDING / STEEL WORKS


1. Fabrication and Installation of STRUCTURAL STEEL
( I-Beam , H-Beam , Wide Flange ) kgs 200.00
2. Fabrication and Installation of Steel Handrailing lin. M. 100.00
3. Fabrication and Installation of Steel Gate sq. m. 50.00
4. Installation of Steel Door pc 5.00

IX MASONRY WORKS
1. CHB Laying
a. CHB 4" thk sq. m. 100.00
b. CHB 5" thk sq. m. 100.00
c. CHB 6" thk sq. m. 100.00

2. Plastering
a. Interior Walls sq. m. 200.00
b. Exterior Walls sq. m. 200.00
c. Corner egde ( kantohan ) lin. M. 100.00

3. Floor Finishes
a. Tile installation sq. m. 100.00
b. Granite installation sq. m. 100.00
c. Wood Parquet installation sq. m. 50.00
d. Peebles installation sq. m. 50.00
e. Marble installation sq. m. 50.00

4. Wall Finishes
a. Tile installation sq. m. 100.00
b. Granite installation sq. m. 50.00
c. Decorative stone installation sq. m. 50.00
d. Window moulding pre-cast installation lin. M. 100.00

X CARPENTRY WORKS
1. Door ( Wood )
a. Door Jamb installation pc 5.00
b. Door installation pc 5.00
c. Door wood casing installation lin. M. 5.00

2. Cabinet ( Wood )
a. Fabrication & installation sq. m. 50.00

3. Dry Wall Partition using Metal Frame


a. Fabrication & installation sq. m. 50.00

4. Dry Wall Partition using Wood Frame


a. Fabrication & installation sq. m. 50.00

5. Others
a. Baseboard wood installation lin. M. 100.00
b. Handrail wood installation lin. M. 100.00
c. Window wood casing installation lin. M. 100.00

XI CEILING WORKS
a. Board on wood frame installation sq. m. 100.00
b. Hardiflex Board on metal frame installation sq. m. 100.00
c. Gypsum Board on metal frame installation sq. m. 100.00
d. Acoustic Board on metal frame installation sq. m. 100.00
e. Spandrel ceiling eaves installation sq. m. 100.00
f. Wood cornice installation lin. M. 100.00

XII PAINTING WORKS


1. Concrete
a. Flat Piant Finish sq. m. 200.00
b. Semi Gloss Paint Finish sq. m. 200.00
c. Gloss Paint Finish sq. m. 200.00

2. Steel / Metal
a. Flat Enamel Paint Finish sq. m. 100.00
b. QDE Paint Finish sq. m. 100.00
c. Automotive Paint Finish sq. m. 100.00
3. Wood
a. Semi Duco Paint Finish sq. m. 100.00
b. Duco Paint Finish sq. m. 100.00
c. Varnish Paint Finish sq. m. 100.00

4. Epoxy Paint Finish sq. m. 100.00

XIII WATERPROOFING WORKS


Application ( Cementituous) sq. m. 100.00

XIV ELECTRICAL WORKS


1. Roughing-in PVC Pipe & fittings lin. M. 200.00
2. Roughing-in Metal Conduits & fittings lin. M. 200.00
3. Installation of Electrical Wiring lin. M. 200.00
4. Installation of Wiring Devices set 5.00
5. Installation of Circuit Breaker on Panel Board set 5.00
6. Installation of Lighting Fixtures pc 30.00

XV PLUMBING WORKS
1. Installation of Waterline ( PPR ) lin. M. 50.00
2. Installation of Sanitary line lin. M. 50.00
3. Installation of Water closet set 3.00
4. Installation of wall hang Lavatory set 3.00
5. Installation of Counter top Lavatory set 2.00
GE LABOR PRODUCTIVITY MANPOWER
T RATE PER UNIT PER DAY Supervisor Foreman Carpenter Mason Steelman Welder Electrician Plumber Paintor

sq. m. / day 1 1 1 0 0 0 0 0 0

sq. m. / day 1 1 1
sq. m. / day 1 1 2
cu. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 0

cu. m. / day 1 1
cu. m. / day 1 1

cu. m. / day 1 1
cu. m. / day 1 1
cu. m. / day 1 1
cu. m. / day 1 1
cu. m. / day 1 1
sq. m. / day 1 1

cu. m. / day 1 1 3
cu. m. / day 1 1 3
cu. m. / day 1 1 3
cu. m. / day 1 1 3
cu. m. / day 1 1 3

cu. m. / day 1 1 3
cu. m. / day 1 1 3
cu. m. / day 1 1 3
cu. m. / day 1 1 3

kgs /day 1 1 2
kgs /day 1 1 2
kgs /day 1 1 2
kgs /day 1 1 2
kgs /day 1 1 2
kgs /day 1 1 2
kgs /day 1 1 2
kgs /day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2

sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2

sq. m. / day 1 1
sq. m. / day 1 1
sq. m. / day 1 1

kgs /day 1 1 2
sq. m. / day 1 1 2
lin. M. / day 1 1 2

kgs /day 1 1 2
lin. M. / day 1 1 2
sq. m. / day 1 1 2
pc / day 1 1 2

sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2

sq. m. / day 1 1 2
sq. m. / day 1 1 2
lin. M. / day 1 1 2

sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2

sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
lin. M. / day 1 1 2

pc / day 1 1 2
pc / day 1 1 2
lin. M. / day 1 1 2

sq. m. / day 1 1 2

sq. m. / day 1 1 2

sq. m. / day 1 1 2

lin. M. / day 1 1 2
lin. M. / day 1 1 2
lin. M. / day 1 1 2

sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
sq. m. / day 1 1 2
lin. M. / day 1 1 2

sq. m. / day 1 1 3
sq. m. / day 1 1 3
sq. m. / day 1 1 3

sq. m. / day 1 1 3
sq. m. / day 1 1 3
sq. m. / day 1 1 3
sq. m. / day 1 1 3
sq. m. / day 1 1 3
sq. m. / day 1 1 3

sq. m. / day 1 1 3

sq. m. / day 1 1 2

lin. M. / day 1 1 2
lin. M. / day 1 1 2
lin. M. / day 1 1 2
set / day 1 1 2
set / day 1 1 2
pc / day 1 1 2

lin. M. / day 1 1 2
lin. M. / day 1 1 2
set / day 1 1 2
set / day 1 1 2
set / day 1 1 2

CONSTRUCTION LABOR RATES

Item Rate per hour Rate per day


Position
No.
Cost Range Cost Range
1 Foreman 65 – 100 520 – 800
2 Fitter 56.25 – 67.5 450 – 540
3 Welder 53.75 – 66.88 430 – 535
4 Electrician 48.75 – 63.75 390 – 510
5 Carpenter 50 – 56.25 400 – 450
6 Painter 48.75 – 55 390 – 440
7 Mason 47.5 – 56.25 380 – 450
8 Driver 43.75 – 56.25 350 – 450
Eqpt
9 50 – 56.25 400 – 450
Operator
10 Helper 35 – 53.75 280 – 430
Helper TOTAL

2 5

2 5
2 6
2 6
2 6
4 6

5 7
5 7

4 6
4 6
4 6
4 6
4 6
4 6

4 9
4 9
4 9
4 9
4 9

4 9
4 9
4 9
4 9

2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6
2 6

2 6
2 6
2 6
2 6
2 6
2 6
2 6

3 5
3 5
3 5

2 6
2 6
2 6

2 6
2 6
2 6
2 6

4 8
4 8
4 8

4 8
4 8
4 8

4 8
4 8
4 8
4 8
4 8

4 8
4 8
4 8
4 8

4 8
4 8
4 8

4 8

4 8

4 8

4 8
4 8
4 8

4 8
4 8
4 8
4 8
4 8
4 8

2 7
2 7
2 7

2 7
2 7
2 7
2 7
2 7
2 7

2 7

2 6

2 6
2 6
2 6
2 6
2 6
2 6

2 6
2 6
2 6
2 6
2 6
EQUIPMENT OUTPUT

EQUIPMENT OUTPUT UNIT


A.1 DOZER 165 HP
Cutting & Stockpilling 30 cu.m/hr
Clearing & Grubbing 200 sq.m/hr
A.2 DOZER D65P-7
Stripping 200 sq.m/hr
Excavation 25 cu.m/hr
Quarrying 50 cu.m/hr
Pushing 3 sq.m/hr
B. LOADER - 1.91 CU.M
Loading 70 cu.m/hr
C. DUMP TRUCK - 10 CU.M
Hauling (dist.=600M) 90 cu.m/hr
D. GRADER - 130 G
10 passes 700 sq.m/hr
Sub grading 300 sq.m/hr
Spreading 40 cu.m/hr
E. VIBRATORY ROLLER
10 passes 600 sq.m/hr
F. SHEETS FOOT ROLLER
Static Rolling 12 passes-15 cu.m lift 135 cu.m/hr
Vibratory Rolling 12 passes-15 cu.m lift
No. 3W Road Roller-static rollinh 24 cu.m/hr
4passes-15 cu.m lift
Tractor Drawn Roller (1-d) 240 cu.m/hr
Static Rolling 6 passes-20 cu.m lift
Tandem Rolling - static rolling 24 cu.m/hr
6 passes 20 cu.m lift
G. BACKHOE
Excavation 30 cu.m/hr
Backfilling 30 cu.m/hr
H. WATER TRUCK - 10CU.M
Watering 1600 sq.m/hr
I. CONCRETE VIBRATOR
Vibrating Concrete 40 cu.m/hr
OTHERS
Plate Compactor 20 cu.m/hr
One bagger mixer 0.25 cu.m/hr
Pumpcrete 28 cu.m/hr
OUTPUT UNIT

0.03333 hr/cu.m
0.005 hr/sq.m

0.005 hr/cu.m
0.04 hr/cu.m
0.02 hr/cu.m
0.33333 hr/cu.m

0.01429 hr/cu.m

0.01111 hr/cu.m

0.00143 hr/sq.m
0.00333 hr/sq.m
0.025 hr/cu.m

0.00167 hr/sq.m

0.00741 hr/cu.m

0.04167 hr/cu.m

0.00417 hr/cu.m

0.04167 hr/cu.m

0.03333 hr/cu.m
0.03333 hr/cu.m

0.00063 hr/sq.m

0.025 hr/cu.m

0.05 hr/cu.m
4 hr/cu.m
0.04 hr/cu.m
CONSTRUCTION LABOR RATES

RATE PER HOUR RATE PER DAY


ITEM NO. POSITION
COST CHANGE COST RANGE
1 Civil Engineer 120 – 150 960 –
2 Foreman 65 – 100 520 – 800
3 Fitter 56.25 – 67.5 450 – 540
4 Welder 53.75 – 66.88 430 – 535
5 Electrician 48.75 – 63.75 390 – 510
6 Carpenter 50 – 56.25 400 – 450
7 Painter 48.75 – 55 390 – 440
8 Mason 47.5 – 56.25 380 – 450
9 Driver 43.75 – 56.25 350 – 450
10 Eqpt Operator 50 – 56.25 400 – 450
11 Helper 35 – 53.75 280 – 430
PROJECT NAME:
LOCATION:

MARK UP

ESTIMATED DIRECT COST INDIRECT COST


MILLION PESOS OCM PROFIT
₱0.00 - ₱5,000,000.00 15% 10%
₱5,000,000.00 - ₱50,000,000.00 12% 8%
₱50,000,000.00 - ₱150,000,000.00 10% 8%
₱150,000,000.00 - ₱150,000,000.00 8% 8%

TO BE USED:
PROJECT ESTIMATED DIRECT COST:
OCM (% OF PROJECT ESTIMATED DIRECT COST):
PROFIT (% OF PROJECT ESTIMATED DIRECT COST):
VAT (% OF EST. DIRECT COST + TOTAL PROJECT COST):
TOTAL PERCENT
INDIRECT COST
25%
20%
18%
16%
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

EXCAVATION (PER M2)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 0
SUB TOTAL 0
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 FOREMAN 1 0.3333 100.00 33.33
2 SKILLED WORKER 2 0.3333 56.25 37.4999999999996
3 UNSKILLED WORKER 4 0.3333 53.75 71.666666666666
TOTAL MANPOWER 6 SUB TOTAL 142.499999999999

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 Backhoe 1 0.033
2 DUMP TRUCK 1 0.040
SUB TOTAL 0

D. TOTAL DIRECT COST 142.5000


E. OCM 17.1000
F. PROFIT 11.4000
G. VAT 7.1250
H. TOTAL INDIRECT COST
35.6250

I. TOTAL ₱ 178.13
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

EXCAVATION (PER CU.M)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 0
SUB TOTAL 0
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 FOREMAN 1 4.0000 100.00 400.00
2 HEAVY EQUIPMENT OPERATOR 1 4.0000 56.25 225
3 LABOR/HELPER 2 4.0000 53.75 430
TOTAL MANPOWER 3 SUB TOTAL 1055

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 BACKHOE 1 4.0000 1,512.94 6051.76
SUB TOTAL 6051.76

D. TOTAL DIRECT COST 7106.7600


E. OCM 852.8112
F. PROFIT 568.5408
G. VAT 355.3380
H. TOTAL INDIRECT COST
1776.6900

I. TOTAL ₱ 8,883.45
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

BACKFILL AND COMPACTION (PER CU.M)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 0
SUB TOTAL 0
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 FOREMAN 1 0.083333 100 8.33333333333333
2 HEAVY EQUIPMENT OPERATOR 1 0.083333 56.25 4.6875
3 LIGHT EQUIPMENT OPERATOR 2 0.083333 55 9.16666666666667
4 LABOR/HELPER 2 0.083333 53.75 8.95833333333333
TOTAL MANPOWER 5 SUB TOTAL 31.1458

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 BACKHOE 1 0.083333 1,512.94 126.078333333333
2 PLATE COMPACTOR 2 0.083333 123.00 20.5
SUB TOTAL 146.578333333333

D. TOTAL DIRECT COST 177.7242


E. OCM 21.3269
F. PROFIT 14.2179
G. VAT 8.8862
H. TOTAL INDIRECT COST
44.4310

I. TOTAL ₱ 222.2
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

CONCRETE WORKS (PER CU.M)


CLASS A
A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 PORTLAND CEMENT (40KG) 9 bags 265 2385


2 GRAVEL - G1 1/2'' 1 cu.m 715 715
3 SAND 0.5 cu.m 650 325
SUB TOTAL 3425
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 CIVIL ENGINEER 1 0.80 150 120
2 FOREMAN 1 0.80 100 80
3 SKILLED WORKER 2 0.80 56.25 90
4 LABOR/HELPER 3 0.80 53.75 129
TOTAL MANPOWER 5 SUB TOTAL 419

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 ONE BAGGER MIXER 1 0.8 172.00 137.6
SUB TOTAL 137.6

D. TOTAL DIRECT COST 3981.60


E. OCM 477.792
F. PROFIT 318.528
G. VAT 199.080
H. TOTAL INDIRECT COST
995.400

I. TOTAL ₱ 4,977.0
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

REBAR WORKS (PER PC (6m))

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 RSB (10 Ø mm X 6 m) 3.6990 kg 42 155.358


1 RSB (12 Ø mm X 6 m) 5.3266 kg 42 223.71552
1 RSB (16 Ø mm X 6 m) 9.4694 kg 42 397.71648
3 TIE WIRE 0.01 roll 1850 23.125
SUB TOTAL ₱ 799.92
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 CIVIL ENGINEER 1 0.500000 150 75
2 FOREMAN 1 0.500000 100 50
3 STEEL MAN 1 0.500000 56.25 28.125
4 LABOR/HELPER 2 0.500000 53.75 53.75
TOTAL MANPOWER 3 SUB TOTAL ₱ 206.88

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1
SUB TOTAL 0

D. TOTAL DIRECT COST 1006.790


E. OCM 120.815
F. PROFIT 80.543
G. VAT 50.340
H. TOTAL INDIRECT COST
251.698

I. TOTAL ₱ 1,258.5
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

FORMWORKS
A. MATERIALS (Per sq. m)

UNIT PRICE
ITEM NO. DESCRIPTION QUANTITY UNIT TOTAL PRICE
(Php)
1 1/2'' X 4' X 8' PLYWOOD 0.3472 pcs 750 260.416666666667
2 2'' X 2'' LUMBER (Beam) 1.5932 pcs 40 63.7295081967213
3 2'' X 2'' LUMBER (Column) 1.7358 pcs 40 69.4330601092896
4 2'' X 2'' x 10' LUMBER (Footing) 0.3 pcs 40 12
5 2'' X 2'' x 10' LUMBER (Suspended Slab) 0.4 pcs 40 16

SUB TOTAL ₱ 421.58


B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 CIVIL ENGINEER 1 0.166667 120 20
2 FOREMAN 1 0.166667 65 10.8333333333333
3 CARPENTER/SKILLED WORKER 2 0.166667 50 16.6666666666667
4 LABOR/HELPER 4 0.166667 35 23.3333333333333
TOTAL MANPOWER 6 SUB TOTAL 70.8333333333333
C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL ₱ -

D. TOTAL DIRECT COST 492.4126


E. OCM 59.0895
F. PROFIT 39.3930
G. VAT 24.6206
H. TOTAL INDIRECT COST
123.1031

I. TOTAL ₱ 615.5
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

MASONRY (PER SQ. M)


SKSS
A. MATERIALS

UNIT PRICE
ITEM NO. DESCRIPTION QUANTITY UNIT TOTAL PRICE
(Php)
1 6'' CHB 12.5 PCS 14 175
2 4'' CHB 12.5 PCS 12 150
3 PORTLAND CEMENT( MORTAR) 1.111 BAGS 265 294.415
4 SAND (MORTAR) 0.0926 CU.M 650 60.19
SUB TOTAL ₱ 679.61
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 FOREMAN 1 0.50 150 75
2 MASON 2 0.50 56.25 56.25
3 LABOR/HELPER 4 0.50 53.75 107.5
TOTAL MANPOWER 6 SUB TOTAL ₱ 238.75

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL ₱ -

D. TOTAL DIRECT COST 238.7500


E. OCM 28.6500
F. PROFIT 19.1000

G. VAT 11.9375
H. TOTAL INDIRECT COST
59.6875

I. TOTAL ₱ 298.4
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

PLASTERING (PER SQ. M)

A. MATERIALS

UNIT PRICE
ITEM NO. DESCRIPTION QUANTITY UNIT TOTAL PRICE
(Php)
3 PORTLAND CEMENT(40 KG) 0.48 BAGS 265 127.2
4 SAND (MORTAR) 0.04 CU.M 650 26
SUB TOTAL ₱ 153.20
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 FOREMAN 1 0.50 100 50
2 MASON 2 0.50 56.25 56.25
3 LABOR/HELPER 4 0.50 53.75 107.5
TOTAL MANPOWER 6 SUB TOTAL ₱ 213.75

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL ₱ -

D. TOTAL DIRECT COST 213.7500


E. OCM 25.6500
F. PROFIT 17.1000

G. VAT 10.6875
H. TOTAL INDIRECT COST
53.4375

I. TOTAL ₱ 267.2
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

Ceiling Works WORKS (Per m²)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 Gypsum Board (1.2m x 2.4m) 0.3472 pcs ₱365.00 ₱126.74


2 Metal Furring 0.6944 pcs ₱95.00 ₱65.97
3 Carrying Channel 0.3472 pcs ₱155.00 ₱53.82
4 Wall Angle 0.125 pcs ₱65.00 ₱8.13
3 Wall Clip 4.1667 pcs ₱8.00 ₱33.33
4 Blind Rivets 5/32'' x 3/4'' 0.06 box ₱195.00 ₱12.19
SUB TOTAL ₱ 300.17
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 Carpenter 1 0.0833 50 4.16666666666667
2 LABOR/HELPER 2 0.0833 35 5.83333333333333
TOTAL MANPOWER 3 SUB TOTAL ₱ 10.00

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL ₱0.00

D. TOTAL DIRECT COST 310.1736


E. OCM 37.2208
F. PROFIT 24.8139
G. VAT 15.5087
H. TOTAL INDIRECT COST
77.5434

I. TOTAL ₱ 387.7
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

PAINTING WORKS (Per m²)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 Concrete Neutralizer 0.03333333333333 gallon 450 15


2 Flat Latex (primer) 0.03333333333333 gallon 550 18.3333333333333
3 Masonry Putty 0.03333333333333 gallon 450 15
4 Semi-gloss Latex (top coat) 0.06666666666667 gallon 650 43.3333333333333
SUB TOTAL ₱ 91.67
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 Painter 1 0.05 48.75 2.4375
2 LABOR/HELPER 2 0.05 35 3.5
TOTAL MANPOWER 3 SUB TOTAL ₱ 5.94

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL 0

D. TOTAL DIRECT COST 97.6042


E. OCM 11.7125
F. PROFIT 7.8083
G. VAT 4.8802
H. TOTAL INDIRECT COST
24.4010

I. TOTAL ₱ 122.0
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

TILE WORKS (Per m²)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 600 mm x 600 mm 2.7778 pcs 175 486.111111111111


2 Tile Adhesive 0.2 bag 265 53
3 Tile Grout 0.05 gallon 70 3.5
SUB TOTAL ₱ 542.61
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 Tile Setter 1 0.08333 60 5
2 LABOR/HELPER 1 0.08333 35 2.917
TOTAL MANPOWER 2 SUB TOTAL ₱ 7.92

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL 0

D. TOTAL DIRECT COST 550.5278


E. OCM 66.0633
F. PROFIT 44.0422
G. VAT 27.5264
H. TOTAL INDIRECT COST
137.6319

I. TOTAL ₱ 688.2
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

ELECTRICAL WORKS (Per lot)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1 Junction Box pcs 34 0


2 UTILITY BOX GAUGE #16 (50mm x 101mm, 53mm) pcs 33 0
3 Electrical tape *3/4'' x 20 yards pcs 31 0
4 1 Gang Switch set 96 0
5 2 Gang Switch set 132 0
6 3 Gang Switch set 178 0
7 Duplex Convenience Outlet set 135 0
Lighting Lines -
1 #12 THHN Stranded Wires Royu box 2460 0
2 #10 THHN Stranded Wire Royu box 2480 0
4 1/2'' PVC conduit lm 2480 0
Power Lines -
1 #6 Copper Entrance Wire lm 180 0
2 #12 THHN Stranded Wires Royu box 2460 0
3 #10 THHN Stranded Wire Royu box 2480 0
4 1/2'' PVC conduit lm 2480 0
Panel -
1 PANELBOARD & CABINETS ( ENCLOSED 30AMP, 2 PST) set 1310 0
2 ENCLOSED AIR CIRCUIT BREAKER 100AF, 3P, 220V, 70AT NEMA I set 1410 0
SUB TOTAL ₱ -
B. LABOR

z
ITEM NO. DESCRIPTION QUANTITY DURATION(Day) RATE PER DAY TOTAL COST
1 Civil Engineer 1 2 960 1920
2 Electrician 1 2 390 780
3 LABOR/HELPER 1 2 280 560
TOTAL MANPOWER 2 SUB TOTAL ₱ 1,340.00

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL 0

D. TOTAL DIRECT COST 1340.0000


E. OCM 160.8000
F. PROFIT 107.2000
G. VAT 67.0000
H. TOTAL INDIRECT COST
335.0000

I. TOTAL ₱ 1,675.0
Project Name:
Location:

DETAILED DERIVED UNIT PRICE ANALYSIS

PLUMBING WORKS (Per lot)

A. MATERIALS

ITEM NO. DESCRIPTION QUANTITY Unit UNIT PRICE TOTAL PRICE

CR BATHROOM FIXTURES 0
1 Floor Drain 1 pcs 292 292
2 Water Closet with Lavatory Fixtures, Soap etc. 1 sets 10000 10000
3 Telephone Shower 1 sets 1000 1000
KITchEN FIXTURES 0
1 Kitchen Sink Faucet (Goose Neck) 1 sets 5400 5400
WASTE LINE SYSTEM 0
1 4'' PVC PIPE 8 pcs 540 4320
3 2'' PVC PIPE 8 pcs 205 1640
4 4'' X 4' 'WYE 6 pcs 85 510
5 2'' X 2' 'WYE 6 pcs 65 390
6 3'' 90-deg Elbow 5 pcs 95 475
7 3 ' 45-deg Elbow 5 pcs 65 325
8 3'' Clean Out 1 pcs 95 95
9 2'' P-Trap 1 pcs 65 65
COLD WATERLINE SYSTEM 0
1 Hose Bibb 2 pcs 200 400
3 Gate Valve PPR 4 pcs 210 840
4 PPR Hot and Cold Water line pipe Pn25 4 sets 260 1040
5 1/2'' Tee 30 pcs 15 450
6 Elbow 45-deg PPR 25 pcs 15 375
7 Female Adaptor 6 pcs 160 960
8 Male Adaptor 6 pcs 160 960
9 Connector 30 pcs 15 450
SUB TOTAL ₱ 18,695.00
B. LABOR

ITEM NO. DESCRIPTION QUANTITY DURATIONDAY) RATE PER DAY TOTAL COST
1 Civil Engineer 1 5 960 4800
1 Skilled Worker 1 5 440 2200
2 LABOR/HELPER 3 5 280 4200
TOTAL MANPOWER 4 SUB TOTAL ₱ 6,400.00

C. EQUIPMENT

ITEM NO. DESCRIPTION QUANTITY DURATION(HRS) RATE PER HOUR TOTAL COST
1 0
SUB TOTAL 0

D. TOTAL DIRECT COST 25095.0000


E. OCM 3011.4000
F. PROFIT 2007.6000
G. VAT 1254.7500
H. TOTAL INDIRECT COST
6273.7500

I. TOTAL ₱ 31,368.8
PROJECT NAME:
LOCATION:

BILL OF MATERIALS

I. EARTHWORKS
ITEM
SCOPE OF WORKS MATERIAL SPECIFICATION
NO.
1 EXCAVATION -
2 BACKFILLING AND COMPACTIO -
3 HAULING AND DISPOSAL -

II. CONCRETE WORKS


ITEM
SCOPE OF WORKS MATERIAL SPECIFICATION
NO.
1 FOOTING CLASS A CONCRETE MIX
2 WALL FOOTING CLASS A CONCRETE MIX
3 COLUMN CLASS A CONCRETE MIX
4 BEAMS CLASS A CONCRETE MIX

III. REBAR WORKS


ITEM
SCOPE OF WORKS MATERIAL SPECIFICATION
NO.
1 FOOTING GRADE 40, REINFORCING BAR
2 WALL FOOTING GRADE 40, REINFORCING BAR
3 COLUMN GRADE 40, REINFORCING BAR
4 BEAMS GRADE 40, REINFORCING BAR

IV. FORM WORKS


ITEM
SCOPE OF WORKS MATERIAL SPECIFICATION
NO.
1 COLUMN 1/2'' ORDINARY PLYWOOD, COCO LUMBER
2 BEAMS 1/2'' ORDINARY PLYWOOD, COCO LUMBER

V. MASONRY WORKS
ITEM
SCOPE OF WORKS MATERIAL SPECIFICATION
NO.
1 6'' CHB LAYING AND FILLER 6'' CHB,PORTLAND CEMENT, SAND

VI. PLASTERING
ITEM
SCOPE OF WORKS MATERIAL SPECIFICATION
NO.
1 PLASTERING PORTLAND CEMENT, SAND

TOTAL MATERIAL COST


ERIALS

QTY UNIT UNIT COST TOTAL COST

552 cu. m - -
844.2353 cu. m - -
717.6 cu. m - -
SUB TOTAL I

QTY UNIT UNIT COST TOTAL COST

18 cu. m 3425 61650


1 cu. m 3425 3425
5 cu. m 3425 17125
1 cu. m 3425 3425
SUB TOTAL II ₱85,625.00

QTY UNIT UNIT COST TOTAL COST

2.47 kg 799.915 1972.59039


225.639 kg 799.915 180492.02069
7.1 kg 799.915 5679.3965
7.1 kg 799.915 5679.3965
SUB TOTAL III ₱193,823.40

QTY UNIT UNIT COST TOTAL COST

bd. Ft #REF! #REF!


bd. Ft #REF! #REF!
SUB TOTAL IV #REF!

QTY UNIT UNIT COST TOTAL COST

5 sq. m 679.605 3398.025


SUB TOTAL V ₱3,398.03
QTY UNIT UNIT COST TOTAL COST

5 sq. m 153.2 766

SUB TOTAL VI ₱766.00

L MATERIAL COST #REF!


Project Name: Proposed Perimeter Fencing

Location: NEUST Gabaldon Campus, Gabaldon, Nueva Ecija

APPROVED BUDGET FOR THE CONTRACT


DIRECT MARKUP TOTAL MARK UP TOTAL INDIRECT
ITEM NO SCOPE OF WORK QTY UNIT UNIT COST EST.DIRECT COST VAT COST UNIT COST TOTAL AMOUNT
OCM PROFIT % AMOUNT
₱1.000 EARTH WORKS 2113.84 m³ #REF! #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF! #REF!
₱2.000 CONCRETE WORKS 0.00 m³ ₱3,981.600 ₱23,396.000 ₱2,807.520 ₱1,871.680 ₱1,169.800 20% ₱4,679.200 ₱5,849.000 ₱4,977.000 ₱29,245.0
₱3.000 REBAR WORKS 242.31 kg ₱1,006.790 ₱243,950.251 ₱29,274.030 ₱19,516.020 ₱12,197.513 20% ₱48,790.050 ₱60,987.563 ₱1,258.490 ₱304,937.8
₱4.000 FORMWORKS 3.00 bd. Ft #REF! #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF! #REF!
₱5.000 MASONRY WORKS 5.00 m² ₱238.750 ₱1,193.750 ₱143.250 ₱95.500 ₱59.688 20% ₱238.750 ₱298.438 ₱298.440 ₱1,492.2
₱6.000 PLASTERING 5.00 m² ₱213.750 ₱1,068.750 ₱128.250 ₱85.500 ₱53.438 20% ₱213.750 ₱267.188 ₱267.190 ₱1,335.9

APPROVED BUDGET FOR THE CONTRACT:


Project Name:
Location:

SU M M AR Y
ITEM NO. DESCRIPTION OF WORK TOTAL COST
I. EARTHWORKS ₱
II. CONCRETE WORKS ₱
III. REBAR WORKS ₱
IV. FORM WORKS ₱
V. MASONRY WORKS ₱
VI. PLASTERING ₱
GRAND TOTAL ₱ 0

IN WORDS: