NIYATI ENGINEERING PVT LTD

Saint Gobain weber plant project


Sr.No Activity
1 SURVEY WORK.
2 UNLOADING & STACKING MATERIAL BY F15
3 MANUAL MATERIAL SHIFTING
4 MATERIAL SHIFTING BY MECHANICAL AIDS.
5 BAR BENDING AND BAR CUTTING
6 CONCRETE WORK(RCC)
7 EXCAVATION WORK
8 GAS CUTTING
9 GRINDING WORK
10 WELDING WORK
11 LIFTING WORK
12 PCC (EXCAVATED PIT)
13 SHUTTERING AND DESHUTTERING
14 BACK FILLING AND ROLLING
15 ELECTRICAL INSTALATION
16 WORK AT HEIGHT
17 SCAFFOLDING ERECTION AND DISMANTLING.
18 CONCRETE CHIPPING AND BREAKING
19 CONCRETE WORK BY BOOM PLACER
20 CONCRETE WORK BY CONCRETE PUMP
21 BLOCK WORK AND BRICK WORK
22 PLASTER WORK
23 ROAD WORK (RCC)
24 WATERPROOFING
25 SOLING WORK
26 BITUMIN
27 TRIMIX ACTIVITY
28 PLUMBING
29 TILE FIXING
30 FLOATER ACTIVITY
31 PCC WORK FOR GROUND LEVEL
32 GROUND OR SOIL LEVELLING BY EXCAVATOR.
33 VEHICLE DISINFECTION USING 5% HYPOCHLORITE
34 ERECTION OF MODULAR SHED.
35 MANUAL CONCRETE WORK.
36 PLY MAKING.
37 POWER TOOLS.
38 REINFORCEMENT OF STEEL.
39 BATCHING PLANT ERECTION.
40 DIESEL REFILLING.
41 HARD BARRICADING.
42 SAFETY NET FITTING AT EXCAVATED PIT.
43 LABOUR SHED ERECTION(G+1)
44 BULKER UNLOADING
45 CANTEEN
46 BATCHING PLANT OPERATION
47 Tower crane(Wheel Mounted)
48 Tower crane(Tractor Mounted)
49 Telehandler
50 Rebarring.
51 Lifeline fixing.
52 Shutting and de-sh(Cheese storage Drain)
53 Groove cutting
54 Antitermite operation.
55 Slab casting in dryer area(4th to 7th Slab)
56 Dismantling of tower crane.
57 Painting work
58 Material shifting 5th and 6th floor Dryer area.
59 Evaporator building slab casting.
60 Confined space
61 Shuttering-Deshuttering work(Evaporator Area).
62 Mini crane
63 Rolling shutter fitting.
64 Core cutting.
65 Window and glass fitting.
66 Evaporator shuttering and de-shuttering 32m,38 and 38m slab.
Activity
Risk Assessment Matrix (RAM)
RISK MATRIX
Very Likely 5 10 15
-5
Likely - 4 4 8 12
Possible - 3 3 6 9
PROBABILITY 

Unlikely - 2 2 4 6

VeryUnlikel 1 2 3
y- 1
1 2 3
Negligib Slight Moderat
le e
SEVERITY 
Risk Risk Action
Level
1 to 6 Low May be acceptable but review task to s
Risk can be reduced
further
8 to 12 Medium Task should only be undertaken
Risk appropriate management autho
after consultation with specialist
15 to 25 High Task must not proceed. It should be red
Risk further control
measuresput in
placetoreducerisk.Thecontrolsshouldbe
X
20 25

16 20
12 15

8 10

4 5

4 5
High Very High

SEVERITY 
Action

ptable but review task to see if risk


ed

d only be undertaken with


e management authorization
ultation with specialist
t proceed. It should be redefined or
ol
in
erisk.Thecontrolsshouldbe
MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-01 ACTIVITY NAME : Survey work Date-


HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk level Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Residual risk Action By
IxP Hazards
Survey Improper access to reach at Injury to person, Property 1.Workmen to be assigned to work only after Physical hazard
Work at site location point - Fall of damage medical check up and safety induction.
Instrument , Fall of 2.Work with valid work
Person.Vehicle permit. 2.First aid
movement,Overhead kit to be available at site. 3.Tool box to be
electrical cables. conducted before start of work.
3.Only trained
workmen to be assigned for the job.
4. Inspect
area before reaching to work location.
5. Make access clear from obstackles.
6. During cleaning close supervision should be
provided.
2 3 6 7.Ensure no workmen stand with stack below 2 2 4 LOW Site Engg & Survey Engg.
overhead cables. 8.Provision of
proper signages at workplace.

1. Only trained workmens allowed to do work.


Improper shifting & Fixing of 2. Area should be levelled properly.
Survey unit / Total Station - Injury to person, Property 2 3 6 3. Only Survey engg and Will handle the 2 2 4 Physical hazard LOW Site Engg & Survey Engg.
damage
Fall of total station activity of setting of total station or level
machine.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO.- 02 ACTIVITY NAME : UNLOADING & STACKING MATERIAL BY F15 Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr. Categories of Residu
ACTIVITY HAZARD RISK INVOLVED I P level CONTROL MEASURES I P level Action By
No Hazards al risk
Improper Access- slip, trip & fall hazard Injury to person. 3 3 9 1.Workmen to be assigned to 3 1 3 Physical and LOW Site engineer
work only after medical check ergonomical hazard.
up and safety induction.

2.Work with valid work permit.

3.First aid kit to be available


at site. 4.Tool box
to be conducted before start
of work.
5.Only trained workmen to
be assigned for the job.

Improper handling of material- Fall of Injury to person, 3 3 9 1. Load shall centralised by 3 1 3 Physical and LOW Site engineer
material,Fall of person from height. property damage. properly tied web slings. ergonomical hazard.
2.Guide rope shall be tied to
both sides.
3.Provision of ladder for
access for height and lifeline
and full body harness .
4.Flagman to be
provided during material
handling.

5.Use standard signals for


lifting.
Unloading & Stacking of Inadequate manpower Health issue,injury to 3 3 9 1.provide sufficient manpower 2 2 4 Physical and LOW Site engineer
2
material -Fall of material/overload to person person as per safe lifting limits. ergonomical hazard.
2.Avoid saging & provide
proper manpower to give
Unauthorized entry of person - Struck by Vehicle Injury to person 3 4 12 support.
1. Area should be barricaded. Physical and LOW Site engineer
3.Provide
2. Restrictclose supervision
unauthorized entry. ergonomical hazard.
3. Ensure reverse horn while
reversing vehicle.
4. Don’t allow to seat person
below the vehicle.

Improper stacking of material- Fall of material Injury to person, 3 2 6 1. Ensure levelled ground for 2 2 4 Physical and LOW Site engineer
property damage material stacking. ergonomical hazard.
2. If required slippers should
be provided.
3. Provide close supervision
during work.
4. Ensure height of stacked
material is not more than 1.2M
5. Provide proper access
around the stacked material.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO.- 03 ACTIVITY NAME : MANUAL MATERIAL SHIFTING Date-


HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Categories of Hazards Residual risk Action By
Improper access - Injury to person. 3 2 6 1.Wokmen assigned for the job after medical check up 2 1 2 Physical and LOW Site Engineer
Slip / Trip and induction. 2.Work ergonomical hazard.
with valid work permit. 3. Provide
proper access.
4. Access should be free from obstacles.
5. Provide proper illumination during the night.
5. Provide close supervision during work.
6. TBT should be conducted for manual material
handling.
7. Provide & ensure use of PPE’s like safety shoes, safety
helmet, safety jacket & hand gloves

Inadequate Injury to 2 3 6 1.provide sufficient manpower as per safe lifting limits. 3 1 3 Physical and Site Engineer
manpower person,Property 2.Avoid saging & provide proper manpower to give ergonomical hazard.
-Fall of Damage. support.
material/overload 3.Provide close supervision.
to person 4.Only trained workmen assigned for the job.
5.Inspect material for sharp edges.Use proper
handgloves .
Manual
3 Material
shifting work
Material may hit Injury to person 1. Provide adequate manpower for handling of material 2 1 2 Physical and Site Engineer
nearby Person (For long steel bar minimum two person of same ht.) ergonomical hazard.
2. Provide proper access.
3. Access should free from obstacles.

Over weight of Injury to person, 3 3 9 1. Avoid carring of overweight. (Max. Wt / Person – 2 2 4 Physical and LOW Site Engineer
material - property damage. 50Kg). ergonomical hazard.
Fall of 2. If needed provide additional manpower.
material 3. Close supervision should be provided.
4. TBT should be conducted for manual material
handling

Inhalation of dust Lungs dieases 3 3 9 1. Provide & ensure use of PPE’s like 2 2 4 Physical and LOW Site Engineer
a. For Cement / dust – Nose mask. ergonomical hazard.
b. For Steel Bars – Hand gloves & Shoulder pad.
c. For Chemicals – Rubber hand gloves.
d. For Sharp material – Hand gloves.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO.- 04 ACTIVITY NAME : MATERIAL SHIFTING BY VEHICLE Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr.
ACTIVITY HAZARD RISK INVOLVED I P level CONTROL MEASURES I P level Categories of Hazards Residual risk Action By
No
Improper access -Fall of person, Toppling of Injury to person, Property 3 2 6 1.Workmen assigned for the job 2 2 4 Physical and Ergonomical LOW Site Engineer
Vehicle damage. after medical check up and
induction.
2.Work with valid work
permit. 3. Only licenses
operator should operate vehicle.
4. Provide proper access.
5. Access should be free from
obstacles.
5. Provide helper for movement of
Vehicle.
6.Use designated
roads as per plan.
Improper working platform -Fall of person, Injuries to person & damage of 3 2 4 1. Provide proper working platform. 2 1 2 LOW Site Engineer
Fall of material materials. 2. TBT should be conducted for
material handling.
3. Provide close supervision during
work.

Sharp edges, Caught in between material serious cut Injury to Person 1. Provide close supervision during LOW Site Engineer
work.
Shifting of
2. Provide & ensure use of safety
material from
shoes, hand gloves.
4 Stock yard to
Construction
Site by Vehicle Inadequate manpower Health issue,injury to person 3 2 6 1.provide sufficient manpower as 2 1 2 LOW Site Engineer
-Fall of material/overload to person per safe lifting limits.
2.Avoid saging & provide proper
manpower to give support.
3.Provide close supervision

Unauthorized entry of person - Struck by Injury to person 3 2 6 1. Area should be barricaded. 2 2 4 LOW Site Engineer
Vehicle 2. Restrict unauthorized entry.
3. Ensure reverse horn while
reversing vehicle.
4. Don’t allow to seat person below
the vehicle.

Overloading of material , Improper stacking Property damage, 3 2 6 1. Material not to be exceed safe 2 2 4 LOW Site Engineer
of material ,Fall of material , Injury to person working load of the vehicle.
hit to person 2. Ensure proper stacking of
material.
3. Material should not come out of
body of Vehicle.
4. Material should tie securely

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO.- 05 ACTIVITY NAME : BAR CUTTING & BENDING Date-


HIRA Page
Severity rating = I , Probability Rating =PRisk
| Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk
Sr.
ACTIVITY HAZARD RISK INVOLVED I P level CONTROL MEASURES I P level Categories of Hazards Residual risk Action By
No
Improper Electrical connection Injury to Person, IxP 1. Only authorized electrician allow to do electrical IxP Physical hazard LOW Site Engineer
Electrocution, Fire Property damage. Connections.
hazard 2. All electrical connection should be through ELCB (30
mA).
3. Inspection of machine And ELCB or RCB weekly.
4. Provision of double earthing to machine.
3 3 9 5. Fire extinguishers should make available at nearby area. 2 2 4

6.Authorised operators name with photo shall be displayed


near machine. 7.Rubber
mat to be used below foot operating . 8. Double
insulated cable with double insulation to be used.
9. Provision of
overhead cable to avoid damage. 10. Follow work
Improper handling of material, Cut injury to person 1. TBT should be conducted before start the work. LOW Site Engineer
permit system. 11.Disconnect
Caught in 2. Close supervision should be provided during work.
power when machine not in use.
between. 3.All
Sharp edges rotating parts shall be guarded.
3 2 6 4. Provide & ensure use of safety helmet, safety shoes, and 2 1 2
hand gloves. 5.Rebar
Steel Bar Cutting/Bending / caps used for prevent injury from sharp edges of bars.
Reinforcement steel work

Improper operating of m/c Cut injury to person, 1. Cutting/Bending machine should be in good condition with LOW Site Engineer
Malfunctioning in operation appropriate guards.
5 property damage. 2. Only trained workers are allowed to operate the m/c’s.
3. Load the bars as per load chart provided by Mfg.
4. Periodic maintenance should be done.
5. M/c’s should be inspected as per client’s checklist.

3 2 6 2 2 4

Improper Stacking of material, Injury to person. 1. Ensure proper stacking of material. 2 2 4 LOW Site Engineer
Fall of property damage 3 3 9 2. Ensure stack ht. below 1.2M.
material

Improper handling of material, Cut injury to person LOW Site Engineer


1. Close supervision should be provided during work.
Caught in
2. Provide & ensure use of safety helmet, safety shoes, and
between.
hand gloves.
Reinforcement binding and Sharp edges , sharp edge of
3 2 6 3. Worker comunication proper 2 1 2
shifting binding wire,
4. Back side of Binding wire sharp edge ,bend towords back
Poor Comunication
side

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO:-06 ACTIVITY NAME : CONCRETE WORK Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
Hazards
1 Follow work permit system. Physical LOW Site Engineer
2.Construction safety plan
3.Separate arrangent for concrete pipe line
4. Follow concrete pump checklist
5. Check all hydraulic hoses for leakage.
6. Replace damaged component
7. Keep concrete pump away from access.
8. Provide red tag to the pump in case of leakage finding..
9. Check all component including locking pin for tightness.
10. Inspect Hopper for cage.
11. Panel door should always be closed to avoid any damages or
perform unauthorized operation.
Fall of concrete pipe, Injury to Person, 12. Deploy authorized operator, display contact details of
4 3 12 operator with photo. 2 2 4
Fall of person Property damage.
13 Ensure concrete pipeline should be laying on stand.
14. Check all supports provided to the pipeline.
15.Area shall be barricaded.
16.Provision of proper PPE like safety helmet,safety
Erection & shoes,reflective jacket,safety goggle anf full body harness.
dismentling
of concrete
pipe line

Inadequate manpower Injury to person 1.provide sufficient manpower as per safe lifting limits. LOW Site Engineer
-Fall of 2.Avoid saging & provide proper manpower to give support.
material/overload to 3 3 9 3.Provide close supervision 2 2 4
person

Improper usage of hand Injury to person, 1. Only trained workmens allow to do work. 2 1 2 LOW Site Engineer
tools - slip /trip & fall property damage 2. Provide close supervision during work.
3. Ensure proper hand tools during work.
3 2 6 4. Hand tools should be inspected before start of work.
5. Provide & ensure usage of PPE's.

1. TBT should be conducted before starting the work.


2. Provide close supervision during work.
Manual
Concrete Concrete may come in Injury to person, Eye 3 2 6 3. Provide & ensure use of ppe’s like safety helmet, safety 2 2 4 LOW Site Engineer
contact with Skin & eye & skin irritation shoes / Gum shoes, safety belt, safety jacket, rubber hand
work
gloves, Safety goggles.

Prepared By Reveiwed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO.-07 ACTIVITY NAME : EXCAVATION AND BRAKING WORK Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr. No ACTIVITY HAZARD RISK INVOLVED I Risk level IxP CONTROL MEASURES I Risk level IxP Categories of Residual risk Action By
P P
Hazards
Improper access at work area Injury to person, Property 1. TBT should be conducted before start work.
– Slip, trip & fall of person. damage. 2. Provide proper access to reach at work area.
Vehicle may topple 3. Access should be free from obstacles.
4. Ensure proper illumination during night.
5.Follow permit to work.
6.Area hard barricadibd to avoid fall.
7.Material shall be stacked 1 m away from excavated pit.
8.Provision of proper signages and flagman. 9.Inspect of
excavator as per checklist.Ensure no oil leakage.
4 3 12 10.Authorised operator license shall be displayed in cabin. 2 2 4 LOW Site Engineer
11.Fire extinguisher should be available in cabin.
12.Loose material shall be removed near pit.
13.Ensure no one come near swing area of excavator.

Damage to underground Property damage , Serious 1. Work permit should be taken from client prior to start the work.
utilities injury to person 2. Area should inspect & clear for utilities before start the excavation.
3. Provide & ensure use of PPE’s like safety shoes, safety helmet & Safety Jacket.
3 3 9 2 2 4 LOW Site Engineer

Unauthorized entry at work Serious injury to person 1. Area should be barricaded before starting the work.
area - Hit by excavator 2. Display the precautionary boards.
3. Close supervision should be provided during work.
4. Provide signal man to control the Vehicles.
3 4 12 2 1 2 LOW Site Engineer
7 Excavation with Physical
JCB / Excavator

Movement of Excavator & Injury to person, Property 1. Only license driver operate the vehicles.
Vehicles - hit by vehicle, damage. 2. All excavator & vehicles should have valid documents.
Toppling of vehicle 3. Provide close supervision.
4. Provide the signal man to control the movement.
5. Vehicle should have reverse horn.
4 3 12 6. Follow traffic rules & display speed limit boards. 3 1 3 LOW Site Engineer
7. Don’t allow workers to seat below the vehicles.
8. Provide proper illumination during the night work.

Improper access to reach Injury to person 1. Provide proper access to reach deep area.
excavated area – Toppling of 2. Access should be free from obstacles.
vehicle, Fall of person 3. Provide proper illumination during night work.
3 2 6 2 2 4 LOW Site Engineer

Land sliding due the Injury to person 1. Vehicle should be keep 1.5 mt. distance from excavation pit.
movement of Vehicle, Fall of 2. Excavated material will be kept 1.5 mt. away from excavation pit.
excavated material - 3. Ensure proper sloping during excavation.
4. Loose material should be removed.
5. If required provide safety net around the pit.
4 3 12 2 1 2 LOW Site Engineer

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
HIRA NO.- 8
PROJECT: PCP EPC2
ACTIVITY NAME : GAS CUTTING WORK
Rev,00
Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
RISK Categories of
Sr. No ACTIVITY HAZARD I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
INVOLVED Hazards
Improper Injury to 1. Tool box talk should be conduct before
access- Slip, person, start the work.
Fall of Property 2. Work permit shall be taken from client
person. Damage before start the work.
3. Access must be clear & unobstructed.
4. Provision of proper access by ladder /
3 2 6 staging work. 2 2 4 LOW Site Engineer
5. Provision of proper working platform.
Provision & ensure use of Life line & full body
harness safety belt

Use of Gas Serious injury 1. Gas cylinder should be inspected.


cylinders & to person & 2. Gas Cylinders kept in upright position & on
Cutting torch property moveable trolley.
- Fire or damage. 3. Weted gunny bags should be covered for
explosion direct sunlight exposed cylinders.
hazard 4. Only ISI marked regulators should be
Electrocutio provided.
n 5. Provide flash back arrestor at cutting torch
Gas Cutting & cylinders.
work. 6. Cutting nozzle should be inspected before
taking in to use.
7. Hose pipes should be free from damage.
8. Fire extinguisher should be available near
cutting set.
9. Soap water should be conducted to inspect
4 4 16 the leakage of cylinders. 2 2 4 LOW Site Engineer
10. Only authorized person allow to do work.
11. Lighter should be provided to ignite the
cutting torch.
8 Physical hazard

Unauthorize Serious injury 3 2 6 1. Area should be barricaded before starting


d entry at to person the work.
work area - 2. Display the precautionary boards.
3. Close supervision should be provided
during work.
4. Provide Fire watcher to control the Fire 2 1 2 LOW Site Engineer

Fire hazard Serious burn 4 4 16 1. Proper housekeeping should be done.


injury to 2. Below area should be inspected &
person ; barricaded before starting the work.
Property 3. Use of fire blanket should be insured.
damage 4. Provide appropriate fire bucket & Fire
extinguishers. 2 2 4 LOW Site Engineer
Training should be provided for workmen’s
for use of fire extinguishers.

Prepered By Reviwed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO.- 9 ACTIVITY NAME : GRINDING WORK Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Sr. No ACTIVITY HAZARD RISK INVOLVED I Risk level CONTROL MEASURES I Risk level Categories of Residual risk Action By
P IxP P IxP Hazards
1.Only trained wormen assigned for the job. Physical hazard LOW Site Engineer
2.Permit to work to be followed.
3.Electrical power tools shall be provided by 30mA ELCB.
4.Grinding m/c shall be inspected prior to use & must be grounded.
5.Grinding machine, cable connection shall be checked by electrician before taking in
to use.
Electrical 6.Only authorized electrician allowed to give electrical connection.
Connection to 7.Proper cable routing to be ensured.
m/c. Electrocution, 8.Cable should be free from joint.
Improper Serious burn 4 3 12 9.Defective plugs must not be used & Use industrial plug top & extension board. 2 1 2
connection - injury. 10.Proper PPE’S is to be used.
Fire hazard. 11.Strict supervision should be provided during the activity.
12.Provision of fire blanket to cover material damage from spatter.

1.Proper rated grinding Wheel with guard shall be used. 2 2 4 LOW Site Engineer
2.Check spindle rpm and suitable rpm grinding wheel shall be used.
Rotatory part 3.Proper cable routing to be ensured for slipping and tripping hazards.
of m/c - 4.Trip switch /sleek guard to be used.
Body parts may Serious injury to 4 3 12 5.Provide & ensure use of PPE’s like Safety helmet with face shield or safety goggle,
come in person safety shoes, nose mask, hand gloves, ear plugs
contact

9 GRINDING
OPERATION 1.TBT should be arrange on use of PPE’s. 2 1 2 LOW Site Engineer
Headache , 2.Provide & ensure use of ear plugs
Hearing loss 3 2 6

Noise.
Eye injury, lungs 1.A trained worker is to be used. 2 2 4 LOW Site Engineer
deases may be 2.Proper PPE’S is to be used like face shield, safety glasses, nose mask etc.
Dust particles. severe injury 3 3 9

1.Work permit procedure should be followed. 2 2 4 LOW Site Engineer


2.Tool Box meeting should be conducted.
3.Safe access & egress should be provided.
4.Proper PPE’s should be warned.
5.Persons working should be trained
6.Signboards/cautionary boards should be displayed.
7.Competent supervision is required.
8.Good housekeeping should be maintained.
9.Work area shall be barricaded.
Eye/cut/burn 10.All flammable materials to be removed before starting the job.
Flying particle injuries. 3 3 9 11.Fire blanket to be provided around the work area to arrest the flying spark.
12.Fire watch to be deployed with portable horn & firefighting equipment.
13.Face shield and other PPE shall be worn at all times.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO.- 10 ACTIVITY NAME : WELDING WORK Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Risk level Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P CONTROL MEASURES RESPONSIBILITY I P Risk level IxP Residual risk Action By
IxP Hazards
1. Tool box talk should be conduct before start the
work.
2. Work permit shall be taken from client before
start the work.
3. Access must be clear & unobstructed.
Improper Injury to 4. Provision of proper access by ladder / staging
Access- person, work. Site Engineer/ Site
Slip, Fall of Property 3 3 9 Supervisor 2 2 4 LOW Site Engineer
5. Provision of proper working platform.
person. Damage 6. Provision & ensure use of Life line & full body
harness safety belt.

Unauthorized Serious injury to 1. Area should be barricaded before starting the


entry at work person work.
area - 2. Display the precautionary boards.
3. Close supervision should be provided during Site Engineer/ Site
2 3 6 work. Supervisor 2 1 2 LOW Site Engineer
4. Provide Fire watcher to control the Fire.

10 Welding 1. Only authorized electrician allowed for electrical Physical hazard


connection.
2. All ele. Connections through 30mA Elcb.
3. Welding m/c should be inspected before
Improper Impropere connecting.
Electrical Electrical 4. PPE’s should be provided & ensure use of PPE’s. Site Engineer/ Site
4 4 16 5. Provide strict supervision during work. 3 1 3 LOW Site Engineer
connection connection Supervisor
6. Provide body earthing to welding m/c.

1. Proper housekeeping should be done.


2. Below area should be inspected & barricaded
before starting the work.
Serious burn 3. Use of fire blanket should be insured.
injury to person 4. Provide appropriate fire bucket & Fire Site Engineer/ Site
Fire hazard 4 3 12 extinguishers. 2 2 4 LOW Site Engineer
; Property Supervisor
damage 5. Training should be provided for workmen’s for
use of fire extinguishers.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO. 11 ACTIVITY NAME :Lifting And Shifting of material by crane Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Risk level Risk level Categories of


Sr. No. Activity Hazard Risk Involved I P IxP Control Measures I P IxP Hazards Residual risk Action By

1. Fallure of Materials. 1.Personal injury. 4 4 16 1.Equipments shall be checked in order to ensure that there is
2. Failure of wire rope 2.Property Damage no leak of hydraulic oil or any other defects,
3.Crane Toppled before starting operation .
4. Damage to material due 2.Crane operators shall have valid Operator License.
to improper handling 3.Never stand underneath of suspended load
5.use of defective tools and 4.Signal man is to be posted & only he will be only authorized to give the
tackles instruction to driver/ operator
6. fall/slip of material 5.Materials Loaded on vehicle are to be tied up properly.
7.sharp edges 6.Work with valid work permit. 7.Ensure
8.Obstruction for Access ground condition is suitable for the vehicle movement. 8.Lifting plan
to approved before lifting.
Lifting &
11 Shifting 2 4
Physical
LOW Site Engineer
2
Of Material. hazard

9.All lifting devices/tackles must have valid test certificates & must be
inspected every day before using.
10.Working area to be barricaded.
11.PPE’S is to be provided for all employees.
12.Trained employees are to be deployed.
13.Work to be carried out under competent supervision.

14.Only authorized person is allowed to give signal.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO.- 12 ACTIVITY NAME : PCC WORK Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Risk level Risk level Categories of


Sr. No ACTIVITY HAZARD RISK INVOLVED I P IxP CONTROL MEASURES I P IxP Hazards Residual risk Action By

Improper access- Injury to person. 1. Provide proper access for movement. LOW Site Engineer
Slip, trip Hazard 2. Keep access free from obstacles.
3. Provide & ensure use of PPE’s like Safety Helmet, Safety
Shoes, and Safety Jacket,rubber handglovesand Gumboot.
4.Follow work
permit system. 5.Ensure
adequate illumination during work.

Charging of sand, grits, cement Lungs diseases 1.TBT should be conducted before starting the work. LOW Site Engineer
and water in mixer machine- 2. Provide & ensure use of Dust mask.
Inhalation of dust .

Shifting and Charging of concrete Injury to person. 1. Provide proper access during work. LOW Site Engineer
with Wheel Barrow into pit- 2. Keep access free from obstacles.
Improper access, Poor 3. Provide proper illumination during the work.
illumination during work Wheel 4. Wheel barrow should be inspected before taking in to
barrow may hit person-Fall of use.
person, Fall of material 5. Provide close supervision during work.
6. Maintain safe distance of wheel barrow from pit.

Improper usage of hand tools - Injury to person, 1. Only trained workmens allow to do work. LOW Site Engineer
12 PCC Work slip /trip & fall property damage 3 3 9 2. Provide close supervision during work. 2 2 4 Physical hazard
3. Ensure proper hand tools during work.
4. Hand tools should be inspected before start of work.
5. Provide & ensure usage of PPE's.

Inadequate manpower Injury to person 1.provide sufficient manpower as per safe lifting limits. LOW Site Engineer
-Fall of material. 2.Avoid saging & provide proper manpower to give
support.
3.Provide close supervision
Fall from height Injury to person. 1. Provide proper Personel protective equipments . And LOW Site Engineer
ensure use of PPE like safety helmet, safety shoes and
safety jacket.2.Ensure barricading of pit to avoid fall.

Pouring of concrete Eye injury, Skin 1. TBT should be conducted for use of PPE’s & First aid . LOW Site Engineer
Concrete may come in contact irritation. 2. Provide close supervision during work.
with eye & skin 3. Provide & ensure use of PPE’s like safety goggle, Rubber
hand gloves & Gum Shoes.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO.- 13 ACTIVITY NAME : SHUTTERING & DESHUTTERING Date-

HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk level Risk level Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P IxP CONTROL MEASURES I P IxP Hazards Residual risk Action By
Sharp edges of Shutters & Bars Abrasion, Injury to 4 4 16 1. Provide & ensure use of hand gloves, shoulder pad. 2 2 4 Physical hazard LOW
person 2. TBT should be conducted before start the work.

Improper access – Fall of Injury to person 1. Provide close supervision during work. LOW
material property damage. 2. Provide proper access during the work.
3. Access should be from obstacles.
4. Provide proper illumination during night work.

Fall of person from height. Injury to person 1. Provide close supervision during work. LOW
property damage. 2. Provide proper access during the work.
3. Provide proper illumination during night work.

Improper usage of hand tools Injury to person, 1. Only trained workmens allow to do work. LOW
Shifting of
boards and - slip /trip & fall property damage 2. Provide close supervision during work.
shuttering 3. Ensure proper hand tools during work.
4. Hand tools should be inspected before start of work.
13 and de-
shuttering of Inadequate manpower Health issue,injury 5. Providesufficient
1.provide & ensure manpower
usage of PPE's.
as per safe lifting limits. LOW
beam,colum -Fall of material/overload to to person 2.Avoid saging & provide proper manpower to give
n and slab person support.
3.Provide close supervision

Improper stacking of material Injury to person, 1. Ensure proper stacking of material. LOW
Property damage. 2. Avoid stacking of material at the edges.

fall of shuttering material Injury to person. 1. Only trained / skilled workmen’s allow to do work. LOW
from height. 2. Provide close supervision during the work.
3. Ensure usage of proper hand tools.
4. Hand tools should be inspected before taking in to use.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO.- 14 ACTIVITY NAME : BACK FILLING & ROLLING Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Categories of Hazards Residual risk Action By
Improper access Injury to person, 4 3 12 1. Provide proper access. 2 2 4 Physical hazard LOW
– Toppling of Property damage 2. Access should be free from obstacles.
Vehicle 3. Provide proper illumination during night work.

During work- Injury to person, 1. Only authorized license operator should operate LOW
Toppling of Property damage. vehicle.
Filling , vehicle 2. All vehicles should have valid documents.
Leveling of 3. TBT should be conducted before starting work.
soil and 4. Close supervision should be provided during the
Rolling Work work.
14 by Dozer , 5. Vehicles should be inspected before taking in to
Dumper, use.
Road
Roller,Bachh
oe excavator
Unauthorized Injury to person 1. Area should be barricaded. LOW
entry of person - 2. Restrict unauthorized entry.
Struck by Vehicle 3. Ensure reverse horn while reversing vehicle.
4. Don’t allow to seat person below the vehicle.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO.- 15 ACTIVITY NAME : ELECTRICAL INSTALATION AT SITE Date-


HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I Risk level Categories of Residual risk Action By
P
IxP Hazards
1. Work permit procedure to be followed. Physical hazard LOW Plant and machinery
2. Allow only licensed electricians to perform on electrical
facilities
3. Use one socket for one appliance.
4. Ensure usage of only fully insulated wires or cables.
5.Don’t place bare wire ends in a socket & use of
industrial plug tops.
6.Ensure earthing of machineries and equipments.
7.Do not use damaged cords and avoid temporary
connections.
8.Provide all connections through 30mA ELCB.
9.Protect electrical cables/equipment from water and
naked flames.
10.Check all connections before energizing.
11.Use insulated hand gloves and other PPE.
Damaged Electrocution, 12.LOTO system to be followed.
electrical Serious burn, 13.Display ‘Danger’ signs.
Temporary injury,
electrical cabels,faulty 14.Do not allow unauthorized connections.
15 damaged 5 3 15 15.Switch off the electrical utilities when not in use. 2 2 4
Installations at power material /
site. tools,Fire 16.Do not lay unarmored cables directly on ground; wall;
equipment. roof of trees.
Hazard 17.Maintain at least 3m distance from HT cables.
18.Provide rubber mat in front of all DB’s & Sub DB’s.
19.Provide extension boards for all temp. hand tools
connections
20.All temporary structure to be earthened.
21.Provision of fire extinguisher.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO:16 ACTIVITY NAME : Work At Height (WAH) Date-
HIRA Page

Severity rating = I , Probability Rating =PRisk


| Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological Risk
Sr. Categories of Residual
ACTIVITY HAZARD RISK INVOLVED I P level CONTROL MEASURES I P level Action By
No Hazards risk
IxP 1. Provide proper access i.e. ladder with hand rails to reach IxP
at height.
2. Provide & ensure use of safety belt to reach at height.
3. Provide close supervision during work.
4. Only trained workers allowed to do work.
Injury to
Fall of person,fall 5. TBT should be conducted for work at height.
person,property 5 4 20 2 2 4 Physical hazard LOW Site Engineer
of material 6.Work with valid work permit.
damage.
7.For height work workmen with vertigo pass shall be
work at height allowed.
8.Standard ladders and scaffold to be used for height
work.

Fall of hand tools, slip 1. Ensure use of proper hand tools.


Improper usage of
& trip - Injury to 3 2 6 2. Inspect hand tools before taken in to use. 2 1 2 LOW Site Engineer
hand tools
16 person 3. Avoid use of damaged hand tools.

1. Provide the guard rails / barricade at the work place. LOW Site Engineer
2. Provide & ensure use of Life line , full body harness,
safety helmets , safety shoes etc.
3. Obtain the work permit before starting the work above
ht. 3M.
Serious injury to 4. Only skilled workmen’s are allowed to ht. work.
Fall of material. 5. Tool box talk should be arrange before starting the
person may prove fatal.
Working at elevated places. Fall of person 5 4 20 work. 2 2 4
Property damage
6. Provide strict supervision during the work.
7. Fall arrestor & safety net must be installed.
8. Provide adequate working place. ( min 0.6m)
9. Provide proper working plat form & it should be tie
properly.
10. Remove the scrap immediately & work place should be
neat and clean.
11. Don’t throw / drop material or equipment from height.
Prepared By Reviewed By 12. All tools should be carry in tool kit bag or tie with in
Approved By
working uniform.
13. Don’t allow to stack loose material at ht.
14. Don’t allow to throw material from height & vice versa.
MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO.- 17 ACTIVITY NAME : SCAFFOLD ERECTION & DISMANTLING Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
Hazards
Improper Surface Injury to person, 1. Inspect ground before erection of Scaffold. Physical hazard LOW Site Engineer
or ground. property damage. 2. Loss ground should be compacted, leveled &
made firm before erection.
3. Scaffold should not erect near to excavated area
and vice versa.

Fall of Person Serious Injury to 1. Only designated workers allowed to erection, LOW Site Engineer
during Scaffold person Repairing & dismantling of Scaffold.
work ,fall of 2. Provide close supervision during work.
material. 3. TBT should be conducted before starting the
work.
4. Provide & ensure use of Safety helmet, Safety
Shoes, safety Jacket & Full body harness safety
belt.
5. Provide & ensure proper access during the
erection & dismantling work.
6. Provide proper support during erection.
7. Provide proper working platform.
8.Workmen with height pass can work for height
work.

Scaffold Erection &


Dismantling(for
17 Column,Pedestral
and Slab) Improper usage Injury to person, 1. Only trained workmens allow to do work. LOW Site Engineer
of hand tools - slip property damage 2. Provide close supervision during work.
/trip & fall 3. Ensure proper hand tools during work.
4. Hand tools should be inspected before start of
work.
5. Provide & ensure usage of PPE's.

Inadequate Health 4 16 1.provide sufficient manpower as per safe lifting 2 2 4 LOW Site Engineer
manpower issue,injury to limits.
person 2.Avoid saging & provide proper manpower to give
support.
3.Provide close supervision

Improper handling Property damage, 1. TBT should be conducted before start work. LOW Site Engineer
of material -Fall of Injury to person. 2. Below area should be barricaded.
material from 3. Close supervision should be provided.
height. 4. Tools and Trackless or Loose material should not
keep at top of scaffold.
5. Materials should not throw from height and vice
versa.

Fall of Scaffold Property damage 1. Provide proper support to Scaffold. LOW Site Engineer
& injury to person 2. Tie the scaffold for permanent structure at
every ‘3M’.
3. Maintain 1:4 ratio during erection.
4. Scaffold should be erected in a plumb.
5. Scaffold should be erected as per the standard
norms and conditions.
6. Scaffolds should be dismantled row wise, before
proceed to next row, the entire components
should be removed.
7. Scaffold should be inspected as per clients check
list.
8. Appropriate tags should be displayed on
scaffold.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO.- 18 ACTIVITY NAME : Concrete chipping & breaking operation. Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr. No. Activity Hazard RISK Involved I P Risk level Control Measures I Risk level IxP Categories of Residual risk Action By
IxP P Hazards

Fall of person, Fall 1. Provide proper access by ramp or ladder.


of hand tools - 2.Access should be free from obstacles.
Improper
Serious injury to 3 2 6 3. Proper illumination should be provided during night 2 1 2 LOW Site engineer
access person; Damage of work.
tools. 4. Provide close supervision during work.

1. Ensure proper usage of hand tools.


Improper usage 2. hand tools should be inspected for any damage.
injury to person 3 3 9 3. Avoid usage of damage hand tools. 2 2 4 LOW Site engineer
of hand tools.
4. TBT should be conducted for usage of hand tools.
5. Provide close supervision during work.
Concrete
18 chipping & Physical hazard
breaking
operation.
1. Only authorized electrician allowed to do electrical
Improper connection.
electrical Electric shock or 2. Only double insulated breakers should allowed to do
connection to electricution to 4 3 12 work. 2 1 2 LOW Site engineer
electrical hand person . 3. Breaker should be inspected before taking in to use.
tools 4. Electrical connection should be provide through
30mA Elcb.

1. Only trained workmen allowed to do work.


2. Provide & ensure usage of safety shoes, safety
Breaking / Flying particles & goggle, nose mask, ear plug.
chipping of dust - Health Issue 3 3 9 3. Provide close supervision during work. 2 1 2 LOW Site engineer
concrete & lungs disease 4. TBT should be conducted for usage of PPE's.
5.Provision of safety goggle,duct mask and earplug.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-19 ACTIVITY NAME : CONCRETE WORK By Boom Placer Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
Hazards

1. Work permit should be obtained from client.


2. Provide proper access for the movement of Vehicles.
3. Access should be free from obstackles.
4. Provide signal man / helper to guide the driver. LOW Site engineer
5. Only licensed driver should operate the vehicles
6. Transist mixer & boom placer should be placed on firm
Movement & ground.
Installation of Injury to person, 7. Boom placers outriggers should be extended throughly.
Trainsist mixer & Property damage. 8. Provide slippers below the outrigger.
Boom placer at site May hit to 9. Boom placer should be leveled properly before extending
near by boom.
working 10. Provide proper illumination during work.
person, 11.TPI for boom placer shall be done.
4 4 16 12.Proper access ladder shall be provided for access.
structure ,
electrical 13.Ensure no oil leakage from hydraulic.
cabels & 14.Ensure no chokig happens.
installations LOW Site engineer

Physical
19
hazard

1. Inspect the area before extending the boom.


2. Only authorised operator should operate the boom
Placer.
Extension of boom Injury to person, LOW Site engineer
of boom placer. Property damage. 3. Provide signal man in critical area ( obstackles & vision
deficient area)
4. Work under hightension cables are restricted.
5. Work should be carried out under close supervision.

Movement of
boom & pipe - 1. TBT should be conducted for concrete work.
May hit to 2. Boom & its hose should be inspected before operating.
person. Injury to person,
Health issue, Skin 3. Provide tag line for holding the rubber hose.
Concrete work 4 3 12 4. Close supervision should be provided. 2 1 2 LOW Site engineer
irritation, Injury to
5. Provide & ensure use of PPE's like safety helmet, Gum
Concrete may eye.
Shoes, safety goggles, Rubber handgloves, ear plug & nose
come in mask.
contact with
skin & eye

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-20 ACTIVITY NAME : CONCRETE WORK BY CONCRETE PUMP Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


RISK Risk level Categories of
Sr. No ACTIVITY HAZARD INVOLVED I P Risk level IxP CONTROL MEASURES I P IxP Hazards Residual risk Action By

1. Only trained persons allow for erection of pipeline


work. 2. Provide close supervision during the
work.
3. Provide & ensure use of PPE’s like safety helmet,
safety shoes, safety belt & safety jacket.
Erection & Fall of concrete pipe, Injury to 4. Area should barricade.
Person, 5. Provide & ensure use of rope for lifting & lowering
of concrete Fall of person from Property pipe. LOW Site engineer
pipe line height.
damage. 6. Provide proper Access & working platform with
Scaffold.
7. Pipe line should be inspected for proper fixing
before taking in to use. 8.Ensure
TPI should be done for concrete pump. 9.Provide
proper scaffolding and locking for concrete pipeline.

1. Improper fixing of 1. Only trained & experienced operator should allow


flanges - sudden removal to fix the pump.
of pipe, 2. Inspect the pump, Pipes & its accessories before
Installation Brusting of pipe Injury to fixing.
& operating 2. Accidental movement person, 3. Inspect area & should be fixed on leveled & on LOW Site engineer
of concrete during installaton & Property firm ground.
pump operation, damage. 4. Area should be barricaded before starting the
3. Unautherised entry. pump. Physical
20 4. Unguarded parts, 5 4 20 5. fire extinguisher should be made available before 2 2 4 hazard,ergonomi
5. Fire hazars operating the pump. cal hazard.

Pouring of 1. Only licensed & autherised operator should


Movement of transist Injury to
concrete in mixer - May hit to pump, person , operate the TM.
pump By 2. Provide helper / Signalman to guide the TM. LOW Site engineer
Transist installtion & near by Property 3. Provide proper illumination during night work.
person damage
Mixer 4. Provide proper access to TM.

1. TBT should be conducted before starting the


work.
Manual Injury to 2. Provide close supervision during work.
Concrete may come in
Concrete contact with Skin & eye person, Eye & 3. Provide & ensure use of ppe’s like safety helmet, LOW Site engineer
work skin irritation safety shoes / Gum shoes, safety belt, safety jacket,
rubber hand gloves, Safety goggles.

Lungs dieases, 1. Provide PPE's like safety helmet, gum shoes,


Inhalation of smoke,
Use of concrete may come in eye inJury, skin rubber hand gloves, nose mask & safety goggles. LOW Site engineer
vibrator irritation,Electri 2. TBT should be conducted before start work.
contact with skin & eye. cution. 3. Provide close supervision during work.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-21 ACTIVITY NAME : Block work/ Brick work Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Hazards Residual risk Action By

1. Driver should be licensed, trained & aware with Physical hazard LOW Site engineer
defensive driving. 2.
Insured blocks carried are properly secured. 3. All
fall of unsecured block. the obstacles in the pathways should be removed.
Transportation of the Obstacles in path Injury to Person, 4. Provide
blocks to the site way.Rough & uneven Property damage. bankmans/ helper during the vehicle at site.
roadways

Site engineer
1. Tool box talk should be arrange on material handling.
Fall of blocks .Wrong lifting 2. Strict &
Unloading the blocks at method. Sharp edges of Injury to person, competent supervision during the work. LOW
site Property damage.
block 3.Provide & ensure the use of PPe’s.

Site engineer

Storage of Blocks Improper storage & stacking Injury to person , 1. Restrict the stack ht. above 1.5 M LOW
of blocks – Fall of blocks Property damage 2. Stacking should be done on firm base.

Site engineer
Improper storage / 1. Deploy trained operator for operating the tough rider.
Shifting blocks, cement
21 unsecured.Obstacles in the Injury to person , 3 3 9 2. All 2 2 4
mortar , sand to site by LOW
tough rider. path ways,toppling of tough Property damage the obstacle should be removed.
rider. 3. Proper illumination during night work.
Site engineer
Shifting blocks, cement 1. Wheel barrow should be inspected before taking in to
mortar, concrete Defective wheel use. 2.
barrow.Obstacles in path Injury to person. LOW
manually ( By use of Provide supervision during work.
ways.
wheeled barrow) 3. Use planks whenever necessary.

Preparation of cement Improper handling of Back Pain.Skin 1. Follow ergonomics rule. 2. LOW Site engineer
mortar and placing of cement bags.Evolution of Irritation & Eye Provide competent supervision.
blocks with cement. dust. injury. 3.Provision of proper PPE.
Cement contact to person.
Fall of blocks.

Site engineer

Use of additives for block Improper handling or Back Pain.Skin 1.Follow ergonomics rule. 2.
Irritation & Eye Provide competent supervision. LOW
work(Black japan) storage,spillage.
injury. 3.Dispal MSDS of addhesives and training to workers.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-22 ACTIVITY NAME : Plastering work Date-


HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I Risk level IxP Categories Residual risk Action By
P of Hazards

1 Provide & ensure use of personal protective


equipment like
Skin Infection.Skin 2. Permit to work shall be
disease like taken check for hazards.
Mixing of plaster Skin contact.
material like Inhalation of Dermatitis. 3. rubber hand gloves and LOW Site engineer
Lung disease rubber gum boots.
cement, Gypsum dust & cement. Personal injury. 4.Dust mask must be worn all the time.
5.Access must be clear & free from obstructions.
6. Regular housekeeping should be done
at work place area.

1. Required rigid standing Platform must be


provided. 2.
Fall of Barricade the area and restrict entry.
Internal plaster. person/material Personal injury. 3. Permit to work shall be taken check LOW Site engineer
from Height for hazards.
4.Ensure proper scaffold for access and egress
shall be provided.

Physical
22 4 3 12 2 2 4
hazard
1. Area should be barricaded before starting the work.
Fall of material Injury to 2. Display the signages .
Internal plaster and fall of person,property 3. Close supervision should be provided during work. LOW Site engineer
person damage. 4. Provision of competent supervision.

1. Proper housekeeping should be done.


2. Below area should be inspected & barricaded
before starting the work.
3. Safety net to be provided to the place
Fall of Injury to 4. Scaffolding of suitable height to be provided with
External plaster. material/perso person,property proper access egress with guard rail, toe board. LOW Site engineer
n from height damage. 5. The person climbing must be properly trained for
use of proper PPE like safety belt, Safety shoes, Safety
glasses, Hand gloves, Safety helmet. Do not allow any
person to be stand below.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-23 ACTIVITY NAME : Road work Date-


HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Risk level Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Residual risk Action By
IxP Hazards

1. Machine should be inspected.


2. Only authorized operators allowed
to operate the machine
Compaction Vehicle Injury to Person; 3. Unauthorized entries should be
LOW Site engineer
by road rollar movement. Property Damage. restricted in work area.
4. Provide & ensure use of PPE’s like safety helmet, safety
shoes(Gumboots), safety jacket, hand gloves, safety goggle
etc.

1. Provide & ensure use of personal protective equipment


like rubber hand gloves and gumboots.
2. Permit to
23 4 3 12 work shall be taken check for hazards. 2 2 4 Physical hazard
Skin contact with
Concrete
cement.Vehicle Personal injury. LOW Site engineer
work 3. Strict supervision should be provide during the activity
movement.
4. Barricade the area
and restrict entry.
5. Only authorised operators should allow to operate the
machine

1. Only authorized electrician allowed for electrical


connection.
2. All electrical Connections through 30mA Elcb.
Use of Electrocution Injury to Person; 3. Machine should be inspected LOW Site engineer
vibrator Property Damage. before taking in to use.
4. Provide strict supervision during
work.
5. TBT should be arrange before start the work.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO:-24 ACTIVITY NAME : Water Proofing Work Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk Risk
Sr. level level Categories of Residual risk
No ACTIVITY HAZARD RISK INVOLVED I P CONTROL MEASURES I P Hazards Action By
Skin disease like IxP 1.TBT should be conducted before starting the work. IxP Physical hazard Site Engineer
Dermatitis. 2. Provide & ensure use of Dust mask.
Surface Cleaning with Broom Flying particles, Dust inhalation. LOW
Personal injury.

1.Electrical power tools shall be provided by 30mA ELCB.


2.Grinding m/c shall be inspected prior to use & must be
grounded.
3.Grinding machine, cable connection shall be checked by
electrician before taking in to use.
4.Only authorized electrician allowed to give electrical
Flying particles, Dust inhalation. Improper Electrocution, Serious burn injury, eye connection.
Grinding for Surface Preperation LOW Site Engineer
electrical connection. injury 5.Proper cable routing to be ensured.
Cable should be free from joint.
6.Defective plugs must not be used & Use industrial plug top
& extension board.
7.Proper PPE’S is to be used.
8.Strict supervision should be provided during the activity.

3.Use proper PPE’S.


4.Proper housekeeping is to be maintained.
Skin irritation, 5.Empty drums to be removed immediately after the
24 Surface preperation by filling the Eye injury , 3 3 9 completion of work. 2 1 2
mortar. Mortar may come in contact with skin & eye. LOW Site Engineer
6.M.S.D.S. should be known to the all workers.

1.Use proper PPE’S.


Application of two coat water proof Water proof compound may come in contact with 2.Proper housekeeping is to be maintained.
Skin irritation, 3.M.S.D.S. should be known to the all workers. LOW Site Engineer
compound by brush / roller skin & eye. Eye injury , 4.Trained workers to be used.

1. Only third party tested tools & Tackles should be taken in


to use.
2. Tools & tackels should be inspected visually before taking in
Shifting of water proof concrete to use.
Fall of material, crane collapse. Property damage, injury to person LOW Site Engineer
with tower crane. 3. Ensure the capacity of lifting belt, slings 4.Trained workers
to be used.

Skin irritation, 1.Use proper PPE’S.


Applying Scrid concrete & water Water proof compound may come in contact with Eye injury ,
proof concrete in three layers 2.Trained workers to be used. LOW Site Engineer
manually. skin & eye. 3.Competent supervision is required.
4.All labours should know about the hazard.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO:-25 ACTIVITY NAME : Soling work Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Risk level Categories of Residual
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Action By
IxP Hazards risk

1. Provide & ensure proper access.


2. Provide proper illumination during work.
Improper access - Injury to person, 3. Keep access free from obstructions.
Toppling of JCB Property damage. 4. Only trained operator should operate the LOW Site engineer
JCB.
5. JCB should have all valid documents.

Shifting the stone from


one location to other 1. Don’t allow to over load the bucket.
with JCB & Unloading. Fall of material 2. Stones should not comes out of the body of
Injury to person. bucket. LOW Site engineer
3. Provide supervision during work.

1. Unloading should be carried out under close


Vehicle hit during supervision.
unloading. Injury to person 2. Area should be inspect before unloading . LOW Site engineer
Physical
25 4 3 12 3. Don’t allow to worker to work near by area. 2 2 4 hazard

1. Don’t allow to worker to throw the stones.


Improper technique 2. If unavoidable area should be barricaded to
( Throwing of stone) - Injury to person restrict unautherised entries. LOW Site engineer
May hit person 3. TBT should be taken before starting the
work.
Manual Shifting & Fixing
of stone.

Sharp edges & uneven 1. Provide & ensure use of safety shoes, safety
surface of stone -
abbression, cut, Caught Injury to person jacket, safety helmet & safety shoes. LOW Site engineer
2. TBT should be conducted for use of PPE's.
in between , fall of stone

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA NO:-26 ACTIVITY NAME : Bitumen road work. Date-
HIRA Page
Severity rating
Risk = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological Risk
Sr. Categories of Residu
No ACTIVITY HAZARD RISK INVOLVED I P level CONTROL MEASURES I P level Hazards al risk Action By
IxP IxP
Injury to Person; 1. Tool box talk should be conduct before start the work. 2. Permit to work shall be obtain before start of activity. 3. Provide close supervision
Improper access, Slip & trip hazard Property Damage. during work. 4. Access must be clear & free from obstructions. 5. Regular housekeeping should be done at work place LOW Site engineer
area.
Bitumen & Fuel wood storage
Injury to Person; 1. Use proper tools ( Rope & Chanels ) for unloading of butumen & wood fuel. 2. Dont allow to throw the drums.
Improper handling of material. Property Damage. 3. Barricade the area and restrict entry. 4. Permit to work shall be taken to check for hazards. LOW Site engineer

1. Only authorized LOW


person should allow to handling of bitumen.
Manual Bitumen Loading , Unloading & Fall of Bitumen, Bitumen may come Injury to Person; 2. Strict supervision should be provide during the activity.
handeling. in contact with Skin. Property Damage. Site engineer
3. TBT should be conducted before starting the work. 4. Provide & ensure use of Safety shoes, safety helmet, Safety Jacket, Leather handgloves.

1. Provide proper hand tools & it should be inspected before taking in to use. 2. Provide close supervision LOW
Improper usage of hand tools,Sharp during the work. 3. Provide & ensure use of PPE's like safety shoes, safety helmet , safety Jacket & Hand gloves. 4.
edges, Improper alignment of Injury to Person;
Aligning & Storing the drum for heating Property Damage. Proper alignment of drum & furnace should be done. Site engineer
drum on furnace.
26

Serious burn injury 1. Area should be barricaded & inspected. 2. Provide close supervision during work.
skin burn, inhalation of fumes & 3. Unauthorized entries should be restricted in work area.
Heating opeartion Heat stroke, Fire . to person ; Site engineer
Property damage 4. Provide & ensure use of PPE’s like safety helmet, safety shoes, safety jacket, hand gloves, nose mask and safety goggle etc.
4 4 16 5. House keeping should be maintain properly. 6. Dont allow to stack exces material near burning area. 7. Fire 2 1 2 Physical hazard
extinguishers & fire buckets make available in work area. 8. Fire watcher made available during
the process. LOW

1. Ensure proper access during shifting.


Fall of bitumen on body , may be Property damage, 2. Access should be free from obstacles.
Pouring the hot bitumen from drum for contacted to near by person, Injury to person, 3. Provide proper hand tools & it should be inspected before taken in to use. LOW Site engineer
mixing & mixing the sand & bitumen. Inhalation of fumes. lungs disease. 4. Provide & ensure use of PPE's.
5. Ensure adequate man power during work.
6. Provide Close supervision during work.

1. Area should be barricaded before starting the work. LOW


2. Display the precautionary boards.
Serious injury to 3. Close supervision should be provided during work.
Work Access for appling bitumen on tank. Fall of person, fall of material. person, Property 4. Provide ladder for access. Site engineer
damage. 5. Access should be free from obstacles.

1. Provide & ensure usage of proper hand tools. LOW


Serious burn injury 2. Below area should be inspected & barricaded before starting the work.
Finishing activity Skin burn to person 3. Use of PPE (hand gloves & shoes) should be insured. Site engineer

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-27 ACTIVITY NAME : Trimix Activity Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
of Hazards
1. MS Channel 1. Caught in-between 1. Trained labour shall be deputed for executing the jobs. Physical LOW Site engineer
fixing by using 2. Hit Personal injury. 2. Use safety shoes, cotton hand gloves, safety helmet. hazard
clamp & finalize during shifting 3. Proper permit shall be taken prior to start the work.
the level of 3.Bodily Injury. 4. Good housekeeping shall be done after completion of work.
channel. 4. Poor Illumination 5. Continuously supervision present at work place.

6. Proper illumination to be provided with all the electrical


Safety precaution.
7. Electrical connections to be provided by Competent person
only.
8. Job Tool Box Talk to be done before start of the work.

2. Fixation of
reinforcement & 1. Caught in-between 1. Trained labour shall be deputed for executing the jobs.
Personal injury.
dowel bar, PVC 2. Hit during shifting. 2. Use safety shoes, cotton hand gloves, safety helmet.
3. Bodily Injury. Hand Injury, Cut 3. Proper permit shall be taken prior to start the work. LOW Site engineer
pipe Injury,

1. Trained labour shall be deputed for executing the jobs. LOW Site engineer
2. Use safety gumboots, rubber hand gloves, safety helmet,
Safety goggles, ear plug.
3. Proper permit shall be taken prior to start the work.
4. Area shall be barricaded with Caution tape.
5. Good housekeeping shall be done after completion of work.
6. Continuously supervision present at work place.
7. Follow all the rules & regulations
8. Proper illumination to be provided with all the electrical
Safety precaution.
3. Pouring of 9. Electrical connections to be provided by Competent person
concrete in 1. Electrical Shock only.
between channels 2. Noise Personal skin 10. Proper earthing to be provided & also to be ensured by
and leveling 3. Eye Injury injury. competent electrician.
concrete by 4. Poor Illumination 11. Job Tool Box Talk to be done before start of the work.
vibrator 12. Regular inspection to be done for the cables before starting
the work to ensure no joints are present.
15. Inspected machinery to be used.

1. Trained labour shall be deputed for executing the jobs. LOW Site engineer
2. Use safety gumboots, rubber hand gloves, safety helmet,
Safety goggles, ear plug.
3. Proper permit shall be taken prior to start the work.
4. Area shall be barricaded with Caution tape.
5. Good housekeeping shall be done after completion of work.
27 4 3 12 6. Continuously supervision present at work place. 2 2 4
7. Follow all the rules & regulations of
8. Proper illumination to be provided with all the electrical
Safety precaution.
9. Electrical connections to be provided by Competent person
only.
1. Electrical Shock 10. Proper earthing to be provided & also to be ensured by
2. Noise competent electrician.
4. Dewatering of 3. Eye Injury
concrete by 11. Inspection of the Vaccum Dewatering pump .
4. Poor Illumination ELECTRICUTION 12. Job Tool Box Talk to be done before start of the work.
vaccum
5. Improper 13. Training to be given to the workers as per the hazards
dewatering pump.
Clamping mentioned.
14. Regular inspection to be done for the cables before starting
the work to ensure no joints are present.
15. Inspected machinery to be used

1. Trained labour shall be deputed for executing the jobs. LOW Site engineer
2. Use safety gumboots, rubber hand gloves, safety helmet,ear
plug.
3. Proper permit shall be taken prior to start the work.
4. Area shall be barricaded with Caution tape & with visible sign
board.
5. Good housekeeping shall be done after completion of work.
6. Continuously supervision present at work place.
7. Follow all the rules & regulation
8. Proper illumination to be provided with all the electrical
Safety precaution.
9. Electrical connections to be provided by Competent person
only.
1.Electrical Shock 10. Proper earthing to be provided & also to be ensured by
5. Floor finishing to 2. Noise Serious injury to competent electrician.
be done by using 3. Poor Illumination person,Electricuti 11. Job Tool Box Talk to be done before start of the work.
Floater. 4.Rotating part on,cut injury 12. Training to be given to the workers as per the hazards
mentioned.
13. Regular inspection to be done for the cables before starting
the work to ensure no joints are present.
14. Cables should not be laying on the ground.
15. Inspected machinery to be used.

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-28 ACTIVITY NAME : PLUMBING Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr. No. Activity Hazard Risk Involved I P Risk level IxP CONTROL MEASURES I Risk level Categories of Residual Action By
P IxP Hazards risk

Defective tool should not be used.


Choose right tool for right job.
Defective cables are not to be used.
Electrical hazard while A power tool is to be checked by electrician prior to
Electrical shock LOW Site engineer
using the power tools’ start the work.
Plug –pin should be used.
One pin for one socket to be used.

Inspection of scaffold should be done by competent


person
Obtain work permit before starting of any work 2 4
Personal Ladder should be checked before use
Fall of person / material
injury.Property Barricade the area LOW Site engineer
Plumbing from height. Safety belt, should be provided with all PPE,
28 damage. 4 3 12 2 Physical hazard
(PVC Pipe) Cautionary board/sign boards to be displayed.
Proper illumination to be provided near the duct area

Stacking to be done properly.


Handling and Cutting of Sharpe edges can be Use PPE’S. LOW Site engineer
the pipes injured the person
Barricade the stack area.

1.Use proper PPE’S like safety goggle and handgloves


Skin irritation, to avoid skin contact. 2.Only trained
Contact with chemicals. persons allowed to work. Site engineer
Eye injury ,

LOW

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO:-29 ACTIVITY NAME : Tiles fixing Date-


HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr. No. Activity Hazard Risk Involved I P Risk level IxP CONTROL MEASURES I P Risk level IxP Categories of Residual risk Action By
Hazards

Mixing of cement, Use Personal protective like rubber hand gloves


Sand to make base Skin Skin Gum boots. (proper PPE’S)
irritation,respiratory LOW Site engineer
for tiling. contact,dust. diseases. House keeping to be maintained.

Make the use of machine in presence of trained


workers
Do not leave the machine in on position while idle
time.
Use safe operating procedure of using cutting
Electrical shock,cut machine. Check the machine before use for
Rotating injury. electrical fault.
29 Cutting of Tiles 4 3 12 Electrical cable should not have any defects. 2 1 2 Physical hazard Site engineer
part,electrical
hazard. Electrical cable must not have any joint.
Electrical work is to be checked by qualified
electrician.
Electrical supply should be with plug & pin.
Use one socket for one machine.

LOW

Store the material properly.


Use proper PPE’S (hand gloves, safety shoes, safety
Cut injury helmet)
Fixing of tiles Sharp edges Storage area to be barricaded. LOW Site engineer
Scrap material to be removed periodically

Prepared By Reviewed By Approved By


MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00

HIRA NO:-30 ACTIVITY NAME : Floater (Finishing ) activity Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
Hazards

1. Provide & ensure use of personal protective equipment


like rubber hand gloves and gumboots.
2. Permit to
work shall be taken check for hazards.
Rotating part. Cut injury. 3. Strict supervision should be provide during the activity
LOW Site engineer
4.Ensure
all rotating parts shall be guarded.
5. Only authorised operators should allow
to operate the machine
Finishing activity Physical
30
by using floater 4 3 12 2 2 4
hazard

1. Only authorized electrician allowed for electrical


connection.
Defective 2. All electrical Connections through 30mA Elcb.
cables,improper
Electricution 3. Machine should be inspected LOW Site engineer
electrical before taking in to use. 4. Provide strict
connections
supervision during work.
5. TBT should be arrange before start the work.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA No.31 Activity:-PCC Work ground level. Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk Involved I P Risk level IxP Control measures I P Risk level IxP Categories of Residual risk Action By
Hazards
Physical
hazard
1.Vehicle toppling due to improper access. Personal injury,property damage 1.Safety induction of driver,only driver with valid licence

allowed to work.

Transit mixer entry at site. LOW Site engineer


2.Speed limit of 15 km/hr to be followed.

3.Provision of proper access.

4.Ensure all vehicle documents with driver.

31 4 3 12 2 2 4
1.Vehicle hit to person/nearby Structure Personal injury,property damage 1.Inspection of vehicle before entering at site for reverse

horn and vehicle condition,provision of vehicle stopper.

Concrete Pouring and 2.Skin iritation due to contact with cement. Dermatitis. 2.Use approriate PPE like rubber handgloves,safety helmet,
LOW Site engineer
Finishing Work.
and gumboot.

3 Flying particles. Eye injury 3.Use safety goggle.

4.Ensure close supervision.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt. Ltd Rev,00

HIRA No.32 Activity:- Soil or ground levelling by Backhoe excavator Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk involved I P Risk level Control measures I P Risk level Categories of Hazards Residual risk Action By
IxP IxP

1.Electrical hazard,damage to underground Electricution. 1.Obtain clearance from authorised person for underground

utilities. utilities. LOW Site engineer

2.Work with valid work permit.

Soil or ground levelling 1.Vehicle hit to person/nearby Structure Personal injury. 1.Inspection of vehicle before entering at site for reverse

using backhoe excavator. horn and vehicle condition.


LOW Site engineer
32 4 4 16 2.Barricading of area to avoid unauthorised entry. 2 2 4 Physical hazards

3.Provision of proper signages.

2.Toppling of bachoe excavator. Personal injury,property damage. 1.Check ground condition.

2.Operator should be competent with valid driving licence.


LOW Site engineer
3.TBT before start of job to give awareness about hazards.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.33 Activity:- Material and vehicle disinfection using 5% sodium hypochlorite. Date-
HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level IxP Categories of Hazards Residual risk Action By

Mixing of Sodium hypochlorite 1.Skin contact Skin disease,skin irritation. 1.Do not touch sodiun hypochlorite solution. Chemical and physical LOW HR,Safety and security
hazard

and water in spray pump. 2.Eye contact Eye injury 2.Use PPE like rubber handgloves,safety goggle and face mask.

3.If contact with skin wash with plenty of water for atleast 15

minutes.

4.Provision of training to concerned worker.

Dis-infection of vehicle and 1.Inhalation Health problem 1.Use face mask to avoid inhalation. LOW HR,Safety and security

33 3 3 9 2 1 2
material using spray pump. 2.Skin contact Skin disease,skin irritation. 2.Use approprite clothing.

3.Eye contact. Eye injury 3.Use approprite goggle.

4.Provision of training to concerned worker.

Storage of sodium hypochlorite. 1.Spillage. Personal injury. 1.Handle carefully to avoid spillage. LOW HR,Safety and security

2.Ignite with a source of heat. Personal injury. 2.Keep away from heat.

3.MSDS to be displayed near storage.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO:-35 ACTIVITY NAME : MANUAL CONCRETE WORK . Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Risk level Categories of


Sr. No ACTIVITY HAZARD RISK INVOLVED I P Control measures I P Risk level IxP Residual risk Action By
IxP Hazards

1.Vehicle to be inspected as per checklist.


2.Provision of proper access.
Transit 3.Provision of pedistrian walkway to avoid man and
Vehicle toppling,Vehicle Injury to Person,
mixer entry vehicle contact. 4. LOW Site engineer
hit to person. Property damage.
at site. Flagman to be diployed.
5.Driver with valid licence to be allowed to drive.

1.Provision of propers signages.


2.Hard barricading to excavated pit.
1.Vehicle toppling in pit.
3.Ensure trained personnels diployed for the task.
2.Vehicle clooide
Pouring of Injury to person,
with person. 3.Cement
35 concrete contact with skin. Property damage. 4 4 16 4.Provision of flagman. 2 1 2 Physical hazard LOW Site engineer
Concrete. Dermatitis. 5.Provision of vehicle stopper.
4 . Flying
6.Use of proper PPE like rubber handgloves and
particles.
safety goggle.

1.Inspection vibrator before use.Check for petrol


1.Fire due to petrol
Use of leakage.
leakage.
petrol or 1.Burn injury 2.Provision of fire extingisher near petrol vibrator.
2.Electrical hazards if LOW Site engineer
electrical 2.Electricution. 3.For
damaged cable or faulty
vibrator. electrical vibrator check electrical connection.Ensure
connection.
damaged electrical cable shall not be used.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.36 Activity:-Ply making work Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr.No. Activity Hazards Risk Involved I P Risk level IxP Control measures I P Risk level IxP Residual risk Action By
Hazards

Ply handling and shifting. 1.Fall of material. Personal injury 1.Workers shall be diployed after medical checkup and safety induction.

2.Work with valid permit to work.

3.Tool box talk to be conducted before start of work activity.


LOW site engineer
4.Provision of proper access.

5.Lift material with proper lifting technique.

Work with proper PPE like safety helmet,safety shoes,safety jacket and
4 3 12 2 2 4 Physical hazard
cotton handgloves.
36
Ply cutting using wood cutter or 1.Rotating parts. 1.Cut injury 1.Only trained persons to be assigned for the job.

ply cutting machine or manual wood 2.Flying particles. 2.Eye injury 2.Machine Inspection and tagging shall be done before issuing machine.
3.TBT to be conducted before start of work.
cutter saw. 3.Electrical hazard 3.Electricution LOW site engineer
4.Ensure all rotating parts have guarded.
5.Check machine spindle rpm and cutting wheel rpm are same.
6.Ensure no electrical cables are damaged and faulty power tools in use.
7.Eye protection is must during ply cutting.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA NO.- 37 ACTIVITY NAME :Bar cutting by Chop saw machine. Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Residual risk Action By
Hazards

Rotating Cut injury,Electricution. 4 3 12 1.Ensure machine is diconnected during 2 2 4 LOW Site engineer
part,Electrical inspection.
Inspection of hazards. 2.RPM for machine and wheel to be
chop saw checked.Wheel with proper rpm to be used.
machine.

Flying Eye injury,cut injury due to 1.Competent operator should be diployed. LOW Site engineer
particles,rotating rotating 2.Work with valid work permit.
parts,electrical parts,electricution,fire if 3.Check electrical connection.No damaged cable
hazards,hot flammabe material available or damaged machine parts allowed to operate.
sparks,dust. around,hearing loss. 4.Ensure
double insulate sign displayed on machine.
5.30 ma ELCB
should be available. 6.Ensure
machine guard is available. 7.No
flammable or combustible material available when
there is chance of spark by power tools.
Stell Bar 8. Provision of proper
37 cutting by PPE like safety goggle,facesheild,hard hat,safety Physical hazard
chop saw shoes,hearing protection if sound level is more
machine than 85 Decible.
9.Ensure dust guard is available to machine.
10.Onle machine with inspected tag permitted for
work.

Change of Electricution,rotating Electricution,cut injury. 1.Ensure machine is diconnected during changing LOW Site engineer
wheel power parts, of wheel or drill bit.
tool. 2.Only competent operator allowed to change
wheel or drill bit.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA NO.- 38 ACTIVITY NAME : Reinforcement of steel bars Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Residual risk Action By
Hazards
1.Steel cutting, 1.Slip, Trip and fall hazards. 1.Personal injury 4 3 12 1.Induction Training and medical check up will be conducting for all staff, 2 1 2 Physical hazard LOW Site engineer
Bending as per 2.Property damage workers before starting work.
drawing 3.Electrocution 2.Appropriate PPEs (Safety helmet, safety shoes, hand gloves) will be providing
for worker.
3.Efficient and effective supervision will be maintained throughout the work.

2.Failure of Machine.

4.First aid Kit will be available @ site.


5.Proper access will be providing separately for man and material movement.
6.Access will be clear from obstructions.
7.Materials will be stacking separately for scrap and useable steels.
3Improper access. 8.Reinforcement yard will be providing separately and its will be isolating and
4.Projecting steel rods. boards displayed.
5.Electrical hazard..

9.Bar cutting and bending machine will be inspecting before start work.
10.Rebar caps will be providing for projected steel rods.
11.Body earthing will be providing for bar cutting and bending machines.
12.Machines connection will be go through 30 MA ELCB/RCCB only.
13.All cables will be routing on overhead.
14.Experienced fitter only operating bar cutting and bending machines.

15.Scrap yard will be providing for store steel scraps.


16.Safety signage will be displayed at work location.
17.All moving parts will be guard safely.
38 18.All electrical connection will be doing authorised electrician only.
19.Industrial sockets will be providing for electrical connection.
20.Illumination will be providing for night works.
21.Hot works permit will be taken from client before starting Works

2.Manually Shifting 1.Steel hit to person. 1.Personal injury. 4 4 16 1.Appropriate PPEs will be providing for worker. 2 2 4 Physical hazard LOW Site engineer
and placing of steel 2.Fall of materials. 2.Fracture 2.Working platform will be providing for height works.
proposed area as per 3.Fall of person. 3.Full body harness will be providing for above 1.8 M. Height.
drawing. 4.Slip, Trip hazards. 4.Scaffolding will be providing for above 1.8M. Height as per standard.

5.Ladder will be providing for access to climbing working platform.


6.Area will be barricading for unauthorised entry.
7.Efficient and effective supervision will be maintained throughout the work.
8.First aid Kit will be available @ site.
9.Throwing of materials will not allow.
10.Rebar caps will be providing for sharp end of the steel.

11.Shoulder pad will be using for steel shifting.


12.Loose materials will clear from working platform.
13.Adequate illumination will be providing for night works.
14.After completion of works area will be maintaining clean. 15.Works
permits will be taken from client before starting works.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA NO.- 40 ACTIVITY NAME : Diesel storage and filling in vehicle. Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Categories of Residual
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Action By
Hazards risk

Flammable material,Spillage,skin Burn injury,Fire,soil 4 3 12 1.Person assigned for the job shall be medically fit and 2 2 4 Physical & LOW Store incharge &
contact. contamination,dermatitis. only inducted persons allowed to do activity. chemical Plant &
hazard machinery
2.Provision of proper shed and spillage tray to incharge
avoid soil contamination.
3.No hot work permitted near diesel storage.
4.Diesel room shall be locked and only
authoried person can have permission.
Diesel storage 5.Electrical connections should be flame proof.
6.MSDS shall be displayed in diesel storage room.
7.Provision of training to concernes workers.
8.Provision of fire extinguisher and fire bucket.
9.Diesel storage should not be more than 2500 ltr.

10.Provision of proper signages like no smoking,


40
flammable material to be displayed.

Diesel Spillage,skin contact,flammable 3 3 9 1.Only trained persons allowed for this activity. 2 1 2 LOW Store incharge &
refilling. material. Plant &
machinery
2.Vehicle should be stopped. incharge
3.Area barricading to be done.
4.For diesel filling manual pump or intrensicaly
safe electrical pump to be used.
5.Mobile shall be switched off during diesel filling.

6.Fire extinguisher and fire bucket filled with dry


sand shall be available.
7.No open flames or hot work in progress near
diesel filling area.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd. Rev,00

HIRA NO.- 41 ACTIVITY NAME : Hard barricading by MS pipe. Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP of Hazards Residual risk Action By
Fall of Personal injury. 3 2 6 1.Person with medicaly fit and inducted shall be assigned 2 1 2 Physical LOW Site engineer
material,slip,trip,Ergonomics,Veh for the job. hazard
icle movement,sharp edges.
2.Ensure proper access with free from obstacles.
3.Inspect material for sharp edges.
4.Work with valid work permit.
Barricading MS pipe 5.TBT to be conducted before start of work.
shifting.
6.Look for vehicles during pipe shifting.
7.Provision of flagman and pedestrian walkway to
avoid vehicle man collision.
8.Lift with correct practice and take frequent breakes

41 to avoid over exertion.


Hard barricading to Slip,trip,fall of person from Personal injury. 4 3 12 1.Ensure flagman is available near excavator. 2 2 4 LOW Site engineer
excavated pit or slab height ,Hit by excavator or
outer edges. vehicle. 2.Keep away from swing distance from excavator.
3.Barricade shall be 1m away from the excavation.
4.Ensure couplers are properly tight and verticle
pipes are secured properly to avoid fall in pit.
5.Look for vehicle movement.

6.Don't stand near edge of excavated pit.


7.Ensure no one in pit where barricading in progress
to avoid injury from fall of material from height.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO.- 42 ACTIVITY NAME : Safety Net fitting at sides of excavation. Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Risk level Risk level Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P IxP Control measures I P IxP Hazards Residual risk Action By

Biological Insect bite,personal injury. 4 3 12 1.Store safety net properly. 2 1 2 Physical hazard LOW Site engineer
hazards,Slip,trip,vehicle
movement. 2.Check safety net by long object to chek any
Safety Net insects
shifting like snakes,scopion are present.
3.Proper access shall be provided.

Safety Net fitting Fall in excavated pit or fall Personal injury. 4 4 16 1.Only trained workmen assigned for the job. 2 2 4 LOW Site engineer
from height,vehicle
movement,fall of loose 2.Hard barricating of pit to avoid fall in pit.
soil. 3.Proper signages to be displayed.
4.Ensure no inside excavated pit during net fitting
42

other than net fitting workmen.


5.Wear safety belt at the edge of excavated pit
during net fitting.
6.Ensure net shall be fitted with proper support or
iron bars on both sides.
7.Long ropes shall be tied in the bottom to stay
away from fall of loose soil during net fitting.
8.Inspect net before fitting for wear and tear.

Prepared By Reviewed By Approved By


Severity rating

Sr.No. Activity Hazards

1.Vehicle movement. 1.Struck by vehicle.

2.Hose connections. 1.Fall of material during handling.

2.Faulty tools.
44

3.Bulkar unloading. 1.Dust.

2.Pneumatic air.

3.Electical hazard.

Prepared By Reveiw
NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd

HIRA No.43 Activity:- Bulker unloading.

HIRA

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychol


Risk level
Risk involved I P
IxP

Personal injury

Personal injury.

3 3 9

Respiratory problem

Personal injury.

Electricution.

Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd

HIRA No.43 Activity:- Bulker unloading.

HIRA

Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Control measures I P Risk level IxP

1.Only licenced driver allowed.

2.Ensure vehicle documents and reverse horn working.

3.Area barricading to avoid unauthorised entry.

4.Provision of proper access to vehicle.

1.Handle material carefully.

2.Inspect hand tools before use.


2 1 2
3.Only competent person will do connections.

1.Area barricading.

2.Ensure connections are tight to avoid cement leak from pipe.

3.Use dust mask.

4.No cable joint allowed.Ensure connections fromELCB of 30ma.

Approved By
Rev,00

Date-

Page

Categories of Hazards Residual risk Action By

LOW P & Machinery incharge

Physical hazard
LOW P & Machinery incharge

LOW P & Machinery incharge


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.46 Activity:- Concrete production in batching plant.
Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk level Categories of
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Residual risk Action By
IxP Hazards

3 2 6 2 1 2
1.Aggregate and sand loading in 1.Vehicle movement. Personal injury 1.Only inducted persons allowed to work. LOW Plant Operator/

hopper by Backhoe excavator. 2.Work with valid permit to work. Plant & Machinary Incharge

2.Shifting of sand and aggregate by 1.Rotating parts. Entanglement. 3 2 6 1.All rotating parts shall be guarded. LOW Plant Operator/

conveyor belt to batcher. Plant & Machinary Incharge

3.Plant operation. 1.Unauthorised operating. Personal injury 1.Cabin shall be locked and key shall be with operator. Plant Operator/

Property damage. LOW Plant & Machinary Incharge

2.Slip,trip and fall. Personal injury. 1.Provision of hand rail to staircase to prevent fall.

2.No material shall be kept in access staircase.

5 4 20 3.No oil spillage or slippery steps.Ensure housekeeping maintained. 2 2 4

3.Electrical hazards. Electricution. 1.No damaged cables allowed.

2.Provision of earthing.

3.All electrical connections shall be from 30ma ELCB.


46
4.Rotating parts of mixture. Amputation. 1..All rotating parts shall be guarded.

2.Provision of trip guard to mixture

5.Unauthorised operating. Personal injury 1.Cabin shall be locked and key shall be with operator.

Property damage. 2.Authorised persons list to be displayed.


1.Work with valid work permit.
4.Chipping in mixture and maintainence. Rotating parts. Amputation. Plant Operator/
5 5 25 2 2 4
Fall from height. Fracture. 2.Ensure all rotating parts are guarded. Plant & Machinary Incharge

Electrical hazards. Electricution. 3.Use LOTO to ensure no one start plant during maintence. LOW

4.Ensure no electrical joint and open connections.

5.Only trainned personnel authorised for the job.

6.Ensure use of full body harness during height work.

5.Concrete filling in Transit mixer. Vehicle movement. Hit by vehicle. 1.Only trained driver with valid driving licence authorised to drive. Plant Operator/
2 1 2
3 2 6 2.Periodical inspection of vehicle. LOW Plant & Machinary Incharge

3.Ensure reverse horn is in working condition. Physical hazard

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00


HIRANo.47 Activity:- Tower crane operation(Wheel mounted.)
Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level IxP Residual risk Action By
Hazards

1.Mobilization of tower crane. 1.Toppling of crane. Personal injury,Property damage. 1.Only inducted operator with valid licence allowed to operate Site Engineer/

crane or towing vehicle. Engineer


3 2 6 2 1 2
2.Ensure proper access for crane movement. LOW

3.Work with valid work permit.

4.Only trained persons diployed for the job.

2.Installation of tower crane. 1.Toppling of crane. Personal injury. 1.The ground on which a tower crane stands has adequate Site Engineer/

2.Fall of person. Property damage load bearing capacity. Engineer


3.Pinch points. 2.Bases for tower cranes and trucks for rail-mounted tower

4.Hit by vehicle(F15). cranes are firm and levelled and such cranes are erected at a

5.Electrical hazards. reasonably safe distance from excavation and are operated within

6.Fall of counter weight. gradient limits as specified by the manufacturer of such cranes.
3.Tower cranes are sited where there is a clear space available for

erection,operation and dismantling of such crane.


4.where two or more tower cranes are sited and operated, every care

is taken to ensure positive and proper communication between

operators of such cranes to avoid any danger or dangerous occurrences.

5.the instructions of the manufacturer of a tower crane and standard safe LOW

practices regarding such crane are followed while operating and using

4 4 16 tower crane. 2 2 4
6.Safe work load shall be displayed on crane.

7.Area shall be barricated to avoid movement below tower crane.

8.Only trained persons shall be diployed for rigging of load.

9.TPI to be done and displayed.

10.Signal man shall be provided available during crane operation and shifting.

11.Provision of proper signages.

12.Pre-inpection shall be done as per checklist.

13.Work permit to be taken before start of work.

14 TBT and JSA training shall be conducted for operator,signalman. and riggers.

15.Ensure no damaged cable in use and connection is from 30ma ELCB.

16.Ensure counter weight shall be attached properly.

47 17.Use proper PPE like safety helmet,safety safety,reflective jacket and full body Physical hazard
harness for height work.

5.Concrete work by tower crane. 1.Fall of material. From height. Personal injury,Property damage. 1.Inspection of crane before start of work. Site Engineer/

2.Crane boom hit to person or 2.Only competent operator can operate crane. Supervisor

adjacent structure. 3.Ensure TBT and JSA training conducted for concerned persons.

3.Fall of person from height due 4.Area barricading and provision of signages to avoid movement of persons

to collision with crane below swinging load.

5.Ensure proper scaffolding provided for work. LOW


4 3 12 2 2 4
6.Ensure signalman use signals as per standard.

7.Ensure overhead amd side clerance for crane movement to avoid collision

of crane to ovehead structure,electrical cables and adjacent structure.

8.Ensure panel shall be locked when crane not in use to avoid unauthorised

operating.

9.Ensure electrical connection is from 30ma ELCB.

6.Material shifting by tower crane 1.Fall of material. Personal injury,Property damage. 1.Rigging of load by trained riggers.

2.Crane toppling. 2.Ensure wire rope sling or web sling to be used for lifting shall be inspected and LOW Site Engineer/

3.Struck to adjacent structure. of correct capacity for the load. Supervisor


4 3 12 2 2 4
3.Provision of barrication and signalman to avoid man movement below swinging

load.

4.Before starting work ensure crane swinging area is free to avoid collision.

7.Dismantling of tower crane 1.Fall of person Personal injury,Property damage. 1.Work permit to be taken before start of work activity. Site Engineer/

2.Topling of crane 2.Provision of training to all concerned persons. Supervisor

3.Electrical hazards. 3.Area to be barricading to avoid unauthorised entry.

4.Pinch points 4.Only competent persons shall be diployed for the job.

5.Fall material. 5.TBT shall be before start of work activity. LOW


4 4 16 2 2 4
6.Follow dismantling sequence.

7.Work activity should be under competent supervision.

8.Swich off power supply when not required.

9.Inspect F15(Farana) and verify documents.

10.Provision of signalman for dismantling activity.

11.Provide full body harness for height work and ensure anchored both hooks.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd


Rev,00
HIRA No.48 Activity:- Tower crane operation(Tractor mounted.)
Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level Categories of Residual risk Action By
IxP Hazards

1.Mobilization of tower crane. 1.Toppling of crane. Personal injury,Property damage. Only Competent operators to be deployed, competency certificate to be diplayed Site Engineer/
3 2 6 2 1 2
in crane. Engineer

2.Ensure proper access for crane movement.

3.Work with valid work permit. LOW

4.Only trained persons diployed for the job.

5.Ensure the area for the crane restricted for the others,

2.Installation of tower crane. 1.Toppling of crane. Personal injury. 1.The ground on which a tower crane stands has adequate Site Engineer/

2.Fall of person. Property damage load bearing capacity. Engineer


3.Pinch points. 2.Bases for tower cranes and trucks for rail-mounted tower LOW

4 3 12
4.Hit by vehicle(F15). cranes are firm and levelled and such cranes are erected at a 2 2 4

5.Electrical hazards. reasonably safe distance from excavation and are operated within

6.Fall of counter weight. gradient limits as specified by the manufacturer of such cranes.
3.Tower cranes are sited where there is a clear space available for

erection,operation and dismantling of such crane.


4.where two or more tower cranes are sited and operated, every care

is taken to ensure positive and proper communication between

operators of such cranes to avoid any danger or dangerous occurrences.

5.the instructions of the manufacturer of a tower crane and standard safe

practices regarding such crane are followed while operating and using

tower crane.

6.Safe work load shall be displayed on crane.

7.Area shall be barricated to avoid movement below tower crane.

8.Only trained persons shall be diployed for rigging of load.

9.TPI to be done and displayed.

10.Signal man shall be provided available during crane operation and shifting.

11.Provision of proper signages.

12.Pre-inpection shall be done as per checklist.

13.Work permit to be taken before start of work.

14 TBT and JSA training shall be conducted for operator,signalman. and riggers.

15.Ensure no damaged cable in use and connection is from 30ma ELCB.

16.Ensure counter weight shall be attached properly.

17Ensure the all manufactures, requirement to be followed for erection, installation

and operation.

18.Ensure all Limit swithces are working, All Wire ropes are not wear and tear and

good condition.

19.Ensure all motors working properly.


48 Physical hazard
20.Ensure Trolly mounted rails limit shwitches working properly,

21.Ensure arthing provided to crane and electrical panel.

22.Use proper PPE like safety helmet,safety safety,reflective jacket and full body

harness for height work.


4 3 12 2 1 2
5.Concrete work by tower crane. 1.Fall of material. From height. Personal injury,Property damage. 1.Inspection of crane before start of work. Site Engineer/

2.Crane boom hit to person or 2.Only competent operator can operate crane. Engineer

adjacent structure. 3.Ensure TBT and JSA training conducted for concerned persons. LOW

3.Fall of person from height due 4.Area barricading and provision of signages to avoid movement of persons

to collision with crane below swinging load.

5.Ensure proper scaffolding provided for work.

6.Ensure signalman use signals as per standard.

7.Ensure overhead amd side clerance for crane movement to avoid collision

of crane to ovehead structure,electrical cables and adjacent structure.

8.Ensure panel shall be locked when crane not in use to avoid unauthorised

operating.

9.Ensure electrical connection is from 30ma ELCB.

10.Provision of proper illumination during night work.


4 3 12 2 1 2
6.Material shifting by tower crane 1.Fall of material. Personal injury,Property damage. 1.Rigging of load by trained riggers.

2.Crane toppling. 2.Ensure wire rope sling or web sling to be used for lifting shall be inspected and

3.Struck to adjacent structure. of correct capacity for the load.

3.Provision of barrication and signalman to avoid man movement below swinging

load.

4.Before starting work ensure crane swinging area is free to avoid collision.

5.Ensure no worker movement below crane during material lifting.

6.Ensure all TPI skaal be done and shared. LOW

7.Remote condition shall be checked daily.

8.Ensure emrrgency switch working properly.

9.Load should not be carry beyond SWL.

10.Ensure guy rope is provided during material shifting.

11.JSA shall be communicated to crane operator and other concerned persons.

12.Emergency plan in case of emrgency of crane shall be communicated to all working

in that vicinity.

13 Area shall be cordonned off during work.

14.All lifting gears TPI shall be available.

15.Daily,Weekly ,monthly crane inspection shall be done as per schedule.

16.If any problem to crane inform immediately to concerned persons.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.49 Activity:- Telehandler operation. Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psycholosical
Risk level Categories of
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Residual risk Action By
IxP Hazards
1.Do not use machine for purposes other than approved by manufacturer. Physical hazard
Material shifting and Concrete work Incorrect or unauthorised use. Property damage, Site Enginner/
2.Do not carry passengers in cabin or on exterior of machine or attachments.
Overloading. Personal injury charts applied to the inside of the cabin of the machine. Supervisor.
3.Do not attempt to lift or carry loads greater than those defined on the load 2 1 2 LOW
4 3 12
Instability and overturnin

Striking against or collision 4.Only authorised operator allowed to operate machine.

Moving parts 5.Inspect machine before start work activity.

Fall of material from height. 6.Check area where machine will be operated for obstructions, adverse ground
conditions, overhanging or low structures, and vehicle and pedestrian traffic.
Fall of person from height.
7.Operators must wear PPE as required for site, and protective gloves when

handling loads, slings or attachments

8.Use only attachments provided with machine or approved by manufacturer.

9.Worn, broken, cracked or distorted components must not be used.

10.Follow specified procedures when fitting or removing attachments.


11.Ensure that attachments are securely fixed to machine, and cannot be

accidentally dislodged during operation of machine.


12.Space forks as wide as possible.
49
13.Do not overtighten locking screws

14.Do not raise boom on unstable or sloping ground.


15.Ensure that stabilisers are in contact with a firm,stable surface.

16.Hook must be securely attached.

17.Do not use machine if controls,lights or signals malfunction.

Ensure no one work below swinging load.

18.Do not attempt unauthorised repairs to load bearing parts.

Work at height in bucket . Fall of material from height. Property damage, 1.Ensure that attachments are securely fixed to machine, and cannot be Site Enginner/
4 4 16 2 2 4
Fall of person from height. Personal injury accidentally dislodged during operation of machine. Supervisor.

Striking against or collision 2.Only competent persons allowed to work at height. LOW

3.Inspect for overhead obstacle.

4.Use mandatory PPE's and specific PPE's like full body harness.

5.Ground codition shall be suitable for vehicle movement.

6.Not more than two persons allowed to work in bucket.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd


Rev,00
HIRA No.50 Activity:- Rebarring operation
Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level Categories of Residual risk Action By
IxP Hazards
1.Only competent person after induction allowed to work 2 2 4 Physical
Drilling operation Rotating part. Cut injury 4 3 12 hazard Site Enginner/
2.Work with valid work permit.
Electrical hazards Electricution Supervisor.
Flying particles. Eye injury 3.Pre-inspect equipment before start work.
4.Ensure no cable joint and equipment damaged.

5.Use mandatory PPE and job specific PPE like safety goggle.
6.All elctrical connections shall be from 30ma ELCB. LOW

7.TBT shall be conducted before stating work.

8.Provision of proper access for work.

1.MSDS shall be available and concerned persons shall be trained. 2 1 2


Filling of rebarring chemical and iron bars in the Chemical handling. Skin irritation 3 3 9 Site Enginner/
50 2.Inspect material for sharp edges and use cotton handgloves for work.
column hole. Sharp edges. Cut injury. Supervisor.
3.Avoid skin contact.

1.Provision of proper scaffolding for height work. 2 2 4


Work at height Fall from height Personal injury. 4 3 12 Site Enginner/

Material fall from height. 2.Scaffolding shall be used after inspection and tagging. Supervisor.
3.Work at height shall be under competent supervision. LOW

4.Only trained persons assigned for the height work.

5.Provide full body harness and ensure hook anchored properly during

work.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.51 Activity:-Lifeline fixing. Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level Categories of Residual risk Action By
IxP Hazards
Life line fittting for height work. 1.Fall of person from height. Fracture. 5 4 20 1.Only trained persons after induction and training deployed for a height work. 2 2 4 Physical hazard
2.Work with valid work permit.
2.Fall of material from height.
Site Engineer
3.Provision og proper access and scaffolding for life line fitting.

4.Ensure mandatory PPe and job specific PPE like full body harness shall be used for

lifeline fitting at height. LOW

5.Ensure life line shall be tied to rigid structure and proper knots shall be tied.
51
6.Don't use binding wire or sharp material to tie lifeline than can damage lifeline.
7.Lifeline sag shall not be more than 15 degree.
8.Ensure lifeline test certificate shall be availble.

9.Lifeline diametre should be more than 20mm.

10.Ensure no damged PP rope used for lifeline.

11.Inspect lifeline for excess wear,tear and for damage.


12.life fitting shall be under a continuous supervision.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA NO.- 52 ACTIVITY NAME : SHUTTERING & DESHUTTERING Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Hazards Residual risk Action By
52 Necessary materials  Vehicle hit to person. Injury to person 4 3 12  Induction Training will be conducting for all staff, workers 2 2 4 Physical hazard LOW
shifting from store yard to  Toppling of vehicle. property damage. before starting work.
work location by  Injury to person.  Appropriate PPEs (Safety Helmet, Shoes, Hand
vehicle /manually and  Collapse of stacked materials gloves,etc.) will be providing for worker.
stacking.  Efficient and effective supervision will be maintained
throughout the work.
 Proper access will be providing for man and vehicle
movement.
 Licensed driver only drive the vehicle.
 All vehicle documents will be verifying before starting the
work.
 Access will be clear from obstructions for man/vehicle Site Engineer/ Site
movement. Supervisor
 Over material loading will not allowing on vehicle.
 Materials will not stacking more than 5 feet height.

Scaffolding erection for  Fall of materials& objects Injury to person, 5 4 20  Working platform will be providing for height works. 2 2 4
column, beam and slab  Fall of person. property damage  Full body harness will be providing for above 1.8 Mtr.
 Collapse of scaffold Height.
 Area will be barricading for unauthorised entry.
 Efficient and effective supervision will be maintained
throughout the work.
 Material lifting and lowering will be carried out by
manually/Rope or tower crane.
 Loose materials will clear from working platform.
 Adequate illumination will be providing for night works.
 Approved design will be following for slab scaffolding.
 Supporting and tie will be providing as per approved
design. Site Engineer/ Site
 Appropriate PPEs (Safety Helmet, Shoes, Hand gloves, Supervisor
Full body harness etc.) will be providing for worker.

Making and fixing of  Fall of materials. Injury to person 4 4 16  Appropriate PPEs (Safety Helmet, Shoes, Hand gloves,
shuttering  Fall of person. property damage. Nose mask,Full body harness etc.) will be providing for
board(Shuttering) as per  Electrocution. worker.
size of the footing, beam  Flying of wooden particles  Scaffolding platform with access will be providing for
column and slab.  Projected nail/Steel rod. height works.(lLedger at 500mm distance from one side)
 Faulty tools/equipments.  Area will be barricading for unauthorised entry.
 Poor housekeeping  Joint free cables will be using for all electrical hand tools
and equipments.
 All hand tools will be inspecting and tagging done before
starting works.
 Shuttering board making activities will be doing only in
shuttering yard .
Appropriate PPEs (Safety Helmet, Shoes, Hand gloves, Nose
mask, Full body harness etc.) will be providing for worker.

 Scaffolding platform with access will be providing for


height works.
 Full body harness will be providing for above 1.8 Mtr.
Height.
 Area will be barricading for unauthorised entry.
 Joint free cables will be using for all electrical hand tools Site Engineer/ Site
and equipments. Efficient and effective supervision will be Supervisor
maintained throughout the work.
 Throwing of materials will not allow.
 Material lifting and lowering will be carried out by
manually/Rope.
 Loose materials will clear from working platform.
 Adequate illumination will be providing for night works.
 Electrical hand tools will be inspecting before start the
work.
 All electrical hand tools connection will be go thorough
30MA ELCB/RCCB only.
 Authorised electrician only does the electrical
connections.
 Safety signages will be displayed at work location.
 All hand tools will be inspecting and tagging done before
starting works.
 Shuttering board making activities will be doing only in
shuttering yard.
 Rebar caps will be providing for projected steel rod.
 Projected nails will be bending/ removing from ply and
also store in separate wooden box.

De shuttering of  Injury to person. 5 4 20  Appropriate PPEs will be providing for worker. 2 2 4 LOW
Footing, Beam and  Fall of materials& objects  Working platform will be providing for height works.
column  Fall of person.  Full body harness will be providing for work above 1.8
Mtr. Height.
 Scaffolding will be providing for above 1.8 mtr. Height as
per standard.
 Area will be barricading for unauthorised entry.
 Efficient and effective supervision will be maintained
throughout the work.
 Throwing of materials will not allow.
 Material lifting and lowering will be carried out by
manually/Rope or tower crane.
 Loose materials will clear from working platform.
 Adequate illumination will be providing for night works. Site Engineer/ Site
 Materials will not stacking more than 1.5 m height. Supervisor
 Necessary work permits will be takenbefore starting
works.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd


Rev,00
HIRA No.47 Activity:- Tower crane operation(Wheel mounted.)
Date-
HIRA
Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Risk level Risk level


Sr.No. Activity Hazards Risk involved I P IxP Control measures I P IxP Categories of Hazards Residual risk Action By

1.Mobilization of tower crane. 1.Toppling of crane. Personal injury,Property damage. 1.Only Competent operators to be deployed, competency certificate to be diplayed at Crane, Site Engineer/

Ensure the area for the crane restricted for the others. Engineer

2.Ensure proper access for crane movement. LOW

3.Work with valid work permit.

4.Only trained persons diployed for the job.

2.Installation of tower crane. 1.Toppling of crane. Personal injury. 1.The ground on which a tower crane stands has adequate Site Engineer/

2.Fall of person. Property damage load bearing capacity. Engineer


3.Pinch points. 2.Bases for tower cranes and trucks for rail-mounted tower LOW

4.Hit by vehicle(F15). cranes are firm and levelled and such cranes are erected at a

5.Electrical hazards. reasonably safe distance from excavation and are operated within

6.Fall of counter weight. gradient limits as specified by the manufacturer of such cranes.
3.Tower cranes are sited where there is a clear space available for

erection,operation and dismantling of such crane.

4.where two or more tower cranes are sited and operated, every care

is taken to ensure positive and proper communication between

operators of such cranes to avoid any danger or dangerous occurrences.

5.the instructions of the manufacturer of a tower crane and standard safe

practices regarding such crane are followed while operating and using

tower crane.

6.Safe work load shall be displayed on crane.

7.Area shall be barricated to avoid movement below tower crane.

8.Only trained persons shall be diployed for rigging of load.

9.TPI to be done and displayed.

10.Signal man shall be provided available during crane operation and shifting.

11.Provision of proper signages.

12.Pre-inpection shall be done as per checklist.

13.Work permit to be taken before start of work.

14 TBT and JSA training shall be conducted for operator,signalman. and riggers.

15.Ensure no damaged cable in use and connection is from 30ma ELCB.

16.Ensure counter weight shall be attached properly.

17.Use proper PPE like safety helmet,safety safety,reflective jacket and full body

harness for height work.

18.Liifting plan for counter weight shall be shared.

19.Ensure the all manufactures, requirement to be followed for erection, installations, and operation,

20.Ensure all TPIs to be done and shared.


47 Physical hazard
21.Ensure all Limit swithces are working, All Wire ropes are not wear and tear and good conditions,

Ensure all the Motors are working properly,


22.Ensure the power supply for the crane is seperately provided and ensure the standby supply for
the cranes,

23.Ensure the only competent operator and Flagman deployed in the activity

24.All lifting gears, buckets, radius, etc marked SWL,

25.Ensure the counter weight as per the manufactures instruction and specifications.

5.Concrete work by tower crane. 1.Fall of material. From heigPersonal injury,Property damage. 1.Inspection of crane before start of work. Site Engineer/

Ensure crane material movement identified and explained to all concerned persons and people

working for that area related hazards and Risk and Control Measures,

Lifting plan should be shared for the Counter weight fixing,

2.Load sould be carry as per the not SWL

2.Crane boom hit to person or 3.Only competent operator can operate crane. LOW Engineer

adjacent structure. 4.Ensure TBT and JSA training conducted for concerned persons.

3.Fall of person from height due 5.Area barricading and provision of signages to avoid movement of persons

to collision with crane below swinging load.

4.Wind effect. 6.Ensure proper scaffolding provided for work.

7.Ensure signalman use signals as per standard.

8.Ensure overhead amd side clerance for crane movement to avoid collision

of crane to ovehead structure,electrical cables and adjacent structure.

9.Ensure panel shall be locked when crane not in use to avoid unauthorised

operating.

10.Ensure electrical connection is from 30ma ELCB.

11.Emergency power cutoff sitiuation, and manual release of load should be know to operators,

12.Cease operation when win speed is excess of the limit.

6.Material shifting by tower crane1.Fall of material. Personal injury,Property damage. 1.Rigging of load by trained riggers.

2.Crane toppling. 2.Ensure wire rope sling or web sling to be used for lifting shall be inspected and

3.Struck to adjacent structure. of correct capacity for the load. LOW

3.Provision of barrication and signalman to avoid man movement below swinging

load.

4.Before starting work ensure crane swinging area is free to avoid collision.

5.Ensure there is no loose material shifting with the crane

6.Emergency power cutoff sitiuation, and manual release of load should be know to operators,

7.Ensure the collision points to be identified and ensure the load should not be near from that,

8.Ensure JSA is communicated to operator and other persons working in the vicinity

9Ensure remote is working condition and checked daily.

10.No person other than operator can operate crane.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA NO.- 53 ACTIVITY NAME :Groove cutting for conduit pipe. Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Residual risk Action By
Hazards
Rotating Cut injury,Electricution. 3 2 6 1.Ensure machine is diconnected during 2 1 2 Physical hazard LOW Site engineer/Site
part,Electrical inspection. supervisor
Inspection of hazards. 2.RPM for machine and wheel to be
grinder. checked.Wheel with proper rpm to be used.

Flying Eye injury,cut injury due to 4 4 16 1.Competent operator should be diployed. 2 2 4 LOW Site engineer/Site
particles,rotating rotating parts,electricution. 2.Work with valid work permit. supervisor
parts,electrical 3.Check electrical connection.No damaged cable
hazards,dust. or damaged machine parts allowed to operate.
4.Ensure
double insulate sign displayed on machine.
5.30 ma ELCB
should be available. 6.Ensure
machine guard is available. 7.No
flammable or combustible material available when
there is chance of spark by power tools.
8. Provision of proper
53 Groove PPE like safety goggle,hard hat,safety
cutting shoes,hearing protection if sound level is more
than 85 Decible.
9.Ensure dust guard is available to machine.
10.Only machine with inspected tag permitted for
work.

Change of Electricution,rotating Electricution,cut injury. 4 3 12 1.Ensure machine is diconnected during changing 2 1 2 LOW
wheel power parts, of wheel or drill bit.
tool. 2.Only competent operator allowed to change
wheel or drill bit.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA NO.- 54 ACTIVITY NAME :Anti-termite operation Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Categories of Residual risk Action By
Hazards
Untrained person Exposure to chemical due to 1.Person shall be deployed after induction and Chemical and LOW Site engineer/Site
lack of awareness. training. physical hazard supervisor
2.Identify the chemical storage and MSDS shall be
displayed.

Skin contact with Skin irritation 1.Work with valid work permit. LOW Site engineer/Site
chemical during 2.Follow MSDS for handling of chemical. 3.Use supervisor
mixing of chemical. rubber handgloves during chemical handling.

Inhalation of Prolonged exposure lead to 1.Use mask and safety goggle to prevent exposure. LOW Site engineer/Site
chemical and eye lung disease and eye 2.Wash supervisor
54 Anti-termite contact during ittitation,personal injury. 4 3 12 hand with soap to after anti-trermite treatment. 2 1 2
activity applying 3.Precautions
chemical,slip,trip,ma shall be taken to avoid mixing of chemical in drinking
terial fall from water and in eating iteams during spraying.
height. 4.Provision of proper
access. 5.Housekeeping to
maintained to avoid trip hazards.
6.Provision of proper
barricading and signages to give aware of overhead
hazard. 7.All openings shall be
closed.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO:-55 ACTIVITY NAME : Concrete work by concrete pump Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


RISK Categories of
Sr. No ACTIVITY HAZARD INVOLVED I P Risk level IxP Control measures I P Risk level IxP Hazards Residual risk Action By

1. Only trained persons allow for erection of pipeline


work. 2.
Provide close supervision during the work.
3. Provide & ensure use of PPE’s like safety helmet,
safety shoes, safety belt & safety jacket.
4. Area should be barricaded.
5. Provide & ensure use of rope for lifting & lowering
Erection of Injury to pipe.
Fall of concrete pipe, Person, Site Engineer/ Site
scaffolding for Fall of person from height. Property 5 4 20 6. Provide proper Access & working platform with 2 2 4 LOW Supervisor
concrete pipe line Scaffold.
damage. 7. Pipe line should be inspected for proper fixing
before taking in to use. 8.Ensure
TPI should be done for concrete pump. 9.Provide
proper scaffolding and locking for concrete pipeline.
10.Ensure concrete
pipes shall be connected properly by clamp and
interlocked to scaffold or column.

1. Improper fixing of flanges - Injury to 4 4 16 1. Only trained & experienced operator should allow
sudden removal of pipe, person, to fix the pump.
Brusting of pipe Property 2. Inspect the pump, Pipes & its accessories before
2. Accidental movement during damage. fixing.
installaton & operation, 3. Inspect area & should be fixed on leveled & on
3. Unautherised entry. firm ground.
Installation & 4. Unguarded parts, 4. Area should be barricaded before starting the
5. Fire hazard. pump. Site Engineer/ Site
operating of Supervisor
concrete pump 5. fire extinguisher should be made available.
physical and
55 ergonomical hazard

1. Only licensed & autherised operator should


Injury to
Pouring of concrete Movement of transist mixer - person , operate the TM.
in pump By Transist May hit to pump, installtion & 4 3 12 2. Provide helper / Signalman to guide the TM. 2 1 2 LOW
Mixer. near by person Property 3. Provide proper illumination during night work.
damage
4. Provide proper access to TM.

1. TBT should be conducted before starting the


work.
Injury to 2. Provide close supervision during work.
Concrete work by Concrete may come in contact person, Eye & 3. Provide & ensure use of ppe’s like safety helmet, 2 Site Engineer/ Site
concrete pump. with Skin & eye 3 3 9 1 2 LOW Supervisor
skin irritation safety shoes / Gum shoes, safety belt, safety jacket,
rubber hand gloves, Safety goggles.

1.Inspect vibrator before use. Site Engineer/ Site


Use of vibrator. Electrical hazards. Electricution 4 2 8 2.Ensure no electical cable has a joint and industrial 2 1 2 LOW
top shall be used. Supervisor

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.56 Activity:- Dismantling of self erected tower crane Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Sr.No. Activity Hazards Risk involved I P Risk level Control measures I P Risk level IxP Categories of Residual risk Action By
IxP Hazards

3 9
Lowering of jib. Jib hit to person,collision with Personal injury,Property damage. 3 1.Work permit to be taken before start of work activity. Site Engineer/

other structure. 2.Provision of training to all concerned persons. Supervisor

3.Area to be barricading to avoid unauthorised entry.

4.Only competent persons shall be diployed for the job. LOW

5.TBT shall be before start of work activity.

6.Follow sequence for lowering of jib.

7.Work activity should be under competent supervision.

8.Swich off power supply when not required.

9.Area barricading to avoid unauthorised entry.


Lowering of mast. Fall of person from height,fall of Personal injury,property damage.
material from height. 4 4 16 1.Inspection of mobile crane (F15).
Site Engineer/
56 Physical hazard
2.Ensure area shall be clear for mobile crane(F15) movement. Supervisor

3.Ensure full body harness provided to concered persons for

height work. LOW

4.Ensure correct hand tools used for activity.


Removing of counter weight. Fall of material,toppling of Personal injury,property damage.
4 4 16 1.Ensure all lifting tools and tackles inspected before use. Site Engineer/

F15,fall of person from height. 2.Ensure correct capacity lifting used as per lifting plan. Supervisor

3.Ensure full body harness shall be used and anchored during LOW

rigging of load at height.

4.Guide rope shall be used for shifting of load.


Removing of outridger. Pinch points. Personal injury. 3 2 6 1.Ensure follow sequence during removing outridgers.
LOW Site Engineer/
2.Competent persons shall be diployed for the job.
Supervisor

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00
HIRA No.57 Activity:- Painting work Date-
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk level Categories of
Sr.No. Activity Hazards Risk involved I P Control measures I P Risk level IxP Residual risk Action By
IxP Hazards
Shifting of material Fall of material,slip and trip. Personal injury & property 1.Housekeeping to be maintained. Site supervisor/
Damage,muscle strain. 3 2 6 2.For heavy load use mechanical aids for litfing. 2 1 2 LOW Site Engineer
3.Use PPE like cotton handgloves ,Safety helmet and
safety shoes.
4.Use safe lifting technique.
5.Strech before work.
6.Maintain posture.
7.work with valid work permit.
8.Perons shall be diployed after induction and training.
Cleaning of workpeace Flying particles,electrical hazard, Eye injury,electricution, 4 3 12 1.Use safety goggle to avoid eye injury. 2 1 2 Site supervisor/
manually or by grinder. sharp objects. cut injury. 2.No electrical cable joint allowed. LOW Site Engineer
3.All electrical connections are from 30ma ELCB.
4.Inspect object for sharp edges. Physical and
57 chemical hazard
5.Use cotton handgloves to avoid cut injury.
Painting at height. Fall of person,fall of material. Personal injury and 4 4 16 1.Work permit to be followed. 2 2 4 Site supervisor/
property damage. 2.Provision of proper scaffolding and start work after LOW Site Engineer
inspection of scaffold.
3.Height work training to be provided for conerned persons.
4.Provision of lifeline where required.
5.Provide safety belt and ensure safety belt anchored
during height work above 1.8m.
6.Provision of proper access.
Storage of paint. Spillage,fire. Personal injury,property 4 3 12 1.Store in dry and ventillated area. 2 2 4 LOW Site supervisor/
damage. 2.Keep away from spark,heat and open flames. Site Engineer
3.Keep containers closed not in use.
4.Provision of fire extinguisher at storage area.

Prepared By Reveiwed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA NO:-58 ACTIVITY NAME :Material shifting Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Hazards Residual risk Action By
Material shifting 1.Fall of material . Personal injury and 1.Ensure only trained operator deployed for the 2 2 4 Physical hazard LOW
(Reinforced and 2.Crane toppling. propery work.
shuttering material )by 3.Struck to adjacent damage,electricution. 2.Rigging of load by trained riggers.
tower crane on 2nd and structure. 3.Ensure wire rope sling or web sling to be used for
4th slab. 4.Eletrical hazard. lifting shall be inspected before use and correct
capacity for the load.
4.Provision of barricading and signalman to avoid
manmovement below crane.
5.Before starting work ensure crane swinging area is
free to avoid collision. 6.In Site suprvisor/Site
4 4 16 emergency cut off situation ensure operator should engineer
know how to manually release load.
7.Ensure JSA is
communicated to operator and persons working in
the vicinity.

Manual material shifting 1.Fall of material . Personal injury and 4 4 16 1.Ensure proper scaffolding and lifeline provided for 2 2 4 LOW
58 to 5th and 6th slab. 2.Fall of person propery damage. material shifting. 2.Use PP rope
(Reinforced bars and wherever required for material shifting at height to
shuttering material) avoid material fall. 3.Ensure lifeline and and
full body harness used during material shifting at Site suprvisor/Site
height. 4.Don't stack materail at the engineer
edge of the slab.

Material shifting by 1.Fall of materail. 1.Personal injury.


electrical winch.(Brick , 2.Electrical hazards. 2.Electricution
cement bags and other 3.Rotating parts. 1.Provision of proper scaffolding for material
loose material) shifting.
2.Area shall be barricaded.
3.Only competent persons after training shall be
assigned for the job. Site suprvisor/Site
4 3 12 4.Electrical connection should be from 30ma ELCB. 2 1 2 LOW engineer
5.No
dammaged elctrical connections allowed. 6.All
rorating parts shall be guarded.

Prepared By Reviewed By Approved By


NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd Rev,00

HIRA:-59 ACTIVITY NAME : Evaporator slab casting. Date-

HIRA Page

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Hazards Residual risk Action By
Erection of scaffold for Fall of concrete pipe, Injury to Person, 5 4 20 1. Only trained persons allow for erection of pipeline 2 2 4 Physical LOW
concrete pipeline. Fall of person from Property damage. work. 2. hazard
height. Provide close supervision during the work.
3. Provide & ensure use of PPE’s like safety helmet,
safety shoes, safety belt & safety jacket.
4. Area should be barricaded.
5. Provide & ensure use of rope for lifting & lowering
pipe.
6. Provide proper Access & working platform with
Scaffold.
7. Pipe line should be inspected for proper fixing
before taking in to use. 8.Ensure
TPI should be done for concrete pump. 9.Provide Site supervisor/Site
proper scaffolding and locking for concrete pipeline. engineer
10.Ensure concrete
pipes shall be connected properly by clamp and
interlocked to scaffold or column.

Installation & operating 1. Improper fixing of Injury to Person, 1. Only trained & experienced operator should allow LOW
of concrete pump flanges - sudden removal Property damage. to fix the pump.
of pipe, 2. Inspect the pump, Pipes & its accessories before
Brusting of pipe fixing.
2. Accidental movement 3. Inspect area & should be fixed on leveled & on
during installaton & firm ground.
operation, 4. Area should be barricaded before starting the
3. Unautherised entry. pump. Site suprvisor/Site
4. Unguarded parts, engineer

59 Pouring of concrete in Movement of transist Injury to person , 4 3 12 1. Only licensed & autherised operator should 2 1 2 LOW
pump By Transist Mixer. mixer - May hit to pump, Property damage operate the TM.
installtion & near by 2. Provide helper / Signalman to guide the TM.
person 3. Provide proper illumination during night work.
4. Provide proper access to TM.
Site suprvisor/Site
engineer

Slab casting work. Fall of person,fall of Injury to person, Eye & 5 4 20


material,Concrete may skin irritation
come in contact with Skin 1. TBT should be conducted before starting the
& eye work.
2. Provide close supervision during work.
3.Provision of hard barricading around all periphery
of slab and slab cutouts. 4.Provision Site Engineer/ Site
of proper access. 5.Inspect 2 2 4 Supervisor
saffold and support.
3. Provide & ensure use of ppe’s like safety helmet,
safety shoes / Gum shoes, safety belt, safety jacket,
rubber hand gloves, Safety goggles.

Use of vibrator. Electrical hazards. Electricution 4 3 12 1.Inspect vibrator before use. 2 1 2


2.Ensure no electical cable has a joint and industrial
top shall be used.

Site Engineer/ Site


Supervisor

Dismantling of pipes and Fall of person and fall of Fracture,personal 5 4 20 1.Sequence of dismantling shall be followed. 2 2 4 LOW
scaffold. material. injury. 2.Ensure provision of proper Scaffolding platform for
height work. 3.Ensure
permit to work shall be followed. 4.Material
trowing from height not allowed.use rope to down
pipes or other material. 5.Use appropriate
PPE for height work. Site Engineer/ Site
Supervisor

Prepared By Reviewed By Approved By


HIRA NO:-60

Severity rating = I , Probability Rati


Sr. No ACTIVITY HAZARD RISK INVOLVED I
Entry and Exit Falling from height Physical injury 3

Shuttering and de- Lack of space,Low oxygen Asphyxiation,physical 4


shuttering work. percent,low injury,electrucution.
visibility,electrical
hazard,fall of material.

60

Water proofing work. Slipery floor,low oxygen Physical 4


percent,low injury,Asphyxiation,ele
visibility,Electrical ctrical
hazard,use of chemicals. shock,posisoning due
to chemical.

Prepared By
Prepared By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd

HIRA NO:-60 ACTIVITY NAME :Confined space

HIRA

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


P Risk level IxP Control measures I
3 9 1. Only trained persons allow for work. 2
2. Provide close supervision
during the work.
3. Provision of proper access and egress.
4.Provison of barricading to prevent fall of person
from opening of confined space.
5. Entry and exit register to be maintained.

4 16 1.Provision for entry and egress maintained.


2.Oxygen to be checked before start of work inside
pit. 3.Provision of
enough lighting. 4.Ensure all
connections through 30ma ELCB. 5.Ensure all
equipmented tested and tagged. 6.Damaged
cables not allowed. 7.Lone
working not allowed in confined space. 8.Ensure 2
provision of proper scaffold for shutttering work and
ensure proper support provided.

4 16 1.Provision of proper access. 2


2.Only trained persons diployed for the job.
3.Oxygen pecentage shall be checked before entry
and recorded.
4.Communication system shall be developed for
inside and outside person. 5.All
electical connections shall be checked and ensure no
damaged cables. 6.MSDS for
all chemical shall be available and persons shall be
trained for handling of chemicals.

Prepared By Reviewed By Approved By


Prepared By Reviewed By Approved By
Rev,00

Date-

Page

al/Psychological
Categories of
P Risk level IxP Hazards Residual risk Action By
1 2 Physical hazard LOW

Site supervisor/Site
engineer

LOW

Site suprvisor/Site
2 4
engineer

2 4 LOW

Site suprvisor/Site
engineer

Approved By
Approved By
HIRA NO.:-61

Severity rating = I , Probability


Sr. No ACTIVITY HAZARD RISK INVOLVED I P
Erection of scaffold. Fall of person and fall of Physical injury, 5 4
material. Property damage.

Shuttering and de- Fall of material,fall of Physical injury and 5 4


shuttering work. person,Electrical property damage.
61 hazards,rotating parts.

Prepared By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd

HIRA NO.:-61 ACTIVITY NAME : Shuttering and de-shuttering.

HIRA

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological


Risk level
Control measures I
IxP
20 1. Only trained persons allow for scaffolding erection. 2
2. Provide close supervision during the work.
3. Provide & ensure use of PPE’s like safety helmet, safety shoes, safety belt & safety
jacket.
4.Provision of proper access.
6.Ensure scaffold is propely interlocked.
7.Ensure railing and proper platform provided for work.
08.Ensure connector pins are used.
09.Esure area shall be barricaded to avoid
unauthoriesd entry.

20 1.Scaffolding platform with access will be providing for height works. 2. Full 2
body harness will be providing for above 1.8 Mtr. Height.
3. Area will be barricading for unauthorised entry.
3. Joint free cables will be using for all electrical hand tools and equipments. 4
Efficient and effective supervision will be maintained throughout the work.
5. Throwing of materials will not allow.
6. Material lifting and lowering will be carried out manually by rope.
7. Loose materials will clear from working platform.
8. Adequate illumination will be providing for night works.
9. Electrical hand tools will be inspecting before start the work.
10. All electrical hand tools connection will be go thorough 30MA ELCB/RCCB only.
11. All hand tools will be inspecting and tagging done before starting works.

Prepared By Reviewed By Approved By


Rev,00

Date-

Page

hological
P Risk level IxP Categories of Hazards Residual risk Action By
2 4 Physical hazard LOW

Site
supervisor/S
ite engineer

2 4 LOW

Site
Engineer/
Site
Supervisor

ved By
Sever
Sr.No. Activity Hazards Risk involved I

1.Installation of crane. 1.Fall of material Physical injury. 4


2.Fall of person. Property damage
3.Pinch points.
4.Electrical hazards.

Material lifting. 1.Fall of material. Physial injury, 5


62 2.Fall of person. Property damage
3.Electical hazards.
4.Toppling of crane.
5.Breaking of wire rope.
6.Rotating parts.

Prepared By Reveiwed By
NIYATI ENGINEERING PVT. LTD.
Site: Saint Gobain Weber industries Pvt.Ltd
HIRA No.62 Activity:- Mini crane
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psycholog
Risk level
P
IxP
4 16

4 20

Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
Site: Saint Gobain Weber industries Pvt.Ltd
HIRA No.62 Activity:- Mini crane
HIRA
rity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures

1.Only trained persons assigned for the job.


2.Inspect power tools and hand tools before use.
3.Ensure barricading area below mini crane to be installed.
4.Ensure edge protection.
5.Ensure joint free cables and electrical connection is from 30ma ELCB.
6.Ensure foundation is fastened properly.
7.Counter weight shall be attached as per requirement.
8.Ensure safe work load.shall be marked on crane.

1.TPI to be done and displayed on crane.


2.Ensure authorised person diployed after training and authorised operator's name shall be
displayed.
3.Operator shall inspect crane daily.
4.Ensure hard barricading is provided and workers working at the adge shall use full body harness.
5.Ensure cable routed properly and no damaged cables in use.
6.Ensure body eathing shall be provided.
7.Ensure all rotating parts shall be guarded.
8.Lift material as per SWL marked on crane.

Approved By
Rev,00
Date-
Page
l
Risk level Categories of
I P Residual risk Action By
IxP Hazards
2 2 4 Site Engineer/
Engineer

LOW

2 1 2 Site Engineer/
Physical hazard Site Supervisor.

LOW
Severity ratin

Sr.No. Activity Hazards

1.Rolling shutter material 1.Sharp edges.


shifting. 2.Fall of person.
3.Fall of material

2.Drilling operation to fit 1.Faulty drilling machine .


end plates. 2.Damaged electrical cables.
3.Sharp edges of drill.
4.Fall from height.
63

3.Welding. 1.Hot object.


2.Fire
3.Electrical Hazard.
4.Fall from height.
5.Material fall from height.

4.Finishing by grinder. 1.Rotating part.


2.Breaking of grinding wheel.
3.Electrical Hazard.
4.Flying particles.

Prepared By Reveiwed By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.63 Activity:-Rolling shutter fitting.
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/E
Risk level
Risk involved I P IxP

Physical injury. 3 3 9
Property damage

Physial injury, 4 3 12
Electricution.
Cut injury.

Burn injury 4 4 16
Property damage
Electricution.
Physical injury.

Cut injury. 4 3 12
Electricution.
Injury to eye due
to flying particles.

Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.63 Activity:-Rolling shutter fitting.
HIRA
ility Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological

Control measures

1.Only trained persons assigned for the job after induction.


2.Inspect material for sharp edges and use cotton handgloves during material shifting.
3.Ensure proper access is provided and obstacle free.
4.Ensure material properly hod and adequate manpower to lift heavy load to avoid fall of material
during shifting.
1.Inspection and tagging of machine by authorised person before use.
2.Ensure trained person deployed for the task.
3.Ensure no damaged electrical cables in use.
4.Ensure drill machine and electrical cables are double insulated.
5.Ensure all electrical connections through 30ma ELCB.
6.Ensure machine is swithed off during change of drill or drill bit.
7.Do not touch drill when in motion.
8.Ensure proper scaffold provision for work at height.
9.Ensure provision and use of full body harness for height work.
1.Use of leather appron,leather handgloves and welding faceshield to prevent burn injuries.
2.Ensure flammable and combustible material removed from work area to avoid fire.
3.Ensure no damaged electrical cables and faulty connections in use.
4.Ensure all connections through 30ma ELCB.
5.For welding at height provide proper scaffold and work platform.
6.For height work ensure full body harness is provided.
7.Ensure fire extinguisher shall be available at work location.
1.Ensure machine guard is available.
2.Ensure specific rpm grinding wheel is used as per grinder.
3.Ensure no damaged electrical connections and faulty connections in use.
4.Use faceshield or safety goggle during grinding work.

Approved By
Rev,00
Date-
Page
gical

I Risk level Categories Residual Action By


P IxP of Hazards risk

2 1 2 Low Site Engineer/


Engineer

2 2 4 Low Site Engineer/


Site Supervisor.

2 2 4 Low Site Engineer/


Site Supervisor.

2 1 2 Low Site Engineer/


Site Supervisor.
Severity rating = I , Proba
Sr.No. Activity Hazards
1.Core cutting by core drill. 1.Rotating part.
2.Sharp edges.
3.Electrical Hazard.
4.Flying particles.
5.Fall of material.
6.Fall of person from height.
7.Dust.

64 2.Core cutting core saw 1.Rotating part.


machine. 2.Sharp edges.
3.Electrical Hazard.
4.Flying particles.
5.Fall of material from height.
6.Fall of person from height.
7.Dust

Prepared By Reveiwed By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.64 Activity:- Core cutting.
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biol
Risk level
Risk involved I P IxP
Cut injury. 4 4 16
Electricution.
Injury to eye due to
flying particles.
Physical injury.
Property damage

Physial injury, 5 4 20
Electricution.
Cut injury.
Property damage

Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.64 Activity:- Core cutting.
HIRA
ng =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures I P

1.Only trained persons assigned for the job after induction. 2 1


2.Inspect machine before use.
3.Ensure rotating parts are guarded.
4.Ensure machine is swithed off during change of drill or drill bit.
5.Ensure no damaged electrical cables in use.
6.Ensure drill machine and electrical cables are double insulated.
7.Ensure all electrical connections through 30ma ELCB.
8.Use safety goggle to avoid injury due to flying particles.
9.Ensure area is barricaded properly and signages displayed.
10.Provision of proper scaffold and work platform for height work.
11.Provide and use full body harness during height work.
12.Use mask to prevent from dust.
1.Inspection and tagging of machine by authorised person before use. 2 2
2.Ensure trained person deployed for the task.
3.Ensure no damaged electrical cables in use.
4 Electrical cables are double insulated and body earthing provided to machine.
5.Ensure all electrical connections through 30ma ELCB.
6.Ensure machine is swithed off during change of wheel or during maintenance.
7.Ensure all rotating parts are properly guarded.
8.Area shall be barricaded and signages to be displayed.
9.Ensure portion of slab to be cut is sceured properly to avoid fall.
10.Provision of proper scaffold and work platform for height work.
11.Use safety goggle to avoid eye injury due to flying particles.
12.Use mask to prevent from dust.

Approved By
Rev,00
Date-
Page

Risk level Residual


Categories of Hazards Action By
IxP risk
2 Physical hazard Low Site Engineer/
Engineer

4 Physical hazard Low Site Engineer/


Site Supervisor.
Severity
Sr.No. Activity Hazards
1.Shifting of glass and 1.Sharp edges.
window frames. 2.Fall of person.
3.Fall of material.

2.Fixing of window frames 1.Rotating part.


by drill machine. 2.Sharp edges.
3.Electrical Hazard.
65 4.Flying particles.
5.Fall of material from height.
6.Fall of person from height.

3.Fixing of glass. 1.Sharp edges.


2.Fall of material.
3.Fall of person.

Prepared By Reviewed By
NIYATI ENGINEERING PVT. LTD.

PROJECT: Saint Gobain Weber industries Pvt.Ltd


HIRA No.65 Activity:- Window and glass fitting.

HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonom
Risk level
Risk involved I P IxP
Cut injury. 3 2 6
Physical injury.
Property damage.

Physial injury, 4 3 12
Electricution.
Cut injury.
Property damage

Physical injury. 3 3 9
Property damage.

Reviewed By Approved By
NIYATI ENGINEERING PVT. LTD.

OJECT: Saint Gobain Weber industries Pvt.Ltd


No.65 Activity:- Window and glass fitting.

HIRA
lity Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures I

1.Only inducted person after training shall be assigned for the job. 2
2.Inspect material for sharp edges.
3.Use cotton handgloves during work.
4.Ensure proper access is provided and no obstacles to avoid trip hazard.
5.Work with valid work permit.
1.Inspection and tagging of machine by authorised person before use. 2
2.Ensure trained person deployed for the task.
3.Ensure no damaged electrical cables in use.
4 Electrical cables are double insulated and body earthing provided to machine.
5.Ensure all electrical connections through 30ma ELCB.
6.Area shall be barricaded and signages to be displayed.
10.Provision of proper scaffold and work platform for height work.
11.Use safety goggle to avoid eye injury due to flying particles.
1.Provision of proper access for work. 2
2.Ensure proper scaffolding is provided for work at height.
3.Ensure use of full body harness and cotton handgloves during work.
4.Ensure area is barricaded.

Approved By
Rev,00

Date-

Page

Risk level Categories Residual


P Action By
IxP of Hazards risk
1 2 Physical Low Site Engineer/
Site Supervisor.

2 4 Physical Low Site Engineer/


Site Supervisor.

1 2 Physical Low Site Engineer/


Site Supervisor.
PR

HIRA NO:-66

Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergo


Risk level
Sr. No ACTIVITY HAZARD RISK INVOLVED I
IxP
Erection of scaffold. Fall of person and fall of Physical injury, 5 20
material. Property damage.

Shuttering and de- Fall of material,fall of Physical injury and 4 16


shuttering work. person,Electrical property damage.
hazards,rotating parts.
66

Prepared By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd

HIRA NO:-66 ACTIVITY NAME : Shuttering and de-shuttering.

HIRA

azards : Physical/Chemical/Ergonomic/Biological/Psychological

CONTROL MEASURES I
1. Only trained persons allow for scaffolding erection. 2
2. Provide close supervision during the work.
3. Provide & ensure use of PPE’s like safety helmet, safety shoes, safety belt & safety
jacket.
4.Provision of proper access.
6.Ensure scaffold is propely interlocked.
7.Ensure railing and proper platform provided for work.
08.Ensure connector pins are used.
09.Esure area shall be barricaded to avoid
unauthoriesd entry.

1.Scaffolding platform with access will be providing for height works. 2


2.Ensure full body harness provided and shall be using for hei
3. Area will be barricading for unauthorised entry.
3. Ensure no damaged electrical cables and faulty equipment in use. 4
Efficient and effective supervision will be maintained throughout the work.
5. Throwing of materials will not allow.
6. Material lifting and lowering will be carried out manually by rope.
7. Loose materials shall be removed from the edge of slaaaaa
8. Adequate illumination will be providing for night works.
9. Electrical hand tools will be inspecting before start the work.
10. All electrical hand tools connection will be go thorough 30MA ELCB/RCCB only.
11. All hand tools shall be inspected and tagging done before starting of works.

By Reviewed By Approved By
Rev,00

Date-

Page

Categories of
P Risk level IxP Residual risk Action By
Hazards
2 4 Physical Low Site
hazard,ergon supervisor/Site
omical engineer
hazard.

2 4 Physical Low Site Engineer/ Site


hazard,ergon Supervisor
omical
hazard.

d By

You might also like