Professional Documents
Culture Documents
Hira Mogsl
Hira Mogsl
Hira Mogsl
Unlikely - 2 2 4 6
VeryUnlikel 1 2 3
y- 1
1 2 3
Negligib Slight Moderat
le e
SEVERITY
Risk Risk Action
Level
1 to 6 Low May be acceptable but review task to s
Risk can be reduced
further
8 to 12 Medium Task should only be undertaken
Risk appropriate management autho
after consultation with specialist
15 to 25 High Task must not proceed. It should be red
Risk further control
measuresput in
placetoreducerisk.Thecontrolsshouldbe
X
20 25
16 20
12 15
8 10
4 5
4 5
High Very High
SEVERITY
Action
Improper handling of material- Fall of Injury to person, 3 3 9 1. Load shall centralised by 3 1 3 Physical and LOW Site engineer
material,Fall of person from height. property damage. properly tied web slings. ergonomical hazard.
2.Guide rope shall be tied to
both sides.
3.Provision of ladder for
access for height and lifeline
and full body harness .
4.Flagman to be
provided during material
handling.
Improper stacking of material- Fall of material Injury to person, 3 2 6 1. Ensure levelled ground for 2 2 4 Physical and LOW Site engineer
property damage material stacking. ergonomical hazard.
2. If required slippers should
be provided.
3. Provide close supervision
during work.
4. Ensure height of stacked
material is not more than 1.2M
5. Provide proper access
around the stacked material.
Inadequate Injury to 2 3 6 1.provide sufficient manpower as per safe lifting limits. 3 1 3 Physical and Site Engineer
manpower person,Property 2.Avoid saging & provide proper manpower to give ergonomical hazard.
-Fall of Damage. support.
material/overload 3.Provide close supervision.
to person 4.Only trained workmen assigned for the job.
5.Inspect material for sharp edges.Use proper
handgloves .
Manual
3 Material
shifting work
Material may hit Injury to person 1. Provide adequate manpower for handling of material 2 1 2 Physical and Site Engineer
nearby Person (For long steel bar minimum two person of same ht.) ergonomical hazard.
2. Provide proper access.
3. Access should free from obstacles.
Over weight of Injury to person, 3 3 9 1. Avoid carring of overweight. (Max. Wt / Person – 2 2 4 Physical and LOW Site Engineer
material - property damage. 50Kg). ergonomical hazard.
Fall of 2. If needed provide additional manpower.
material 3. Close supervision should be provided.
4. TBT should be conducted for manual material
handling
Inhalation of dust Lungs dieases 3 3 9 1. Provide & ensure use of PPE’s like 2 2 4 Physical and LOW Site Engineer
a. For Cement / dust – Nose mask. ergonomical hazard.
b. For Steel Bars – Hand gloves & Shoulder pad.
c. For Chemicals – Rubber hand gloves.
d. For Sharp material – Hand gloves.
Sharp edges, Caught in between material serious cut Injury to Person 1. Provide close supervision during LOW Site Engineer
work.
Shifting of
2. Provide & ensure use of safety
material from
shoes, hand gloves.
4 Stock yard to
Construction
Site by Vehicle Inadequate manpower Health issue,injury to person 3 2 6 1.provide sufficient manpower as 2 1 2 LOW Site Engineer
-Fall of material/overload to person per safe lifting limits.
2.Avoid saging & provide proper
manpower to give support.
3.Provide close supervision
Unauthorized entry of person - Struck by Injury to person 3 2 6 1. Area should be barricaded. 2 2 4 LOW Site Engineer
Vehicle 2. Restrict unauthorized entry.
3. Ensure reverse horn while
reversing vehicle.
4. Don’t allow to seat person below
the vehicle.
Overloading of material , Improper stacking Property damage, 3 2 6 1. Material not to be exceed safe 2 2 4 LOW Site Engineer
of material ,Fall of material , Injury to person working load of the vehicle.
hit to person 2. Ensure proper stacking of
material.
3. Material should not come out of
body of Vehicle.
4. Material should tie securely
Improper operating of m/c Cut injury to person, 1. Cutting/Bending machine should be in good condition with LOW Site Engineer
Malfunctioning in operation appropriate guards.
5 property damage. 2. Only trained workers are allowed to operate the m/c’s.
3. Load the bars as per load chart provided by Mfg.
4. Periodic maintenance should be done.
5. M/c’s should be inspected as per client’s checklist.
3 2 6 2 2 4
Improper Stacking of material, Injury to person. 1. Ensure proper stacking of material. 2 2 4 LOW Site Engineer
Fall of property damage 3 3 9 2. Ensure stack ht. below 1.2M.
material
HIRA Page
Inadequate manpower Injury to person 1.provide sufficient manpower as per safe lifting limits. LOW Site Engineer
-Fall of 2.Avoid saging & provide proper manpower to give support.
material/overload to 3 3 9 3.Provide close supervision 2 2 4
person
Improper usage of hand Injury to person, 1. Only trained workmens allow to do work. 2 1 2 LOW Site Engineer
tools - slip /trip & fall property damage 2. Provide close supervision during work.
3. Ensure proper hand tools during work.
3 2 6 4. Hand tools should be inspected before start of work.
5. Provide & ensure usage of PPE's.
HIRA Page
Sr. No ACTIVITY HAZARD RISK INVOLVED I Risk level IxP CONTROL MEASURES I Risk level IxP Categories of Residual risk Action By
P P
Hazards
Improper access at work area Injury to person, Property 1. TBT should be conducted before start work.
– Slip, trip & fall of person. damage. 2. Provide proper access to reach at work area.
Vehicle may topple 3. Access should be free from obstacles.
4. Ensure proper illumination during night.
5.Follow permit to work.
6.Area hard barricadibd to avoid fall.
7.Material shall be stacked 1 m away from excavated pit.
8.Provision of proper signages and flagman. 9.Inspect of
excavator as per checklist.Ensure no oil leakage.
4 3 12 10.Authorised operator license shall be displayed in cabin. 2 2 4 LOW Site Engineer
11.Fire extinguisher should be available in cabin.
12.Loose material shall be removed near pit.
13.Ensure no one come near swing area of excavator.
Damage to underground Property damage , Serious 1. Work permit should be taken from client prior to start the work.
utilities injury to person 2. Area should inspect & clear for utilities before start the excavation.
3. Provide & ensure use of PPE’s like safety shoes, safety helmet & Safety Jacket.
3 3 9 2 2 4 LOW Site Engineer
Unauthorized entry at work Serious injury to person 1. Area should be barricaded before starting the work.
area - Hit by excavator 2. Display the precautionary boards.
3. Close supervision should be provided during work.
4. Provide signal man to control the Vehicles.
3 4 12 2 1 2 LOW Site Engineer
7 Excavation with Physical
JCB / Excavator
Movement of Excavator & Injury to person, Property 1. Only license driver operate the vehicles.
Vehicles - hit by vehicle, damage. 2. All excavator & vehicles should have valid documents.
Toppling of vehicle 3. Provide close supervision.
4. Provide the signal man to control the movement.
5. Vehicle should have reverse horn.
4 3 12 6. Follow traffic rules & display speed limit boards. 3 1 3 LOW Site Engineer
7. Don’t allow workers to seat below the vehicles.
8. Provide proper illumination during the night work.
Improper access to reach Injury to person 1. Provide proper access to reach deep area.
excavated area – Toppling of 2. Access should be free from obstacles.
vehicle, Fall of person 3. Provide proper illumination during night work.
3 2 6 2 2 4 LOW Site Engineer
Land sliding due the Injury to person 1. Vehicle should be keep 1.5 mt. distance from excavation pit.
movement of Vehicle, Fall of 2. Excavated material will be kept 1.5 mt. away from excavation pit.
excavated material - 3. Ensure proper sloping during excavation.
4. Loose material should be removed.
5. If required provide safety net around the pit.
4 3 12 2 1 2 LOW Site Engineer
HIRA Page
1.Proper rated grinding Wheel with guard shall be used. 2 2 4 LOW Site Engineer
2.Check spindle rpm and suitable rpm grinding wheel shall be used.
Rotatory part 3.Proper cable routing to be ensured for slipping and tripping hazards.
of m/c - 4.Trip switch /sleek guard to be used.
Body parts may Serious injury to 4 3 12 5.Provide & ensure use of PPE’s like Safety helmet with face shield or safety goggle,
come in person safety shoes, nose mask, hand gloves, ear plugs
contact
9 GRINDING
OPERATION 1.TBT should be arrange on use of PPE’s. 2 1 2 LOW Site Engineer
Headache , 2.Provide & ensure use of ear plugs
Hearing loss 3 2 6
Noise.
Eye injury, lungs 1.A trained worker is to be used. 2 2 4 LOW Site Engineer
deases may be 2.Proper PPE’S is to be used like face shield, safety glasses, nose mask etc.
Dust particles. severe injury 3 3 9
HIRA Page
HIRA NO. 11 ACTIVITY NAME :Lifting And Shifting of material by crane Date-
HIRA Page
1. Fallure of Materials. 1.Personal injury. 4 4 16 1.Equipments shall be checked in order to ensure that there is
2. Failure of wire rope 2.Property Damage no leak of hydraulic oil or any other defects,
3.Crane Toppled before starting operation .
4. Damage to material due 2.Crane operators shall have valid Operator License.
to improper handling 3.Never stand underneath of suspended load
5.use of defective tools and 4.Signal man is to be posted & only he will be only authorized to give the
tackles instruction to driver/ operator
6. fall/slip of material 5.Materials Loaded on vehicle are to be tied up properly.
7.sharp edges 6.Work with valid work permit. 7.Ensure
8.Obstruction for Access ground condition is suitable for the vehicle movement. 8.Lifting plan
to approved before lifting.
Lifting &
11 Shifting 2 4
Physical
LOW Site Engineer
2
Of Material. hazard
9.All lifting devices/tackles must have valid test certificates & must be
inspected every day before using.
10.Working area to be barricaded.
11.PPE’S is to be provided for all employees.
12.Trained employees are to be deployed.
13.Work to be carried out under competent supervision.
HIRA Page
Improper access- Injury to person. 1. Provide proper access for movement. LOW Site Engineer
Slip, trip Hazard 2. Keep access free from obstacles.
3. Provide & ensure use of PPE’s like Safety Helmet, Safety
Shoes, and Safety Jacket,rubber handglovesand Gumboot.
4.Follow work
permit system. 5.Ensure
adequate illumination during work.
Charging of sand, grits, cement Lungs diseases 1.TBT should be conducted before starting the work. LOW Site Engineer
and water in mixer machine- 2. Provide & ensure use of Dust mask.
Inhalation of dust .
Shifting and Charging of concrete Injury to person. 1. Provide proper access during work. LOW Site Engineer
with Wheel Barrow into pit- 2. Keep access free from obstacles.
Improper access, Poor 3. Provide proper illumination during the work.
illumination during work Wheel 4. Wheel barrow should be inspected before taking in to
barrow may hit person-Fall of use.
person, Fall of material 5. Provide close supervision during work.
6. Maintain safe distance of wheel barrow from pit.
Improper usage of hand tools - Injury to person, 1. Only trained workmens allow to do work. LOW Site Engineer
12 PCC Work slip /trip & fall property damage 3 3 9 2. Provide close supervision during work. 2 2 4 Physical hazard
3. Ensure proper hand tools during work.
4. Hand tools should be inspected before start of work.
5. Provide & ensure usage of PPE's.
Inadequate manpower Injury to person 1.provide sufficient manpower as per safe lifting limits. LOW Site Engineer
-Fall of material. 2.Avoid saging & provide proper manpower to give
support.
3.Provide close supervision
Fall from height Injury to person. 1. Provide proper Personel protective equipments . And LOW Site Engineer
ensure use of PPE like safety helmet, safety shoes and
safety jacket.2.Ensure barricading of pit to avoid fall.
Pouring of concrete Eye injury, Skin 1. TBT should be conducted for use of PPE’s & First aid . LOW Site Engineer
Concrete may come in contact irritation. 2. Provide close supervision during work.
with eye & skin 3. Provide & ensure use of PPE’s like safety goggle, Rubber
hand gloves & Gum Shoes.
HIRA Page
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Risk level Risk level Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P IxP CONTROL MEASURES I P IxP Hazards Residual risk Action By
Sharp edges of Shutters & Bars Abrasion, Injury to 4 4 16 1. Provide & ensure use of hand gloves, shoulder pad. 2 2 4 Physical hazard LOW
person 2. TBT should be conducted before start the work.
Improper access – Fall of Injury to person 1. Provide close supervision during work. LOW
material property damage. 2. Provide proper access during the work.
3. Access should be from obstacles.
4. Provide proper illumination during night work.
Fall of person from height. Injury to person 1. Provide close supervision during work. LOW
property damage. 2. Provide proper access during the work.
3. Provide proper illumination during night work.
Improper usage of hand tools Injury to person, 1. Only trained workmens allow to do work. LOW
Shifting of
boards and - slip /trip & fall property damage 2. Provide close supervision during work.
shuttering 3. Ensure proper hand tools during work.
4. Hand tools should be inspected before start of work.
13 and de-
shuttering of Inadequate manpower Health issue,injury 5. Providesufficient
1.provide & ensure manpower
usage of PPE's.
as per safe lifting limits. LOW
beam,colum -Fall of material/overload to to person 2.Avoid saging & provide proper manpower to give
n and slab person support.
3.Provide close supervision
Improper stacking of material Injury to person, 1. Ensure proper stacking of material. LOW
Property damage. 2. Avoid stacking of material at the edges.
fall of shuttering material Injury to person. 1. Only trained / skilled workmen’s allow to do work. LOW
from height. 2. Provide close supervision during the work.
3. Ensure usage of proper hand tools.
4. Hand tools should be inspected before taking in to use.
HIRA Page
During work- Injury to person, 1. Only authorized license operator should operate LOW
Toppling of Property damage. vehicle.
Filling , vehicle 2. All vehicles should have valid documents.
Leveling of 3. TBT should be conducted before starting work.
soil and 4. Close supervision should be provided during the
Rolling Work work.
14 by Dozer , 5. Vehicles should be inspected before taking in to
Dumper, use.
Road
Roller,Bachh
oe excavator
Unauthorized Injury to person 1. Area should be barricaded. LOW
entry of person - 2. Restrict unauthorized entry.
Struck by Vehicle 3. Ensure reverse horn while reversing vehicle.
4. Don’t allow to seat person below the vehicle.
1. Provide the guard rails / barricade at the work place. LOW Site Engineer
2. Provide & ensure use of Life line , full body harness,
safety helmets , safety shoes etc.
3. Obtain the work permit before starting the work above
ht. 3M.
Serious injury to 4. Only skilled workmen’s are allowed to ht. work.
Fall of material. 5. Tool box talk should be arrange before starting the
person may prove fatal.
Working at elevated places. Fall of person 5 4 20 work. 2 2 4
Property damage
6. Provide strict supervision during the work.
7. Fall arrestor & safety net must be installed.
8. Provide adequate working place. ( min 0.6m)
9. Provide proper working plat form & it should be tie
properly.
10. Remove the scrap immediately & work place should be
neat and clean.
11. Don’t throw / drop material or equipment from height.
Prepared By Reviewed By 12. All tools should be carry in tool kit bag or tie with in
Approved By
working uniform.
13. Don’t allow to stack loose material at ht.
14. Don’t allow to throw material from height & vice versa.
MUHICK OIL & GAS SERVICES LIMITED
PROJECT: PCP EPC2 Rev,00
HIRA Page
Fall of Person Serious Injury to 1. Only designated workers allowed to erection, LOW Site Engineer
during Scaffold person Repairing & dismantling of Scaffold.
work ,fall of 2. Provide close supervision during work.
material. 3. TBT should be conducted before starting the
work.
4. Provide & ensure use of Safety helmet, Safety
Shoes, safety Jacket & Full body harness safety
belt.
5. Provide & ensure proper access during the
erection & dismantling work.
6. Provide proper support during erection.
7. Provide proper working platform.
8.Workmen with height pass can work for height
work.
Inadequate Health 4 16 1.provide sufficient manpower as per safe lifting 2 2 4 LOW Site Engineer
manpower issue,injury to limits.
person 2.Avoid saging & provide proper manpower to give
support.
3.Provide close supervision
Improper handling Property damage, 1. TBT should be conducted before start work. LOW Site Engineer
of material -Fall of Injury to person. 2. Below area should be barricaded.
material from 3. Close supervision should be provided.
height. 4. Tools and Trackless or Loose material should not
keep at top of scaffold.
5. Materials should not throw from height and vice
versa.
Fall of Scaffold Property damage 1. Provide proper support to Scaffold. LOW Site Engineer
& injury to person 2. Tie the scaffold for permanent structure at
every ‘3M’.
3. Maintain 1:4 ratio during erection.
4. Scaffold should be erected in a plumb.
5. Scaffold should be erected as per the standard
norms and conditions.
6. Scaffolds should be dismantled row wise, before
proceed to next row, the entire components
should be removed.
7. Scaffold should be inspected as per clients check
list.
8. Appropriate tags should be displayed on
scaffold.
HIRA NO.- 18 ACTIVITY NAME : Concrete chipping & breaking operation. Date-
HIRA Page
Sr. No. Activity Hazard RISK Involved I P Risk level Control Measures I Risk level IxP Categories of Residual risk Action By
IxP P Hazards
HIRA Page
Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
Hazards
Physical
19
hazard
Movement of
boom & pipe - 1. TBT should be conducted for concrete work.
May hit to 2. Boom & its hose should be inspected before operating.
person. Injury to person,
Health issue, Skin 3. Provide tag line for holding the rubber hose.
Concrete work 4 3 12 4. Close supervision should be provided. 2 1 2 LOW Site engineer
irritation, Injury to
5. Provide & ensure use of PPE's like safety helmet, Gum
Concrete may eye.
Shoes, safety goggles, Rubber handgloves, ear plug & nose
come in mask.
contact with
skin & eye
HIRA Page
HIRA Page
1. Driver should be licensed, trained & aware with Physical hazard LOW Site engineer
defensive driving. 2.
Insured blocks carried are properly secured. 3. All
fall of unsecured block. the obstacles in the pathways should be removed.
Transportation of the Obstacles in path Injury to Person, 4. Provide
blocks to the site way.Rough & uneven Property damage. bankmans/ helper during the vehicle at site.
roadways
Site engineer
1. Tool box talk should be arrange on material handling.
Fall of blocks .Wrong lifting 2. Strict &
Unloading the blocks at method. Sharp edges of Injury to person, competent supervision during the work. LOW
site Property damage.
block 3.Provide & ensure the use of PPe’s.
Site engineer
Storage of Blocks Improper storage & stacking Injury to person , 1. Restrict the stack ht. above 1.5 M LOW
of blocks – Fall of blocks Property damage 2. Stacking should be done on firm base.
Site engineer
Improper storage / 1. Deploy trained operator for operating the tough rider.
Shifting blocks, cement
21 unsecured.Obstacles in the Injury to person , 3 3 9 2. All 2 2 4
mortar , sand to site by LOW
tough rider. path ways,toppling of tough Property damage the obstacle should be removed.
rider. 3. Proper illumination during night work.
Site engineer
Shifting blocks, cement 1. Wheel barrow should be inspected before taking in to
mortar, concrete Defective wheel use. 2.
barrow.Obstacles in path Injury to person. LOW
manually ( By use of Provide supervision during work.
ways.
wheeled barrow) 3. Use planks whenever necessary.
Preparation of cement Improper handling of Back Pain.Skin 1. Follow ergonomics rule. 2. LOW Site engineer
mortar and placing of cement bags.Evolution of Irritation & Eye Provide competent supervision.
blocks with cement. dust. injury. 3.Provision of proper PPE.
Cement contact to person.
Fall of blocks.
Site engineer
Use of additives for block Improper handling or Back Pain.Skin 1.Follow ergonomics rule. 2.
Irritation & Eye Provide competent supervision. LOW
work(Black japan) storage,spillage.
injury. 3.Dispal MSDS of addhesives and training to workers.
Physical
22 4 3 12 2 2 4
hazard
1. Area should be barricaded before starting the work.
Fall of material Injury to 2. Display the signages .
Internal plaster and fall of person,property 3. Close supervision should be provided during work. LOW Site engineer
person damage. 4. Provision of competent supervision.
HIRA Page
Sharp edges & uneven 1. Provide & ensure use of safety shoes, safety
surface of stone -
abbression, cut, Caught Injury to person jacket, safety helmet & safety shoes. LOW Site engineer
2. TBT should be conducted for use of PPE's.
in between , fall of stone
1. Provide proper hand tools & it should be inspected before taking in to use. 2. Provide close supervision LOW
Improper usage of hand tools,Sharp during the work. 3. Provide & ensure use of PPE's like safety shoes, safety helmet , safety Jacket & Hand gloves. 4.
edges, Improper alignment of Injury to Person;
Aligning & Storing the drum for heating Property Damage. Proper alignment of drum & furnace should be done. Site engineer
drum on furnace.
26
Serious burn injury 1. Area should be barricaded & inspected. 2. Provide close supervision during work.
skin burn, inhalation of fumes & 3. Unauthorized entries should be restricted in work area.
Heating opeartion Heat stroke, Fire . to person ; Site engineer
Property damage 4. Provide & ensure use of PPE’s like safety helmet, safety shoes, safety jacket, hand gloves, nose mask and safety goggle etc.
4 4 16 5. House keeping should be maintain properly. 6. Dont allow to stack exces material near burning area. 7. Fire 2 1 2 Physical hazard
extinguishers & fire buckets make available in work area. 8. Fire watcher made available during
the process. LOW
HIRA Page
2. Fixation of
reinforcement & 1. Caught in-between 1. Trained labour shall be deputed for executing the jobs.
Personal injury.
dowel bar, PVC 2. Hit during shifting. 2. Use safety shoes, cotton hand gloves, safety helmet.
3. Bodily Injury. Hand Injury, Cut 3. Proper permit shall be taken prior to start the work. LOW Site engineer
pipe Injury,
1. Trained labour shall be deputed for executing the jobs. LOW Site engineer
2. Use safety gumboots, rubber hand gloves, safety helmet,
Safety goggles, ear plug.
3. Proper permit shall be taken prior to start the work.
4. Area shall be barricaded with Caution tape.
5. Good housekeeping shall be done after completion of work.
6. Continuously supervision present at work place.
7. Follow all the rules & regulations
8. Proper illumination to be provided with all the electrical
Safety precaution.
3. Pouring of 9. Electrical connections to be provided by Competent person
concrete in 1. Electrical Shock only.
between channels 2. Noise Personal skin 10. Proper earthing to be provided & also to be ensured by
and leveling 3. Eye Injury injury. competent electrician.
concrete by 4. Poor Illumination 11. Job Tool Box Talk to be done before start of the work.
vibrator 12. Regular inspection to be done for the cables before starting
the work to ensure no joints are present.
15. Inspected machinery to be used.
1. Trained labour shall be deputed for executing the jobs. LOW Site engineer
2. Use safety gumboots, rubber hand gloves, safety helmet,
Safety goggles, ear plug.
3. Proper permit shall be taken prior to start the work.
4. Area shall be barricaded with Caution tape.
5. Good housekeeping shall be done after completion of work.
27 4 3 12 6. Continuously supervision present at work place. 2 2 4
7. Follow all the rules & regulations of
8. Proper illumination to be provided with all the electrical
Safety precaution.
9. Electrical connections to be provided by Competent person
only.
1. Electrical Shock 10. Proper earthing to be provided & also to be ensured by
2. Noise competent electrician.
4. Dewatering of 3. Eye Injury
concrete by 11. Inspection of the Vaccum Dewatering pump .
4. Poor Illumination ELECTRICUTION 12. Job Tool Box Talk to be done before start of the work.
vaccum
5. Improper 13. Training to be given to the workers as per the hazards
dewatering pump.
Clamping mentioned.
14. Regular inspection to be done for the cables before starting
the work to ensure no joints are present.
15. Inspected machinery to be used
1. Trained labour shall be deputed for executing the jobs. LOW Site engineer
2. Use safety gumboots, rubber hand gloves, safety helmet,ear
plug.
3. Proper permit shall be taken prior to start the work.
4. Area shall be barricaded with Caution tape & with visible sign
board.
5. Good housekeeping shall be done after completion of work.
6. Continuously supervision present at work place.
7. Follow all the rules & regulation
8. Proper illumination to be provided with all the electrical
Safety precaution.
9. Electrical connections to be provided by Competent person
only.
1.Electrical Shock 10. Proper earthing to be provided & also to be ensured by
5. Floor finishing to 2. Noise Serious injury to competent electrician.
be done by using 3. Poor Illumination person,Electricuti 11. Job Tool Box Talk to be done before start of the work.
Floater. 4.Rotating part on,cut injury 12. Training to be given to the workers as per the hazards
mentioned.
13. Regular inspection to be done for the cables before starting
the work to ensure no joints are present.
14. Cables should not be laying on the ground.
15. Inspected machinery to be used.
HIRA Page
Sr. No. Activity Hazard Risk Involved I P Risk level IxP CONTROL MEASURES I Risk level Categories of Residual Action By
P IxP Hazards risk
LOW
LOW
HIRA Page
Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP CONTROL MEASURES I P Risk level IxP Residual risk Action By
Hazards
HIRA Page
Sr.No. Activity Hazards Risk Involved I P Risk level IxP Control measures I P Risk level IxP Categories of Residual risk Action By
Hazards
Physical
hazard
1.Vehicle toppling due to improper access. Personal injury,property damage 1.Safety induction of driver,only driver with valid licence
allowed to work.
31 4 3 12 2 2 4
1.Vehicle hit to person/nearby Structure Personal injury,property damage 1.Inspection of vehicle before entering at site for reverse
Concrete Pouring and 2.Skin iritation due to contact with cement. Dermatitis. 2.Use approriate PPE like rubber handgloves,safety helmet,
LOW Site engineer
Finishing Work.
and gumboot.
HIRA Page
Sr.No. Activity Hazards Risk involved I P Risk level Control measures I P Risk level Categories of Hazards Residual risk Action By
IxP IxP
1.Electrical hazard,damage to underground Electricution. 1.Obtain clearance from authorised person for underground
Soil or ground levelling 1.Vehicle hit to person/nearby Structure Personal injury. 1.Inspection of vehicle before entering at site for reverse
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level IxP Categories of Hazards Residual risk Action By
Mixing of Sodium hypochlorite 1.Skin contact Skin disease,skin irritation. 1.Do not touch sodiun hypochlorite solution. Chemical and physical LOW HR,Safety and security
hazard
and water in spray pump. 2.Eye contact Eye injury 2.Use PPE like rubber handgloves,safety goggle and face mask.
3.If contact with skin wash with plenty of water for atleast 15
minutes.
Dis-infection of vehicle and 1.Inhalation Health problem 1.Use face mask to avoid inhalation. LOW HR,Safety and security
33 3 3 9 2 1 2
material using spray pump. 2.Skin contact Skin disease,skin irritation. 2.Use approprite clothing.
Storage of sodium hypochlorite. 1.Spillage. Personal injury. 1.Handle carefully to avoid spillage. LOW HR,Safety and security
2.Ignite with a source of heat. Personal injury. 2.Keep away from heat.
HIRA Page
HIRA Page
Ply handling and shifting. 1.Fall of material. Personal injury 1.Workers shall be diployed after medical checkup and safety induction.
Work with proper PPE like safety helmet,safety shoes,safety jacket and
4 3 12 2 2 4 Physical hazard
cotton handgloves.
36
Ply cutting using wood cutter or 1.Rotating parts. 1.Cut injury 1.Only trained persons to be assigned for the job.
ply cutting machine or manual wood 2.Flying particles. 2.Eye injury 2.Machine Inspection and tagging shall be done before issuing machine.
3.TBT to be conducted before start of work.
cutter saw. 3.Electrical hazard 3.Electricution LOW site engineer
4.Ensure all rotating parts have guarded.
5.Check machine spindle rpm and cutting wheel rpm are same.
6.Ensure no electrical cables are damaged and faulty power tools in use.
7.Eye protection is must during ply cutting.
Categories of
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Residual risk Action By
Hazards
Rotating Cut injury,Electricution. 4 3 12 1.Ensure machine is diconnected during 2 2 4 LOW Site engineer
part,Electrical inspection.
Inspection of hazards. 2.RPM for machine and wheel to be
chop saw checked.Wheel with proper rpm to be used.
machine.
Flying Eye injury,cut injury due to 1.Competent operator should be diployed. LOW Site engineer
particles,rotating rotating 2.Work with valid work permit.
parts,electrical parts,electricution,fire if 3.Check electrical connection.No damaged cable
hazards,hot flammabe material available or damaged machine parts allowed to operate.
sparks,dust. around,hearing loss. 4.Ensure
double insulate sign displayed on machine.
5.30 ma ELCB
should be available. 6.Ensure
machine guard is available. 7.No
flammable or combustible material available when
there is chance of spark by power tools.
Stell Bar 8. Provision of proper
37 cutting by PPE like safety goggle,facesheild,hard hat,safety Physical hazard
chop saw shoes,hearing protection if sound level is more
machine than 85 Decible.
9.Ensure dust guard is available to machine.
10.Onle machine with inspected tag permitted for
work.
Change of Electricution,rotating Electricution,cut injury. 1.Ensure machine is diconnected during changing LOW Site engineer
wheel power parts, of wheel or drill bit.
tool. 2.Only competent operator allowed to change
wheel or drill bit.
HIRA Page
2.Failure of Machine.
9.Bar cutting and bending machine will be inspecting before start work.
10.Rebar caps will be providing for projected steel rods.
11.Body earthing will be providing for bar cutting and bending machines.
12.Machines connection will be go through 30 MA ELCB/RCCB only.
13.All cables will be routing on overhead.
14.Experienced fitter only operating bar cutting and bending machines.
2.Manually Shifting 1.Steel hit to person. 1.Personal injury. 4 4 16 1.Appropriate PPEs will be providing for worker. 2 2 4 Physical hazard LOW Site engineer
and placing of steel 2.Fall of materials. 2.Fracture 2.Working platform will be providing for height works.
proposed area as per 3.Fall of person. 3.Full body harness will be providing for above 1.8 M. Height.
drawing. 4.Slip, Trip hazards. 4.Scaffolding will be providing for above 1.8M. Height as per standard.
Categories of Residual
Sr. No ACTIVITY HAZARD RISK INVOLVED I P Risk level IxP Control measures I P Risk level IxP Action By
Hazards risk
Flammable material,Spillage,skin Burn injury,Fire,soil 4 3 12 1.Person assigned for the job shall be medically fit and 2 2 4 Physical & LOW Store incharge &
contact. contamination,dermatitis. only inducted persons allowed to do activity. chemical Plant &
hazard machinery
2.Provision of proper shed and spillage tray to incharge
avoid soil contamination.
3.No hot work permitted near diesel storage.
4.Diesel room shall be locked and only
authoried person can have permission.
Diesel storage 5.Electrical connections should be flame proof.
6.MSDS shall be displayed in diesel storage room.
7.Provision of training to concernes workers.
8.Provision of fire extinguisher and fire bucket.
9.Diesel storage should not be more than 2500 ltr.
Diesel Spillage,skin contact,flammable 3 3 9 1.Only trained persons allowed for this activity. 2 1 2 LOW Store incharge &
refilling. material. Plant &
machinery
2.Vehicle should be stopped. incharge
3.Area barricading to be done.
4.For diesel filling manual pump or intrensicaly
safe electrical pump to be used.
5.Mobile shall be switched off during diesel filling.
HIRA Page
HIRA NO.- 42 ACTIVITY NAME : Safety Net fitting at sides of excavation. Date-
HIRA Page
Biological Insect bite,personal injury. 4 3 12 1.Store safety net properly. 2 1 2 Physical hazard LOW Site engineer
hazards,Slip,trip,vehicle
movement. 2.Check safety net by long object to chek any
Safety Net insects
shifting like snakes,scopion are present.
3.Proper access shall be provided.
Safety Net fitting Fall in excavated pit or fall Personal injury. 4 4 16 1.Only trained workmen assigned for the job. 2 2 4 LOW Site engineer
from height,vehicle
movement,fall of loose 2.Hard barricating of pit to avoid fall in pit.
soil. 3.Proper signages to be displayed.
4.Ensure no inside excavated pit during net fitting
42
2.Faulty tools.
44
2.Pneumatic air.
3.Electical hazard.
Prepared By Reveiw
NIYATI ENGINEERING PVT. LTD.
HIRA
Personal injury
Personal injury.
3 3 9
Respiratory problem
Personal injury.
Electricution.
Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
HIRA
1.Area barricading.
Approved By
Rev,00
Date-
Page
Physical hazard
LOW P & Machinery incharge
3 2 6 2 1 2
1.Aggregate and sand loading in 1.Vehicle movement. Personal injury 1.Only inducted persons allowed to work. LOW Plant Operator/
hopper by Backhoe excavator. 2.Work with valid permit to work. Plant & Machinary Incharge
2.Shifting of sand and aggregate by 1.Rotating parts. Entanglement. 3 2 6 1.All rotating parts shall be guarded. LOW Plant Operator/
3.Plant operation. 1.Unauthorised operating. Personal injury 1.Cabin shall be locked and key shall be with operator. Plant Operator/
2.Slip,trip and fall. Personal injury. 1.Provision of hand rail to staircase to prevent fall.
2.Provision of earthing.
5.Unauthorised operating. Personal injury 1.Cabin shall be locked and key shall be with operator.
Electrical hazards. Electricution. 3.Use LOTO to ensure no one start plant during maintence. LOW
5.Concrete filling in Transit mixer. Vehicle movement. Hit by vehicle. 1.Only trained driver with valid driving licence authorised to drive. Plant Operator/
2 1 2
3 2 6 2.Periodical inspection of vehicle. LOW Plant & Machinary Incharge
HIRA Page
1.Mobilization of tower crane. 1.Toppling of crane. Personal injury,Property damage. 1.Only inducted operator with valid licence allowed to operate Site Engineer/
2.Installation of tower crane. 1.Toppling of crane. Personal injury. 1.The ground on which a tower crane stands has adequate Site Engineer/
4.Hit by vehicle(F15). cranes are firm and levelled and such cranes are erected at a
5.Electrical hazards. reasonably safe distance from excavation and are operated within
6.Fall of counter weight. gradient limits as specified by the manufacturer of such cranes.
3.Tower cranes are sited where there is a clear space available for
5.the instructions of the manufacturer of a tower crane and standard safe LOW
practices regarding such crane are followed while operating and using
4 4 16 tower crane. 2 2 4
6.Safe work load shall be displayed on crane.
10.Signal man shall be provided available during crane operation and shifting.
14 TBT and JSA training shall be conducted for operator,signalman. and riggers.
47 17.Use proper PPE like safety helmet,safety safety,reflective jacket and full body Physical hazard
harness for height work.
5.Concrete work by tower crane. 1.Fall of material. From height. Personal injury,Property damage. 1.Inspection of crane before start of work. Site Engineer/
2.Crane boom hit to person or 2.Only competent operator can operate crane. Supervisor
adjacent structure. 3.Ensure TBT and JSA training conducted for concerned persons.
3.Fall of person from height due 4.Area barricading and provision of signages to avoid movement of persons
7.Ensure overhead amd side clerance for crane movement to avoid collision
8.Ensure panel shall be locked when crane not in use to avoid unauthorised
operating.
6.Material shifting by tower crane 1.Fall of material. Personal injury,Property damage. 1.Rigging of load by trained riggers.
2.Crane toppling. 2.Ensure wire rope sling or web sling to be used for lifting shall be inspected and LOW Site Engineer/
load.
4.Before starting work ensure crane swinging area is free to avoid collision.
7.Dismantling of tower crane 1.Fall of person Personal injury,Property damage. 1.Work permit to be taken before start of work activity. Site Engineer/
4.Pinch points 4.Only competent persons shall be diployed for the job.
11.Provide full body harness for height work and ensure anchored both hooks.
HIRA Page
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level Categories of Residual risk Action By
IxP Hazards
1.Mobilization of tower crane. 1.Toppling of crane. Personal injury,Property damage. Only Competent operators to be deployed, competency certificate to be diplayed Site Engineer/
3 2 6 2 1 2
in crane. Engineer
5.Ensure the area for the crane restricted for the others,
2.Installation of tower crane. 1.Toppling of crane. Personal injury. 1.The ground on which a tower crane stands has adequate Site Engineer/
4 3 12
4.Hit by vehicle(F15). cranes are firm and levelled and such cranes are erected at a 2 2 4
5.Electrical hazards. reasonably safe distance from excavation and are operated within
6.Fall of counter weight. gradient limits as specified by the manufacturer of such cranes.
3.Tower cranes are sited where there is a clear space available for
practices regarding such crane are followed while operating and using
tower crane.
10.Signal man shall be provided available during crane operation and shifting.
14 TBT and JSA training shall be conducted for operator,signalman. and riggers.
and operation.
18.Ensure all Limit swithces are working, All Wire ropes are not wear and tear and
good condition.
22.Use proper PPE like safety helmet,safety safety,reflective jacket and full body
2.Crane boom hit to person or 2.Only competent operator can operate crane. Engineer
adjacent structure. 3.Ensure TBT and JSA training conducted for concerned persons. LOW
3.Fall of person from height due 4.Area barricading and provision of signages to avoid movement of persons
7.Ensure overhead amd side clerance for crane movement to avoid collision
8.Ensure panel shall be locked when crane not in use to avoid unauthorised
operating.
2.Crane toppling. 2.Ensure wire rope sling or web sling to be used for lifting shall be inspected and
load.
4.Before starting work ensure crane swinging area is free to avoid collision.
in that vicinity.
Fall of material from height. 6.Check area where machine will be operated for obstructions, adverse ground
conditions, overhanging or low structures, and vehicle and pedestrian traffic.
Fall of person from height.
7.Operators must wear PPE as required for site, and protective gloves when
Work at height in bucket . Fall of material from height. Property damage, 1.Ensure that attachments are securely fixed to machine, and cannot be Site Enginner/
4 4 16 2 2 4
Fall of person from height. Personal injury accidentally dislodged during operation of machine. Supervisor.
Striking against or collision 2.Only competent persons allowed to work at height. LOW
4.Use mandatory PPE's and specific PPE's like full body harness.
HIRA Page
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level Categories of Residual risk Action By
IxP Hazards
1.Only competent person after induction allowed to work 2 2 4 Physical
Drilling operation Rotating part. Cut injury 4 3 12 hazard Site Enginner/
2.Work with valid work permit.
Electrical hazards Electricution Supervisor.
Flying particles. Eye injury 3.Pre-inspect equipment before start work.
4.Ensure no cable joint and equipment damaged.
5.Use mandatory PPE and job specific PPE like safety goggle.
6.All elctrical connections shall be from 30ma ELCB. LOW
Material fall from height. 2.Scaffolding shall be used after inspection and tagging. Supervisor.
3.Work at height shall be under competent supervision. LOW
5.Provide full body harness and ensure hook anchored properly during
work.
Sr.No. Activity Hazards Risk involved I P Risk level IxP Control measures I P Risk level Categories of Residual risk Action By
IxP Hazards
Life line fittting for height work. 1.Fall of person from height. Fracture. 5 4 20 1.Only trained persons after induction and training deployed for a height work. 2 2 4 Physical hazard
2.Work with valid work permit.
2.Fall of material from height.
Site Engineer
3.Provision og proper access and scaffolding for life line fitting.
4.Ensure mandatory PPe and job specific PPE like full body harness shall be used for
5.Ensure life line shall be tied to rigid structure and proper knots shall be tied.
51
6.Don't use binding wire or sharp material to tie lifeline than can damage lifeline.
7.Lifeline sag shall not be more than 15 degree.
8.Ensure lifeline test certificate shall be availble.
Scaffolding erection for Fall of materials& objects Injury to person, 5 4 20 Working platform will be providing for height works. 2 2 4
column, beam and slab Fall of person. property damage Full body harness will be providing for above 1.8 Mtr.
Collapse of scaffold Height.
Area will be barricading for unauthorised entry.
Efficient and effective supervision will be maintained
throughout the work.
Material lifting and lowering will be carried out by
manually/Rope or tower crane.
Loose materials will clear from working platform.
Adequate illumination will be providing for night works.
Approved design will be following for slab scaffolding.
Supporting and tie will be providing as per approved
design. Site Engineer/ Site
Appropriate PPEs (Safety Helmet, Shoes, Hand gloves, Supervisor
Full body harness etc.) will be providing for worker.
Making and fixing of Fall of materials. Injury to person 4 4 16 Appropriate PPEs (Safety Helmet, Shoes, Hand gloves,
shuttering Fall of person. property damage. Nose mask,Full body harness etc.) will be providing for
board(Shuttering) as per Electrocution. worker.
size of the footing, beam Flying of wooden particles Scaffolding platform with access will be providing for
column and slab. Projected nail/Steel rod. height works.(lLedger at 500mm distance from one side)
Faulty tools/equipments. Area will be barricading for unauthorised entry.
Poor housekeeping Joint free cables will be using for all electrical hand tools
and equipments.
All hand tools will be inspecting and tagging done before
starting works.
Shuttering board making activities will be doing only in
shuttering yard .
Appropriate PPEs (Safety Helmet, Shoes, Hand gloves, Nose
mask, Full body harness etc.) will be providing for worker.
De shuttering of Injury to person. 5 4 20 Appropriate PPEs will be providing for worker. 2 2 4 LOW
Footing, Beam and Fall of materials& objects Working platform will be providing for height works.
column Fall of person. Full body harness will be providing for work above 1.8
Mtr. Height.
Scaffolding will be providing for above 1.8 mtr. Height as
per standard.
Area will be barricading for unauthorised entry.
Efficient and effective supervision will be maintained
throughout the work.
Throwing of materials will not allow.
Material lifting and lowering will be carried out by
manually/Rope or tower crane.
Loose materials will clear from working platform.
Adequate illumination will be providing for night works. Site Engineer/ Site
Materials will not stacking more than 1.5 m height. Supervisor
Necessary work permits will be takenbefore starting
works.
1.Mobilization of tower crane. 1.Toppling of crane. Personal injury,Property damage. 1.Only Competent operators to be deployed, competency certificate to be diplayed at Crane, Site Engineer/
Ensure the area for the crane restricted for the others. Engineer
2.Installation of tower crane. 1.Toppling of crane. Personal injury. 1.The ground on which a tower crane stands has adequate Site Engineer/
4.Hit by vehicle(F15). cranes are firm and levelled and such cranes are erected at a
5.Electrical hazards. reasonably safe distance from excavation and are operated within
6.Fall of counter weight. gradient limits as specified by the manufacturer of such cranes.
3.Tower cranes are sited where there is a clear space available for
4.where two or more tower cranes are sited and operated, every care
practices regarding such crane are followed while operating and using
tower crane.
10.Signal man shall be provided available during crane operation and shifting.
14 TBT and JSA training shall be conducted for operator,signalman. and riggers.
17.Use proper PPE like safety helmet,safety safety,reflective jacket and full body
19.Ensure the all manufactures, requirement to be followed for erection, installations, and operation,
23.Ensure the only competent operator and Flagman deployed in the activity
25.Ensure the counter weight as per the manufactures instruction and specifications.
5.Concrete work by tower crane. 1.Fall of material. From heigPersonal injury,Property damage. 1.Inspection of crane before start of work. Site Engineer/
Ensure crane material movement identified and explained to all concerned persons and people
working for that area related hazards and Risk and Control Measures,
2.Crane boom hit to person or 3.Only competent operator can operate crane. LOW Engineer
adjacent structure. 4.Ensure TBT and JSA training conducted for concerned persons.
3.Fall of person from height due 5.Area barricading and provision of signages to avoid movement of persons
8.Ensure overhead amd side clerance for crane movement to avoid collision
9.Ensure panel shall be locked when crane not in use to avoid unauthorised
operating.
11.Emergency power cutoff sitiuation, and manual release of load should be know to operators,
6.Material shifting by tower crane1.Fall of material. Personal injury,Property damage. 1.Rigging of load by trained riggers.
2.Crane toppling. 2.Ensure wire rope sling or web sling to be used for lifting shall be inspected and
load.
4.Before starting work ensure crane swinging area is free to avoid collision.
6.Emergency power cutoff sitiuation, and manual release of load should be know to operators,
7.Ensure the collision points to be identified and ensure the load should not be near from that,
8.Ensure JSA is communicated to operator and other persons working in the vicinity
Flying Eye injury,cut injury due to 4 4 16 1.Competent operator should be diployed. 2 2 4 LOW Site engineer/Site
particles,rotating rotating parts,electricution. 2.Work with valid work permit. supervisor
parts,electrical 3.Check electrical connection.No damaged cable
hazards,dust. or damaged machine parts allowed to operate.
4.Ensure
double insulate sign displayed on machine.
5.30 ma ELCB
should be available. 6.Ensure
machine guard is available. 7.No
flammable or combustible material available when
there is chance of spark by power tools.
8. Provision of proper
53 Groove PPE like safety goggle,hard hat,safety
cutting shoes,hearing protection if sound level is more
than 85 Decible.
9.Ensure dust guard is available to machine.
10.Only machine with inspected tag permitted for
work.
Change of Electricution,rotating Electricution,cut injury. 4 3 12 1.Ensure machine is diconnected during changing 2 1 2 LOW
wheel power parts, of wheel or drill bit.
tool. 2.Only competent operator allowed to change
wheel or drill bit.
Skin contact with Skin irritation 1.Work with valid work permit. LOW Site engineer/Site
chemical during 2.Follow MSDS for handling of chemical. 3.Use supervisor
mixing of chemical. rubber handgloves during chemical handling.
Inhalation of Prolonged exposure lead to 1.Use mask and safety goggle to prevent exposure. LOW Site engineer/Site
chemical and eye lung disease and eye 2.Wash supervisor
54 Anti-termite contact during ittitation,personal injury. 4 3 12 hand with soap to after anti-trermite treatment. 2 1 2
activity applying 3.Precautions
chemical,slip,trip,ma shall be taken to avoid mixing of chemical in drinking
terial fall from water and in eating iteams during spraying.
height. 4.Provision of proper
access. 5.Housekeeping to
maintained to avoid trip hazards.
6.Provision of proper
barricading and signages to give aware of overhead
hazard. 7.All openings shall be
closed.
HIRA Page
1. Improper fixing of flanges - Injury to 4 4 16 1. Only trained & experienced operator should allow
sudden removal of pipe, person, to fix the pump.
Brusting of pipe Property 2. Inspect the pump, Pipes & its accessories before
2. Accidental movement during damage. fixing.
installaton & operation, 3. Inspect area & should be fixed on leveled & on
3. Unautherised entry. firm ground.
Installation & 4. Unguarded parts, 4. Area should be barricaded before starting the
5. Fire hazard. pump. Site Engineer/ Site
operating of Supervisor
concrete pump 5. fire extinguisher should be made available.
physical and
55 ergonomical hazard
Sr.No. Activity Hazards Risk involved I P Risk level Control measures I P Risk level IxP Categories of Residual risk Action By
IxP Hazards
3 9
Lowering of jib. Jib hit to person,collision with Personal injury,Property damage. 3 1.Work permit to be taken before start of work activity. Site Engineer/
F15,fall of person from height. 2.Ensure correct capacity lifting used as per lifting plan. Supervisor
3.Ensure full body harness shall be used and anchored during LOW
HIRA Page
Manual material shifting 1.Fall of material . Personal injury and 4 4 16 1.Ensure proper scaffolding and lifeline provided for 2 2 4 LOW
58 to 5th and 6th slab. 2.Fall of person propery damage. material shifting. 2.Use PP rope
(Reinforced bars and wherever required for material shifting at height to
shuttering material) avoid material fall. 3.Ensure lifeline and and
full body harness used during material shifting at Site suprvisor/Site
height. 4.Don't stack materail at the engineer
edge of the slab.
HIRA Page
Installation & operating 1. Improper fixing of Injury to Person, 1. Only trained & experienced operator should allow LOW
of concrete pump flanges - sudden removal Property damage. to fix the pump.
of pipe, 2. Inspect the pump, Pipes & its accessories before
Brusting of pipe fixing.
2. Accidental movement 3. Inspect area & should be fixed on leveled & on
during installaton & firm ground.
operation, 4. Area should be barricaded before starting the
3. Unautherised entry. pump. Site suprvisor/Site
4. Unguarded parts, engineer
59 Pouring of concrete in Movement of transist Injury to person , 4 3 12 1. Only licensed & autherised operator should 2 1 2 LOW
pump By Transist Mixer. mixer - May hit to pump, Property damage operate the TM.
installtion & near by 2. Provide helper / Signalman to guide the TM.
person 3. Provide proper illumination during night work.
4. Provide proper access to TM.
Site suprvisor/Site
engineer
Dismantling of pipes and Fall of person and fall of Fracture,personal 5 4 20 1.Sequence of dismantling shall be followed. 2 2 4 LOW
scaffold. material. injury. 2.Ensure provision of proper Scaffolding platform for
height work. 3.Ensure
permit to work shall be followed. 4.Material
trowing from height not allowed.use rope to down
pipes or other material. 5.Use appropriate
PPE for height work. Site Engineer/ Site
Supervisor
60
Prepared By
Prepared By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA
Date-
Page
al/Psychological
Categories of
P Risk level IxP Hazards Residual risk Action By
1 2 Physical hazard LOW
Site supervisor/Site
engineer
LOW
Site suprvisor/Site
2 4
engineer
2 4 LOW
Site suprvisor/Site
engineer
Approved By
Approved By
HIRA NO.:-61
Prepared By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA
20 1.Scaffolding platform with access will be providing for height works. 2. Full 2
body harness will be providing for above 1.8 Mtr. Height.
3. Area will be barricading for unauthorised entry.
3. Joint free cables will be using for all electrical hand tools and equipments. 4
Efficient and effective supervision will be maintained throughout the work.
5. Throwing of materials will not allow.
6. Material lifting and lowering will be carried out manually by rope.
7. Loose materials will clear from working platform.
8. Adequate illumination will be providing for night works.
9. Electrical hand tools will be inspecting before start the work.
10. All electrical hand tools connection will be go thorough 30MA ELCB/RCCB only.
11. All hand tools will be inspecting and tagging done before starting works.
Date-
Page
hological
P Risk level IxP Categories of Hazards Residual risk Action By
2 4 Physical hazard LOW
Site
supervisor/S
ite engineer
2 4 LOW
Site
Engineer/
Site
Supervisor
ved By
Sever
Sr.No. Activity Hazards Risk involved I
Prepared By Reveiwed By
NIYATI ENGINEERING PVT. LTD.
Site: Saint Gobain Weber industries Pvt.Ltd
HIRA No.62 Activity:- Mini crane
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psycholog
Risk level
P
IxP
4 16
4 20
Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
Site: Saint Gobain Weber industries Pvt.Ltd
HIRA No.62 Activity:- Mini crane
HIRA
rity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures
Approved By
Rev,00
Date-
Page
l
Risk level Categories of
I P Residual risk Action By
IxP Hazards
2 2 4 Site Engineer/
Engineer
LOW
2 1 2 Site Engineer/
Physical hazard Site Supervisor.
LOW
Severity ratin
Prepared By Reveiwed By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.63 Activity:-Rolling shutter fitting.
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/E
Risk level
Risk involved I P IxP
Physical injury. 3 3 9
Property damage
Physial injury, 4 3 12
Electricution.
Cut injury.
Burn injury 4 4 16
Property damage
Electricution.
Physical injury.
Cut injury. 4 3 12
Electricution.
Injury to eye due
to flying particles.
Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.63 Activity:-Rolling shutter fitting.
HIRA
ility Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures
Approved By
Rev,00
Date-
Page
gical
Prepared By Reveiwed By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.64 Activity:- Core cutting.
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biol
Risk level
Risk involved I P IxP
Cut injury. 4 4 16
Electricution.
Injury to eye due to
flying particles.
Physical injury.
Property damage
Physial injury, 5 4 20
Electricution.
Cut injury.
Property damage
Reveiwed By Approved By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA No.64 Activity:- Core cutting.
HIRA
ng =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures I P
Approved By
Rev,00
Date-
Page
Prepared By Reviewed By
NIYATI ENGINEERING PVT. LTD.
HIRA
Severity rating = I , Probability Rating =P | Categories of Hazards : Physical/Chemical/Ergonom
Risk level
Risk involved I P IxP
Cut injury. 3 2 6
Physical injury.
Property damage.
Physial injury, 4 3 12
Electricution.
Cut injury.
Property damage
Physical injury. 3 3 9
Property damage.
Reviewed By Approved By
NIYATI ENGINEERING PVT. LTD.
HIRA
lity Rating =P | Categories of Hazards : Physical/Chemical/Ergonomic/Biological/Psychological
Control measures I
1.Only inducted person after training shall be assigned for the job. 2
2.Inspect material for sharp edges.
3.Use cotton handgloves during work.
4.Ensure proper access is provided and no obstacles to avoid trip hazard.
5.Work with valid work permit.
1.Inspection and tagging of machine by authorised person before use. 2
2.Ensure trained person deployed for the task.
3.Ensure no damaged electrical cables in use.
4 Electrical cables are double insulated and body earthing provided to machine.
5.Ensure all electrical connections through 30ma ELCB.
6.Area shall be barricaded and signages to be displayed.
10.Provision of proper scaffold and work platform for height work.
11.Use safety goggle to avoid eye injury due to flying particles.
1.Provision of proper access for work. 2
2.Ensure proper scaffolding is provided for work at height.
3.Ensure use of full body harness and cotton handgloves during work.
4.Ensure area is barricaded.
Approved By
Rev,00
Date-
Page
HIRA NO:-66
Prepared By
NIYATI ENGINEERING PVT. LTD.
PROJECT: Saint Gobain Weber industries Pvt.Ltd
HIRA
azards : Physical/Chemical/Ergonomic/Biological/Psychological
CONTROL MEASURES I
1. Only trained persons allow for scaffolding erection. 2
2. Provide close supervision during the work.
3. Provide & ensure use of PPE’s like safety helmet, safety shoes, safety belt & safety
jacket.
4.Provision of proper access.
6.Ensure scaffold is propely interlocked.
7.Ensure railing and proper platform provided for work.
08.Ensure connector pins are used.
09.Esure area shall be barricaded to avoid
unauthoriesd entry.
By Reviewed By Approved By
Rev,00
Date-
Page
Categories of
P Risk level IxP Residual risk Action By
Hazards
2 4 Physical Low Site
hazard,ergon supervisor/Site
omical engineer
hazard.
d By