JOB SAFETY ANALYSIS

Job: Date: 28.09.2021 JSA Team:

Vehicle entry to the laydown area Basil:

Muflih:

Document no: Approval:

ASC/P165/JSA/10 Magesh :

Naveed/Rupam :

Work Location & Equipment:

Laydown area

3ton Pick up, Skid Steer loader, Back hoe loader, Boom loader and 1ton pickup

Required Personal Protective Equipment for the above job (PPE):

Safety Helmet, Full sleeve coverall, Safety Shoe, Hand Gloves, Safety Eye Glass, Covid 19 Mask,

Activity:

 Planning, Preparation and obtain permit.

 Mobilization of equipment and materials.

 Loading and Unloading of Materials

Activity Potential Hazards / Consequence Risk Control Measures

 Planning, Preparation and  Lack of information.  Write clearly about the work.

obtain permit.  Lack of communication.  Get required work permit from

 Lack of planning authorized person & they

aware work is going on.

QF-HSSE-030
JOB SAFETY ANALYSIS

 Mobilization of Plant/vehicles  Hitting of people and adjacent  Driver should have Valid UAE

and Materials to and from the structures driving license.

laydown area  Failure of vehicle/Mobile plants  Vehicle should have updated

registration papers

 Mobile Plants should have

approved third party certificate

 Mobile Plant operator shall

have Competency certificate

 All drivers and Operators shall

follow site speed limit

20km/hr.

 All drivers shall wear seat belt.

 Should obey SEOT Security

guidelines

 Spark/Fire  Spark arrestor shall be

installed in every

vehicles/Mobile plants.

 All vehicles/Mobile plants

shall have Fire extinguisher

 Loading and unloading of  Overturning  Don't overload the vehicle.

materials  Collision Between Mobile Plants  Stack lighter loads on top of

and Pick ups heavier loads.

 Hitting of people and structures  Spread the loads out evenly for

QF-HSSE-030
JOB SAFETY ANALYSIS

 Falling of materials from the balanced weight distribution.

pickups.  Banks man assistance.

 Instability  Follow ASC logistics and

traffic management plan.

 Secure and lash the loads

properly.

 Ensure that the stacking

arrangement is stable.

 Ensure that the loads have not

shifted during transportation

before unloading.

 Ensure that all equipment used

for unloading are in good

working condition.

 Perform unloading on flat and

firm ground.