Professional Documents
Culture Documents
2.1.0 Project Administration Contents
2.1.0 Project Administration Contents
6
BI-21-00025
Petrokemya Ethane Meter Upgrade Rev. No. A
PROJECT
Rev. Date 23-Oct-12
SECTION 2 PROJECT EXECUTION INSTRUCTIONS
2.1 PROJECT ADMINISTRATION Page 1 of 1
CONTENTS
Contents
2.1.1 INTRODUCTION
2.1.2 GENERAL REQUIREMENTS
2.1.3 COMPLETION AND TURNOVER
2.1.4 CORRESPONDENCE PROCEDURES
2.1.5 INFORMATION SECURITY – Not Used
2.1.6 PROTECTION OF OWNER TECHNOLOGY – Not Used
A 23-Oct-12 WTL
This document is issued by SABIC E&PM, Jubail Industrial City, Kingdom of Saudi Arabia. The information contained in this document
is the confidential property of SABIC. It cannot be disclosed, copied or used for any purpose without approval from SABIC. If you are
not authorized to posses this document, please destroy it immediately.