Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INVITATION TO BID Sub Sec. 2.1.1 – 2.1.

6
BI-21-00025
Petrokemya Ethane Meter Upgrade Rev. No. A
PROJECT
Rev. Date 23-Oct-12
SECTION 2 PROJECT EXECUTION INSTRUCTIONS
2.1 PROJECT ADMINISTRATION Page 1 of 1
CONTENTS

SECTION 2 – PROJECT EXECUTION INSTRUCTIONS

2.1 - PROJECT ADMINISTRATION

Contents

2.1.1 INTRODUCTION
2.1.2 GENERAL REQUIREMENTS
2.1.3 COMPLETION AND TURNOVER
2.1.4 CORRESPONDENCE PROCEDURES
2.1.5 INFORMATION SECURITY – Not Used
2.1.6 PROTECTION OF OWNER TECHNOLOGY – Not Used

Rev. Prepared by Reviewed by Remarks

A 23-Oct-12 WTL

This document is issued by SABIC E&PM, Jubail Industrial City, Kingdom of Saudi Arabia. The information contained in this document
is the confidential property of SABIC. It cannot be disclosed, copied or used for any purpose without approval from SABIC. If you are
not authorized to posses this document, please destroy it immediately.

You might also like