Painting/ Coating Release

Contract Title.: Project Delivery Contract - North Project Name: LEK-B Rationalization Project

Contract No.: C3100000175 Client: PETROLEUM DEVELOPMENT OF OMAN

Location (Site) LEKHWAIR Date: 27-Jun-23

The following may be released for Painting / Coating which is ready for Fabrication / Installation
Surface Number of
Painting Paint
SL.# Item/Spool Number Drawing No. Qty, Preparation coats at * Remarks/ Final coat colour
System(PCS) Manufacturer
(Sa**/St** etc.) Shop/ Site

LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
1 89 2343-00005-0032 1 JOTUN SA 2.5 2
System WHITE
REV-01
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
2 90 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
3 91 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
4 92 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
5 93 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
6 94 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
7 95 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
8 96 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
9 97 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
10 98 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02
LEK-17-PDFEED-MP-
PCS-1 (2 Coat Shade RAL 9010
11 99 2343-00005-0033 1 JOTUN SA 2.5 2
System WHITE
REV-02

Name: Date: 27-Jun-23


(Discipline Supervisor)

Note : (* Delete Shop/ site as applicable)

The item / material being released for Painting / Coating ( * delete shop/ site as applicable) shall be described suitably - indicating Tag No., Drawing No.,
Isometric No., Section No., Equipment No., etc., as applicable. If required sketches may attached indicating area to be painted.

VERIFICATION

Checked for completion of all previous activities including NDT. Verified the painting system specified above and Released for Painting / Coating.

Remarks

Signature

Name: Date:
QC Inspector)

Arabian Industries Projects LLC


AIP-C3100000175-CONM-32 Rev 1