Download as pdf
Download as pdf
You are on page 1of 2
¢ > JOINT VENTURE WITH a o/ ISAN CORPORATION GEO DESIGNS & RESEARCH (P) LTD. Letter No: - GSIE2202R/08 Date: 19-10-2022 To, Authorized Signatory, Block no. 106, 34 floor, “Artefact towers “, 54/3, Chhatrapati square, Wardha Road, Nagpur-440015, Maharashtra. (artefactngp@artefactprojects.com) Subject: Independent Engineer(IE) Services for operation and maintenance works and supervision of balance construction works for the projects (i) 4 laning of Kagvadar - Una section of NH-8E from km 139.915 to km 180.478 (design chainage from km 140.470 to km 181.450) (Package-IV) through HAM (ii) 4 laning of Una - Kodinar section of NH-8E (new NH-51) from km 180,478 to km 221.610 (design chainage from km 181.450 to km 222.400) (package-V) through HAM (iii) 4 laning of Kodinar -Veraval section of NH-8E from km 221.610 to km 263.000 (design chainage from km 222.400 to km 263.180) (Package-VI) through HAM in the state of Gujarat. Handing over of Project from Independent Engineer (Package IV). Ref :1. LOA no. NHAI/RO-GNR/pkg-4, 5, 6/NH-51/IE/2021/D-2561 dated 01.09.2022. 2. Commencement letter NHAI/RO-GNR/pkg-4, 5, 6/NH-51/1E/2021/D-3123 dtd 07.10.2022 3. PIU, Bhavnagar letter no NHAI/PIU-Bhavnagar/2022/Kag-Una/IE/V-01/F-3//D-1171 dated 07.10.2022 4. Your office letter no APL/NH-8E/Kagavadar-Una/PKG-IV/02/2022-23/38 dated 15.10.2022 (Received on mail on 19.10.2022, Hard copy not received) 5. This office letter no GSIE2202R/06 dated 17.10.2022 Dear Sir, In context to the above-mentioned subject, we would like to inform you that we have started the taking over process in compliance of Project Director, PIU Bhavnagar letter under reference at Sr. no 3 from your representatives. During our taking over process we have visited your good office four to five times and communicated with your representatives (Mr. Akhtar Khan) in your office at Una. Also, in your letter referred above as ref. no 4, the list/bundle of documents which you have enclosed with your letter is not completed and even the process oftaking over has not been completed till date. We have already sent the list of all approved documents required for taking over in our office letter dated 17.10.2022 referred above as sr.no 5. During the taking over process, our representative did not get all approved Structural drawings and designs, approved Plan and Profile, approved Toll Plaza Drawings, all approved working drawings, approved QAP etc. and any documents regarding payment to Concessionaire along with the deductions made or required from Concessionaire as per Contract Agreement. Our representative has mentioned the comments on each page except page no 1 (enclosed), Page 1 of 2 Reg Office: Site Address: B-10, krishna ind. Estate, Opp. BIDC Gorwa, Vadodara - 390 016. ~~ Krushnanagar Society, Near Sai Villa, Gujarat. Mo. No: +-91 265 2290222, + 91 82380 98214 Kodinar -362720. Mobile No: 7575802407 Email: pme@geogroup.in, nfra@geogroup.in Email: gdrienh8e@gmall.com the contents mentioned in this page 1 neither put up not handed over to our representative. Hence that has not been signed by him. In addition to above, we have also requested your representative for joint site visit and verification of work done at site, but he refused for that. Itis again requested that please provide all the approved documents as above and mentioned in our letter dated 17.10.2022. Also direct your representative to complete the proper handing over process along with all required documents. Until we did not receive required approved documents in hard copies as well as soft copies, the process of handing over - taking over willnot be completed. May please take it on priority and also convey us when your representative will complete the whole process of handing over. ‘Thanking You, “Av oe 1 [Authorized Signatory] M/s ISAN Corporation in JV with Geo Designs and Research Pvt Ltd. Copy to 1.CGM (T) & RO NHAI, Gandhinagar for kind information please. 2. Project Director, PIU Bhavnagar for kind information and with request may please direct to the Independent Engineer (Artefact) for handing over all required documents as mentioned above and, in our letter, dated 17.10.2022 at Sr.no 5. 3, Project Director, PIU Somnath for kind information please. 4, Site Office, M/s Artefact Projects Ltd, Behind Divine School, Near Pataleshvar ‘Temple, Una, Dist-Gir Somnath -3625600 for information and necessary action. 5. M/s Agroh Kodinar Veraval Highways Pvt Ltd., Umaria-Mhow, Dist. Indore (MP) forinformation and necessary action please. Page 2 of 2

You might also like