Resume (1) - 3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

EXPERIENCE

RECEP TAYYIP ERDOGEN HOSPITAL,


MUZAFFARGARH.
14TH JANUARY 2020 TO AUGUST 24TH, 2021
Work as Shift Supervisor in Maintenance dept. for round
about 2 years. Here, I’m managed MEP team, complain
execution through HMIS Software in terms of Breakdown and
Preventive manners, preparing to equipment log sheets,
maintaining inventory & ledger and also to dept. Consumption
of stock, preparing to staff duty rosters, daily job assignments,
compiling to office records on daily basis, evaluation of
MUJTABA ALI KHAN parametric reports of plants and equipment, communication
ELECTRICAL ENGINEER with outsource vendors through emails, conducting Training
sessions to educate technicians.

FARAN FLOUR & GENERAL MILLS, LAYYAH


OBJECTIVE
To utilize my technical expertise for
OCTOBER 25TH, 2011 TO NOVEMBER 14, 2015
Work as Electrical Supervisor for more than 4 years. My core
achieving the target and developing the best
responsibilities were to ensure smooth and safe functionality
performance in the organization. of Electrical equipment’s like Power Transformer, Milling
Motors, and Electric Panels etc. and to execute Preventive
Schedules as priority.
VITAL INFORMATION
DOB:
February 3rd, 1993. LAYYAH SUGAR MILLS, LAYYAH
CNIC: FEBRUARY 1ST, 2016 TO MAY 31ST, 2016
32203-6393819-3 Internship as Internee Engineer for 4 months, got
Nationality: practical knowledge about electrical machinery, shifts
Pakistani reports, data logging, operations of power machinery
Domicile: etc.
Layyah (Punjab)
Marital Status:
Single
EDUCATION
Cell: MS ELECTRICAL ENGINEERING
0333-2962425 Session 2017 to 2019 with CGPA 3.5/4 from Superior
Email: University, Lahore.
alikhan2425@outlook.com
Driving License: BSC. ELECTRICAL ENGINEERING TECHNOLOGY
LH-18-223 (Non-Commercial)
Session 2012 to 2016 with CGPA 3.97/4 from Govt.
Address:
College University, Faisalabad.
W #17, Mohallah Faizabad,
Layyah.
DAE ELECTRICAL TECHNOLOGY
Session 2009 to 2011 with Percentage 78.14% through
Punjab Board of Technical Education, Lahore.
2

MUJTABA ALI KHAN PROFESSIONAL SKILLS


ELECTRICAL ENGINEER  6 months short course for AutoCAD under PM Youth Skill
Development Program.
 3 months short course for Chinese Language under CM
Language Learning Program.
 Completed 21 days Driving Course under Punjab Traffic
Police.
 Participated in “International Conference on Engineering
& Emerging Technologies 2018” under IEEE.
 Attended 1-day PEC-CPD Workshop on “Efficient
Grounding System & Modern Power System Protection
Control Techniques”.
 3 months short for Safety Inspector under Punjab Skills
Development Program sponsored by UK.

COMMUNICATION& LEADERSHIP
Good know how of work from the grass root to managerial level.
Experience in testing and regular maintenance of the electrical
appliances. Experience of handling the vendors, managing the
contracts, staff development and management, quality check of
work, purchase of the goods etc. Effective communication skills.
Hard-working and punctual with ability to control the complete
team with comfort and ease.

LANGUAGE SKILLS
English, Urdu, Punjabi, Chinese (Little Bit).

REFERENCES
Will be furnished on demand.

You might also like