Download as pdf
Download as pdf
You are on page 1of 8
RINAVE Registro Internacional Naval SA SHIPS IN SERVICE SURVEY REPORT 09578 FUNCHAL, 5124162 Agate Nenber Shenae wrote Connecting District BV LISBON (LBNO) Marine Center BVMADRID (CMD1M) Flag PORTUGAL, ‘Ship Manager 'SCMA - SOCIEDADE DE CONSULTORES MARITIMOS, LDA ‘Ship Owner PEARL CRUISES - TRANSPORTES MARITIMOS, LDA DATES OF SURVEY PLACE OF SURVEY Start 09/09/2014 LISBON : Lisbon - Passenger terminal Alcantara Rocha End 18/09/2014 Dornan SURVEYORS ‘SSOM Miguel Lopes, Jorge Amaral Jorge Amaral Report validated Stamp on 2ovt012014 by Jorge Amaral TRinave- Marine Division - “The et publi leo Bren Verias Marie Divina te Rime Marie Division Genera Contes thei Page 18 ‘neonate eg: 09578. FUNCHAL, Ref: ung/2014/J0062 SURVEY STATEMENT Pa RUT Oe A CORSE Re SC RL Cercatr/ Documents of Compliance sa Expiry Date SOLAS Penh St Terni cacomed 002014 Code sarvey Name a cam | Notne Ostet Soy ext __| say Penge Oot Sn amber Deertnton Limit Date | Type | Yt [exten Up ‘Statutory -SOLAS Passenger Ship Safety Cerifiate ‘AcoresDeck, Galley and Port and Starboard bunker ation with ee acces to two stairway enclosures at RINO/2014/J0082-PS1R_— | frame 90, port and statboan tobe rectified a deemed necessary, sononos | Ree | 2 ‘Means of enclose stairway excape in Algarve Deck etween fe 98 nd 122 and in MIVZI between frames 14 ‘and 33 shall be coninvous fie shelter rom the evel of uvov7014/50082-PS2 J orginto the aproprate lifeboat ad lifeatembarkason | 30/10/2014 | Ree | 2 decks or the highest lve served by the stairway, ‘whichever level isthe highest unless otherwise accepted by the Flag Administation, ‘eceplion office onthe Acores desk to be provided with an anoo14sooke-rsaR | aleuative ir supply and vetiiaton pian beamended | sonnoro1e | Rec | 2 scoordingly a doomed necessary Namber Description Limit Date | Type Sch.” Class Hull Roc O51, Subjest of ee.04.1 (PS Madeira Deck between Fr. K to Ft. M desk plating amv012014140076-H1R | buckled; L buckled and side shell plating iwo Fr. Kto Fr. M found deformed. To. | 20/142014 | Ree | 2 ‘be repnited) postponed. Limit dat: 20 November 2014 7 "Res. 05 2-Following WE tanks tobe ebited for internal exainatoninposton pawo2014i007640R | FPeak; DB wt C, DB Nid PSASTB: DBNr3 PSASTB, DB Ne PSESTB: AK | 201117014 | Ree | 2 Peak rl and Aft Peak Ne2. Limit date: 20 November 2014 “verification scheme oor cr aoniestreport by authorized person and confimation of action taken through ht Aww. veristarcom by the indcated ae aoe etary sudanca to be kept on board, Verification/eonfimation by the Socily Surveyor during next attendance ‘onboard. 2. ‘Survey by the Society Surveyor by limit date. Verification scheme oe ae etorvtestepor by authorized person and confimation of action taken trough iteuhwws.veristar com by the nated He aete Documentary evienes tobe Kept on board. Veriication/confimation bythe Society Surveyor during next atendance ‘onboard. 2, Suey by the Soctety Surveyor by init date. ‘Rinave- Marine Division - De mt pubis Res of Breas Vers Marie Dison a the Rive Marne Divison Geol Conitos erin Page 28 Reajos7s FUNCHAL, if norzon4isonE RRNTINan Tn nna ecto ember Description States Statatry-SOLAS Passenger Ship Safer Cerente morovumorersin [ORARS Seri caFSoaTHD Faye mTOR Tah pean] On atar sk dtpp ob aval a 2 ad 7nd consonant’ ‘ Rmionorasnnr6sak | tye url veatn oes oc om across Sei ‘On Main dock 1661S, bulked between twee pl ore md at em iow ovoaorasooresan [On Mae deka dea with ‘Main deck 187181 STD, BS also ee rl ope SK ween rmozovaoe-rsax_ | OnMadei deck ses with ‘On Main deck 18/188 STD, sd lc bon cer, cc ane cover oa RaAO14H0I76- PSR | ane ed eer comesponing ein ner shih ; On mca deck 71, Posen elt trea (171 on md kw be IO 20140076-FS6R Seat wi 201800 ae sith Fie contol ln, Velaton Plan and sain nob pis corny ecclesia be vin ubiea ion een ait Ar trait tm te barbed ABD poston of fe damper nd salon of Ses inway of 1307S &STOD. on Aon dak ant inmy of #125, on Maen deck essa Pete deception fc a 783 on Alar ek - Caron of : waisleank pom Sechelt 1 and conepontn wings be pd Fass monoranomT6s7R |Sy Sst ts ving sony ane Toone Acres ecko eteinthe | Swi feccatl ian atn par be propre ih & 8B cleus Ciscoe onary ot pa sarees Pry sada Ds be rem 8 Carseat eas obser on he tuo an “One Mae eck, eisaldtacboiats een capny T2anfenepy 90 Becomes om B13 AD Cate inlon pi (ss - Machinery TRNO@OMRITEMIR | RECOG-Labe i emis of ME PSASTO wt prov an ited rein ceutvih InspTest ; tem Description cn Remark? Pele MACHINE Ta [tera reertone x © Cnet encer 2 See amexpoye7 > era Examination « Sora examination + Fanmng Fee nave Marie Divon = sre tsstpbted Reo tae Vers Me Dvn te Rane Mare Dvn Geen Conn hn Paget sre arpliable fegogsre ica, ___f vz4100082 SURVEY REPORT Table of contents Page 1. Surveyor's statement. 5 2. Documentation 5 3. Machinery and electric 3 4, Safety - Miscellaneot 5 5, Annex for credited CS items with remar! oT ‘Rinave- Marine Division - jon ad te Rive Maree Divison Gener Conon erin Paget ‘pbae 2D De et psi Rales oF Brea Veron Marie Roa: 09578 FUNCHAL Ref: RINO/2014/30082 1, Surveyor's statement pecoA = CSM. Cost 0.0 Confirmation that applicable tems of Rules and Regulations and Intemational Conventions relevant to the present survey ‘scope have been surveyed to the surveyor's satisfaction without remark, except when indicated otherwise hereunder Deonsc su Cost :0.0 Confirmation that the Master has been asked if he had anything to declare or put to his attention and that no additional points have been raised by the Master with respect to the ship's classification and statutory certification. a 2. Documentation Documents OCADIOA —OSH-OSPA.CSM Coot :0.0 ‘See Remark Verification of records of previous PSC inspections which have raised PSC deficiencies in relation with class or statutory certificate issued by BV (ship detained or not). Confirmation, through records or survey, that these deficiencies have been effectively corrected, ‘Remark Last PSC dated 05 April 2014 carried out at Cadiz with 2 duly deficiencies rectified. 3. Machinery and electricity Machinery occasional survey oswoa ost coot:00 ‘See Remark ‘Scope and description of the Machinery occasional survey: Description and remark Occasional survey of machinery carried out as per request ofthe owner's for dealt with recommendation: RINO/2014/J0076-MIR - Rec.06.1 Lube oil analysis of ME PS&STB to be provided and submited for review. During this attendance the Chief Eng. presented and reviewed lub oil analysis of ME PS&STB dated 19 August 2014 ‘without remark. Recomuinendation dealt with and cancelled 4. Safety - Miscellaneous Occasional statutory surveys ocsuso ——OSPA Coef:0.0 ‘See Remark ‘Scope and description ofthe Safety Passenger occasional survey: Descriotion and remark Safety Passenger occasional survey carried out as per request of the manager's for deal with the following, recommendations: RIN0/2014/J0076-PSIR - On Azores deck, at Fr.130 on PS and STBD, fire damper and A60 insulation to be fitted on ventilation ducts - A60 Insulation fitted, deficiency rectified as surveyor satisfaction. RIN0/2014/J0076- PS2R - On Algarve deck, duct pipe to be removed at fi.82 and at fr.78 and corresponding bulkhead integrity to be ensured, ventilation of stores to be ensured from accommodation area - Deficiency rectified pipe removed and respective integrity bulkhead fitted as surveyor satisfaction. [RINO/2014/J0076-PS3R - On Madeira deck fr.180/181 PS, bulkhead between paint store and exit from Crew bar to be insulated A30 - A30 insulation fitted and deficiency rectified as surveyor satisfaction, RINO/2014/J0076-PS4R - On Madeira deck fr.180/181 STBD, B15 bulkheads to be fitted until upper deck between corridor and locker - BIS insulation/bulkheads fitted and deficiency rectified as surveyor satisfaction. ‘Rinave - Marine Division - The et pais Re of Bre Vests Marie Division and the Rive Maree Divison General Conon teen D Page Sit Regiggs7e NCHA, _____ Ref: novzosausonga, RINO/2014/10076-PSSR On Madeira deck fr.181/188 STBD, Inside Electric board locker, electric panel cover to be permanently fitted as per corresponding protection index - Top of electrical panel cover with plate with an angle of 15 egrees iwo hatch entrance to prevent splashes of water to reach to electrical panel. Also on sides was closed with a ‘metallic mesh to prevent any contact with erew member. Deficiency rectified as surveyor satisfaction RINO/2014/10076-PS6R On Madeira deck fr.171, Passage pipe in the electric store at (fr171) on madeira deck to be properly done. - Penetration filled with aflame retardant packing and effected in a watertight manner and deficiency rectified at Surveyor satisfaction ‘RIN0/2014/J0076-PS7R - Fire control plan, Ventilation Plan and Insulation Plan to be updated accordingly and submitted fot approval regarding the following: bulkhead insulation between paint store and exit from Crew bar to be amended to 30 “position of fire damper and insulation of ducts in way of f.130 PS & STBD, on Azores deck, and in way of ft125, on Madeira deck and on Promenade deck, position of ducts at fr.78/82 on Algarve deck. “Category of sprinkler tank room to be changed to 10 and corresponding drawings to be updated. “Fans L-XIV and L-15 serving the stairway at frame 76 on the Acores deck to be indicated in the fire control plan. “Insulation plan to be properly updated with A & B class bulkheads “Category of forward part of paint store (ft. 188 to fiw) at Madeira Deck to be renamed as bosun store, AO bulkhead to be indicated on the insulated plan. “On Madeira Deck, fr. 160/171 the bulkheads between category 13 to category 3 to be corrected from B15 to AO on the insulation plan -On the Agores Deck, Bakery to be categorized in 12 Deficiencies properly reviewed /corrected and updated plans end presented on board the following plans: Fire Control Plan Stamped reviewed 17 Sept. 2014 Insulation Plan Stamped reviewed 17 Sept. 2014 ‘Ventilation Plan Stamped reviewed 17 Sept. 2014 ‘After completion of survey satisfactorily and deficiencies dealt with and cancelled the Provisional PSSC LBNO/TAM/20140820182602 was withdrawn and Short term PSSC LBNO/JAM/20140925192835 issued with valid until 30 October 2014 with the following recommendations on base of the review of drawings, with respective authorization from Flag Administration: 1 Agores Deck - Galley and port and starboard bunker stations with direct access to two stairway enclosures at frame 90, port and starboard to be rectified as deemed necessary. pet Means of enclosed stairway escape in Algarve deck between frames 98 and 122 in MVZ1 between frames 14 and 33 ‘hall be continuous fire shelter from the level of its origin to the appropriate lifeboat and liferaft embarkation decks or the highest level served by the stairway, whichever level is the highest unless otherwise accepted by Flag Administration 3 Reception office on the Acores Deck to be provided with an alternative air supply and ventilation plan to be amended accordingly as deemed necessary. > ‘Rinave- Marine Division - 1D rotten poised Rakes of Buen Vesa Darn Divs ath neve Marie Divion Genera Conon hrs tre apleabe Page 6 Roa: 09578 FUNCHAL Ref: RIN0/2014/J0082 5. Annex for credited CS items with remarks a Description "MACHINERY 160 | Other ar receiverbotle Remark: This tom was creited on Job RINO/2013/J0016 validated on 09 Dec. 2013 * Chief Engineer 2 |nlernal Examination * Extemal Examination “ Running Test TRinave- Marine Division - “Te net ied Roe of Baca Verits Mae Divito an he Rina Marine Division Geers Condon hein Page 718 ‘we appinble Reg: 09578 FUNCHAL et: RINO/2014/J0062 LIST OF DOCUMENTS ATTACHED TO JOB NUMBER RINO/2014/J0082 RFS (Electronic document attached) End of List Rinave- Marine Division - “Te et pete Rakes of Burns Venias Marine Divison the Reve Marne Division Geer Conins hein Pages sscappicable 2

You might also like