Method Statement for Waterproofing
Project: NEOM GREEN HYDROGEN PROJECT
NEOM GREEN HYDROGEN PROJECT
Page 1 of 12
XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 2 of 12
Discipline Civil
Revision History
Purpose of
Rev. Description of Changes Date
Issue
00 XXXXXXXX IFA DD.MM.YYYY
01 XXXXXXXX IFA DD.MM.YYYY
02 XXXXXXXX IFA DD.MM.YYYY
Status Codes:
IFR: Issued for Review
IFA: Issued for Approval
IFC: Issued for Construction
CONTENTS
1. PURPOSE.......................................................................................................................................................................
2. SCOPE............................................................................................................................................................................
3. REFERENCES..................................................................................................................................................................
4. ACRONYMS & DEFINITIONS.........................................................................................................................................
5. ROLES & RESPONSIBILITIES..........................................................................................................................................
6. PLANT, EQUIPMENT, TOOLS & TACKLES......................................................................................................................
7. MATERIALS...................................................................................................................................................................
8. WORKFORCE.................................................................................................................................................................
9. Application:..................................................................................................................................................................
10. APPENDICES..............................................................................................................................................................
APPENDIX – A............................................................................................................................................................
APPENDIX – B............................................................................................................................................................
APPENDIX – C............................................................................................................................................................
1. PURPOSE
To ensure the Waterproofing has been done and inspected according to the NEOM / AP
requirements, project drawings specifications, and safety compliance, to protect the people
and to prevent damages and completion of work on time.
2. SCOPE
Site preparation.
Waterproofing.
3. REFERENCES
HSE Management Plan.
Project Technical Specifications.
Applicable local regulation.
1.
2.
3.
4.
5.
5.1. Project Manager
Provide the team with appropriate resources to ensure that works are done in accordance
with the project Quality and EHS requirements and shall be responsible for the approval
of method statement and overall project management.
5.5. Surveyor
Study drawing and establish control points as per plot plan / approved drawing.
Acquire information from reference stations & datum level provided by client; establish
new control points at site & cross verify with reference station/s and datum level.
Conduct survey, prepare survey report, and maintain records.
Provide route markings and obtain approvals.
Ensure calibration of survey equipment and its maintenance.
Ensure that work is carried out in safe manner in coordination with Site Engineer, sub-
contractors, etc.
All concerned parties shall be exposed to the method statements applicable to their
working scope and must attend a safety briefing prior to carrying out any works on site.
All personnel shall ensure safe working conditions prior to the start of work.
Great emphasis shall be made on all matters of health, safety, and environmental both in
the workplace, and to the public during the execution of works.
Check and ensure compliance of issuance and usage of Personal Protective Equipment
(PPE) by all employees and visitors
7. MATERIALS
Bituminous primer.
Bitumen member.
8. WORKFORCE
1 Engineer.
1 Foreman.
Technician as needed.
Workers as needed.
9. Application:
Any undulations or protrusions on the surface would be removed in order to obtain a
smooth surface. The surface must be thoroughly cleaned and free from dust, dirt loose
materials, oil or grease.
For horizontal waterproofing membrane application. Two layers of 4mm thick
modified bituminous membrane shall be laid fully torched on blinding concrete with a
minimum of 100m side laps and 150mm end laps.
The blinding surface shall be primed with the bituminous primer recommended by the
manufacturer of the membrane prior to placing the membrane. Prior to succeeding
works, the applied primer shall be inspected by the Engineer 24 hours after the
placement.