Professional Documents
Culture Documents
Bui &shanto
Bui &shanto
µ
925000.000000
350
SNNPR @
?
.000000
Gurage
890000
300
855000 .000000
YEM Siliti
.000000
SHEKA Hadiya
820000
Alaba 250
785000 .000000
.000000
Konta Wolayita
200
750000
Depth, M
Sidama
715000 .000000
.000000
Amaro Special
100
.000000
Konso Special
50
.000000
540000
505000 .000000
0
.000000
Kilometers
0 60,000 120,000 240,000
App. SN (Ω)
.000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000
-25000 45000 115000 185000 255000 325000 395000 465000 535000 605000
JULY 2020
i
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Contents
1. GENERAL.................................................................................................................... 1
2. LOCATIONS ................................................................................................................ 1
3. DRILLING & CONSTRUCTION.......................................................................................... 1
4. PACKING ................................................................................................................... 1
5. DEVELOPMENT ............................................................................................................ 2
6. PUMPING TESTS ........................................................................................................... 2
a. Purpose...................................................................................................................................................... 2
b. Methodology ........................................................................................................................................... 3
c. Pumping Test Operation....................................................................................................................... 3
d. Step drawdown pumping test ............................................................................................................ 3
e. Constant Test ........................................................................................................................................... 3
7. CHEMICAL ANALYSIS ................................................................................................... 3
8. WELL HEAD CONSTRUCTION.......................................................................................... 4
BT-PW-01-2019................................................................................................................... 5
1. SAILENT FEATURE (BT-PW-01-2019) ................................................................................. 6
1.1. Drilling and construction ........................................................................................... 6
1.2. General Information ................................................................................................. 6
1.3. Basic Well Characteristics ......................................................................................... 6
1.4. Drilling History Summery............................................................................................ 7
2. Geological & Electrical Logging, .................................................................................. 8
2.1. Geological Logging............................................................................................................................... 8
2.2. Geophysical Logging ............................................................................................................................ 9
2.2.1. Electrical logging ............................................................................................... 9
3. Casing and Observation Pipe installation and Packing ................................................. 10
3.1. Casing Installation.................................................................................................. 10
3.2. Observation Pipe Installation ................................................................................... 10
3.3. Gravel Packing...................................................................................................... 11
4. Well Development .................................................................................................... 11
5. Pumping Test Methods and Analysis ........................................................................... 11
5.1. Objective of pumping Test ...................................................................................... 11
5.2. Performed Pumping Tests ........................................................................................ 12
5.2.1. Provisional Pumping Tests:.................................................................................... 12
5.2.2. Constant Discharge Rate Test: .............................................................................. 12
5.2.3. Constant & Recovery Pumping Test Analysis Results ............................................................. 12
6. Water Quality ........................................................................................................... 14
7. Well head construction.............................................................................................. 15
8. Problem Encountered During Well Construction............................................................ 16
ii
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
iii
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
iv
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
v
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
vi
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
vii
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
LIST OF ACRONYMS
viii
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
1. GENERAL
Water is the most essential element to life on Earth, sometimes scarce resource
and yet Fundamental for a living. It is also essential for both agriculture in many
regions of the world and means to achieve sustainability in production systems.
Water demands in different parts of Ethiopia; particularly in Rural areas where
there is very poor water management & luck of enough water supply at these
towns, not to mention an increment population intensity, inside the main towns
and around, the client decided to exploit additional groundwater resources for
both towns after a detail groundwater resource potential study by our office,
(Blue Matrix Consultant)
Herein with, the SNNPR invite and encourages Contractors, (Nejmet Deep Water
Drilling & Construction plc) to participate on Drilling and construction of six (6)
deep wells, whose depth ranges from 300 to 350 meter depth, under the
supervision of our office, (Blue Matrix Consultant) three wells for Buee Town (BT-
PW-01-2019, BT-PW-02-2019 & BT-PW-03-2019) and three wells in Shanto Town, (ST-
PW-01-2019, ST-PW-02-2019 & ST-PW-03-2019), were proposed at different
localities of woredas for water supply of respective towns
Among the proposed six deep wells, five deep wells were successfully drilled and
completed starting from December, 2019 and completed on May, 2020, but
during this time the contractor drilled a total of seven wells and one well at
shanto (the 1st BT-PW-01-2019) were abandoned by the contractors’ Technical
problem, whereas (BT-PW-03-2019) drilling in Bu’ee town were rejected because
of financial problem from the client side,
2. LOCATIONS
Bu’ee Town is located 120 Km from Addis Ababa towards South West direction
along Addis Ababa – Butajira main asphalt road, Shanto is located 250 km along
the way to Sodo from Bu’ee town, also the geographic coordinate of borehole at
Bu’ee and Shanto towns are shown in the location map below under UTM
projection with Adindan Datum
1
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
.000000 .000000 .000000 .000000 .000000
437000 444000 451000 458000 465000
.000000
.000000
Tiya Town
932000
932000
Suten Town
.000000
.000000
925000
925000
Gurage
Figure 1 Location Map of Shanto and Bu’ee Towns Bu'ee Town, Washi Locality
well location @
?
Bu'ee Town, Woldiya River Bridge Locality
? Bui Town
@
.000000
.000000
.000000
.000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000
-200000 50000 100000 150000 200000 250000 300000 350000 400000 450000 500000 550000 600000
µ
.000000
918000
918000
370000.000000 380000.000000
960000
µ
.000000
Amaleka .R
Bush
930000
.000000
Gamo .R
@
?
a
910000
.R
Gurage
.000000
880000
Matene .R
.000000
Bu
YEM Kela Town .R
780000 .000000
.000000
Siliti s
860000
.000000
.000000
ha te
. R
.000000
am
780000
911000
911000
Hadiya D
SHEKA
830000
.000000
Kilometers
Alaba 0 2,500 5,000 10,000
810000
.000000
Kembata Timbaro 437000
.000000
444000
.000000
451000
.000000
@
?
458000
.000000
465000
.000000
Ka
@
?
780000
Hadiya
@
.000000
do
Dawuro Awassa Town Shanto Town, Abota Ulto Locality
Te
@
.
?
760000
Konta
R
Wolayita
Wedeba .R
a bo
.000000
.R
Sidama
730000
.000000
Fo
Shemao .R
710000
lk
a
.000000
.R
Bench Maji Basketo Gamo Gofa Wolayita
Gedeo 680000
.000000
M
Shanto Town, Warite Locality
@
?
660000
ad Wele
a ncha
.000000
.R
.R .R
Amaro Special
h e
630000
.000000
As
Derashe Lyiu Wereda Deaneba .R
610000
Alo
Ada
.000000
Ze
Sha
Konso Special
la
f
g
a .R
580000
De
er
.R
.000000
ba
Demona
ro
.R
.
560000
We
fka
R Anole .R
An
.000000
Koy
770000 .000000
.000000
e .R
ch
sha ele
.R Deb
530000
a.
.000000
.R
770000
R
Da inisha .R
510000
nc c ha
.000000
ele
Kilometers
he
T
Wefika .R
.R
Cherake .R
e
.R
.000000
.000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000 .000000
-200000 50000 100000 150000 200000 250000 300000 350000 400000 450000 500000 550000 600000
Ig e
kil
Kilometers
i
An
Wa
0 1,950 3,900 7,800
na
.000000 .000000
370000 380000
1
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
As Per the contract Agreement for drilling and construction of five deep wells
have a target depth of 350 meter, Depending on the rate of drilling and
geologic property of samples from the well the drilling technique was
changed either MUD Rotary or DTH method,
Drilling of the Top most sections 10 – 30 meter where there was a fall and a
collapse zones of boulders during drilling were drilled by 17“ Drilling bit and
install a surface casing of 14” inch in diameter to protect collapse and
Pollution and further drilling after installation of surface casing continued up to
300 – 350 meter depth by 12(1/2)” to install 8” production casing
After Completing drilling, the effective depth of each wells were installed with
8” Blind and Screen Production casing were installed alternately where
appropriate up on the information gathered from Geophysical and
Lithological logging followed by Installation of observation pipe (1”) in size, this
observation pipe helps to detect dynamic water level of the well during
pumping tests
The annular space between an installed production casing and the well wall
was packed / filled with an appropriate size (9 – 12 mm) of Clean and
rounded gravel to filter the groundwater flow towards the production casings
finally the well becomes ready for development and Pumping Test
4. PACKING
Following the installation of casing the annular space between casing and
borehole wall was packed with selected and well sorted river gravel, 9-
12mm,diameter to filter the water entering in to the well and also to increase
the inter granular permeability around the well. The well is then developed for
15 - 30 hours by double compressed air until stable discharge is obtained and
the water gets clear from silts, clays and other turbidity. Finally, residual inert
clay back fill was placed above the gravel pack. Top of the clay back fill is
grouted with mass concrete to protect the entrance of polluted surface
water. Large quantity of water was continuously coming out from the well
forming wide-open space outside the surface casing and borehole wall. The
open space is estimated to extend down to the bottom of surface casing and
the continuously falling loose material ,like coarse gravel , in to the well
disturbed the drilling operation by stacking the drilling tools rotation system.
Hence, space is grouted by mass concrete and drilling work is resumed.
1
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
5. DEVELOPMENT
Before starting development by compressor, the well was added with
chemical called Sodium Tri-Polyphospate and wait for 24 Hrs, this chemical
helps to dismantle mud cake and Bentonite from the well, and start well
Development with the recommended types of development such as
Development by compressor, Development Double Tube, Development by
Surge Block, depending on the supervisor one of the development type will be
conducted until the water is clean from mud cake and other cuttings from the
well
6. PUMPING TESTS
a. Purpose
Pumping tests were conducted to determine the performance
characteristics of a well and the hydraulic parameters of the aquifer. For
a well performance test, yield and draw down are recorded so that the
specific capacity can be calculated. These data, taken under
controlled conditions, give a measure for the productive capacity of the
completed wells and also provide for the selection of appropriate
pumping equipment.
- The second purpose of pumping tests is to provide data from which the
principal factors of aquifer performance:-Transmissivity, Hydraulic
conductivity and storage coefficient can be calculated. This type of
test is called an aquifer test because it is primarily the aquifer
characteristics that are being determined, even though the specific
capacity and maximum yield of the well can also be calculated.
Aquifer test will predict;
- The effect of new withdrawals on existing wells;
- The draw down in a well at future times and different discharges;
- The radius of the cone of influence for individual or multiple wells.
Therefore, the pumping test of well may be considered as an evaluation
stage that includes the estimation of hydrogeological parameters, the
design and analysis of wells and the calculation of aquifer and well
yield. The aquifer yield concept is essential to understand as it decides
the maximum rate of water withdrawal that can be allowed without
causing a long-term decline on the water table of the region. Test
pumping of wells forms the base for any ground water development
strategy in a regional or local hydrologic system. Pumping test serves
many important purposes:
- Assessing the "design yield" of a well or an aquifer;
- Assessing the ground water quality through sampling;
- Obtaining information for pump selection;
2
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
b. Methodology
Pumping tests will not produce accurate data unless the tests are
carried out methodologically by carefully recording the time,
discharge and depth.
The most common ones are step drawdown, continuous and
Recovery test mainly by constantly discharging or pumping a single
well or multiple wells. Nevertheless, it is also possible to conduct
variable discharge tests, as there are analytical methods as well.
e. Constant Test
Following to the recovery made immediately after Step – Draw –
Down test constant pumping test has been conducted for maximum
of 72 hours with the maximum discharge rate of step – Draw – Down
Test, this data records during Constant Pumping Test will be analyzed
using Aquifer Test Software to get Hydraulic Conductivity (K),
Transmissivity (T) and Storativity(S) of the aquifer system
7. CHEMICAL ANALYSIS
3
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
purpose. For this reason, analysis of major Cations such as Calcium (Ca 2+),
Magnesium (Mg+2), Sodium (Na+), Potassium (K+), Iron (Fe3+), Manganese (Mn+)
and major anions such as Chloride (Cl -), Fluoride (F-), Carbonate (CaCo32-),
Bicarbonate (HCo3-), Sulfate (So42-), Nitrate (No32-), Phosphate (So42-) and Boron
(Br-) were conducted and compared to WHO standard. In addition general
parameters such as Electrical conductivity, pH, Total dissolved solids; Alkalinity
and Hardness of water samples were measured, analyzed and displayed with
appropriate diagram with the help of a software called Aquitest 4.0
The final part of the well construction is the well head. Well head was done
according to the specified design as in actual fact to protect the stick up above
ground from breakage and Movement during pump installation including
capping of piezometer is constructed. But most importantly to avoid the rescue
of pollution and for sanitary purpose, the well head should be constructed with
special care with mixing ratio and quality of sand, water, cement and
aggregate are used with common dimension of 1m x 1m x 1.5m with 0.75m
bedded After the completion of well head construction, the well was sealed and
capped with a lid of 4 - 6 mm thick steel plate of the same diameter as the
conductor pipe was welded as security measure to assure
That no foreign object falls into the well before the well start to give the intended
service. An appropriate socket and plug will be installed in the steel cap to
enable static water Level observations through observation pipe.
4
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
BT-PW-01-2019
5
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
6
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
7
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
8
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Right after the completion of the Figure 1.1 Electrical logging work
drilling operation, geophysical logging
were conducted which aid also in
arrangement of the casing. The
logging methods were short normal,
long normal resistively and SP.
300 300
250 250
200
200
Depth, M
Depth, m
150
150
100
100
50
50
0
2.00 Resistivity, in20.00
Ohm 0
App. SN (Ω) App. LN (Ω) -100 -90 -80 -70 -60
SP, (Mv)
9
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The rock and soil samples were collected at 2m interval to prepare the casing
arrangement. Accordingly, outer diameter of 8” steel screen casings are installed
parallel to the most permeable strata aquifer, while the remaining depth is cased
with the same diameter blind casing respectively. Casing arrangements are set as
shown on table 1.4, the stick out of the borehole have both the production and
surface casing with 1 meter from the ground level to protect any additives and
contamination in to the well
3.1. Casing Installation
Table 1.4 Casing arrangement
Observation pipes installed between the wall of the well and steel casing
before gravel pack. The total length of these 1(1/4)” galvanized steel
observation pipes is 200 m out of which 20 m are slotted.
10
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
After the completion of casing installation the annular space between the
wall of the well and the casing packed with a total volume of 20 m3 gravel.
The sizes of the gravels ranges: 6 – 9 mm.
4. Well Development
The main objective of the pumping test is aimed at the determination of some of the
most relevant hydraulic parameters of
the aquifer and well characteristics,
which include:
Determine the efficiency and
performance of the well at different pumping rates.
Determine well and aquifer loss constants,
Determine aquifer parameters such as Transmissivity and Permeability,
Estimate the pump position and select suitable pumping equipment using the
depth, perennial yield of the well and dynamic water level in determining future
operational set ups.
Determine hydraulic characteristics of the aquifer and the regional pattern of
ground water flow.
Determine future monitoring of wells for scientific study, economic use and safe
environment.
Take water samples to determine water quality (chemical, physical, and
bacteriological tests).
11
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The constant pumping tests Analysis using and Copper & Jacob method &
Theis Recovery was done and have shown similar hydraulic Conductivity
and Transmissivity and the results are 1.18E+0 m/d and 1.24E+2 m2/d
respectively
I) Method Analysis after COOPER & JACOB (by Version 3.5) Constant Pumping
Test
12
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
II) Thies Recovery Method Analysis after COOPER & JACOB (by Version 3.5)
No Values /Parameters
DESCRIPTION
1 GENERAL Buii Town Site
Well ID BT-PW-01-2019
2 Effective Depth (m) 336 m
13
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
6. Water Quality
After collection water sample from the well while conduction the pumping test it was
labeled, the label was comprised stated date, time and the depth from which the
sample was taken and handed over for laboratory chemical quality analysis. In most
cases the known standards have a direct
relationship with geology.
In general, the chemical quality of the well
water is fit to Ethiopian standard for house
hold uses and WHO. Check the result of the
laboratory analysis and summery of the
interpretation of the chemical analysis as
follows:-
The chemical analysis result of the water
sample collected during constant pumping
test at 24 Hours shows that the water of the
well is chemically Ca-Mg-HCO3 and have a
TDS value of 95 mg/l, that makes the water is
safe for drinking purpose
Figure 1.7 Pie Chart Chemical Analysis Representations
14
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The final part of the well construction is the well head. Well head was done
according to the specified design as in actual fact to protect the stick up above
ground from breakage and movement during pump installation including capping
of Piezometer is constructed. But most importantly to avoid the rescue of pollution
and for sanitary purpose with special care is taken for the mixing ratio and quality
of sand, water, cement and aggregate used for the construction of the well head
have a trapezoidal shape with horizontal
dimensions of 0.50 m x 0.50m and 0.30
meter below surface 1.00 meter above
surface
15
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
There was no problem while drilling the borehole, the problem encountered during
electrical loggig activity were a collapse of the borehole at 170 meter where there
is a tuff & clay geologic formation, However become successful after washing the
borehole
The following essentials may be concluded from the analysis of the drilling and pumping
test:
(i) The location of this water point is sloppy area, heavy runoff will damage the
well head construction, hence drainage structure nearby is recommended
(ii) The well has good discharge (yield), if the well have been drilled telescopic
and install 12” & 8” production casing the well would have a better discharge
(iii) The analysis verified that the well is a good yielding well at a reasonable
drawdown
(iv) Further drilling from 336 meter, will result bad water quality because of Iron (Fe)
rich basaltic formation
(v) The analysis result from the pumping test shows that it is advisable to set the
pump position above 116 meter, the discharge of the water would be higher
than 28 l/s.
(vi) The result of water quality for the measured parameters shows that the water is
rich in Florine(F-) and Iron (Fe) cathions, Treatment or disinfectant should be
recommended
16
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
17
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Nejmet water well drilling plc is a private sector working on the recent drilling and
construction of these Borehole for Bu’ee TOWN water supply, This Borehole
located in near River Bridge Called Meki River Locality that have a Geographic
Coordinate of 37p East: 448,037 North 920,231 and found near the bridge
Drilling operation was carried out from 07-Feb-2020 to 04-April-2020 using Direct
Rotary up to a depth of 340 meter Depth. Drilling by 17(1/2)’’ Mud Rotary Bit up to
15 meter was done, followed by Drilling by 12(1/2)” rock Bit from 15 meter to 340
meter depth and installed with 14” inch steel surface casing up to 15 meter, then
all depth was installed with 8” blind & screen production casing up to 340 meter,
after a good examination of the lithological and Electrical logging of the well
18
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
19
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
20
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
1.2. Geophysical Logging
300
280
250
230
200
Depth, m
180
150
130
100
50 80
0
30
2.00 20.00 200.00 2000.00
2.00 20.00 200.00
SN (Ω) LN(Ω) Resistivity in Ohms (Ω) SP-mv
21
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
22
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The rock and soil samples were collected at 2m interval to prepare the casing
arrangement. Accordingly, outer diameter of 8” steel screen casings are installed
parallel to the most permeable strata aquifer, while the remaining depth is cased
with the same diameter blind casing respectively. Casing arrangements are set as
shown on table 3.4, the stick out of the borehole have both the production and
surface casing with one meter from the ground level to protect any additives and
contamination in to the well
3.1. Casing Installation
23
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Observation pipes installed between the wall of the well and steel casing
before gravel pack. The total length of these 1(1/4)” galvanized steel
observation pipes is 102 m out of which 30.6 m are slotted the remaining
71.4 meter becomes Blind.
3.3. Gravel Packing
After the completion of casing installation the annular space between the
wall of the well and the casing packed with a total volume of 24 m3 gravel.
The sizes of the gravels ranges: 6 - 9 mm.
4. Well Development
24
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
5. Pumping Test Methods and Analysis
25
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
II. Thies Recovery Method Analysis after COOPER & JACOB (by Version 3.5)
26
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
No Values
DESCRIPTION /Parameters
1 GENERAL Bu’ee Town Site
Well ID BT-PW-02-2019,
2 Effective Depth (m) 340 m
Static Water level below Ground (m) 8.28 M
Pump Position – m 75
Provisional Pumping test conducted- hrs 2 hrs
Provisional Test Discharge Rate , Q 18 l/s
Constant Rate Test (yield (L/S) – Q, l/s 23.5 l /s
Dynamic water level after constant rate test 34.28 m
Constant Rate Test -in hrs 40 hr
Total draw down in m after constant rate test 26.00 m
Recovery monitoring constant Rate test Duration in hrs 12 hrs
Remaining Residual Draw Down [m] after 12 hrs 0.620
Power Source Generating set out put[ kva] 200 Kv
Submersible Pump power output, [Kw] 45 KW
3 TRANSMISSIVITY :
Aquitest , Cooper – Jacob Time – Drawdown Method 8.44E+1 [m2/d]
Aquitest ,Theis Recovery test 7.49E+1[m2/d]
4 HYDRAULIC CONDUCTIVITY :
Aquitest software Copper Jacob Time Draw Down for 6.93E-1 [m/day]
confined aquifer m2/day
Aquitest , Theis recovery Test 6.15E-1 [m/day]
5 Water Type Na-HCO3
6 Design Yield , l/s >23 [L/s] at 55 m
of depth pump
position
27
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
6. Water Quality
6.
6. After collection water sample from the well while conduction the pumping test it was
6. labeled, the label was comprised stated date, time and the depth from which the
sample was taken and handed over for laboratory chemical quality analysis. In most
6.
cases the known standards have a direct relationship with geology.
6.
In general, the chemical quality of the well
6.
water is fit to Ethiopian standard for house hold
6.
uses and WHO. Check the result of the
6.
laboratory analysis and summery of the
6.
interpretation of the chemical analysis as
6.
follows:-
6.
The chemical analysis result of the water
6.
sample collected during constant pumping
6.
test at 38 Hours shows that the water is
6.
chemically Na--HCO3 and Rich a little bit iron
6.
which is measured as 0.35 mg/l
6. Figure 2.7 Pie Chart Chemical Analysis Representations
6. Table 2.6 Chemical Analysis Results Data
6.
Source of Sample Bore Hole WHO Maximum Allowable
6.
Location Bu’ee Town Concentration (mg/l)
Date Of Testing 21-May-2020
6.
Name of the borehole BT-PW-02-2019(40hr)
6.
LAB. ID. NO. 01 -
6. (app)
Color -
Temperature , Degree Celsius 22.7
6.
Turbidity (NTU) FTU 5.0
6. Solids 1050 C (mg/l)
Total -
Total Dissolved Solids, 1050C(mg/l) 196 1000
6.
Electrical Conductivity µs/cm) (EC) 391 -
6.H
P 7.9 6.5-8.5
Ammonia (mg/l NH3) 0.37 -
6.
Sodium (mg/l Na) 98.4 200
6.
Potassium (mg/l K) 11.5 -
Total Hardness (mg/l CaCO3) 500
6.
Calcium (mg/lCa2) 0 200
6.
Copper (Cu+2) 0.17 2
Chroromium (Cr+2) 0.03 0.05
6.
Bromine (Br2)
6.
Magnesium (mg/l Mg2-) 150
Total Iron (mg/l Fe) 0.35 0.3
6.
Manganese (mg/l Mn) <0.1 0.1
6.
Fluoride (mg/l F-) 1.07 1.5
Chloride (mg/l Cl-) <10 250
6.
Nitrite (mg/l NO2) 0.02 3
6.
Nitrate (mg/l NO3-) 10.1 45
Alkalinity (mg/lCaCO3) 215 -
6.
Carbonate (mg/l CO32-) -
6.
Bicarbonate (mg/l HCO 3) 262 -
Sulphate (mg/l SO42-) <2.0 250
6.
Phosphate (mg/l PO43-) 0.28 -
6.
6.
6.
6. 28
BLUE MATRIX CONSULTANT
6. ADDRESS :
6.
6.
6.
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
- There was a circulation loss starting from 114 meter to 270 meter depth, no
sample was coming out from the well.
- Failure of submersible pump during Constant pumping test, and took a week to
replace the pump by a new one
29
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
30
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
1. SAILENT FEATURE (ST-PW-01-2019)
1.1. Locations
Nejmet water well drilling plc is a private sector working on the recent drilling and
construction of these Borehole for SHANTO TOWN water supply, This Borehole
located in Zamine Locality that have a Geographic Coordinate of 37p East:
370571North: 778392 and found near the bridge
31
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
32
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
33
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
330
300
280
250
Depth, m
230
200
Depth, m
180
150
130
100
80
50
30
0
0.01 0.10 -20 1.00 10.00 100.00 1000.00
1.00 10.00 100.00 1000.00 10000.00
Resistivity in Ohms SN (Ω) LN (Ω) Spontaneous Potential , Mv
SP…
Figure 3.2 Electrical Logging of well ID-ST-PW-01-2019 REPLACEMED
34
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
35
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The rock and soil samples were collected at 2m interval to prepare the casing
arrangement. Accordingly, outer diameter of 8” steel screen casings are installed
parallel to the most permeable strata aquifer, while the remaining depth is cased
with the same diameter blind casing respectively. Casing arrangements are set as
shown on table 1.4, the stick out of the borehole have both the production and
surface casing with one meter from the ground level to protect any additives and
contamination in to the well
36
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
3.2. Observation Pipe Installation
Observation pipes installed between the wall of the well and steel casing
before gravel pack. The total length of these 1(1/4)” galvanized steel
observation pipes is 167 m out of which 30 m are slotted.
After the completion of casing installation the annular space between the
wall of the well and the casing packed with a total volume of 17 m3 gravel.
The sizes of the gravels ranges: 6 – 9 mm.
4. Well Development
37
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
5. Pumping Test Methods and Analysis
38
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The well Efficiency is calculated using a formula that include well Loss & Aquifer
loss as follows E = BQ/(BQ + CQ2)
Table 3.5 Well Loss & Aquifer Loss Data
No Steps Q, (l/s) Q, B C E = BQ/(BQ Remark
+ CQ2)
(m3/d)
1 Step – 1 15 1296 1.67E-03 4.20E-06 23%
2 Step – 2 18 1555.2 1.67E-03 4.20E-06 20%
3 Step – 3 22 1900.8 1.67E-03 4.20E-06 17%
This well seems to have lower efficiency, Since during Pumping the draw down
was not achieved for every 2 hour step pumping test, if the step pumping test
were done more than 2 hours, the well would have the maximum draw down
and achieve stable dynamic water in this case the dynamic water level is not
stable
After the Dynamic Water Level Stabilizes on 60.71 meter, a Recovery record
was done until the water level comes back to the static Water Level of the
well hence the recovery took many hours which was more than 30 Hrs
II. Method Analysis after COOPER & JACOB (by Version 3.5) Constant Pumping Test
39
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
III. Thies Recovery Method Analysis after COOPER & JACOB (by Version 3.5)
No Values /Parameters
DESCRIPTION
1 GENERAL Shanto Town Site
Well ID ST-PW-01-2019,
2 Effective Depth (m) Replaced
350 m
Static Water level below Ground (m) 37 M
Pump Position – m 100
Provisional Pumping test conducted- hrs 1 hrs
Provisional Test Discharge Rate , Q 23 l/s
Constant Rate Test (yield (L/S) – Q, l/s 22 l /s
Dynamic water level after constant rate test 60.71 m
Constant Rate Test -in hrs 30 hr
Total draw down in m after constant rate test 23.71 m
Recovery monitoring constant Rate test Duration in hrs 36 hrs
Remaining Residual Draw Down [m] after 3 hrs 0.40
Power Source Generating set out put[ kva] 200 Kv
Submersible Pump power output, [Kw] 37 KW
3 TRANSMISSIVITY :
Aquitest , Cooper – Jacob Time – Drawdown Method 6.37E+1 [m2/d]
Aquitest ,Theis Recovery test 7.20E+1[m2/d]
4 HYDRAULIC CONDUCTIVITY :
Aquitest software Copper Jacob Time Draw Down for 6.10E-1 [m/day]
confined aquifer m2/day
Aquitest , Theis recovery Test 6.90E-1 [m/day]
5 Water Type Na-Ca-HCO3
6 Design Yield , l/s 22 [L/s] at 100 m of
depth
40
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
6. Water Quality
After collection water sample from the well while conduction the pumping test it was
labeled, the label was comprised stated date, time and the depth from which the
sample was taken and handed over for laboratory chemical quality analysis. In most
cases the known standards have a direct relationship with geology.
In general, the chemical quality of the well water is fit to Ethiopian standard for house
hold uses and WHO. Check the result of the
laboratory analysis and summery of the
interpretation of the chemical analysis as follows:-
The chemical analysis result of the water sample
collected during constant pumping test at 30
Hours shows that the water is chemically Na-Ca-
HCO3 and Rich in iron measured as 1.8 mg/l that
makes the water is not safe for drinking purpose
unless it is treated
41
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The final part of the well construction is the well head. Well head was done
according to the specified design as in actual fact to protect the stick up above
ground from breakage and movement during pump installation including capping
of Piezometer is constructed. But most importantly to avoid the rescue of pollution
and for sanitary purpose with special care is taken for the mixing ratio and quality
of sand, water, cement and aggregate used for the construction of the well head
have a trapezoidal shape with horizontal dimensions of 0.50 m x 0.50m and 0.30
meter below surface 1.00 meter above surface
After the completion of well head construction, the well sealed and capped with a
lid of 9 mm thick steel plate of the same diameter as the conductor pipe was
welded as security measure to assure that no foreign object fall into the well before
the well starts giving the intended service. An appropriate socket and plug installed
in the steel cap enable to observe static water level through observation pipe.
- There was a circulation loss starting from 114 meter to 270 meter depth, no
sample was coming out from the well.
- Failure of submersible pump during Constant pumping test, and took a week to
replace the pump by a new one
42
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
43
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Nejmet water well drilling plc is a private sector working on the recent drilling and
construction of these Borehole for SHANTO TOWN water supply, This Borehole
located in warite Locality that have a Geographic Coordinate of 37p East:
376150, North: 774211and found near the bridge
Drilling operation was carried out from 20 – MAR – 2020 to 29-MAR-2020 using
Direct Rotary up to a depth of 350 meter Depth. Drilling by 17(1/2)’’ Mud Rotary Bit
up to 26 meter was done, followed by Drilling by 12(1/2)” rock Bit from30 meter to
350 meter depth and installed with 14” inch steel surface casing up to 30 meter,
then all depth was installed with 8” blind & screen production casing after a good
examination of the lithological and Electrical logging of the well
44
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
1.5. Drilling History Summery
Table 4.2 Drilling History
45
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
46
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
ELECTRICAL LOGGING
310
260
210
Depth, m
160
110
60
10
1 10 100 1000 10000
Resistivity in Ohms
SN Ω LN Ω
Figure 4.1 Geophysical Logging (Resistivity)
47
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
48
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The rock and soil samples were collected at 2m interval to prepare the casing
arrangement. Accordingly, outer diameter of 8” steel screen casings are installed
parallel to the most permeable strata aquifer, while the remaining depth is cased
with the same diameter blind casing respectively. Casing arrangements are set as
shown on table 1.4, the stick out of the borehole have both the production and
surface casing with one meter from the ground level to protect any additives and
contamination in to the well
49
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
3.2. Observation Pipe Installation
Observation pipes installed between the wall of the well and steel casing
before gravel pack. The total length of these 1(1/4)” galvanized steel
observation pipes is 100 m out of which 30 m are slotted.
After the completion of casing installation the annular space between the
wall of the well and the casing packed with a total volume of 24 m3 gravel.
The sizes of the gravels ranges: 6 – 9 mm.
4. Well Development
Well Development was held to remove detrital and cuttings from the borehole and to
increase the natural porosity and permeability of the formation in the vicinity of the
borehole; well development is carried out by compressor for only 29 hours until the
water becomes clean and silt/sand free.
50
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
A pumping test crew and equipment mobilized and start pumping test on 15-04-
2012 to 18-04-2012 aimed at the determination of well and aquifer characteristics.
After the Dynamic Water Level Stabilizes on 81.77 meter, a Recovery record was
done until the water level comes back to the static Water Level of the well
hence the recovery took only 4 hours which is a fast recovery
I. Method Analysis after COOPER & JACOB (by Version 3.5) Constant Pumping Test
51
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
II. Thies Recovery Method Analysis after COOPER & JACOB (by Version 3.5)
52
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Table 4.5 Pumping Test Summary
No Values
DESCRIPTION /Parameters
1 Shanto Town Site,
GENERAL warite Locality
Well ID ST-PW-02-2019,
2 Effective Depth (m) 350 m
Static Water level below Ground (m) 65.58 M
Pump Position – m 110
Provisional Pumping test conducted- hrs 1 hrs
Provisional Test Discharge Rate , Q 22 l/s
Constant Rate Test (yield (L/S) – Q, l/s 20 l /s
Dynamic water level after constant rate test 81.77 m
Constant Rate Test -in hrs 42 hr
Total draw down in m after constant rate test 16.19 m
Recovery monitoring constant Rate test Duration in hrs 4 hrs
Remaining Residual Draw Down [m] after 4 hrs 0.28
Power Source Generating set out put[ kva] 200 Kv
Submersible Pump power output, [Kw] 37 KW
3 TRANSMISSIVITY :
Aquitest , Cooper – Jacob Time – Drawdown Method 1.3E+2 [m2/d]
Aquitest ,Theis Recovery test 1.41E+2[m2/d]
4 HYDRAULIC CONDUCTIVITY :
Aquitest software Copper Jacob Time Draw Down for 1.13E+0 [m/day]
confined aquifer m2/day
Aquitest , Theis recovery Test 1.22E+0 [m/day]
5 Water Type Na-Mg-HCO3
6 Design Yield , l/s < 20 [L/s] at 110
m of depth
53
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
6. Water Quality
The chemical analysis result of the water sample collected during constant pumping
test at 30 Hours shows that the water is chemically Na-Mg-HCO3 the water is Rich in
iron measured as 0.43 mg/l and Florine 1.96 that makes the water is not safe for
drinking purpose unless it is treated
Table 4.6 Chemical Analysis Results Data
Source of Sample Bore Hole WHO Maximum
Location Shanto Town Allowable
Date Of Testing 19/08/2012 Concentration
Date of collection 14/08/2012 (mg/l)
Name of the borehole ST-PW-02-2019
LAB. ID. NO. 01 -
Turbidity (NTU) FTU 5.0
Total Solids 1050 C (mg/l) -
Total Dissolved Solids, 1050C(mg/l) 195 1000
Electrical Conductivity µs/cm) (EC) 390 -
PH 7.7 6.5-8.5
Ammonia (mg/l NH3) 0.3 -
Sodium (mg/l Na) 40.1 200
Potassium (mg/l K) 11 -
Total Hardness (mg/l CaCO3) 125 500
Calcium (mg/lCa2) 16 200
Copper (Cu+2) 0.35 2
Chroromium (Cr+2) <10 0.05
Bromine (Br2) <0.05
Magnesium (mg/l Mg2-) 20.7 150
Total Iron (mg/l Fe) 0.43 0.3
Manganese (mg/l Mn) <0.1 0.1
Fluoride (mg/l F-) 1.96 1.5
Chloride (mg/l Cl-) <10 250
Nitrite (mg/l NO2) 0.02 3
Nitrate (mg/l NO3-) 6.6 45
Alkalinity (mg/lCaCO3) 215 -
Carbonate (mg/l CO32-) 0 -
Bicarbonate (mg/l HCO3) 262 -
Sulphate (mg/l SO42-) <2 250
Phosphate (mg/l PO43-) 0.23 -
54
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The final part of the well construction is the well head. Well head was done
according to the specified design as in actual fact to protect the stick up above
ground from breakage and movement during pump installation including capping
of Piezometer is constructed. But most importantly to avoid the rescue of pollution
and for sanitary purpose with special care is taken for the mixing ratio and quality
of sand, water, cement and aggregate used for the construction of the well head
have a trapezoidal shape with horizontal dimensions of 0.50 m x 0.50m and 0.30
meter below surface 1.50 meter above surface
After the completion of well head construction, the well sealed and capped with a
lid of 9 mm thick steel plate of the same diameter as the conductor pipe was
welded as security measure to assure that no foreign object fall into the well before
the well starts giving the intended service. An appropriate socket and plug installed
in the steel cap enable to observe static water level through observation pipe.
There was a circulation loss, no sample was coming out from the well.
The following essentials may be concluded from the analysis of the drilling and pumping
test:
(vii) The Submersible Pump Should be bigger than the one the contractor used for
Pumping Test
(viii) From the water quality analysis Result Iron is a bit higher than the value of
WHO, Therefore there should be an EC measurement during Drilling, so that it
is possible to detect and identify an Iron Rich zone of the aquifer
(ix) Drilling activity should not be on a rainy season, there was a problem of
moving items and materials during rainy time
55
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
56
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Nejmet water well drilling plc is a private sector working on the recent drilling and
construction of these Borehole for SHANTO TOWN water supply, This Borehole
located in Abota Ulto Site Locality that have a Geographic Coordinate of 37p
East: 372,291, North: 777,292 and found near the bridge
Drilling operation was carried out from April – 2020 to 06-June-2020 using Direct
Rotary up to a depth of 310 meter Depth. Drilling by 17(1/2)’’ Mud Rotary Bit up to
28 meter was done, followed by Drilling by 12(1/2)” rock Bit from28 meter to 310
meter depth and installed with 14” inch steel surface casing up to 28 meter, then
all the remaining depth was installed with 8” blind & screen production casing
after a good examination of the lithological and Electrical logging of the well
57
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
58
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
2 Pumice 6 20
4 Pumice 36 46
59
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
2.2. Geophysical Logging
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
1.00 10.00 100.00 1000.00 10000.00
Apparent Resistivity ohm-m Long short
60
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
61
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The rock and soil samples were collected at 2m interval to prepare the casing
arrangement. Accordingly, outer diameter of 8” steel screen casings are installed
parallel to the most permeable strata aquifer, while the remaining depth is cased
with the same diameter blind casing respectively. Casing arrangements are set as
shown on table 5.4, the stick out of the borehole have both the production and
surface casing with one meter from the ground level to protect any additives and
contamination in to the well
Casing
Casing Length Diameter,
Depth (m) Casing Number inch
From To Blind Screen Blind Screen
310 298.4 11.6 2 Blind 8
298.4 286.8 11.6 2 Screen 8
286.8 269.4 17.4 3 Blind 8
269.4 257.8 11.6 2 Screen 8
257.8 252 5.8 1 Blind 8
252 240.4 11.6 2 Screen 8
240.4 223 17.4 3 Blind 8
223 217.2 5.8 1 Screen 8
217.2 199.8 17.4 3 Blind 8
199.8 182.4 17.4 3 Screen 8
182.4 159.2 23.2 4 Blind 8
159.2 153.4 5.8 1 Screen 8
153.4 147.6 5.8 1 Blind 8
147.6 141.8 5.8 1 Screen 8
141.8 130.2 11.6 2 Blind 8
130.2 118.6 11.6 2 Screen 8
118.6 107 11.6 2 Blind 8
107 101.2 5.8 1 Screen 8
101.2 95.4 5.8 1 Blind 8
95.4 83.8 11.6 2 Screen 8
83.8 0 83.8 14.44828 Blind 8
62
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
4. Well Development
63
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
5. Pumping Test Methods and Analysis
5.1. Provisional Pumping test
This test was conducted for only two (2) hour on 03-May-2020, after
putting the pump at 100 meter depth position, and the well gave only
20l/s, pump position was again raised to70 meter depth and makes
another provisional test for one hour, at this position the well gave 23l/s
with only 3 meter draw down from static water level
Figure 5.5 Constant Pumping Test result after Copper Jacob ST-PW-03-2019
II. Thies Recovery Method Analysis after COOPER & JACOB (by Version 3.5)
Figure 5.6 Theis Recovery Pumping Test result after Copper Jacob ST-PW-03-2019
64
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
No Values /Parameters
DESCRIPTION
1 GENERAL Shanto Town Site
Well ID ST-PW-03-2019,
2 Effective Depth (m) 312 m
Static Water level below Ground (m) 48.43 M
Pump Position – m 70 meter
Provisional Pumping test conducted- hrs 2 hrs
Provisional Test Discharge Rate , Q 22 l/s
Constant Rate Test (yield (L/S) – Q, l/s 23 l /s
Dynamic water level after constant rate test 51.40 m
Constant Rate Test -in hrs 19 hr
Total draw down in m after constant rate test 2.97 m
Recovery monitoring constant Rate test Duration in hrs 55 minutes
Remaining Residual Draw Down [m] after 3 hrs 0.63
Power Source Generating set out put[ kva] 200 Kv
Submersible Pump power output, [Kw] 37 KW
3 TRANSMISSIVITY :
Aquitest , Cooper – Jacob Time – Drawdown Method 5.18E+2 [m2/d]
Aquitest ,Theis Recovery test 5.18E+2[m2/d]
4 HYDRAULIC CONDUCTIVITY :
Aquitest software Copper Jacob Time Draw Down for 5.26E+0 [m/day]
confined aquifer m2/day
Aquitest , Theis recovery Test 5.25E+0 [m/day]
5 Water Type Na-HCO3, Good water
6 Design Yield , l/s 23 [L/s] at <70 m pump
position
65
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
6. Water Quality
After collection water sample from the well while conduction the pumping test it was
labeled, the label was comprised stated date, time and the depth from which the
sample was taken and handed over for laboratory chemical quality analysis. In most
cases the known standards have a direct
relationship with geology.
In general, the chemical quality of the well
water is fit to Ethiopian standard for house
hold uses and WHO. Check the result of the
laboratory analysis and summery of the
interpretation of the chemical analysis as
follows:-
The chemical analysis result of the water
sample collected during constant pumping
test at 19 Hours shows that the water is
chemically Na-HCO3
Figure 5.7 Pie Chart Chemical Analysis Representations ST-PW-03-2019
The final part of the well construction is the well head. Well head was done
according to the specified design as in actual fact to protect the stick up above
ground from breakage and movement during pump installation including capping
of Piezometer is constructed. But most importantly to avoid the rescue of pollution
and for sanitary purpose with special
care is taken for the mixing ratio and
quality of sand, water, cement and
aggregate used for the construction of
the well head have a trapezoidal shape
with horizontal dimensions of 0.8 m x 0.8M
and 0.50 meter below surface 1.00 meter
above surface
- There was a circulation loss starting from 70 meter to 310 meter depth, no
sample was coming out from the well.
- The drilling season was rainy time, hence a heavy rainfall stagers the drilling and
construction time schedule
-
67
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
The following essentials may be concluded from the analysis of the drilling and pumping
test:
(x) If the well is reamed with 17.5 inch bit and install 12 inch production casing up
to 100 meter and the remaining depth was installed 8 inch casing, the well
would have given more than 40 l/s
(xi) The hydrogeology of the area has a good water quality than the rest of the
wells at shanto area, the two wells have rich in iron and floride, therefore
additional borehole near this site would be recommended to have a good
water quality of groundwater
(xii) During Drilling specially at a zone where there is no sample coming out from
the well, the viscosity of the Bentonite should be tested and checked to rise
the cuttings from the well
68
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
69
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
71
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Depth Short_N Long_N 6.28, App. 12.56, App. SP, Mv
Res Res.
202 0.85 0.86 5.31 10.74
204 0.82 0.85 5.17 10.66 -78.04
206 0.87 0.84 5.46 10.56
208 0.84 0.92 5.28 11.57 -85.96
210 0.85 1.05 5.31 13.19
212 0.88 1.02 5.55 12.85 -82.18
214 0.85 0.86 5.33 10.78
216 0.87 0.92 5.47 11.54 -82.33
218 1.13 1.32 7.07 16.53
220 1.48 2.86 9.29 35.87 -79.41
222 1.08 1.11 6.78 13.97
224 0.97 1.43 6.10 17.99 -87.15
226 0.97 0.98 6.10 12.28
228 0.83 0.85 5.18 10.73 -84.54
230 0.76 0.75 4.74 9.42
232 0.82 0.84 5.12 10.50 -77.16
234 0.81 0.82 5.06 10.25
236 0.69 0.71 4.33 8.93 -76.28
238 0.72 0.75 4.52 9.47
240 0.76 0.81 4.79 10.17 -76.31
242 0.79 0.80 4.95 10.00
244 0.79 0.79 4.95 9.87 -79.62
246 0.92 1.00 5.80 12.55
248 0.86 0.81 5.38 10.19 -76.51
250 0.85 0.88 5.36 11.05
252 0.85 0.98 5.34 12.36 -78.41
254 0.96 1.07 6.04 13.43
256 1.09 1.51 6.83 18.99 -82.20
258 1.19 1.62 7.48 20.37
260 1.28 1.62 8.03 20.32 -81.03
262 1.39 1.87 8.73 23.49
264 1.45 2.01 9.08 25.21 -86.51
266 1.66 2.37 10.44 29.79
268 1.88 2.96 11.80 37.14 -82.48
270 1.95 2.88 12.24 36.14
272 1.92 2.84 12.07 35.62 -79.70
274 2.12 3.14 13.33 39.49
276 2.61 4.46 16.41 56.03 -79.26
278 3.37 8.07 21.14 101.32
280 1.60 2.20 10.06 27.64 -82.65
282 1.35 1.73 8.49 21.72
284 1.36 1.73 8.51 21.72 -90.00
286 1.33 1.57 8.35 19.74
288 1.40 4.09 8.81 51.36 -86.68
290 1.20 4.59 7.54 57.65
292 1.01 3.12 6.37 39.16 -88.88
294 1.12 2.94 7.01 36.88
296 1.02 2.45 6.39 30.71 -77.85
298 0.89 2.20 5.58 27.68
300 0.89 2.08 5.60 26.10 -68.39
302 0.86 2.28 5.43 28.69
72
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Depth Short_N Long_N 6.28, App. 12.56, App. SP, Mv
Res Res.
304 0.86 2.04 5.41 25.57 -68.25
306 0.87 2.06 5.47 25.91
308 0.86 1.93 5.39 24.27 -68.10
310 0.88 1.98 5.52 24.87
312 0.87 1.97 5.44 24.68 -67.96
314 0.89 1.99 5.57 24.97
316 0.90 2.00 5.62 25.06 -68.02
318 0.99 2.26 6.24 28.44
320 0.77 1.95 4.80 24.50 -67.82
322 0.87 1.97 5.48 24.74
324 0.80 2.34 5.04 29.43 -67.75
326 0.87 2.02 5.46 25.37
328 0.76 2.03 4.79 25.45 -67.54
330 0.90 2.35 5.63 29.55
332 0.89 1.27 5.61 16.00 -67.55
334 0.97 1.38 6.10 17.31
336 1.00 1.40 6.26 17.52 -67.40
73
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
74
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
76
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
77
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Depth- Short Long Depth- Short Long
m Normal SN (Ω) Normal LN(Ω) m Normal SN (Ω) Normal LN(Ω)
90 4.35 21.84 7.37 147.69 240 2.38 11.95 6.10 122.24
92 2.90 14.56 6.06 121.44 242 1.73 8.68 2.95 59.02
94 3.11 15.61 6.17 123.65 244 1.80 9.04 4.20 84.17
96 3.56 17.87 6.57 131.66 246 1.72 8.63 3.27 65.51
98 3.96 19.88 7.15 143.29 248 1.86 9.34 3.50 70.14
100 4.01 20.15 7.21 144.45 250 1.79 8.99 3.60 72.14
102 4.10 20.58 7.05 141.26 252 1.73 8.68 3.50 70.14
104 5.36 26.91 7.94 159.12 254 1.77 8.89 3.90 78.16
106 7.13 35.81 10.48 210.02 256 1.50 7.53 3.10 62.12
108 7.41 37.20 10.60 212.42 258 2.45 12.30 5.80 116.23
110 3.45 17.32 6.53 130.94 260 2.70 13.55 6.21 124.41
112 3.49 17.52 6.48 129.86 262 1.30 6.53 4.04 80.96
114 6.36 31.93 9.36 187.57 264 1.30 6.53 2.47 49.50
116 6.22 31.22 7.30 146.29 266 1.10 5.52 3.40 68.14
118 6.90 34.64 10.30 206.41 268 1.70 8.53 2.70 54.11
120 6.11 30.67 10.51 210.60 270 1.40 7.03 1.90 38.08
122 3.20 16.06 5.75 115.23 272 1.20 6.02 2.10 42.08
124 3.17 15.89 5.45 109.22 274 2.60 13.05 5.46 109.42
126 1.74 8.73 3.47 69.54 276 1.30 6.53 6.10 122.24
128 3.60 18.09 5.49 110.02 278 1.70 8.53 3.90 78.16
130 1.70 8.53 4.01 80.39 280 1.90 9.54 2.10 42.08
132 1.40 7.03 3.20 64.13 282 1.31 6.58 2.66 53.31
134 1.60 8.03 3.30 66.13 284 1.20 6.02 2.90 58.12
136 1.08 5.41 2.50 50.10 286 2.50 12.55 2.60 52.10
138 1.07 5.37 1.89 37.78 288 1.30 6.53 2.65 53.11
140 1.21 6.07 2.56 51.30 290 1.40 7.03 2.90 58.12
142 1.30 6.53 2.77 55.51 292 1.36 6.81 2.70 54.11
144 1.40 7.03 2.90 58.12 294 1.40 7.03 3.10 62.12
146 1.20 6.02 2.60 52.10 296 2.60 13.05 2.90 58.12
148 1.02 5.12 1.81 36.27 298 1.42 7.13 2.89 57.92
150 1.60 8.03 2.70 54.11 300 1.60 8.03 3.00 60.16
152 0.99 4.95 1.70 34.07 302 1.25 6.28 3.30 66.13
154 0.97 4.87 1.80 36.13 304 1.11 5.57 2.60 52.10
156 0.90 4.51 1.64 32.87 306 1.20 6.02 2.80 56.11
158 1.06 5.32 1.95 39.08 308 1.19 5.96 2.38 47.70
160 1.11 5.55 2.01 40.28 310 1.19 5.97 2.14 42.89
162 1.12 5.62 2.22 44.55 312 1.21 6.07 2.15 43.09
78
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
80
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
81
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
83
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
84
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Discharge
Water Draw Measurement Residual
Time, Level, WL Down. V-Notch Q, EC, Temp. Draw
Min (m) DD (m) (mm) (l/s) µs/cm oC Recovery Down
0 36.15 0.00 200 24
1 44.05 7.90 " " 53.43 16.13
2 45.40 9.25 " " 51.80 14.50
3 46.20 10.05 " " 50.65 13.35
4 46.90 10.75 " " 50.00 12.70
5 47.50 11.35 " " 49.55 12.25
6 47.90 11.75 " " 49.15 11.85
7 48.20 12.05 " " 48.88 11.58
8 48.45 12.30 " " 48.60 11.30
9 48.70 12.55 " " 48.52 11.22
10 48.90 12.75 196 23 48.38 11.08
12 49.05 12.90 " " 47.98 10.68
14 49.40 13.25 " " 47.80 10.50
16 49.65 13.50 " " 47.60 10.30
18 49.90 13.75 " " 47.48 10.18
20 50.10 13.95 " " 47.35 10.05
25 50.55 14.40 " " 46.98 9.68
30 50.92 14.77 " " 46.85 9.55
35 51.20 15.05 " " 46.70 9.40
40 51.38 15.23 " " 46.48 9.18
45 51.59 15.44 " " 46.30 9.00
50 51.79 15.64 " " 45.95 8.65
60 52.07 15.92 195.6 22 45.82 8.52
70 52.40 16.25 " " 45.59 8.29
80 52.75 16.60 " " 45.35 8.05
90 53.00 16.85 " " 45.17 7.87
100 53.65 17.50 " " 45.02 7.72
120 53.80 17.65 " " 44.59 7.29
140 54.06 17.91 " " 44.35 7.05
160 54.45 18.30 " " 44.08 6.78
180 54.90 18.75 " " 43.77 6.47
210 55.35 19.20 " " 43.49 6.19
85
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Discharge
Water Draw Measurement Residual
Time, Level, WL Down. V-Notch Q, EC, Temp. Draw
Min (m) DD (m) (mm) (l/s) µs/cm oC Recovery Down
240 55.65 19.50 " " 43.20 5.90
270 55.90 19.75 " " 42.95 5.65
300 56.50 20.35 " " 42.73 5.43
330 56.70 20.55 195.6 22 42.50 5.20
360 56.99 20.84 " " 42.32 5.02
420 57.35 21.20 " " 42.20 4.90
480 57.62 21.47 " " 42.10 4.80
540 57.92 21.77 " " 41.90 4.60
600 58.38 22.23 " " 41.89 4.59
660 58.70 22.55 " " 41.70 4.40
720 58.92 22.77 " " 40.55 3.25
780 59.40 23.25 " " 40.20 2.90
840 59.60 23.45 " " 40.03 2.73
900 59.63 23.48 " " 39.94 2.64
960 60.10 23.95 " " 39.74 2.44
1020 60.10 23.95 " " 39.67 2.37
1080 60.20 24.05 " " 39.41 2.11
1140 60.20 24.05 " " 39.08 1.78
1200 60.35 24.20 195.6 22 38.97 1.67
1260 60.55 24.40 " " 38.91 1.61
1320 60.62 24.47 " " 38.78 1.48
1380 60.71 24.56 " " 38.68 1.38
1440 60.71 24.56 " " 38.41 1.11
1500 60.72 24.57 " " 38.33 1.03
1560 60.75 24.60 " " 38.29 0.99
1620 60.71 24.56 " " 38.18 0.88
1680 60.71 24.56 " " 38.14 0.84
1740 60.71 24.56 " " 38.09 0.79
1800 60.71 24.56 195.6 22 38.01 0.71
1860 37.98 0.68
1920 37.82 0.52
1980 37.74 0.44
2040 37.56 0.26
2100 37.50 0.20
2160 36 37.46 0.16
86
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
87
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
88
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Draw
Time, Water Level, Down. DD Residual
Min WL (m) (m) Q (l/s) Recovery Draw Down
0 65.70 0.00 77.87 12.17
1 78.30 12.60 21 67.65 1.95
2 74.40 8.70 67.45 1.75
3 74.95 9.25 67.20 1.50
4 75.25 9.55 67.08 1.38
5 75.75 10.05 67.05 1.35
6 75.90 10.20 67.04 1.34
7 75.95 10.25 66.98 1.28
8 76.15 10.45 66.90 1.20
9 76.20 10.50 66.82 1.12
10 76.30 10.60 66.78 1.08
12 76.42 10.72 21 66.68 0.98
14 76.50 10.80 66.65 0.95
16 76.65 10.95 66.55 0.85
18 76.71 11.01 66.47 0.77
20 76.76 11.06 66.44 0.74
25 76.90 11.20 66.30 0.60
30 77.40 11.70 66.29 0.59
35 77.50 11.80 66.21 0.51
40 77.64 11.94 21 66.10 0.40
45 77.67 11.97 66.05 0.35
50 77.72 12.02 66.03 0.33
55 77.82 12.12 66.01 0.31
60 77.87 12.17 65.98 0.28
89
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Water
Time, Level, WL Draw Down. Temp. Residual
Min (m) DD (m) Q (l/s) oC Recovery Draw Down
0 65.58 0.00 81.77 16.19
1 72.80 7.22 73.60 8.02
2 73.86 8.28 72.87 7.29
3 74.58 9.00 72.40 6.82
4 75.20 9.62 72.03 6.45
5 75.40 9.82 20 71.82 6.24
6 75.68 10.10 71.67 6.09
7 75.70 10.12 71.53 5.95
8 75.82 10.24 71.44 5.86
9 75.92 10.34 71.35 5.77
10 76.08 10.50 71.28 5.70
12 76.28 10.70 71.09 5.51
14 76.35 10.77 71.00 5.42
16 76.56 10.98 70.88 5.30
18 76.60 11.02 70.78 5.20
20 76.65 11.07 70.68 5.10
25 77.24 11.66 70.52 4.94
30 77.30 11.72 70.38 4.80
35 77.40 11.82 70.25 4.67
40 77.54 11.96 70.12 4.54
45 77.71 12.13 70.04 4.46
50 77.76 12.18 69.86 4.28
60 77.85 12.27 69.70 4.12
70 77.94 12.36 20 69.48 3.90
80 78.08 12.50 69.20 3.62
90 78.19 12.61 69.15 3.57
100 78.27 12.69 69.09 3.51
120 78.45 12.87 68.90 3.32
140 78.60 13.02 68.77 3.19
160 78.70 13.12 68.62 3.04
180 78.88 13.30 68.51 2.93
210 79.02 13.44 68.20 2.62
240 79.15 13.57 68.11 2.53
90
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Water
Time, Level, WL Draw Down. Temp. Residual
Min (m) DD (m) Q (l/s) oC Recovery Draw Down
270 79.30 13.72
300 79.36 13.78
330 79.38 13.80
360 79.41 13.83
420 79.45 13.87
480 79.50 13.92
540 79.65 14.07
600 79.75 14.17
660 79.97 14.39 20
720 80.10 14.52
780 80.19 14.61
840 80.30 14.72
900 80.38 14.80
960 80.48 14.90
1020 80.65 15.07
1080 80.72 15.14
1140 80.82 15.24
1200 80.88 15.30
1260 80.92 15.34
1320 81.06 15.48
1380 81.12 15.54
1440 81.18 15.60
1500 81.25 15.67
1560 81.30 15.72
1620 81.36 15.78
1680 81.40 15.82 20
1740 81.42 15.84
1800 81.49 15.91
1860 81.53 15.95
1920 81.56 15.98
1980 81.60 16.02
2040 81.64 16.06
2100 81.68 16.10
2160 81.70 16.12
2220 81.75 16.17 20
2280 81.76 16.18
2340 81.77 16.19
2400 81.77 16.19
2460 81.77 16.19
2520 81.77 16.19
91
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
93
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
94
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Discharge
Measurements
Water V- EC, Residual
Level, Draw Q, Notch, Micro Temp, Recovery, Draw
Minutes m Down, m l/s mm cimens OC m Down, m
0 48.43 0.00 23.5 196 530 33.1 51.40 2.97
1 49.20 0.77 '' '' '' '' 50.30 1.87
2 49.52 1.09 '' '' '' '' 50.03 1.60
3 49.57 1.14 '' '' '' '' 49.99 1.56
4 49.78 1.35 '' '' '' '' 49.90 1.47
5 49.82 1.39 '' '' '' '' 49.80 1.37
6 49.87 1.44 '' '' '' '' 49.73 1.30
7 49.93 1.50 '' '' '' '' 49.70 1.27
8 50.02 1.59 '' '' '' '' 49.67 1.24
9 50.04 1.61 '' '' '' '' 49.63 1.20
10 50.06 1.63 23.7 197 '' '' 49.58 1.15
12 50.12 1.69 '' '' '' '' 49.55 1.12
14 50.16 1.73 '' '' '' '' 49.49 1.06
16 50.16 1.73 '' '' '' '' 49.45 1.02
18 50.18 1.75 '' '' '' '' 49.42 0.99
20 50.25 1.82 '' '' '' '' 49.39 0.96
25 50.30 1.87 '' '' 518 33 49.35 0.92
30 50.30 1.87 '' '' '' '' 49.28 0.85
35 50.35 1.92 '' '' '' '' 49.22 0.79
40 50.40 1.97 '' '' '' '' 49.19 0.76
45 50.50 2.07 '' '' '' '' 49.15 0.72
50 50.55 2.12 '' '' '' '' 49.09 0.66
55 50.62 2.19 '' '' '' '' 49.06 0.63
60 50.65 2.22 23.7 197 '' ''
70 50.67 2.24 '' '' '' ''
80 50.75 2.32 '' '' '' ''
90 50.76 2.33 '' '' '' ''
100 50.78 2.35 '' '' '' ''
120 50.83 2.40 '' '' 518 33
95
BLUE MATRIX CONSULTANT ADDRESS :
WELL COMPLETION REPORT OF BU’EE & SHANTO TOWN WATER SUPPLY PROJECT
Discharge
Measurements
Water V- EC, Residual
Level, Draw Q, Notch, Micro Temp, Recovery, Draw
Minutes m Down, m l/s mm cimens OC m Down, m
140 50.88 2.45 '' '' '' ''
160 50.92 2.49 '' '' '' ''
180 50.95 2.52 '' '' '' ''
210 50.99 2.56 '' '' '' ''
240 50.99 2.56 '' '' '' ''
270 51.00 2.57 '' '' '' ''
300 51.07 2.64 '' '' '' ''
330 51.10 2.67 23.7 197 518 33
360 51.13 2.70 '' '' '' ''
420 51.15 2.72 '' '' '' ''
480 51.18 2.75 '' '' '' ''
540 51.21 2.78 '' '' '' ''
600 51.24 2.81 '' '' '' ''
660 51.30 2.87 '' '' '' ''
720 51.34 2.91 '' '' '' ''
780 51.38 2.95 '' '' '' ''
840 51.39 2.96 '' '' '' ''
900 51.39 2.96 '' '' '' ''
960 51.40 2.97 '' '' '' ''
1020 51.40 2.97 '' '' '' ''
1080 51.40 2.97 '' '' '' ''
1140 51.40 2.97 23.7 197 518 33
96
BLUE MATRIX CONSULTANT ADDRESS :