Electrical Power Distribution (ELE-4333)

Project

Fujairah Higher Colleges of Technology


Project Design and analysis of
Due Date
Power Distribution Lay
out for the given
drawing
Max Marks 100 Date Submitted

% of final grade 20% Section

Student Name(s) Student ID(s)

Declaration: Group/Individual

1. No part of this assignment has been copied from another source, (not from another group or
student, an internet source or a book)
2. When another person’s words are used, this is shown in the text with “…” and referenced.
3. No part of this assignment has been written by anyone other than the member(s) of the group
named below.
4. We/I have a copy of this assignment that we/I can produce if the first copy is lost or damaged.

Names and Signatures :

Name:-……………………………………………………… Signature ……………………

N.B. The marker may choose not to mark this assignment if the above declaration is not signed.

 If the declaration is found to be false, appropriate action will be taken.


 Plagiarism is copying and handing in someone’s work as your own. Any student found guilty of
this type of cheating will be dismissed from the college.
Received By………………………… Date ……………………………

1
Electrical Power Distribution (ELE-4333)

Design and analysis of Power Distribution Lay out for the given
drawing .

Objectives:

i. Finding symbols from DEWA Regulation Report


ii. Drawing the Lay out using AUTOCAD(Power and Light)
iii. Load Calculations and Load Distribution schedule(All DBs)
iv. Cable and Circuit Breaker Selection (for all DBs)
v. Power factor Correction
vi. Earthing System used

Assesment Strategy:

i. Finding symbols from DEWA Regulation Report (1%)


ii. Drawing the Lay out using AUTOCAD (2%)
iii. Load Calculations and schedule (4%)
iv. Cable & Circuit Breaker Selection (5%)
v. Power factor Correction (2%)
vi. Earthing System used (2%)
vii. Presentation (2%)
viii. Project Report Writing (2%)
Introduction
Table of Contents
Load calculations
Load Distribution Schedule
Cable size calculations
MCB selection
Power factor Correction
Earthing System used
Conclusion
Appendix

Guidelines:

Architectural drawing for the Typical Floor of a residential building is given.


It has
 6 Flats
 Staircase Area
 Watchman Room
 Electrical Room
 Etisalat Room

2
Electrical Power Distribution (ELE-4333)

 Fire Room
 2 Lifts and lift lobby etc. as in the drawing.
In the Design,
1. Consider Separate DBs for all Flats (6 Nos-DBs 1 to 6).
2. Another One DB for common Services (DB-Service).
3. Calculate Connected load for all DBs and the Total Load.
4. Prepare Load Schedule for all DBs.
5. Select proper size of Cables and Breakers for all DBs.
6. Calculate the additional kVAR required for the Power factor correction from 0.8
to 0.95.

Use the given figure as reference.

Fig. 1

a. A sample load distribution schedule is given

3
Electrical Power Distribution (ELE-4333)

c. Power Ratings

Light: 100 W
C.Fan: 100 W
E.Fan:100 W
WH:1500 W
AC: 3000 W
(Note:You can have other Electrical appliances in th Villa)

d. Three Phase 4- Wire system

e. Ambient Temperature 30 Co

f. Multi Core General Purpose PVC cable enclosed in conduit on a wall

Acknowledgement: