SESSION 1: INTRODUCTION AND COURSE OBJECTIVE
This Topic Content;
1. Introduction, Objective and Scope,
2. What is Effective Construction Site Supervisor (CSS)?,
3. Effective CSS vs. Accredited Inspector of Works (IOW),
4. How CIDB [Act 520 / Rev 2011 / Sect 33A] helps Stakeholder?
5. Tutorial @ page 29
CIDB SKP F01 (5 - 9 Mar 2023) by Ts. Sharif bin Zakaria KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 19
http://ezy.la/SKPFM01 Phone : 011 – 2896 0889
EFFECTIVE CSS vs. ACCREDITED IOW
Quality Management System QMS [MS 9001:2015];
CCPM
CCM
CIMS PM
CCSS
IOW, RE, RA https://cims.cidb.gov.my/pbsearch/Forms/ KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 28
Ar. , Ir. , Sr. Transactions/search.aspx?opt=N Phone : 011 – 2896 0889
HOW CIDB [ACT 520 / 2011 / 33A] HELPS CONTRACTOR
New G Forms Signatory Requirement for Project CCC;
CSS / CCM / CCPM IOW / RE / RA Ar. / Ir. / Sr.
https://cims.cidb.gov.my/pb
search/Forms/Transactions/
search.aspx?opt=N
3). How CIDB [Act 520 / Rev 2011 / Sect 33A] Helps Contractor?
Ans. ________________________________________________
4). Why the Client and PSP must ensure Site Supervisor with CIDB Accreditation as CCSS?
Ans. ________________________________________________
[Act 118]
June Sept
2023 2023 Mar
2025 ???
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
42
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Operasi Penguatkuasaan Bersepadu CIDB / Shah Alam 28 Feb 2023
SAMPLE INSPECTION
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 55
QUALIFIED AND COMPETENT PERSONNEL Phone : 011 – 2896 0889
WHO IS EFFECTIVE CSS AND ACCREDITED IOW?
JKR 203A [REV 1 / 2010];
PDA PILING
TEST WORKS
PILE LOAD
CAP TEST
RESULT
OK
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
77
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G4 – Structure / Struktur
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Pre and Post ✓ CSS to monitor and record
Casting ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, 2. Measure and Analyse
Detail Plan, Sample Test Report
and Approval 3. Best Practices
b).
G Form Sign by;
Principal Submitting Person PSP
Ar. BAM
➢ Usually, subject to the contract, a material stock of between 10 per cent and 15 per cent is
to be acquired from the main contractor in respect to tiles, granite, marble, door locks and
handles, manual call point and paints.
➢ Under Housing Development Act (HAD) Malaysia, the DLP is 24 months, starting from the
date you receive your keys (VP). Within this period, the homeowner will need to check for
any damage, defects, as well as poor or faulty workmanship.
➢ When the S.O. considers that all items on the schedule of defects have been made good,
they issue the CMGD. This has the effect of releasing the remainder of any retention
(balance 2.5%) and brings about issuing of the final certificate.
➢ The Contractor must submit Final Claim with all supporting documents (within 3 month)
after received the CMGD from S.O. The S.O. with the process of calculating and agreeing
any adjustments to the contract sum, will prepare the Final Account and release the Final
Certificate to the Contractor
b).
CMGD Sign by;
Principal Submitting Person PSP
Ar. BAM
2). When to prepare G Forms and validate works completion for CCC Final Inspection?
Ans. ________________________________________________
3). Which G Forms with Final Inspection for Surat Sokongan before complete as 21 nos. G Forms?
Ans. ________________________________________________
4). Why Risks and Opportunities can built up Effective Construction Site Supervisors?
Ans. ________________________________________________
Riwayat Muslim (1631), al-Nasa’i (3651), al-Tirmizi (1376) dan Abu Daud (2880)